tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1721461183000 | 0 | None | None | Roads | Improvements to SH-27 Virajpete-Byndoor road from Ch335.4 KM to 374.40 KM (in selected reaches) in Kundapura Taluk of Udupi District-Reconstruction Reach | 35739587.8 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3561825 | 129062 | None | VOL-III-2.5-ii-A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 . complete as directed as per the specification and direction of Engineer in-charge of the work-In area of Light jungle
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.5-ii-A Page No.9)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 519.38 | 519.38 | 41.76 | False | None | None | False | None | False | 21689.3088 | 0 | 3561826 | 129062 | None | VOL-III-2.1-A-i | Cutting of Trees, excluding removal of stumps and roots of trees Girth from 300 mm to 600 mm
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.1-A-i Page No.9)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 786.35 | 786.35 | 3.0 | False | None | None | False | None | False | 2359.05 | 0 | 3561827 | 129062 | None | VOL-III-2.1-A-ii | Cutting of Trees, excluding removal of stumps and roots of trees Girth from 600 mm to 900 mm
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.1-A-ii Page No.9)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 2340.55 | 2340.55 | 5.0 | False | None | None | False | None | False | 11702.75 | 0 | 3561828 | 129062 | None | VOL-III-2.1-A-iii | Cutting of Trees, excluding removal of stumps and roots of trees Girth from 900 mm to 1800 mm
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.1-A-iii Page No.9)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 2340.55 | 2340.55 | 4.0 | False | None | None | False | None | False | 9362.2 | 0 | 3561829 | 129062 | None | VOL-I-1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.12 Page No.8)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 125.55 | 125.55 | 5851.15 | False | None | None | False | None | False | 734611.8825 | 0 | 3561830 | 129062 | None | VOL-I-1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the Work . In all kinds of soils Depth upto 3 m
MORTH Specification No. 304 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the work
Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.14.1 Page No.8)
)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 134.8 | 134.8 | 79.41 | False | None | None | False | None | False | 10704.468 | 0 | 3561831 | 129062 | None | VOL-III-3.5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead etc
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-3.5 Page No.17)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 7.93 | 7.93 | 8745.0 | False | None | None | False | None | False | 69347.85 | 0 | 3561832 | 129062 | None | VOL-I-1.7 | KSRRB M300-Construction of Embankment with Material deposited from Roadway cutting. KSRRB M300-54. Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2 complete asper specifications.which includes , watering charges & compaction by vibratory roller) MORTH Specification No. 305 -. complete as directed as per the specification and direction of Engineer-in-charge of the work
Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.7 Page No.7)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 157.27 | 157.27 | 2610.53 | False | None | None | False | None | False | 410558.0531 | 0 | 3561833 | 129062 | None | VOL-III-3.6 | Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-3.6 Page No.17)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 651.54 | 651.54 | 1990.84 | False | None | None | False | None | False | 1297111.8936 | 0 | 3561834 | 129062 | None | VOL-III-4.2-v | Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-4.2-v Page No.23)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3117.65 | 3117.65 | 2220.08 | False | None | None | False | None | False | 6921432.412 | 0 | 3561835 | 129062 | None | VOL-III-4.17 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-4.17 Page No.26)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3381.97 | 3381.97 | 3070.94 | False | None | None | False | None | False | 10385826.9518 | 0 | 3561836 | 129062 | None | VOL-III-5.1-A(i) | Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means.PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-5.1-A(i) Page No.31)
Rates are Inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 54.19 | 54.19 | 12577.03 | False | None | None | False | None | False | 681549.2557 | 0 | 3561837 | 129062 | None | VOL-III-5.4 | Tack coat on Granular surface treated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular Surface.PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-5.4 Page No.31) Rates are Inclusive of 18 percent GST
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 18.5 | 18.5 | 12577.03 | False | None | None | False | None | False | 232675.055 | 0 | 3561838 | 129062 | None | VOL-III-5.12-C | Dense Graded Bituminous Macadam Grading - II for traffic less than 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-5.12-C Page No.35) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 12487.8 | 12487.8 | 754.6 | False | None | None | False | None | False | 9423293.88 | 0 | 3561839 | 129062 | None | VOL-III-5.16-C | Bituminous Concrete Grading II for traffic less than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects, complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-5.16-C Page No.38)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 14476.81 | 14476.81 | 345.8 | False | None | None | False | None | False | 5006080.898 | 0 | 3561840 | 129062 | None | VOL-III- 5.29(b) | Providing and laying Bituminous Concrete with not less than 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.78% Bitumen and waste plastic 8% of Bitumen of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respectsPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III- 5.29(b) Page No.42)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 13764.46 | 13764.46 | 31.5 | False | None | None | False | None | False | 433580.49 | 0 | 3561841 | 129062 | None | VOL-III-8.29-i | Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. Single row for one utility servicePWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.29-i Page No.71)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 2923.38 | 2923.38 | 30.0 | False | None | None | False | None | False | 87701.4 | 0 |
| 1721461183000 | 1 | None | None | Roads | Improvements to SH-27 Virajpete-Byndoor road from Ch335.4 KM to 374.40 KM (in selected reaches) in Kundapura Taluk of Udupi District-Side widening and Strengthening Reach | 25006254.59 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3561842 | 129063 | None | VOL III 2.5 ii B | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in charge of the work In area of thorny jungle
PWD SOR for Roads & Bridges 2023 24 ( Item No. VOL III 2.5 ii B Page No.9)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 519.39 | 519.39 | 22.32 | False | None | None | False | None | False | 11592.7848 | 0 | 3561843 | 129063 | None | VOL I 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth)
Common SOR For Engineering Departments 2023 2024 ( Item No. VOL I 1.12 Page No.8)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 125.55 | 125.55 | 5511.06 | False | None | None | False | None | False | 691913.583 | 0 | 3561844 | 129063 | None | VOL I 1.7 | KSRRB Cum00 Construction of Embankment with Material deposited from Roadway cutting. KSRRB Cum00 54. Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300 2 complete asper specifications.which includes , watering charges & compaction by vibratory roller) MORTH Specification No. 305 Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in charge of the work
Common SOR For Engineering Departments 2023 2024 ( Item No. VOL I 1.7 Page No.7)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 157.27 | 157.27 | 3041.81 | False | None | None | False | None | False | 478385.4587 | 0 | 3561845 | 129063 | None | VOL III 3.6 | Construction of sub grade and earthen shoulders with approved material ( CBR min 10 Percent) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300 2
PWD SOR for Roads & Bridges 2023 24 ( Item No. VOL III 3.6 Page No.17)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 651.55 | 651.55 | 2194.65 | False | None | None | False | None | False | 1429924.2075 | 0 | 3561846 | 129063 | None | VOL III 4.2 v | Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-4.2-v Page No.23)
(Rates are inclusive of 18 Percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3117.65 | 3117.65 | 992.09 | False | None | None | False | None | False | 3092989.3885 | 0 | 3561847 | 129063 | None | VOL III 4.17 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
PWD SOR for Roads & Bridges 2023 24 ( Item No. VOL III 4.17 Page No.26)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3381.97 | 3381.97 | 958.42 | False | None | None | False | None | False | 3241347.6874 | 0 | 3561848 | 129063 | None | VOL III 5.1 A | Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per Sqm using mechanical means.
PWD SOR for Roads & Bridges 2023 24 ( Item No. VOL III 5.1 A Page No.31)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 54.19 | 54.19 | 3485.68 | False | None | None | False | None | False | 188888.9992 | 0 | 3561849 | 129063 | None | VOL III 5.3 | Tack coat on Bituminous surface
Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/Sqm on the prepared bituminous surface cleaned with mechanical broom
PWD SOR for Roads & Bridges 2023 24 ( Item No. VOL III 5.3 Page No.31)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 15.86 | 15.86 | 13228.18 | False | None | None | False | None | False | 209798.9348 | 0 | 3561850 | 129063 | None | VOL III 5.12 C | Dense Graded Bituminous Macadam Grading II for traffic lessthan20 MSA
Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG 30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads & Bridges 2023 24 ( Item No. VOL III 5.12 C Page No.35)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 12487.8 | 12487.8 | 798.48 | False | None | None | False | None | False | 9971258.544 | 0 | 3561851 | 129063 | None | VOL III 5.16 C | Bituminous Concrete Grading II for traffic Lessthan20 MSA
Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG 30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects, complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads & Bridges 2023 24 ( Item No. VOL III 5.16 C Page No.38)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 14476.81 | 14476.81 | 289.74 | False | None | None | False | None | False | 4194510.9294 | 0 | 3561852 | 129063 | None | VOL-III- 5.29(b) | Providing and laying Bituminous Concrete with not less than 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.78% Bitumen and waste plastic 8% of Bitumen of mix and filler, transporting the hot mix to work site, laying with mechanical
paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III- 5.29(b) Page No.42)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 13764.46 | 13764.46 | 107.1 | False | None | None | False | None | False | 1474173.666 | 0 | 3561853 | 129063 | None | VOL-III-5.23-i | Providing and laying slurry seal consisting of a mix of fine aggregates, portland cement filler, bituminous emulsion and water on a road surface including cleaning of surface, mixing of slurry seal in a suitable mobile plant, laying and compacting to provide even riding surface ,2-3 mm thickness (Type-I)
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-5.23-i Page No.40)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 62.12 | 62.12 | 26.1 | False | None | None | False | None | False | 1621.332 | 0 | 3561854 | 129063 | None | VOL-III-2.1-A-i | Cutting of Trees, excluding removal of stumps and roots of trees Girth from 300 mm to 600 mm
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.1-A-i Page No.9)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 786.35 | 786.35 | 4.0 | False | None | None | False | None | False | 3145.4 | 0 | 3561855 | 129063 | None | VOL-III-2.1-A-ii | Cutting of Trees, excluding removal of stumps and roots of trees Girth from 600 mm to 900 mm
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.1-A-ii Page No.9) Rates are Inclusive of GSt 18 percent
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 1250.23 | 1250.23 | 4.0 | False | None | None | False | None | False | 5000.92 | 0 | 3561856 | 129063 | None | VOL-III-2.1-A-iii | Cutting of Trees, excluding removal of stumps and roots of trees Girth from 900 mm to 1800 mm
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.1-A-iii Page No.9) Rates Are Inclusive of GST 18Percent
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 2340.55 | 2340.55 | 5.0 | False | None | None | False | None | False | 11702.75 | 0 |
| 1721461183000 | 0 | None | None | Roads | Improvements to SH-27 Virajpete-Byndoor road from Ch335.4 KM to 374.40 KM (in selected reaches) in Kundapura Taluk of Udupi District-Strengthening reach | 4956785.74 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3561857 | 129064 | None | VOL III 5.3 | Tack coat on Bituminous surface
Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/Sqm on the prepared bituminous surface cleaned with mechanical broom
PWD SOR for Roads & Bridges 2023 24 ( Item No. VOL III 5.3 Page No.31) Rate is inclusive GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 15.86 | 15.86 | 4184.88 | False | None | None | False | None | False | 66372.1968 | 0 | 3561858 | 129064 | None | VOL III 5.12 C | Dense Graded Bituminous Macadam Grading II for traffic less than 20 MSA
Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG 30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads & Bridges 2023 24 ( Item No. VOL III 5.12 C Page No.35) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 12487.8 | 12487.8 | 253.23 | False | None | None | False | None | False | 3162285.594 | 0 | 3561859 | 129064 | None | VOL-III- 5.29(b) | Providing and laying Bituminous Concrete with not less than 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.78% Bitumen and waste plastic 8% of Bitumen of mix and filler, transporting the hot mix to work site, laying with mechanical
paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III- 5.29(b) Page No.42) Rate is inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 13764.46 | 13764.46 | 125.55 | False | None | None | False | None | False | 1728127.953 | 0 |
| 1721461183000 | 0 | None | None | Roads | Improvements to SH-27 Virajpete-Byndoor road from Ch335.4 KM to 374.40 KM (in selected reaches) in Kundapura Taluk of Udupi District-Road furnitures | 3325404.59 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3561860 | 129065 | None | VOL-III-16.29 | i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangle shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the Rect Angle shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year f installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-16.29 Page No.149)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 20289.2 | 20289.2 | 4.0 | False | None | None | False | None | False | 81156.8 | 0 | 3561861 | 129065 | None | VOL-III-8.16-ii | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc-
(ii) Ordinary kilometer stone (precast) MORTH Specification No. 804 - complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.16-ii Page No.67)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 3868.32 | 3868.32 | 3.0 | False | None | None | False | None | False | 11604.96 | 0 | 3561862 | 129065 | None | VOL-III-8.16-iii | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc-
(ii) Ordinary kilometer stone (precast) MORTH Specification No. 804 - complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.16-ii Page No.67)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 1112.79 | 1112.79 | 15.0 | False | None | None | False | None | False | 16691.85 | 0 | 3561863 | 129065 | None | VOL-III-8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.15 Page No.67)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 700.45 | 700.45 | 1066.2 | False | None | None | False | None | False | 746819.79 | 0 | 3561864 | 129065 | None | VOL-III-8.5-ii | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle
Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.5-ii Page No.64)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 6190.37 | 6190.37 | 54.0 | False | None | None | False | None | False | 334279.98 | 0 | 3561865 | 129065 | None | VOL-III-8.5-viii | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (viii) 60 cm circular complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.5-viii Page No.64)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 5678.92 | 5678.92 | 98.0 | False | None | None | False | None | False | 556534.16 | 0 | 3561866 | 129065 | None | VOL-III-8.6-(x) | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x
3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 80 mm x 60 mm rectangular TYPE XI
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.6-(x) Page No.65)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 7275.41 | 7275.41 | 2.0 | False | None | None | False | None | False | 14550.82 | 0 | 3561867 | 129065 | None | VOL-III-8.5-iv | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 60 cm equilateral triangle
Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.5-iv Page No.64)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 4726.04 | 4726.04 | 18.0 | False | None | None | False | None | False | 85068.72 | 0 | 3561868 | 129065 | None | VOL-III-8.6-(xv) | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x
3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 90 cm high octagon Stop Board -TYPE XI
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.6-(xv) Page No.65)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 8755.6 | 8755.6 | 4.0 | False | None | None | False | None | False | 35022.4 | 0 | 3561869 | 129065 | None | VOL-III-8.7 | Direction and Place Identification Signs upto 0.9 sqm Size Board: Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide Clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75mm x 75mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45cm x 45cm x 60 cm, 60 em below ground level as per approved drawing. - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.7 Page No.65)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 11907.62 | 11907.62 | 5.4 | False | None | None | False | None | False | 64301.148 | 0 | 3561870 | 129065 | None | VOL-III-8.10 | KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.10 Page No.66)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | cm | 144.05 | 144.05 | 72.0 | False | None | None | False | None | False | 10371.6 | 0 | 3561871 | 129065 | None | VOL-III-8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.
- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.43 Page No.74)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 482.38 | 482.38 | 622.0 | False | None | None | False | None | False | 300040.36 | 0 | 3561872 | 129065 | None | VOL-III-8.17 | Road Delineators
Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings.
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.17 Page No.67)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 2670.95 | 2670.95 | 40.0 | False | None | None | False | None | False | 106838.0 | 0 | 3561873 | 129065 | None | VOL-III-8.25-i | Metal Beam Crash Barrier
(i)Type - A, "W" : Metal Beam Crash Barrier Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811
MORTH Specification No. 810 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.25-i Page No.69)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 4810.62 | 4810.62 | 200.0 | False | None | None | False | None | False | 962124.0 | 0 |
| 1721461183000 | 0 | None | None | Roads | Improvements to SH-27 Virajpete-Byndoor road from Ch335.4 KM to 374.40 KM (in selected reaches) in Kundapura Taluk of Udupi District-Box Culverts | 1006288.03 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3561874 | 129066 | None | VOL I 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the Work . In all kinds of soils Depth upto 3 m
MORTH Specification No. 304 Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in charge of the work
Common SOR For Engineering Departments 2023 2024 ( Item No. VOL I 1.14.1 Page No.8)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 134.8 | 134.8 | 48.3 | False | None | None | False | None | False | 6510.84 | 0 | 3561875 | 129066 | None | VOL I 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates. complete as directed as per the specification and direction of Engineer in charge of the work
Common SOR For Engineering Departments 2023 2024 ( Item No. VOL I 2.1.3 Page No.15)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7915.06 | 7915.06 | 8.56 | False | None | None | False | None | False | 67752.9136 | 0 | 3561876 | 129066 | None | VOL I 2.5.2 (20percent for Slab Centring) | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (20% for Slab centring )
Common SOR For Engineering Departments 2023 2024 ( Item No. VOL I 2.5.2 (20percent for Slab Centring) Page No.16)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 10852.45 | 10852.45 | 11.93 | False | None | None | False | None | False | 129469.7285 | 0 | 3561877 | 129066 | None | VOL I 2.11 h | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in charge of the work
Common SOR For Engineering Departments 2023 2024 ( Item No. VOL I 2.11 h Page No.18)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | t | 104420.94 | 104420.94 | 3.32 | False | None | None | False | None | False | 346677.5208 | 0 | 3561878 | 129066 | None | VOL III 13.2 | Providing and laying Cement concrete wearing coat M 30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) complete as per specifications. MORTH Specification No. 2702
PWD SOR for Roads & Bridges 2023 24 ( Item No. VOL III 13.2 Page No.121)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 18464.07 | 18464.07 | 2.5 | False | None | None | False | None | False | 46160.175 | 0 | 3561879 | 129066 | None | VOL III 2.8 ii (a) | KSRRB M200-13.1. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts complete as per specifications. II. By Mechanical Means. A. Cement Concrete Grade M-15 &M-20. MORTH Specification No. 202 - complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.8-ii-(a) Page No.10)
(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 950.23 | 950.23 | 20.73 | False | None | None | False | None | False | 19698.2679 | 0 | 3561880 | 129066 | None | VOL III 2.11 II (a) | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead Dismantling Stone Masonry, By Mechanical Means Dismantling Brick / Tile work / rubble masonry / pitching / etc
PWD SOR for Roads & Bridges 2023 24 ( Item No. VOL III 2.11 II (a) Page No.10)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 237.89 | 237.89 | 13.87 | False | None | None | False | None | False | 3299.5343 | 0 | 3561881 | 129066 | None | VOL-I-2.4.3 (20percent for centring) | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (M 25) Using 20 mm nominal size graded crushed coarse aggregate (20% for centring)
Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.4.3 (20% for centring) Page No.16)
Rate is inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 10048.39 | 10048.39 | 35.67 | False | None | None | False | None | False | 358426.0713 | 0 | 3561882 | 129066 | None | VOL-III-8.18 | Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting Boundary pillar / Guard Stone
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.18 Page No.67) Rate in inclusive GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 988.56 | 988.56 | 24.0 | False | None | None | False | None | False | 23725.44 | 0 | 3561883 | 129066 | None | VOL-I-1.10 | KSRB 2-4 : Refilling available earth around pipe lines, cables in layers not exceeding 20cms in depth, compacting each deposited layer by ramming after watering with lead upto SOm. and lift upto 1.5 m. including cost of all labour complete as per specifications.
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-I-1.10 Page No.7) rate is inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 211.46 | 211.46 | 21.6 | False | None | None | False | None | False | 4567.536 | 0 |
| 1721461183000 | 0 | None | None | Roads | Improvements to SH-27 Virajpete-Byndoor road from Ch335.4 KM to 374.40 KM (in selected reaches) in Kundapura Taluk of Udupi District-Retaining wall | 1555455.92 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3561884 | 129067 | None | VOL I 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the Work . In all kinds of soils Depth upto 3 m
MORTH Specification No. 304 Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in charge of the work
Common SOR For Engineering Departments 2023 2024 ( Item No. VOL I 1.14.1 Page No.8) Rate is inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 134.8 | 134.8 | 100.8 | False | None | None | False | None | False | 13587.84 | 0 | 3561885 | 129067 | None | VOL I 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates. complete as directed as per the specification and direction of Engineer in charge of the work
Common SOR For Engineering Departments 2023 2024 ( Item No. VOL I 2.1.3 Page No.15) Rate is inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7915.06 | 7915.06 | 11.55 | False | None | None | False | None | False | 91418.943 | 0 | 3561886 | 129067 | None | VOL I 2.11 h | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in charge of the work
Common SOR For Engineering Departments 2023 2024 ( Item No. VOL I 2.11 h Page No.18) Rate is inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | t | 104420.94 | 104420.94 | 7.03 | False | None | None | False | None | False | 734079.2082 | 0 | 3561887 | 129067 | None | VOL-III-12.3-A | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification-Granular Material
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-12.3-A Page No.117) Rate is inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 1543.63 | 1543.63 | 42.0 | False | None | None | False | None | False | 64832.46 | 0 | 3561888 | 129067 | None | VOL-I-2.4.2 (10percent for Earth ret.Centring) | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (M 20) Using 20 mm nominal size graded crushed coarse aggregate (10% Earth retaining Structure)
Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.4.2 (10% for Earth ret.Centring) Page No.16) "
Rate is inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 9192.12 | 9192.12 | 70.88 | False | None | None | False | None | False | 651537.4656 | 0 |
| 1721461183000 | 1 | None | None | Roads | Improvements to SH-27 Virajpete-Byndoor road from Ch335.4 KM to 374.40 KM (in selected reaches) in Kundapura Taluk of Udupi District-Field Culvert works | 1277631.47 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3561889 | 129068 | None | VOL I 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the Work . In all kinds of soils Depth upto 3 m
MORTH Specification No. 304 Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer in charge of the work
Common SOR For Engineering Departments 2023 2024 ( Item No. VOL I 1.14.1 Page No.8) Rate is inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 134.8 | 134.8 | 165.74 | False | None | None | False | None | False | 22341.752 | 0 | 3561890 | 129068 | None | VOL I 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates... complete as directed as per the specification and direction of Engineer in charge of the work
Common SOR For Engineering Departments 2023 2024 ( Item No. VOL I 2.1.3 Page No.15) Rate is inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7915.06 | 7915.06 | 11.56 | False | None | None | False | None | False | 91498.0936 | 0 | 3561891 | 129068 | None | VOL I 2.4.2 (8Percent for Centring) | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (M 20) Using 20 mm nominal size graded crushed coarse aggregate (8Percent for centring)
Common SOR For Engineering Departments 2023 2024 ( Item No. VOL I 2.4.2 (8Percent for Centring) Page No.16) Rate is inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 9024.99 | 9024.99 | 88.93 | False | None | None | False | None | False | 802592.3607 | 0 | 3561892 | 129068 | None | VOL I 2.11 h | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer in charge of the work
Common SOR For Engineering Departments 2023 2024 ( Item No. VOL I 2.11 h Page No.18) Rate is inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | t | 104420.94 | 104420.94 | 1.3 | False | None | None | False | None | False | 135747.222 | 0 | 3561893 | 129068 | None | VOL III 16.15 iii | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101 750mm. dia Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single row
PWD SOR for Roads & Bridges 2023 24 ( Item No. VOL III 16.15 iii Page No.146) Rate is inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 4407.54 | 4407.54 | 50.0 | False | None | None | False | None | False | 220377.0 | 0 | 3561894 | 129068 | None | VOL I 1.10 | KSRB 2 4 : Refilling available earth around pipe lines, cables in layers not exceeding 20cms in depth, compacting each deposited layer by ramming after watering with lead upto SOm. and lift upto 1.5 m. including cost of all labour complete as per specifications.
PWD SOR for Roads & Bridges 2023 24 ( Item No. VOL I 1.10 Page No.7)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 211.46 | 211.46 | 24.0 | False | None | None | False | None | False | 5075.04 | 0 |
| 1721461183000 | 0 | None | None | Roads | Improvements to SH-27 Virajpete-Byndoor road from Ch335.4 KM to 374.40 KM (in selected reaches) in Kundapura Taluk of Udupi District. -Water supply works | 1031330.56 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3561895 | 129069 | None | VOL-I-1.17.1 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds of soils. Depth upto 1.50 mCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.17.1 Page No.10)
Rate is inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 346.26 | 346.26 | 702.0 | False | None | None | False | None | False | 243074.52 | 0 | 3561896 | 129069 | None | VOL-5 - 9.2.3 | Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For :HDPE PE 80 PN 8.0, 90mm diaPWD SOR for Water Supply & Sewerage Works - 2023-24 ( Item No. VOL-5 - 9.2.3 Page No.96) Rate is inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 504.85 | 504.85 | 1300.0 | False | None | None | False | None | False | 656305.0 | 0 | 3561897 | 129069 | None | VOL-I-1.10 | KSRB 2-4 : Refilling available earth around pipe lines, cables in layers not exceeding 20cms in depth, compacting each deposited layer by ramming after watering with lead upto SOm. and lift upto 1.5 m. including cost of all labour complete as per specifications.PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-I-1.10 Page No.7)
Rate is inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 211.46 | 211.46 | 624.0 | False | None | None | False | None | False | 131951.04 | 0 |
| 1721461183000 | 0 | None | None | Roads | Improvements to SH-27 Virajpete-Byndoor road from Ch335.4 KM to 374.40 KM (in selected reaches) in Kundapura Taluk of Udupi District.-ELECTRICAL WORKS | 1053196.05 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3561898 | 129070 | None | VOL VI 1.01 | RCC Pole 9 Mtr Long, 145 Kg WL (V 6 ESCOM P.No 3/ 1/1.01)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 9351.64 | 9351.64 | 24.0 | False | None | None | False | None | False | 224439.36 | 0 | 3561899 | 129070 | None | VOL VI 2.02 | Labour for RCC pole (V 6 ESCOM P.No 44/ 30/2.02)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 1470.94 | 1470.94 | 24.0 | False | None | None | False | None | False | 35302.56 | 0 | 3561900 | 129070 | None | VOL VI 2.08 | LT 2 Pin Cross Arm GI(V 6 ESCOM P.No 4/18/2.08)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 228.64 | 228.64 | 12.0 | False | None | None | False | None | False | 2743.68 | 0 | 3561901 | 129070 | None | VOL VI 5.01 | Labour for 2 Pin Cross Arm (V 6 ESCOM P.No 45/50/5.01)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 211.46 | 211.46 | 12.0 | False | None | None | False | None | False | 2537.52 | 0 | 3561902 | 129070 | None | VOL VI 12.2.02 | 11 kV, Horizontal Cross Arm (V 6 ESCOM P.No 3/12.2.02)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 643.62 | 643.62 | 12.0 | False | None | None | False | None | False | 7723.44 | 0 | 3561903 | 129070 | None | VOL VI 5.04 | Labour for Horizontal Cross Arm (V 6 ESCOM P.No 45/52/5.04)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 211.46 | 211.46 | 12.0 | False | None | None | False | None | False | 2537.52 | 0 | 3561904 | 129070 | None | VOL VI 6.06 | 11 kV, 5 KN Composite/Polymeric Pin Insulator (24 mm Dia FRP Rod) (V 6 ESCOM P.No 5/52.6.06)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 270.93 | 270.93 | 12.0 | False | None | None | False | None | False | 3251.16 | 0 | 3561905 | 129070 | None | VOL VI 6.10 | 11 kV, 45 KN Polymeric Insulator (V 6 ESCOM P.No 5/56/6.10)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 245.82 | 245.82 | 12.0 | False | None | None | False | None | False | 2949.84 | 0 | 3561906 | 129070 | None | VOL VI 2.06 | LT 4 Pin Cross Arm GI (Escom Pg 4 I.No 16/2.06)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 500.89 | 500.89 | 12.0 | False | None | None | False | None | False | 6010.68 | 0 | 3561907 | 129070 | None | VOL VI 5.02 | Labour for 4 Pin Cross Arm (Escom Pg 45 I.No 50/5.02)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 211.46 | 211.46 | 12.0 | False | None | None | False | None | False | 2537.52 | 0 | 3561908 | 129070 | None | VOL VI 21.05 | Double Pole TC Set for erection of Transformer on RCC/PSCC 9 Mtr Long Poles as per IS 1977 (V 6 ESCOM P.No 9/144/21.05) For 100/300 kVA 4/5 Star Rated Transformer on PSCC Pole 9 Mtr Long, 300 Kg WL MS(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 29771.68 | 29771.68 | 4.0 | False | None | None | False | None | False | 119086.72 | 0 | 3561909 | 129070 | None | VOL VI 3.02 | Labour For DP TC Set (V 6 ESCOM P.No 44/39/3.02)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 7880.7 | 7880.7 | 4.0 | False | None | None | False | None | False | 31522.8 | 0 | 3561910 | 129070 | None | VOL VI 2.02 | Releasing and Refixing of RCC Pole 9 Mtr Long, 145 Kg WL Labour (V 6 ESCOM P.No 44/ 30/2.02) (1113*1.9)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 2794.79 | 2794.79 | 48.0 | False | None | None | False | None | False | 134149.92 | 0 | 3561911 | 129070 | None | VOL VI 7.02 | Releasing and Restringing of Conductor (including pin binding, providing jumps, dead ending, etc.,) Labour (Escom Pg 46, I.No 67/7.02)(5233*1.9)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 13140.27 | 13140.27 | 3.6 | False | None | None | False | None | False | 47304.972 | 0 | 3561912 | 129070 | None | VOL VI 8.01 | Erection of 100 kVA Transformer on Transformer Structure (Escom Pg 46, /72/8.01) (1193*1.9)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 3992.55 | 3992.55 | 4.0 | False | None | None | False | None | False | 15970.2 | 0 | 3561913 | 129070 | None | VOL VI CDS26 | Erection of 11kV/433V, 100 kVA, 3 Phase 50 Cys Distribution Transformer BEE 5 Star Rated with Oil Using 9 Mtr RCC Pole DPTC (303940 221952) (CDS 26)(With out Transformer)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 108355.34 | 108355.34 | 2.0 | False | None | None | False | None | False | 216710.68 | 0 | 3561914 | 129070 | None | ELE LABOUR | Labour For Erection TC (CDS 26)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 25668.12 | 25668.12 | 4.0 | False | None | None | False | None | False | 102672.48 | 0 | 3561915 | 129070 | None | SUPER | Supervision Charges 10percentage(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Job | 95745.0 | 95745.0 | 1.0 | False | None | None | False | None | False | 95745.0 | 0 |
| 1721461183000 | 0 | None | None | Roads | Improvements to SH-27 Virajpete-Byndoor road from Ch335.4 KM to 374.40 KM (in selected reaches) in Kundapura Taluk of Udupi District-1st Year Maintaince | 0.06 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3561916 | 129071 | None | VOL-III-2.5-ii-A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 . complete as directed as per the specification and direction of Engineer in-charge of the work-In area of thorny jungle
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.5-ii-A Page No.9)
(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 0.1 | 0.1 | 0.1 | False | None | None | False | None | False | 0.01 | 0 | 3561917 | 129071 | None | VOL I 16 19 | Maintenance of Drains
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads and Bridges 2023 24 ( Item No. VOL I 16.19 Page No.147)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 0.1 | 0.1 | 0.1 | False | None | None | False | None | False | 0.01 | 0 | 3561918 | 129071 | None | VOL III 10 3 | Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads and Bridges 2023 24 ( Item No. VOL III 10.2 Page No.91)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.1 | 0.1 | 0.1 | False | None | None | False | None | False | 0.01 | 0 | 3561919 | 129071 | None | VOL III 10 2 | KSRRB 3000 Filling Pot holes and Patch Repairs and attending to Ravelling/Rutting/Edge Breaking with Bituminous Concrete, 40 mm KSRRB Cum000 5. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, applying tack coat on the sides and base of excavation at 2.5kg/1Osqm as per clause 500.3, filling back the pot holes with hot bituminous material as per clause 500.4, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3004.2 (PWD, Bangalore, SR 2018 19 Page No.259. Item No.35.5)(If there are pot holes on the road) Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads and Bridges 2023 24 ( Item No. VOL III 10.5 Page No.91)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.1 | 0.1 | 0.1 | False | None | None | False | None | False | 0.01 | 0 | 3561920 | 129071 | None | VOL III 10 5 | Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery and other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth)
Common SOR For Engineering Departments 2023 2024 ( Item No. VOL I 1.12 Page No.8)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 0.1 | 0.1 | 0.1 | False | None | None | False | None | False | 0.01 | 0 | 3561921 | 129071 | None | VOL-I-1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.12 Page No.8)
(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 0.1 | 0.1 | 0.1 | False | None | None | False | None | False | 0.01 | 0 |
| 1721461183000 | 0 | None | None | Roads | Improvements to SH-27 Virajpete-Byndoor road from Ch335.4 KM to 374.40 KM (in selected reaches) in Kundapura Taluk of Udupi District. 2nd Year Maintaince | 0.06 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3561922 | 129072 | None | VOL-III-2.5-ii-A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 . complete as directed as per the specification and direction of Engineer in-charge of the work-In area of thorny jungle
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.5-ii-A Page No.9)
(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 0.1 | 0.1 | 0.1 | False | None | None | False | None | False | 0.01 | 0 | 3561923 | 129072 | None | VOL I 16 19 | Maintenance of Drains
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads and Bridges 2023 24 Item No VOL I 16 19 Page No 147(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 0.1 | 0.1 | 0.1 | False | None | None | False | None | False | 0.01 | 0 | 3561924 | 129072 | None | VOL III 10 3 | Maintenance of Earth Shoulder stripping excess soil Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003. complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads and Bridges 2023 24 Item No VOL III 10 3 Page No 91(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.1 | 0.1 | 0.1 | False | None | None | False | None | False | 0.01 | 0 | 3561925 | 129072 | None | VOL III 10 2 | Maintenance of Earthen Shoulder filling with fresh soil Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No 3003 complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads and Bridges 2023 24 Item No VOL III 10 2 Page No 91(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.1 | 0.1 | 0.1 | False | None | None | False | None | False | 0.01 | 0 | 3561926 | 129072 | None | VOL III 10 5 | KSRRB 3000 Filling Pot holes and Patch Repairs and attending to Ravelling Rutting Edge Breaking with Bituminous Concrete, 40 mm KSRRB Cum000 5. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, applying tack coat on the sides and base of excavation at 2.5kg 1Osqm as per clause 500.3, filling back the pot holes with hot bituminous material as per clause 500.4, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3004.2 (PWD, Bangalore, SR 2018 19 Page No.259. Item No.35.5)(If there are pot holes on the road) Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads and Bridges 2023 24 ( Item No. VOL III 10.5 Page No.91)(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.1 | 0.1 | 0.1 | False | None | None | False | None | False | 0.01 | 0 | 3561927 | 129072 | None | VOL I 1 12 | Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery and other appurtenances required to complete the work. In all kinds of soils upto 300 mm depthCommon SOR For Engineering Departments 2023 2024 Item No VOL I 1 12 Page No 8(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.1 | 0.1 | 0.1 | False | None | None | False | None | False | 0.01 | 0 |
| 1721461183000 | 0 | None | None | Roads | Improvements to SH-27 Virajpete-Byndoor road from Ch335.4 KM to 374.40 KM (in selected reaches) in Kundapura Taluk of Udupi District.-3rd Year Maintaince | 319187.27 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3561928 | 129073 | None | VOL III 2.5 ii B | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges excetra. complete as directed as per the specification and direction of Engineer in charge of the work In area of thorny jungle PWD SOR for Roads and Bridges 2023 24 ( Item No. VOL III 2.5 ii B Page No.9). Rates are inclusive of 18% GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 581.71 | 581.71 | 43.2 | False | None | None | False | None | False | 25129.872 | 0 | 3561929 | 129073 | None | VOL I 16.19 | Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges excetra. complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads and Bridges 2023 24 ( Item No. VOL I 16.19 Page No.147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 8.88 | 8.88 | 2376.0 | False | None | None | False | None | False | 21098.88 | 0 | 3561930 | 129073 | None | VOL III 10.3 | Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 .complete as directed as per the specification and direction of Engineer in charge of the work PWD SOR for Roads and Bridges 2023 24 ( Item No. VOL III 10.3 Page No.91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 57.72 | 57.72 | 267.3 | False | None | None | False | None | False | 15428.556 | 0 | 3561931 | 129073 | None | VOL III 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads and Bridges 2023 24 ( Item No. VOL III 10.2 Page No.91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 143.57 | 143.57 | 891.0 | False | None | None | False | None | False | 127920.87 | 0 | 3561932 | 129073 | None | VOL III 16.22 | Maintenance of Road Signs Maintenance of road signs by way of cleaning and repainting of mandatory requlatory cautionary informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (Panchayat road SR 2018 19 Bangalore Circle Item no 15.9 page no 121) Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges excetra. complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads and Bridges 2023 24 ( Item No. VOL III 16.22 Page No.147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 2936.7 | 2936.7 | 3.6 | False | None | None | False | None | False | 10572.12 | 0 | 3561933 | 129073 | None | VOL III 16.24 (i) | Maintenance of 200 metre and km stones Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 (Panchayat Raj SR 2018 19 Bangalore circle item 15.11 page no 121 i) Painting two coats with synthetic enamel paint (I No. 15.11.i) Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges excetra. complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads and Bridges 2023 24 ( Item No. VOL III 16.24 (i) Page No.148) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 304.92 | 304.92 | 3.6 | False | None | None | False | None | False | 1097.712 | 0 | 3561934 | 129073 | None | VOL III 10.5 | KSRRB 3000 Filling Pot holes and Patch Repairs and attending to Ravelling Rutting Edge Breaking with Bituminous Concrete, 40 mm KSRRB Cum000 5. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, applying tack coat on the sides and base of excavation at 2.5kg 1Osqm as per clause 500.3, filling back the pot holes with hot bituminous material as per clause 500.4, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3004.2 (PWD, Bangalore, SR 2018 19 Page No.259. Item No.35.5)(If there are pot holes on the road) Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges excetra. complete as directed as per the specification and direction of Engineer in charge of the work PWD SOR for Roads and Bridges 2023 24 ( Item No. VOL III 10.5 Page No.91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 630.56 | 630.56 | 134.4 | False | None | None | False | None | False | 84747.264 | 0 | 3561935 | 129073 | None | VOL I 1.12 | Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery and other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth) Common SOR For Engineering Departments 2023 2024 ( Item No. VOL I 1.12 Page No.8) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 140.61 | 140.61 | 150.0 | False | None | None | False | None | False | 21091.5 | 0 | 3561936 | 129073 | None | VOL-III-8.10 | KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.10 Page No.66) Rate is inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 161.34 | 161.34 | 75.0 | False | None | None | False | None | False | 12100.5 | 0 |
| 1721461183000 | 0 | None | None | Roads | Improvements to SH-27 Virajpete-Byndoor road from Ch335.4 KM to 374.40 KM (in selected reaches) in Kundapura Taluk of Udupi District.-4th Year Maintaince | 438445.55 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3561937 | 129074 | None | VOL III 2.5 ii B | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in charge of the work In area of thorny jungle
PWD SOR for Roads and Bridges 2023 24 ( Item No. VOL III 2.5 ii B Page No.9). Rates are inclusive of 18% GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 602.49 | 602.49 | 43.2 | False | None | None | False | None | False | 26027.568 | 0 | 3561938 | 129074 | None | VOL I 16.19 | Maintenance of Drains
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads and Bridges 2023 24 ( Item No. VOL I 16.19 Page No.147). Rates are inclusive of 18% GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 9.19 | 9.19 | 2376.0 | False | None | None | False | None | False | 21835.44 | 0 | 3561939 | 129074 | None | VOL III 10.3 | Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads and Bridges 2023 24 ( Item No. VOL III 10.3 Page No.91). Rates are inclusive of 18% GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 59.78 | 59.78 | 267.3 | False | None | None | False | None | False | 15979.194 | 0 | 3561940 | 129074 | None | VOL III 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads and Bridges 2023 24 ( Item No. VOL III 10.2 Page No.91). Rates are inclusive of 18% GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 148.7 | 148.7 | 1782.0 | False | None | None | False | None | False | 264983.4 | 0 | 3561941 | 129074 | None | VOL III 10.5 | KSRRB 3000 Filling Pot holes and Patch Repairs and attending to RavellingRuttingEdge Breaking with Bituminous Concrete, 40 mm KSRRB Cum000 5. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, applying tack coat on the sides and base of excavation at 2.5kg1Osqm as per clause 500.3, filling back the pot holes with hot bituminous material as per clause 500.4, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3004.2 (PWD, Bangalore, SR2018 19 Page No.259. Item No.35.5)(If there are pot holes on the road) Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads and Bridges 2023 24 ( Item No. VOL III 10.5 Page No.91). Rates are inclusive of 18% GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 653.08 | 653.08 | 134.4 | False | None | None | False | None | False | 87773.952 | 0 | 3561942 | 129074 | None | VOL I 1.12 | Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery and other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth)
Common SOR For Engineering Departments 2023 2024 ( Item No. VOL I 1.12 Page No.8). Rates are inclusive of 18% GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 145.64 | 145.64 | 150.0 | False | None | None | False | None | False | 21846.0 | 0 |
| 1721461183000 | 1 | None | None | Roads | Improvements to SH-27 Virajpete-Byndoor road from Ch335.4 KM to 374.40 KM (in selected reaches) in Kundapura Taluk of Udupi District.-5th Year Maintrainced | 544378.44 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3561943 | 129075 | None | VOL III 2.5 ii B | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in charge of the work In area of thorny jungle
PWD SOR for Roads and Bridges 2023 24 ( Item No. VOL III 2.5 ii B Page No.9). Rates are inclusive of 18% GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 623.26 | 623.26 | 43.2 | False | None | None | False | None | False | 26924.832 | 0 | 3561944 | 129075 | None | VOL I 16.19 | Maintenance of Drains
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads and Bridges 2023 24 ( Item No. VOL I 16.19 Page No.147). Rates are inclusive of 18% GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 9.51 | 9.51 | 2376.0 | False | None | None | False | None | False | 22595.76 | 0 | 3561945 | 129075 | None | VOL III 10.3 | Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads and Bridges 2023 24 ( Item No. VOL III 10.3 Page No.91). Rates are inclusive of 18% GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 61.85 | 61.85 | 267.3 | False | None | None | False | None | False | 16532.505 | 0 | 3561946 | 129075 | None | VOL III 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads and Bridges 2023 24 ( Item No. VOL III 10.2 Page No.91). Rates are inclusive of 18% GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 153.83 | 153.83 | 1782.0 | False | None | None | False | None | False | 274125.06 | 0 | 3561947 | 129075 | None | VOL III 10.5 | KSRRB 3000 Filling Pot holes and Patch Repairs and attending to RavellingRuttingEdge Breaking with Bituminous Concrete, 40 mm KSRRB Cum000 5. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, applying tack coat on the sides and base of excavation at 2.5kg1Osqm as per clause 500.3, filling back the pot holes with hot bituminous material as per clause 500.4, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3004.2 (PWD, Bangalore, SR2018 19 Page No.259. Item No.35.5)(If there are pot holes on the road) Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads and Bridges 2023 24 ( Item No. VOL III 10.5 Page No.91). Rates are inclusive of 18% GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 675.6 | 675.6 | 268.8 | False | None | None | False | None | False | 181601.28 | 0 | 3561948 | 129075 | None | VOL I 1.12 | Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery and other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth)
Common SOR For Engineering Departments 2023 2024 ( Item No. VOL I 1.12 Page No.8). Rates are inclusive of 18% GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 150.66 | 150.66 | 150.0 | False | None | None | False | None | False | 22599.0 | 0 |
| 1721461183000 | 0 | None | None | Roads | Improvements to SH-27 Virajpete-Byndoor road from Ch335.4 KM to 374.40 KM (in selected reaches) in Kundapura Taluk of Udupi District.-6th Year Renewal | 16193072.83 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3561949 | 129076 | None | VOL III 5.3 | Tack coat on Bituminous surface
Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom
PWD SOR for Roads & Bridges 2023 24 ( Item No. VOL III 5.3 Page No.31). (Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 19.67 | 19.67 | 26880.0 | False | None | None | False | None | False | 528729.6 | 0 | 3561950 | 129076 | None | VOL III 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10 97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/ 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/ 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/ 2 mm and height not less than 30+/ 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro reflectance of the reflecting panel, to the Engineer.
Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads & Bridges 2023 24 ( Item No. VOL III 8.43 Page No.74).(Rates are inclusive of 18% GST). ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 598.16 | 598.16 | 622.0 | False | None | None | False | None | False | 372055.52 | 0 | 3561951 | 129076 | None | VOL III 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads & Bridges 2023 24 ( Item No. VOL III 8.15 Page No.67). (Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 868.56 | 868.56 | 912.0 | False | None | None | False | None | False | 792126.72 | 0 | 3561952 | 129076 | None | VOL III 8.10 | KSRRB M800 6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads & Bridges 2023 24 ( Item No. VOL III 8.10 Page No.66). (Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 178.63 | 178.63 | 63.6 | False | None | None | False | None | False | 11360.868 | 0 | 3561953 | 129076 | None | VOL III 16.24 (i) | Maintenance of 200 metre and km stones Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 (Panchayat Raj SR 2018 19 Bangalore circle item 15.11 page no 121 i) Painting two coats with synthetic enamel paint (I No. 15.11.i) Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads & Bridges 2023 24 ( Item No. VOL III 16.24 (i) Page No.148). (Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 337.59 | 337.59 | 3.6 | False | None | None | False | None | False | 1215.324 | 0 | 3561954 | 129076 | None | VOL III 16.22 | Maintenance of Road Signs Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (Panchayat road SR 2018 19 Bangalore Circle Item no 15.9 page no 121) Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads & Bridges 2023 24 ( Item No. VOL III 16.22 Page No.147). (Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 3251.35 | 3251.35 | 3.6 | False | None | None | False | None | False | 11704.86 | 0 | 3561955 | 129076 | None | VOL III 5.16 C | Bituminous Concrete Grading II for traffic 20 MSA
Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG 30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects, complete as directed as per the specification and direction of Engineer in charge of the work
PWD SOR for Roads & Bridges 2023 24 ( Item No. VOL III 5.16 C Page No.38). (Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 17951.24 | 17951.24 | 806.4 | False | None | None | False | None | False | 14475879.936 | 0 |
| 1721461183000 | 0 | None | None | Roads | Improvements to SH-27 Virajpete-Byndoor road from Ch335.4 KM to 374.40 KM (in selected reaches) in Kundapura Taluk of Udupi District-Drain works | 3458202.71 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3561956 | 129077 | None | VOL-I-1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the Work . In all kinds of soils Depth upto 3 m
MORTH Specification No. 304 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the work
Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.14.1 Page No.8) (Rates are inclusive of 18% GST)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 134.8 | 134.8 | 624.0 | False | None | None | False | None | False | 84115.2 | 0 | 3561957 | 129077 | None | VOL-I-2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates. complete as directed as per the specification and direction of Engineer-in-charge of the work
Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.1.3 Page No.15)
(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7915.06 | 7915.06 | 66.0 | False | None | None | False | None | False | 522393.96 | 0 | 3561958 | 129077 | None | VOL-I-2.4.2 (35percent for Drain Centring) | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (M 20) Using 20 mm nominal size graded crushed coarse aggregate (35% for Drain centring)
Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.4.2 (35% for Drain Centring) Page No.16)
(Rates are inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 11281.24 | 11281.24 | 182.25 | False | None | None | False | None | False | 2056005.99 | 0 | 3561959 | 129077 | None | VOL I 2.11 h | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer in charge of the work
Common SOR For Engineering Departments 2023 2024 ( Item No. VOL I 2.11 h Page No.18) Rate is inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | t | 104420.94 | 104420.94 | 7.62 | False | None | None | False | None | False | 795687.5628 | 0 |
|
|
---|