tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1721106652000 | 0 | None | None | Buildings | GROUND FLOOR | 7988247.08 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3529080 | 126991 | None | I.No. 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth (CSR 2023-24 Vol-1, Pg No 5, Sl.no- 1.12) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 99.75 | 99.75 | 50.16 | False | None | None | False | None | False | 5003.46 | 0 | 3529081 | 126991 | None | I.No. 4.1 | Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ( CSR 2023-2024 Vol-2 Sl No. 4.1 P.No-5) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 123.9 | 123.9 | 334.37 | False | None | None | False | None | False | 41428.443 | 0 | 3529082 | 126991 | None | I.No. 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m Note: Cost of De-watering upto 5 % of (A+B) may be added, where required assessment for dewatering shall be made as per site condition In all kinds of soils Depth upto 3 m (CSR 2023-2024 Vol-1 Sl No 1.14.1 P.No-8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 107.1 | 107.1 | 548.88 | False | None | None | False | None | False | 58785.048 | 0 | 3529083 | 126991 | None | I.No. 1.23 | Provding and filling in plinth with granite /trap broken metal 100mm and down size & with aprroved sand including hand packing watering including cost of all materials and Labour with all lead and lift complete as per Specfcation (CSR 2023-24 Vol-1 Item Code-1.23) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 2816.1 | 2816.1 | 73.95 | False | None | None | False | None | False | 208250.595 | 0 | 3529084 | 126991 | None | I.No. 2.1.2 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8(M10) Using 40 mm nominal size graded crushed coarse aggregates (CSR 2023-24 Volume-1 Item Code-2.1.2 P.no 15) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 5947.2 | 5947.2 | 93.49 | False | None | None | False | None | False | 556003.728 | 0 | 3529085 | 126991 | None | I.No. 5.4 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (CSR 2023-24 Volume-2 sl.no-5.4 P.no 9) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6708.45 | 6708.45 | 34.43 | False | None | None | False | None | False | 230971.9335 | 0 | 3529086 | 126991 | None | I.No. 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (CSR 2023-2024 Vol-1 Sl No. 1.9 P.No-7) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 279.3 | 279.3 | 382.41 | False | None | None | False | None | False | 106807.113 | 0 | 3529087 | 126991 | None | I.No. 1.8 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work (CSR 2023-24 Volume-I Sl.no-1.8 P.No-7) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 497.7 | 497.7 | 312.74 | False | None | None | False | None | False | 155650.698 | 0 | 3529088 | 126991 | None | I.No. 2.2.3 | Footing:-Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 2023-24 Volume-I Sl.no-2.2.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6633.15 | 6633.15 | 76.69 | False | None | None | False | None | False | 508696.2735 | 0 | 3529089 | 126991 | None | I.No. 2.2.3 | Additionalities for Formwork, Centering & Scaffolding 8% for footings. CSR 2023-24 Addendum I P.No 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 532.22 | 532.22 | 76.69 | False | None | None | False | None | False | 40815.9518 | 0 | 3529090 | 126991 | None | I.No. 2.2.3 | Columns-Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 2023-24 Vol-I Sl.no 2.2.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6652.8 | 6652.8 | 6.0 | False | None | None | False | None | False | 39916.8 | 0 | 3529091 | 126991 | None | I.No. 2.2.3 | Additionalities for Formwork, Centering & Scaffolding 70% for Columns. CSR 2023-24 Addendum I P.No 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4656.96 | 4656.96 | 6.0 | False | None | None | False | None | False | 27941.76 | 0 | 3529092 | 126991 | None | I.No. 2.3.2 | Plinth Beam-Providing and laying in Reinforced cement concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregate (CSR 2023-24 Volume-I Sl.no-2.3.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6804.0 | 6804.0 | 34.7 | False | None | None | False | None | False | 236098.8 | 0 | 3529093 | 126991 | None | I.No. 2.3.2 | Additionalities for Formwork, Centering & Scaffolding 50% for Beam ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3402.0 | 3402.0 | 4.85 | False | None | None | False | None | False | 16499.7 | 0 | 3529094 | 126991 | None | I.No. 2.3.2 | Additionalities for Formwork, Centering & Scaffolding 10% for Earth Retaining Structure CSR 2023-24 Addendum I P.No 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 680.4 | 680.4 | 29.85 | False | None | None | False | None | False | 20309.94 | 0 | 3529095 | 126991 | None | I.No. 2.5.2 | Columns Above Plinth-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately))-M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 2023-24 Volume-I Sl.no-2.5.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7185.15 | 7185.15 | 10.29 | False | None | None | False | None | False | 73935.1935 | 0 | 3529096 | 126991 | None | I.No. 2.5.2 | Additionalities for Formwork, Centering & Scaffolding 70% for Columns. CSR 2023-24 Addendum I P.No 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 5029.61 | 5029.61 | 10.29 | False | None | None | False | None | False | 51754.6869 | 0 | 3529097 | 126991 | None | I.No. 2.5.2 | Beam,Lintel & Roof-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately))-M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 2023-24 Vol-1 Sl.no-2.5.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7185.15 | 7185.15 | 72.78 | False | None | None | False | None | False | 522935.217 | 0 | 3529098 | 126991 | None | I.No. 2.5.2 | Additionalities for Formwork, Centering & Scaffolding 60% for Beam & Lintel. CSR 2023-24 Addendum I P.No 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4311.09 | 4311.09 | 18.01 | False | None | None | False | None | False | 77642.7309 | 0 | 3529099 | 126991 | None | I.No. 2.5.2 | Additionalities for Formwork, Centering & Scaffolding 50 % for Roof slab & Staircase CSR 2023-24 Addendum I P.No 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3592.58 | 3592.58 | 54.77 | False | None | None | False | None | False | 196765.6066 | 0 | 3529100 | 126991 | None | I.No. 2.5.1 | Chejjas-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) -M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 2023-24 Vol-1 Sl.no-2.5.1 P.No-16) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6961.5 | 6961.5 | 1.73 | False | None | None | False | None | False | 12043.395 | 0 | 3529101 | 126991 | None | I.No. 2.5.1 | Additionalities for Formwork, Centering & Scaffolding 45% for Chejjas ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3132.68 | 3132.68 | 1.73 | False | None | None | False | None | False | 5419.5364 | 0 | 3529102 | 126991 | None | I.No. 2.1.4 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates (CSR 2023-2024 Vol-1 Sl No. 2.1.4 P.No-15 ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6527.85 | 6527.85 | 0.73 | False | None | None | False | None | False | 4765.3305 | 0 | 3529103 | 126991 | None | I.No. 2.11 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. (CSR 2023-2024 Vol-2 Sl No. 2.11 P.No-18) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Tonne | 93929.85 | 93929.85 | 17.15 | False | None | None | False | None | False | 1610896.9275 | 0 | 3529104 | 126991 | None | I.No. 6.8 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (CSR 2023-2024 Vol-2 Sl No. 6.8 P.No-14) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 8367.45 | 8367.45 | 81.02 | False | None | None | False | None | False | 677930.799 | 0 | 3529105 | 126991 | None | I.No. 12.13.1 | Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. (CSR 2023-24 Vol 2 Sl.no-12.13.1, Pg.no: 100) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 103755.75 | 103755.75 | 0.3 | False | None | None | False | None | False | 31126.725 | 0 | 3529106 | 126991 | None | I.No. 12.51 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. (CSR 2023-24 Volume-2 Sl.no-12.51, Pg.no: 104) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Nos | 1066.8 | 1066.8 | 5.0 | False | None | None | False | None | False | 5334.0 | 0 | 3529107 | 126991 | None | I.No. 12.57.5 | Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. 35 mm thick one side teak and one side commercial (CSR 2023-24 Volume-II Sl.no-12.57.5 P.No 105) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 4091.85 | 4091.85 | 14.4 | False | None | None | False | None | False | 58922.64 | 0 | 3529108 | 126991 | None | I.No. 11.3 | Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2 mm and braced with flat iron diagonals 20x5 mm size, with top and bottom rail of T-iron 40x40x6 mm, with 40 mm dia steel pulleys, complete with bolts, nuts, locking arrangement, stoppers, handles, including applying a priming coat of approved steel primer including cost of materials ,labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (CSR 2023-24 Volume-II Sl.no-11.3 P.No 77) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 8689.8 | 8689.8 | 17.47 | False | None | None | False | None | False | 151810.806 | 0 | 3529109 | 126991 | None | I.No. 12.86 | Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm X 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock.Wall thickness of frame & sash shall be of 1.8+-0.2 mm. Maximum possible size - 1519mm x 1519mm. (The cost is inclusive of all fixturesand separate charges for minor T&P's shall not be made) (CSR 2023-24 Vol-2 Sl.no-12.86 P.No 109) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 5659.5 | 5659.5 | 40.5 | False | None | None | False | None | False | 229209.75 | 0 | 3529110 | 126991 | None | I.No. 12.85 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size - 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) (CSR 2023-24 Vol-2 Sl.no-12.85, P.No 109) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 6004.95 | 6004.95 | 2.88 | False | None | None | False | None | False | 17294.256 | 0 | 3529111 | 126991 | None | I.No. 11.34A | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding (CSR 2023-2024 Vol-2 Sl No.11.34A P.No.86) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Kgs | 176.4 | 176.4 | 1611.54 | False | None | None | False | None | False | 284275.656 | 0 | 3529112 | 126991 | None | I.No. 8.1.2 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-24 Vol-2 Sl.no-8.1.2 P.No 41) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 253.05 | 253.05 | 650.41 | False | None | None | False | None | False | 164586.2505 | 0 | 3529113 | 126991 | None | I.No. 8.8 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-2024 Vol-2 Sl No.8.8 P.No.42) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 389.55 | 389.55 | 424.43 | False | None | None | False | None | False | 165336.7065 | 0 | 3529114 | 126991 | None | I.No. 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (CSR 2023-24 Vol-2 Sl.no-8.51 p.no 50) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 105.0 | 105.0 | 948.87 | False | None | None | False | None | False | 99631.35 | 0 | 3529115 | 126991 | None | I.No. 4.21 | KSRB 4-2.12 ; Extra for providing throating or drip moulding to RCC chajja with plastering (labour charges only ) as per specification. Specification No. KBS (2018-19 PWP&IWTD Ballari circle DSR Item No. 4.21 P.No-15) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 34.65 | 34.65 | 68.6 | False | None | None | False | None | False | 2376.99 | 0 | 3529116 | 126991 | None | I.No. 8.25 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-2024 Vol-2 Sl No.8.25 P.No 45) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 143.85 | 143.85 | 948.87 | False | None | None | False | None | False | 136494.9495 | 0 | 3529117 | 126991 | None | I.No. 8.28 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar dropsb and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-2024 Vol-2 Sl No.8.28 P.No 45) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 93.45 | 93.45 | 328.55 | False | None | None | False | None | False | 30702.9975 | 0 | 3529118 | 126991 | None | I.No. 8.29 | Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 ltr/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-2024 Vol-2 Sl No.8.29 P.No.45) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 297.15 | 297.15 | 95.88 | False | None | None | False | None | False | 28490.742 | 0 | 3529119 | 126991 | None | I.No. 8.34 | Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (CSR 2023-2024 (Vol-2) Sl No.8.34.1 P.No.47) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 55.65 | 55.65 | 34.56 | False | None | None | False | None | False | 1923.264 | 0 | 3529120 | 126991 | None | I.No. 8.33.2 | Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-2024 Vol-2 Sl No.8.33.2 P.No.46) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 144.9 | 144.9 | 34.56 | False | None | None | False | None | False | 5007.744 | 0 | 3529121 | 126991 | None | I.No. 8.40 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR rate 2023-24 Vol-2 Sl.no 8.40) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 120.75 | 120.75 | 76.74 | False | None | None | False | None | False | 9266.355 | 0 | 3529122 | 126991 | None | I.No. 9.24 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including ubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent. (CSR 2023-2024 Vol-2 Sl No.9.24 P.No.63) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 2994.6 | 2994.6 | 37.51 | False | None | None | False | None | False | 112327.446 | 0 | 3529123 | 126991 | None | I.No. 10.2 | Providing edge moulding to 18mm thick Granite stone counters, vanitiesetc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge (CSR 2023-2024 Vol-2 Sl No.10.2 P.No.69) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 344.4 | 344.4 | 57.6 | False | None | None | False | None | False | 19837.44 | 0 | 3529124 | 126991 | None | I.No. 9.23 | Providing and laying flamed finish Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rub bing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge (CSR 2023-2024 Vol-2 Sl No.9.23 P.No 64) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 2589.3 | 2589.3 | 320.58 | False | None | None | False | None | False | 830077.794 | 0 | 3529125 | 126991 | None | I.No. 11.26.1 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineerin-Charge (CSR 2023-2024 Vol-2 Sl No.11.26.1 P.No.84) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Kgs | 144.9 | 144.9 | 648.72 | False | None | None | False | None | False | 93999.528 | 0 | 3529126 | 126991 | None | I.No. 12.73.1 | Providing and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete :125mm (CSR 2023-2024 Vol-2 Sl No 12.73.1 P.No 107) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 46.2 | 46.2 | 20.0 | False | None | None | False | None | False | 924.0 | 0 | 3529127 | 126991 | None | I.No. 12.74.1 | Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete :125x64x1.90mm (CSR 2023-2024 Vol-2 Sl No 12.74.1 P.No 107) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 107.1 | 107.1 | 40.0 | False | None | None | False | None | False | 4284.0 | 0 | 3529128 | 126991 | None | I.No. 12.72 | Providing and fixing ISI marked oxidised M.S. tower bolt black finish, (Barrel type) with necessary screws etc. complete : (CSR 2023-2024 Vol-2 Sl No 12.72 P.No 107) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 86.1 | 86.1 | 10.0 | False | None | None | False | None | False | 861.0 | 0 | 3529129 | 126991 | None | I.No. 12.63 | Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete (CSR 2023-2024 Vol-2 Sl No 12.63 P.No 105) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 136.5 | 136.5 | 20.0 | False | None | None | False | None | False | 2730.0 | 0 | 3529130 | 126991 | None | I.No. 0220 | 0220 Locking arrangements ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Nos | 633.0 | 633.0 | 11.0 | False | None | None | False | None | False | 6963.0 | 0 | 3529131 | 126991 | None | I.No. 8.84 | Providing wall black board in 12mm thick with CM 1:3 and applied with primer and two coats of acrylic emulsion black paint including finishing etc complete . (CSR 2023-2024 Vol-2 Sl No 8.84 P.No 55) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 498.75 | 498.75 | 14.4 | False | None | None | False | None | False | 7182.0 | 0 |
| 1721106652000 | 0 | None | None | Buildings | FIRST FLOOR | 5001314.46 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3529132 | 126992 | None | I.No. 2.5.2 | Columns-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately))-M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 2023-24 Volume-I Iteam Code-2.5.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7257.0 | 7257.0 | 12.87 | False | None | None | False | None | False | 93397.59 | 0 | 3529133 | 126992 | None | I.No. 2.2.3 | Additionalities for Formwork, Centering & Scaffolding 70% for Columns. CSR 2023-24 Addendum I P.No 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 5079.9 | 5079.9 | 12.87 | False | None | None | False | None | False | 65378.313 | 0 | 3529134 | 126992 | None | I.No. 2.5.2 | Beam,Lintel & Roof-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately))-M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 2023-24 Vol-1 Sl.no-2.5.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7257.0 | 7257.0 | 71.87 | False | None | None | False | None | False | 521560.59 | 0 | 3529135 | 126992 | None | I.No. 2.5.2 | Additionalities for Formwork, Centering & Scaffolding 60% for Beam & Lintel. CSR 2023-24 Addendum I P.No 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4354.2 | 4354.2 | 16.8 | False | None | None | False | None | False | 73150.56 | 0 | 3529136 | 126992 | None | I.No. 2.5.2 | Additionalities for Formwork, Centering & Scaffolding 50 % for Roof slab & Staircase CSR 2023-24 Addendum I P.No 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3628.5 | 3628.5 | 55.07 | False | None | None | False | None | False | 199821.495 | 0 | 3529137 | 126992 | None | I.No. 2.5.1 | Chejjas-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) -M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (CSR 2023-24 Vol-1 Sl.no-2.5.1 P.No-16) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7031.12 | 7031.12 | 1.73 | False | None | None | False | None | False | 12163.8376 | 0 | 3529138 | 126992 | None | I.No. 2.5.1 | Additionalities for Formwork, Centering & Scaffolding 45% for Chejjas ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3164.0 | 3164.0 | 1.73 | False | None | None | False | None | False | 5473.72 | 0 | 3529139 | 126992 | None | I.No. 2.1.4 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates (CSR 2023-2024 Vol-1 Sl No. 2.1.4 P.No-15 ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6593.13 | 6593.13 | 2.35 | False | None | None | False | None | False | 15493.8555 | 0 | 3529140 | 126992 | None | I.No. 2.11 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. (CSR 2023-2024 Vol-2 Sl No. 2.11 P.No-18) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Tonne | 94869.15 | 94869.15 | 9.2 | False | None | None | False | None | False | 872796.18 | 0 | 3529141 | 126992 | None | I.No. 6.8 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (CSR 2023-2024 Vol-2 Sl No. 6.8 P.No-14) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 8451.12 | 8451.12 | 93.52 | False | None | None | False | None | False | 790348.7424 | 0 | 3529142 | 126992 | None | I.No. 6.8 | Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in foundations and plinth in Cement mortar 1:3 (1 cement : 3 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work (CSR 2023-24 Volume-II Iteam Code-6.12) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1063.68 | 1063.68 | 51.91 | False | None | None | False | None | False | 55215.6288 | 0 | 3529143 | 126992 | None | I.No. 12.13.1 | Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. (CSR 2023-24 Vol 2 Sl.no-12.13.1, Pg.no: 100) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 104793.31 | 104793.31 | 0.3 | False | None | None | False | None | False | 31437.993 | 0 | 3529144 | 126992 | None | I.No. 12.51 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. (CSR 2023-24 Volume-2 Sl.no-12.51, Pg.no: 104) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Nos | 1077.47 | 1077.47 | 5.0 | False | None | None | False | None | False | 5387.35 | 0 | 3529145 | 126992 | None | I.No. 12.57.5 | Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. 35 mm thick one side teak and one side commercial (CSR 2023-24 Volume-II Sl.no-12.57.5 P.No 105) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 4132.77 | 4132.77 | 14.4 | False | None | None | False | None | False | 59511.888 | 0 | 3529146 | 126992 | None | I.No. 12.86 | Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm X 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock.Wall thickness of frame & sash shall be of 1.8+-0.2 mm. Maximum possible size - 1519mm x 1519mm. (The cost is inclusive of all fixturesand separate charges for minor T&P's shall not be made) (CSR 2023-24 Vol-2 Sl.no-12.86 P.No 109) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 5716.1 | 5716.1 | 40.5 | False | None | None | False | None | False | 231502.05 | 0 | 3529147 | 126992 | None | I.No. 11.34A | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding (CSR 2023-2024 Vol-2 Sl No.11.34A P.No.86) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Kgs | 178.16 | 178.16 | 1626.66 | False | None | None | False | None | False | 289805.7456 | 0 | 3529148 | 126992 | None | I.No. 8.1.2 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-24 Vol-2 Sl.no-8.1.2 P.No 41) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 255.58 | 255.58 | 720.36 | False | None | None | False | None | False | 184109.6088 | 0 | 3529149 | 126992 | None | I.No. 8.8 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-2024 Vol-2 Sl No.8.8 P.No.42) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 353.15 | 353.15 | 483.37 | False | None | None | False | None | False | 170702.1155 | 0 | 3529150 | 126992 | None | I.No. 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (CSR 2023-24 Vol-2 Sl.no-8.51 p.no 50) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 106.05 | 106.05 | 1018.82 | False | None | None | False | None | False | 108045.861 | 0 | 3529151 | 126992 | None | I.No. 4.21 | KSRB 4-2.12 ; Extra for providing throating or drip moulding to RCC chajja with plastering (labour charges only ) as per specification. Specification No. KBS (2018-19 PWP&IWTD Ballari circle DSR Item No. 4.21 P.No-15) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 34.65 | 34.65 | 43.2 | False | None | None | False | None | False | 1496.88 | 0 | 3529152 | 126992 | None | I.No. 8.39 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (CSR 2023-2024 Vol-2 Sl No.8.39 P.No.48) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 134.68 | 134.68 | 1018.82 | False | None | None | False | None | False | 137214.6776 | 0 | 3529153 | 126992 | None | I.No. 8.30 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-2024 Vol-2 Sl No.8.30 P.No.46) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 184.53 | 184.53 | 346.67 | False | None | None | False | None | False | 63971.0151 | 0 | 3529154 | 126992 | None | I.No. 8.29 | Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 ltr/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-2024 Vol-2 Sl No.8.29 P.No.45) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 300.12 | 300.12 | 136.7 | False | None | None | False | None | False | 41026.404 | 0 | 3529155 | 126992 | None | I.No. 8.34 | Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (CSR 2023-2024 (Vol-2) Sl No.8.34.1 P.No.47) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 56.21 | 56.21 | 34.56 | False | None | None | False | None | False | 1942.6176 | 0 | 3529156 | 126992 | None | I.No. 8.33.2 | Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-2024 Vol-2 Sl No.8.33.2 P.No.46) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 146.35 | 146.35 | 34.56 | False | None | None | False | None | False | 5057.856 | 0 | 3529157 | 126992 | None | I.No. 8.40 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR rate 2023-24 Vol-2 Sl.no 8.40) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 121.96 | 121.96 | 77.46 | False | None | None | False | None | False | 9447.0216 | 0 | 3529158 | 126992 | None | I.No. 9.24 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including ubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent. (CSR 2023-2024 Vol-2 Sl No.9.24 P.No.63) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 3024.55 | 3024.55 | 32.76 | False | None | None | False | None | False | 99084.258 | 0 | 3529159 | 126992 | None | I.No. 10.2 | Providing edge moulding to 18mm thick Granite stone counters, vanitiesetc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge (CSR 2023-2024 Vol-2 Sl No.10.2 P.No.69) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 347.84 | 347.84 | 60.0 | False | None | None | False | None | False | 20870.4 | 0 | 3529160 | 126992 | None | I.No. 9.23 | Providing and laying flamed finish Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rub bing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge (CSR 2023-2024 Vol-2 Sl No.9.23 P.No 64) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 2615.19 | 2615.19 | 294.3 | False | None | None | False | None | False | 769650.417 | 0 | 3529161 | 126992 | None | I.No. 11.26.1 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineerin-Charge (CSR 2023-2024 Vol-2 Sl No.11.26.1 P.No.84) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Kgs | 146.35 | 146.35 | 162.0 | False | None | None | False | None | False | 23708.7 | 0 | 3529162 | 126992 | None | I.No. 12.73.1 | Providing and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete :125mm (CSR 2023-2024 Vol-2 Sl No 12.73.1 P.No 107) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 46.2 | 46.2 | 16.0 | False | None | None | False | None | False | 739.2 | 0 | 3529163 | 126992 | None | I.No. 12.74.1 | Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete :125x64x1.90mm (CSR 2023-2024 Vol-2 Sl No 12.74.1 P.No 107) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 107.1 | 107.1 | 32.0 | False | None | None | False | None | False | 3427.2 | 0 | 3529164 | 126992 | None | I.No. 12.72 | Providing and fixing ISI marked oxidised M.S. tower bolt black finish, (Barrel type) with necessary screws etc. complete : (CSR 2023-2024 Vol-2 Sl No 12.72 P.No 107) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 86.1 | 86.1 | 8.0 | False | None | None | False | None | False | 688.8 | 0 | 3529165 | 126992 | None | I.No. 12.63 | Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete (CSR 2023-2024 Vol-2 Sl No 12.63 P.No 105) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 136.5 | 136.5 | 32.0 | False | None | None | False | None | False | 4368.0 | 0 | 3529166 | 126992 | None | I.No. 0220 | 0220 Locking arrangements ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Nos | 633.0 | 633.0 | 8.0 | False | None | None | False | None | False | 5064.0 | 0 | 3529167 | 126992 | None | I.No. 8.84 | Providing wall black board in 12mm thick with CM 1:3 and applied with primer and two coats of acrylic emulsion black paint including finishing etc complete . (CSR 2023-2024 Vol-2 Sl No 8.84 P.No 55) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 503.74 | 503.74 | 14.4 | False | None | None | False | None | False | 7253.856 | 0 | 3529168 | 126992 | None | I.No. 8.49 | Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (CSR 2023-2024 Vol-2 Sl No.8.49 P.No.49) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | cm | 4.2 | 4.2 | 5000.0 | False | None | None | False | None | False | 21000.0 | 0 |
| 1721106652000 | 0 | None | None | Buildings | INTERNAL ELECTRIFICATION | 697264.5 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3529169 | 126993 | None | I.No. 1.2.1 | Supplying heavy gauge PVC conduit pipe ……mm dia .......mm thick confirming to IS 2509 with suitable size bends,metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary. 19/20 mm dia 2mm thick ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 66.0 | 66.0 | 950.0 | False | None | None | False | None | False | 62700.0 | 0 | 3529170 | 126993 | None | I.No. 1.2.2 | Supplying heavy gauge PVC conduit pipe ……mm dia .......mm thick confirming to IS 2509 with suitable size bends,metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary. 25mm dia 2mm thick ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 78.0 | 78.0 | 300.0 | False | None | None | False | None | False | 23400.0 | 0 | 3529171 | 126993 | None | I.No. 1.2.3 | Supplying heavy gauge PVC conduit pipe ……mm dia .......mm thick confirming to IS 2509 with suitable size bends,metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary. 32mm dia 2.5mm thick ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 103.0 | 103.0 | 50.0 | False | None | None | False | None | False | 5150.0 | 0 | 3529172 | 126993 | None | I.No. 1.2.4 | Supplying heavy gauge PVC conduit pipe ……mm dia .......mm thick confirming to IS 2509 with suitable size bends,metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary. 32mm dia 2.5mm thick 40 mm dia 2.5 mm thick ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 147.0 | 147.0 | 30.0 | False | None | None | False | None | False | 4410.0 | 0 | 3529173 | 126993 | None | I.No. 1.4.1 | Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. 75x75x65mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 106.0 | 106.0 | 2.0 | False | None | None | False | None | False | 212.0 | 0 | 3529174 | 126993 | None | I.No. 1.4.2 | Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. 100x75x65mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 118.0 | 118.0 | 8.0 | False | None | None | False | None | False | 944.0 | 0 | 3529175 | 126993 | None | I.No. 1.4.3 | Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. 135 x 75 x 65 mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 139.0 | 139.0 | 4.0 | False | None | None | False | None | False | 556.0 | 0 | 3529176 | 126993 | None | I.No. 1.4.4 | Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. 180X90X65mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 161.0 | 161.0 | 2.0 | False | None | None | False | None | False | 322.0 | 0 | 3529177 | 126993 | None | I.No. 1.4.5 | Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. 200x90x65mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 179.0 | 179.0 | 20.0 | False | None | None | False | None | False | 3580.0 | 0 | 3529178 | 126993 | None | I.No. 1.4.7 | Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. 200x200x65mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 348.0 | 348.0 | 20.0 | False | None | None | False | None | False | 6960.0 | 0 | 3529179 | 126993 | None | I.No. 1.5.1 | Supplying and fixing PVC/metal conduit Deep junction box 19/20mm Deep Junction Box ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 49.0 | 49.0 | 40.0 | False | None | None | False | None | False | 1960.0 | 0 | 3529180 | 126993 | None | I.No. 1.5.2 | Supplying and fixing PVC/metal conduit Deep junction box 25mm Deep Junction Box ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 56.0 | 56.0 | 28.0 | False | None | None | False | None | False | 1568.0 | 0 | 3529181 | 126993 | None | I.No. 1.7.1 | Extra for Groove cutting in brick wall/CC floor to the suitable depth for concealing of Conduit/GI pipe and plastering, finishing upto wall surface complete. upto 50mm Conduit in Brick Walls ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 29.0 | 29.0 | 200.0 | False | None | None | False | None | False | 5800.0 | 0 | 3529182 | 126993 | None | I.No. 1.13 | Supplying And Fixing Metal Fan Box with Round Hook. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Nos | 117.0 | 117.0 | 40.0 | False | None | None | False | None | False | 4680.0 | 0 | 3529183 | 126993 | None | I.No. 2.2.1 | Point wiring Copper without switch.Supplying and wiring adopting loop system in existing PVC Conduit /casing usingf 1100v Grade , COPPER conductor flexible multistrand FRLS PVC insulated., 2x1.5 Sqm. Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose length in a wood /PVC round block. Complete for each outlet(5/2.3) Group. A Short piont up to 3 Mtr from tapping piont out let via switch. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 269.0 | 269.0 | 102.0 | False | None | None | False | None | False | 27438.0 | 0 | 3529184 | 126993 | None | I.No. 2.2.2 | Point wiring Copper without switch.Supplying and wiring adopting loop system in existing PVC Conduit /casing usingf 1100v Grade , COPPER conductor flexible multistrand FRLS PVC insulated., 2x1.5 Sqm. Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose length in a wood /PVC round block. Complete for each outlet(5/2.3) Group. A medium point above 3m to 6 Mtr from tapping piont out ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 379.0 | 379.0 | 30.0 | False | None | None | False | None | False | 11370.0 | 0 | 3529185 | 126993 | None | I.No. 2.2.3 | Point wiring Copper without switch.Supplying and wiring adopting loop system in existing PVC Conduit /casing usingf 1100v Grade , COPPER conductor flexible multistrand FRLS PVC insulated., 2x1.5 Sqm. Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose length in a wood /PVC round block. Complete for each outlet(5/2.3) Group. A Short piont up to 10 Mtr from tapping piont out ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 555.0 | 555.0 | 40.0 | False | None | None | False | None | False | 22200.0 | 0 | 3529186 | 126993 | None | I.No. 2.3.2 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 1.5 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 26.0 | 26.0 | 600.0 | False | None | None | False | None | False | 15600.0 | 0 | 3529187 | 126993 | None | I.No. 2.3.3 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 2.5 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 42.0 | 42.0 | 900.0 | False | None | None | False | None | False | 37800.0 | 0 | 3529188 | 126993 | None | I.No. 2.3.4 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 4 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 63.0 | 63.0 | 300.0 | False | None | None | False | None | False | 18900.0 | 0 | 3529189 | 126993 | None | I.No. 2.3.5 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 6 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 92.0 | 92.0 | 250.0 | False | None | None | False | None | False | 23000.0 | 0 | 3529190 | 126993 | None | I.No. 2.3.6 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 10 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 167.0 | 167.0 | 60.0 | False | None | None | False | None | False | 10020.0 | 0 | 3529191 | 126993 | None | I.No. 3.5.2 | Supplying and fixing superior quality switch mounting poly carbonate plate with necessary supporting back plate with required nos of machine tools, bolts, nuts etc., complete on the existing metal/PVC box. 1 to 3 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 161.0 | 161.0 | 2.0 | False | None | None | False | None | False | 322.0 | 0 | 3529192 | 126993 | None | I.No. 3.5.3 | Supplying and fixing superior quality switch mounting poly carbonate plate with necessary supporting back plate with required nos of machine tools, bolts, nuts etc., complete on the existing metal/PVC box. 4 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 175.0 | 175.0 | 8.0 | False | None | None | False | None | False | 1400.0 | 0 | 3529193 | 126993 | None | I.No. 3.5.4 | Supplying and fixing superior quality switch mounting poly carbonate plate with necessary supporting back plate with required nos of machine tools, bolts, nuts etc., complete on the existing metal/PVC box. 6 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 234.0 | 234.0 | 4.0 | False | None | None | False | None | False | 936.0 | 0 | 3529194 | 126993 | None | I.No. 3.5.5 | Supplying and fixing superior quality switch mounting poly carbonate plate with necessary supporting back plate with required nos of machine tools, bolts, nuts etc., complete on the existing metal/PVC box. 8 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 284.0 | 284.0 | 2.0 | False | None | None | False | None | False | 568.0 | 0 | 3529195 | 126993 | None | I.No. 3.5.6 | Supplying and fixing superior quality switch mounting poly carbonate plate with necessary supporting back plate with required nos of machine tools, bolts, nuts etc., complete on the existing metal/PVC box. 10-12 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 363.0 | 363.0 | 20.0 | False | None | None | False | None | False | 7260.0 | 0 | 3529196 | 126993 | None | I.No. 3.5.7 | Supplying and fixing superior quality switch mounting poly carbonate plate with necessary supporting back plate with required nos of machine tools, bolts, nuts etc., complete on the existing metal/PVC box. 16 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 397.0 | 397.0 | 20.0 | False | None | None | False | None | False | 7940.0 | 0 | 3529197 | 126993 | None | I.No. 3.6.1 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6Amps one way ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 102.0 | 102.0 | 95.0 | False | None | None | False | None | False | 9690.0 | 0 | 3529198 | 126993 | None | I.No. 3.6.2 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6Amps two way ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 166.0 | 166.0 | 2.0 | False | None | None | False | None | False | 332.0 | 0 | 3529199 | 126993 | None | I.No. 3.6.4 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. Stepped fan regulator ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 357.0 | 357.0 | 40.0 | False | None | None | False | None | False | 14280.0 | 0 | 3529200 | 126993 | None | I.No. 3.6.7 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 16Amps one way switch ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 180.0 | 180.0 | 30.0 | False | None | None | False | None | False | 5400.0 | 0 | 3529201 | 126993 | None | I.No. 3.6.9 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 32Amps DP switch ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 326.0 | 326.0 | 2.0 | False | None | None | False | None | False | 652.0 | 0 | 3529202 | 126993 | None | I.No. 3.6.10 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6/16Amps universal socket ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 236.0 | 236.0 | 25.0 | False | None | None | False | None | False | 5900.0 | 0 | 3529203 | 126993 | None | I.No. 3.6.11 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. TV/Telephone socket ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 156.0 | 156.0 | 1.0 | False | None | None | False | None | False | 156.0 | 0 | 3529204 | 126993 | None | I.No. 3.7 | Supplying and fixing 32Amps security and energy saving DP switch with key tag suitable to operate on 230 Volts,50Hz AC supply & completely wired on existing box. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 646.0 | 646.0 | 1.0 | False | None | None | False | None | False | 646.0 | 0 | 3529205 | 126993 | None | I.No. 5.2.1 | Supplying fully automatic star-delta starter unit push button type with suitable wires, 3 contactors, one adjustable thermal timer mounted on a common base plate held in steel enclosure for use on 400/440 volts 3 phase and wired after fixing to the existing wooden board for motor. Upto 12.5HP ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 7455.0 | 7455.0 | 1.0 | False | None | None | False | None | False | 7455.0 | 0 | 3529206 | 126993 | None | I.No. 5.18.1 | Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and C Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 Amps SP ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 415.0 | 415.0 | 1.0 | False | None | None | False | None | False | 415.0 | 0 | 3529207 | 126993 | None | I.No. 5.18.3 | Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and C Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 Amps SP 6-32 Amps DP ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 739.0 | 739.0 | 1.0 | False | None | None | False | None | False | 739.0 | 0 | 3529208 | 126993 | None | I.No. 5.19.9 | Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCBs single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure. II - Double Door 12 Way SP & N ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 2329.0 | 2329.0 | 2.0 | False | None | None | False | None | False | 4658.0 | 0 | 3529209 | 126993 | None | I.No. 5.19.11 | Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCBs single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure. III - Double Door 4 Way TP&N ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 4038.0 | 4038.0 | 1.0 | False | None | None | False | None | False | 4038.0 | 0 | 3529210 | 126993 | None | I.No. 5.21 | Supplying, fixing and wiring earth leakage relay with core balanced current transformer suitable for single phase 50 Hz AC with latest microcontroller based, digital readout of percentage leakage current, programmable delay/auto/ manual reset facility suitable to mount on DIN rail/ flush mounting on panel board. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 9255.0 | 9255.0 | 1.0 | False | None | None | False | None | False | 9255.0 | 0 | 3529211 | 126993 | None | I.No. 5.40.2 | Supplying ......... amps rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete. 250Amps 4x30x10mm Aluminium Strips ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 3435.0 | 3435.0 | 2.0 | False | None | None | False | None | False | 6870.0 | 0 | 3529212 | 126993 | None | I.No. 5.40.3 | Supplying ......... amps rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete. 400Amps 4x50x10mm Aluminium Strips ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 4445.0 | 4445.0 | 0.5 | False | None | None | False | None | False | 2222.5 | 0 | 3529213 | 126993 | None | I.No. 5.33 | Supplying of multi function digital meter with three line back light LCD type display for voltage, Current, frequency,Power, power factor, KVA, KWH, KVAR suitable for 3 phase, 4 wire LT network with IP 54 degree of protection and completely wired as required with communication Port and Class 0.5s accuracy. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 9315.0 | 9315.0 | 1.0 | False | None | None | False | None | False | 9315.0 | 0 | 3529214 | 126993 | None | I.No. 5.31 | Supplying and fixing Electronic Trivector Meter (ETV) suitable for operation LT operation and -CT operated meter in polycarbonate body in class 0.5 accuracy as per IS 14697 and completely wired. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 4390.0 | 4390.0 | 1.0 | False | None | None | False | None | False | 4390.0 | 0 | 3529215 | 126993 | None | I.No. 12.56 | Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipments on the meter board using 40mm dia 2.90mm thick GI pipe 2.5 mtr long buried in a pit … The pit should be filled with equal proportion of salt and charcoal 150mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per ISI specification 7.3.3. of IS 732 using 12mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Nos | 3510.0 | 3510.0 | 3.0 | False | None | None | False | None | False | 10530.0 | 0 | 3529216 | 126993 | None | I.No. 32.07 | Supplying of 1.1 KV LT UG cable XLPE or Heat resistant PVC insulated, PVC extruded Inner sheath armoured UG LT cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness in average +5% and resistivity 14 Ohms/Kms (Max) as per IS-3975 3.5 core 25 sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 139.55 | 139.55 | 30.0 | False | None | None | False | None | False | 4186.5 | 0 | 3529217 | 126993 | None | I.No. 32.07 | Labour charges for laying of 1.1 KV class UG cable in existing trench GI pipe / stoneware pipe / on wall / on pole as required. 25 sqmm to 75 sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 23.65 | 23.65 | 30.0 | False | None | None | False | None | False | 709.5 | 0 | 3529218 | 126993 | None | I.No. 29.01 | Digging of trench of 0.6m deep x 0.50 mtr wide refilling the trench to the required ground level and consolidating etc.,complete.(As per Civil SR KSRB I-2, P-7) In Soil (Ordinary) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 889.0 | 889.0 | 30.0 | False | None | None | False | None | False | 26670.0 | 0 | 3529219 | 126993 | None | I.No. 29.07 | Refilling the cable trenches with selected available earth from trench excavation including watering, consolidation in layers of 15 cm. Thickness including depositing of the surplus earth with a lead of 200 Mtr ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 58.0 | 58.0 | 30.0 | False | None | None | False | None | False | 1740.0 | 0 | 3529220 | 126993 | None | I.No. 35.01 | Epoxy Terminating Kit (Pothead) suitable for 1.1 kV, LTUG Cable Up to 4C x 50 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 382.0 | 382.0 | 8.0 | False | None | None | False | None | False | 3056.0 | 0 | 3529221 | 126993 | None | I.No. 6.2.1 | Supplying of 1440rpm heavy duty exhaust fan with bracketblades suitable to operate on 230V 50Hz, AC Supply complete. 12 Sweep (300mm) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 2969.0 | 2969.0 | 6.0 | False | None | None | False | None | False | 17814.0 | 0 | 3529222 | 126993 | None | I.No. 6.3.1 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts,50 cycles. Single phase AC supply conforming to ISS-3741979 and with double ball bearing system. 48 Sweep (1200mm) Regular model ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 2984.0 | 2984.0 | 40.0 | False | None | None | False | None | False | 119360.0 | 0 | 3529223 | 126993 | None | I.No. 11.3.2 | Supplying of ......feet - PVC Batten with integrated LED tube .....W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V @ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fighting 1 x4- 20/22 w ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 690.0 | 690.0 | 20.0 | False | None | None | False | None | False | 13800.0 | 0 | 3529224 | 126993 | None | I.No. 11.5.2 | Supply of round/square recess/surface mounted rolling type LED Down light with W GU 10 LED Lamp Rib Fabricated from Die cast aluminium with white powder coated prewired to mains connector & has swiveling unit of aluminium die cast eye ball & LED Lamp position retained by circular wire spring, with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V @ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED square or round down light 10-12W ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 885.0 | 885.0 | 30.0 | False | None | None | False | None | False | 26550.0 | 0 | 3529225 | 126993 | None | I.No. 12.21 | Supplying and fixing of 5-80 Watts of T8 Fluorescent Tube with 54W power consumption with low 3mg Mercury content less phosphor coating. Operating voltage range from 180V to 265V, 50Hz AC power Supply ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Nos | 520.0 | 520.0 | 30.0 | False | None | None | False | None | False | 15600.0 | 0 | 3529226 | 126993 | None | I.No. 12.25.2 | Supplying of patty fitting, made out of CRCA Sheet metal body with locking type holder completely wired with HF Electronic Ballast, Operating voltage range from 180V to 265V, 50Hz AC power supply excluding Tube. 1 x 4 Tube light fitting. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 340.0 | 340.0 | 30.0 | False | None | None | False | None | False | 10200.0 | 0 | 3529227 | 126993 | None | I.No. 12.46 | Supplying & Fixing of 70-150 Watts lamp holder 2 Pin ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Nos | 63.0 | 63.0 | 15.0 | False | None | None | False | None | False | 945.0 | 0 | 3529228 | 126993 | None | I.No. 13.7.1 | Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. On wall / ceiling / Rafter / Girders ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 122.0 | 122.0 | 80.0 | False | None | None | False | None | False | 9760.0 | 0 | 3529229 | 126993 | None | I.No. 13.11 | Fixing a ceiling / wall mounting fan of all capacities and all types, with necessary clamps and S hook made out of 15mm dia MS rod, with 5 amps. ceiling rose of approved quality with necessary length of 23 / 0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size
wooden board and wired. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 315.0 | 315.0 | 40.0 | False | None | None | False | None | False | 12600.0 | 0 | 3529230 | 126993 | None | I.No. 13.13 | Fixingoneexhaustfanaftermakingasuitablenotchinthewallandfinishingwithcementmortarandcolouringtomatchtheexistingwallorbrackets,withboltsandnutsanda5A,ceilingrosewithsufficientlengthof23/0.0076inchPVCinsulatedtwincorewireofapproved make with wire mesh and wooden frame. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 707.0 | 707.0 | 6.0 | False | None | None | False | None | False | 4242.0 | 0 | 3529231 | 126993 | None | I.No. 13.19 | Fixing all types and all capacities of 1x4 / 2x2 LED Light fittings indoor on the wall / ceiling / rafters / girders with necessary supporting frame, using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 490.0 | 490.0 | 50.0 | False | None | None | False | None | False | 24500.0 | 0 | 3529232 | 126993 | None | I.No. 5.34 | Supplying, fixing and wiring 50/5 to 400/5Amps 5VA burden Current Transformer Class 0.5
accuracy with Tape Wound., with all lead, lifts, loading, un-loading charges, including cost of all materials, cost oflabour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental andequipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 562.0 | 562.0 | 1.0 | False | None | None | False | None | False | 562.0 | 0 | 3529233 | 126993 | None | I.No. 5.38 | Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440v A.C. 50 Hz 12/24v D.C. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 515.0 | 515.0 | 2.0 | False | None | None | False | None | False | 1030.0 | 0 |
| 1721106652000 | 0 | None | None | Buildings | EXTERNAL ELECTRIFICATION | 186929.84 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3529234 | 126994 | None | I.No. 200105 | RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. BESCOM/GM/QS&S/02 Dtd 24.11.2018) asper IS-785 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Nos | 7076.0 | 7076.0 | 6.0 | False | None | None | False | None | False | 42456.0 | 0 | 3529235 | 126994 | None | I.No. 303202 | Lightning Arrester as per IEC-60099-4 10 kV, 5 kA Lightning Arrester Polymeric type with
GROUND DISCONNECTOR ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1584.0 | 1584.0 | 3.0 | False | None | None | False | None | False | 4752.0 | 0 | 3529236 | 126994 | None | I.No. 302122 | HG Fuse Unit as per IS-5350 Part-2 11 kV, HG Fuse Unit with Solid Core Insulator ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Nos | 1069.0 | 1069.0 | 3.0 | False | None | None | False | None | False | 3207.0 | 0 | 3529237 | 126994 | None | I.No. 304212 | GOS as per IS-9921, IS-1977 11 kV, 200 Amps Single Break GOS ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Set | 9450.0 | 9450.0 | 6.0 | False | None | None | False | None | False | 56700.0 | 0 | 3529238 | 126994 | None | I.No. 302011 | DOLO Cutout as per IS-9385, Part-1 to 3 11 kV, DOLO Cutout Conventional to Erstwhile KEB
Specification ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Set | 5875.0 | 5875.0 | 1.0 | False | None | None | False | None | False | 5875.0 | 0 | 3529239 | 126994 | None | I.No. 287210 | 1.1 kV, XLPE or Heat resistant PVC
insulated, PVC exutruted Inner Seath
Armoured LTUG Cable as per IS-1554 (Part-
1) or IS-7098 Part-1, Armouring strip
thickness and resistivity as per IS-3975 70 Sqmm, 3.5 Core, (18 GI Strips - 4 x 0.8 mm) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Km | 317912.0 | 317912.0 | 0.05 | False | None | None | False | None | False | 15895.6 | 0 | 3529240 | 126994 | None | I.No. 288159 | Epoxy Terminating Kit (Pothead) suitable
for 1.1 kV, LTUG Cable 3.5 x 70/95/120 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Set | 382.0 | 382.0 | 1.0 | False | None | None | False | None | False | 382.0 | 0 | 3529241 | 126994 | None | I.No. 5.8.1 | Supplying of Switch disconnector fuse unit (TPN) HRC type (but
without HRC fuses). With AC-23A duty and as per IS- 13947. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Nos | 2312.0 | 2312.0 | 1.0 | False | None | None | False | None | False | 2312.0 | 0 | 3529242 | 126994 | None | I.No. 281674 | Grounding Material
Pipe Grounding
GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long,
3.2 mm thick with bolt, nut, GI Strips and washer
complete Mnimum Weight of GI Pipe: 7.3 Kg ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 743.0 | 743.0 | 8.0 | False | None | None | False | None | False | 5944.0 | 0 | 3529243 | 126994 | None | I.No. 600095 | Good Quality well burnt Charcoal for grounding
purposes packed in non returnable gunny bag of 30 Kg
each ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 676.0 | 676.0 | 8.0 | False | None | None | False | None | False | 5408.0 | 0 | 3529244 | 126994 | None | I.No. 607054 | Good Quality Salt for grounding purposes packed in 50
Kg gunny bag ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 310.0 | 310.0 | 8.0 | False | None | None | False | None | False | 2480.0 | 0 | 3529245 | 126994 | None | I.No. 284108 | ACSR Conductor as per IS-398 (Part -
2/1996)
Rabbit ACSR
(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Km | 46234.0 | 46234.0 | 0.36 | False | None | None | False | None | False | 16644.24 | 0 | 3529246 | 126994 | None | I.No. 283005 | Insulator as per IS-1445 for Ceremic, IS-
7935 for GI Pin, IEC-61109 for Polymeric
11 kV Ceramic Pin Insulator (Shell only) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 83.0 | 83.0 | 6.0 | False | None | None | False | None | False | 498.0 | 0 | 3529247 | 126994 | None | I.No. 283055 | 11 kV GI Pin for 11 kV Ceramic Shell Insulator ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 66.0 | 66.0 | 9.0 | False | None | None | False | None | False | 594.0 | 0 | 3529248 | 126994 | None | I.No. 283040 | DISC Insulator 45 kN Porcelain ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 510.0 | 510.0 | 6.0 | False | None | None | False | None | False | 3060.0 | 0 | 3529249 | 126994 | None | I.No. 281008 | Guy Wire & GI Wire as per IS-2141 8 SWG GI Wire
(4.064 mm Dia), Std Wt: 125 Kg/KM ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Km | 75040.0 | 75040.0 | 0.1 | False | None | None | False | None | False | 7504.0 | 0 | 3529250 | 126994 | None | I.No. 1.1.1 | Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC/PSCC supports as per approved Drawing. Ordinary Soil Per Pit 416 478 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Pit | 629.0 | 629.0 | 6.0 | False | None | None | False | None | False | 3774.0 | 0 | 3529251 | 126994 | None | I.No. 1.6.1 | Digging of Pit for providing GI Pipe type Earthing ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Pit | 759.0 | 759.0 | 6.0 | False | None | None | False | None | False | 4554.0 | 0 | 3529252 | 126994 | None | I.No. 1.8.1 | Concrete works
Providing cement concrete to Poles and Guy sets with material and labour including necessary curing etc., complete (cost does
not include excavation)
a) Pole base for 11/9.5/9/8 Mtr supports (500x650x150mm) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Pit | 273.0 | 273.0 | 6.0 | False | None | None | False | None | False | 1638.0 | 0 | 3529253 | 126994 | None | I.No. 1.8.3 | Providing Coping for Pole with CC 1:2:4 (As per actuals) a) 150 mm all around the Pole for an height of 300 mm for RCC ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Pit | 542.0 | 542.0 | 6.0 | False | None | None | False | None | False | 3252.0 | 0 |
|
|
---|