noticeInvitingTenderDTO
createdTs1721554069805
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee750.00
emd60000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose07-08-2024 16:30:00
tenderQueryClose29-07-2024 17:00:00
technicalBidOpen08-08-2024 17:00:00
publishedDate21-07-2024 18:25:26
publishedByPostTP_CO_GUB
publishedByUserKPE17246 - MANJULADEVI
bidValidityPeriod180
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonBINDUSARA TS
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9035946482
tenderSupplierListNone
tenderSchedule
createdTs1721554069838
version7
createdDateNone
modifiedDateNone
tenderNumberDMA/2024-25/BD/WORK_INDENT22656
titleConstruction of Proposed 3 TPD MRF Centre (Material Recovery Facility) of PEB Structure (PRIMARY SHED) At Gubbi Town Panchayath Limits Under SBM 2.0
descriptionConstruction of Proposed 3 TPD MRF Centre (Material Recovery Facility) of PEB Structure (PRIMARY SHED) At Gubbi Town Panchayath Limits Under SBM 2.0
categoryWORKS
categoryTextWorks
ecv3000000.00
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2408
locationNameDMA Town Panchayat Gubbi
provisionalAmount3000000.0
groupOverheadTotal54335.58
fileNumberTP/GUB/15FG/SWM/CR/01/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17215540700000NoneNoneBuildingsConstruction of Proposed 3 TPD MRF Centre (Material Recovery Facility) of PEB Structure (PRIMARY SHED) At Gubbi Town Panchayath Limits Under SBM 2.02945664.42
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3571438129734NonePWD CSR 2023-24, VOL-1, Page No -8, I No 1.14.1KSRB 1-1.14.1: Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. (I No. 1.14.1 Page No. 8 Vol.1 PWD SR) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Cum123.97123.9729.406FalseNoneNoneFalseNoneFalse3645.461820
3571439129734NonePWD CSR 2023-24, VOL-1, Page -15, I No 2.1.2KSRB 2-2.1.2: Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates (The cost of steel reinforcement & formwork shall be paid separately. Specification No. KBS 2.1, (I No. 2.1.2 Page No. 15 Vol.1 PWD SR) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Cum6884.026884.0228.9702FalseNoneNoneFalseNoneFalse199431.4362040
3571440129734NonePWD CSR 2023-24, VOL-1, Page -16, I No 2.3.2KSRB 2-2.3.2:Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately). M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Specification No. KBS 2.3., 2.3 (I No. 2.3.2 Page No. 16 Vol.1 PWD SR & Appendix I page No.115) FOOTING ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Cum7875.797875.797.12FalseNoneNoneFalseNoneFalse56075.62480
3571441129734NonePWD CSR 2023-24, VOL-1, Page -16, I No 2.3.2KSRB 2-2.3.2:Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately). M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Specification No. KBS 2.3., 2.3 (I No. 2.3.2 Page No. 16 Vol.1 PWD SR & Appendix I page No.115) COLUMN ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Cum7875.797875.791.63FalseNoneNoneFalseNoneFalse12837.53770
3571442129734NonePWD CSR 2023-24, VOL-1, Page -16, I No 2.3.2KSRB 2-2.3.2:Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately). M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Specification No. KBS 2.3., 2.3 (I No. 2.3.2 Page No. 16 Vol.1 PWD SR & Appendix I page No.115) HALL GRADE SLAB ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Cum7875.797875.7928.62FalseNoneNoneFalseNoneFalse225405.10980
3571443129734NoneAppendix I page No.115Formwork As per the Recommendation of Technical working group rates for formwork shall be added on percentage basis to the finished concrete item rate. For Footing works consider 8% of item concrete rate FOOTING ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Cum611.71611.717.116FalseNoneNoneFalseNoneFalse4352.928360
3571444129734NoneAppendix I page No.115Formwork As per the Recommendation of Technical working group rates for formwork shall be added on percentage basis to the finished concrete item rate. For Column works consider 70% of item concrete rate COLUMN ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Cum5352.485352.481.63FalseNoneNoneFalseNoneFalse8724.54240
3571445129734NoneAppendix I page No.115Formwork As per the Recommendation of Technical working group rates for formwork shall be added on percentage basis to the finished concrete item rate. For Slab works consider 8% of item concrete rate HALL GRADE SLAB ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Cum611.71611.7128.62FalseNoneNoneFalseNoneFalse17507.14020
3571446129734NonePWD CSR 2023-24, VOL-1, Page -15, I No 2.2.3KSRB 2-2.2.3.1 :Providing and laying in Reinforced cement concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately). M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (I No. 2.2.3 Page No. 15 Vol.1 PWD SR & Appendix I page No.115) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Cum7700.777700.774.82FalseNoneNoneFalseNoneFalse37117.71140
3571447129734NonePWD CSRAppendix I page No.115Formwork As per the Recommendation of Technical working group rates for formwork shall be added on percentage basis to the finished concrete item rate. For Plinth Beam works consider 50% of item concrete rate PLINTH BEAM ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Cum3738.243738.244.82FalseNoneNoneFalseNoneFalse18018.31680
3571448129734NonePWD SRRB 2023-24, VOL-1, Page -18, I No 2.11KSRB 2.11 Steel Fabrication: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening,cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. (I No. 2.11 Page No. 18 Vol.1 PWD SR) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Tonne108726.03108726.032.4171FalseNoneNoneFalseNoneFalse262801.6871130
3571449129734NonePWD CSR 2023-24, VOL-2, Page -9, I No 5.4KSRB 5-5.4: Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) . (I No. 5.4 Page No. 9 Vol.2 PWD SR) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Cum7765.197765.1916.6701FalseNoneNoneFalseNoneFalse129446.4938190
3571450129734NonePWD SRB 2023-24, VOL-1, Page -07, I No 1.8KSRB 1-1.8: Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work (I No. 1.8 Page No. 7 Vol.1 PWD SR) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Cum559.32559.32128.79FalseNoneNoneFalseNoneFalse72034.82280
3571451129734NonePWD CSR 2023-24, VOL-2, Page No -17, I No 6.33KSRB 6-6.33: Providing and constructing load bearing wall with Solid Concrete blocks of size 400x150x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. (I No. 6.33 Page No. 17 Vol.2 PWD SR) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Sqm1496.151496.1591.078FalseNoneNoneFalseNoneFalse136266.34970
3571452129734NonePWD CSR 2023-24, VOL-2, Page No -41, I No 8.2.1KSRB 8-8.3.1: Providing 15mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(I No. 8.3.1, Page No. 41, Vol.2) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Sqm358.54358.54187.56FalseNoneNoneFalseNoneFalse67247.76240
3571453129734NonePWD SRRB 2023-24, VOL-2, Page -77, I No 11.2Providing and fixing Structural Steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-inCharge. (I No. 11.2, Page No. 77, Vol.2) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Kgs137.34137.346130.0FalseNoneNoneFalseNoneFalse841894.20
3571454129734NonePWD SRRB 2023-24, VOL-3, Page -26, I No 7.38Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+0.05 %) total coated thickness with zinc coating 120 g/m2 as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 m or as desired by Engineerin-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. (I No. 7.38, Page No. 26, Vol.2) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Sqm690.35690.35518.21FalseNoneNoneFalseNoneFalse357746.27350
3571455129734NonePWD SRRB 2023-24, VOL-2, Page -50, I No 8.51KSRB 8-8.51 : Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge.(I No. 8.51, Page No. 50, Vol.2) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Sqm121.54121.54187.56FalseNoneNoneFalseNoneFalse22796.04240
3571456129734NonePWD SRRB 2023-24, VOL-2, Page -50, I No 8.54.1KSRB 8-8.54.1 : Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. One coat as per specifications and as per directions of Engineer in charge.(I No. 8.54.1, Page No. 50, Vol.2) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Nos88.7288.7291.08FalseNoneNoneFalseNoneFalse8080.61760
3571457129734NonePWD SRB 2023-24, VOL-2, Page -42, I No 8.54.1KSRB 8-8.54.1 : Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. One coat as per specifications and as per directions of Engineer in charge.(I No. 8.54.1, Page No. 50, Vol.2) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Nos88.7288.7291.08FalseNoneNoneFalseNoneFalse8080.61760
3571458129734NonePWD CSR 2023-24, VOL-2, Page No -76, I No 11.6.1KSRB 11-11.6.1:Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters. 80x1.25 mm M.S. laths with 1.25 mm thick top cover including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (I No. 11.6.1, Page No. 76, Vol.2) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Sqm3200.143200.149.0FalseNoneNoneFalseNoneFalse28801.260
3571459129734NonePWD CSR 2021-22, VOL-2, Page No -77, I No 11.8.4KSRB 11-11.8.4:Extra for providing 2 HP Mild Steel Auto Reverse Shutter Gearbox for operating rolling shutters including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.(I No. 11.8.4, Page No. 77, Vol.2) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Nos30003.3630003.361.0FalseNoneNoneFalseNoneFalse30003.360
3571460129734NoneKUWS&DB 2023-24, VOL-2, Page -87, I No 11.35.1.1KSRB 11-11.35.1.1:Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate sections and other sections of approved make conforming to IS: 733 and IS:1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing, paneling and dash fasteners to be paid for separately) :For Fixed Portion: Powder coated aluminium (minimum thickness of powder coating 50 micron) including cost of materials, labour, usage charges of machinery complete as per specifications..(I No. 11.35.1.1, Page No. 87, Vol.2) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Kg549.36549.36240.0FalseNoneNoneFalseNoneFalse131846.40
3571461129734NonePWD Electrical 2023-24, VOL-6, Page -4, I No 1.1.3Supplying heavy gauge PVC conduit pipe 32 dia 2 mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc , and fixing using inverted wood plugs in case of RCC ceiling and RCC wall/ stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws..(I No. 1.1.3, Page No.4,PWD Electrical SR Vol-06) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.m128.83128.83325.0FalseNoneNoneFalseNoneFalse41869.750
3571462129734NonePWD Electrical 2023-24, VOL-6, Page -6, I No 2.5.1Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS 8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100 Volts as per IS-694:1990 .(I No. 2.5.1, Page No.6,PWD Electrical SR Vol-06)3C X 4 mm2 ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.m209.05209.05325.0FalseNoneNoneFalseNoneFalse67941.250
3571463129734NonePWD Electrical 2023-24, VOL-6, Page -8, I No 3.4.5Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 8 Way (I No. 3.4.5, Page No.8,PWD Electrical SR Vol-06) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Each317.21317.218.0FalseNoneNoneFalseNoneFalse2537.680
3571464129734NonePWD Electrical 2023-24, VOL-6, Page -8, I No 3.5.5Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 8 Module (I No. 3.5.5, Page No.8,PWD Electrical SR Vol-06) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Each345.17345.178.0FalseNoneNoneFalseNoneFalse2761.360
3571465129734NonePWD Electrical 2023-24, VOL-6, Page -9, I No 3.13Supplying and fixing of metal clad industrial plugs and sockets. ,(I No. 3.13.1, Page No.9,PWD Electrical SR Vol-06) 2pole+earth 250V PLUG 16A ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Each471.28471.284.0FalseNoneNoneFalseNoneFalse1885.120
3571466129734NonePWD Electrical 2023-24, VOL-6, Page -9, I No3.13.2Supplying and fixing of metal clad industrial plugs and sockets. ,(I No. 3.13.2, Page No.9,PWD Electrical SR Vol-06) 2pole+earth 250V PLUG 32A ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Each666.13666.134.0FalseNoneNoneFalseNoneFalse2664.520
3571467129734NonePWD Electrical 2023-24, VOL-6, Page -9, I No3.13.3Supplying and fixing of metal clad industrial plugs and sockets. ,(I No. 3.13.3, Page No.9,PWD Electrical SR Vol-06) 3pole+earth 440V PLUG 16A ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Each549.51549.514.0FalseNoneNoneFalseNoneFalse2198.040
3571468129734NonePWD Electrical 2023-24, VOL-6, Page -9, I No3.13.4Supplying and fixing of metal clad industrial plugs and sockets. ,(I No. 3.13.4, Page No.9,PWD Electrical SR Vol-06) 3pole+earth 440V PLUG 32A ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Each741.22741.224.0FalseNoneNoneFalseNoneFalse2964.880
3571469129734NonePWD Electrical 2023-24, VOL-6, Page -9, I No3.13.5Supplying and fixing of metal clad industrial plugs and sockets. ,(I No. 3.13.5, Page No.9,PWD Electrical SR Vol-06) 2pole+earth 250V SOCKET 16A ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Each645.34645.344.0FalseNoneNoneFalseNoneFalse2581.360
3571470129734NonePWD Electrical 2023-24, VOL-6, Page -9, I No3.13.6Supplying and fixing of metal clad industrial plugs and sockets. ,(I No. 3.13.6, Page No.9,PWD Electrical SR Vol-06) 2pole+earth 250V SOCKET 32A ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Each810.72810.724.0FalseNoneNoneFalseNoneFalse3242.880
3571471129734NonePWD Electrical 2023-24, VOL-6, Page -9, I No3.13.7Supplying and fixing of metal clad industrial plugs and sockets. ,(I No. 3.13.7, Page No.9,PWD Electrical SR Vol-06) 3pole+earth 440V SOCKET 16A ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Each770.29770.294.0FalseNoneNoneFalseNoneFalse3081.160
3571472129734NonePWD Electrical 2023-24, VOL-6, Page -9, I No3.13.8Supplying and fixing of metal clad industrial plugs and sockets. ,(I No. 3.13.8, Page No.9,PWD Electrical SR Vol-06) 3pole+earth 440V SOCKET 32A ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Each1006.131006.134.0FalseNoneNoneFalseNoneFalse4024.520
3571473129734NonePWD Electrical 2023-24, VOL-6, Page -10, INo3.14.1Supplying And fixing/replacing of 6/16/32A electrical accessories on existing switch board,(I No. 3.14.1, Page No.10,PWD Electrical SR Vol-06) 6A SP Switch ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Nos66.8466.8434.0FalseNoneNoneFalseNoneFalse2272.560
3571474129734NonePWD Electrical 2023-24, VOL-6, Page -10, INo3.14.3Supplying And fixing/replacing of 6/16/32A electrical accessories on existing switch board,(I No. 3.14.3, Page No.10,PWD Electrical SR Vol-06) 6A Three Way 5 Pin Socket ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Nos85.0885.087.0FalseNoneNoneFalseNoneFalse595.560
3571475129734NonePWD Electrical 2023-24, VOL-6, Page -10,INo3.14.10Supplying And fixing/replacing of 6/16/32A electrical accessories on existing switch board,(I No. 3.14.10, Page No.10,PWD Electrical SR Vol-06) 16A SP Switch ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Nos159.21159.218.0FalseNoneNoneFalseNoneFalse1273.680
3571476129734NonePWD Electrical 2023-24, VOL-6, Page -10,INo3.14.12Supplying And fixing/replacing of 6/16/32A electrical accessories on existing switch board,(I No. 3.14.12, Page No.10,PWD Electrical SR Vol-06) 16A Three Way 5 Pin Socket ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Nos139.77139.779.0FalseNoneNoneFalseNoneFalse1257.930
3571477129734NonePWD Electrical 2023-24, VOL-6, Page -10,INo3.14.14Supplying And fixing/replacing of 6/16/32A electrical accessories on existing switch board,(I No. 3.14.14, Page No.10,PWD Electrical SR Vol-06) 32A Bakelite DP ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Nos281.97281.978.0FalseNoneNoneFalseNoneFalse2255.760
3571478129734NonePWD Electrical 2023-24, VOL-6, Page -10,INo3.14.15Supplying And fixing/replacing of 6/16/32A electrical accessories on existing switch board,(I No. 3.14.15, Page No.10,PWD Electrical SR Vol-06) 16/6A combined plug and socket with control switch ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Nos264.95264.958.0FalseNoneNoneFalseNoneFalse2119.60
3571479129734NonePWD Electrical 2023-24, VOL-6, Page -17,INo 5.18.1Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898.,6-32 A SP(I No. 5.18.1, Page No.17,PWD Electrical SR Vol-06) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Each504.39504.398.0FalseNoneNoneFalseNoneFalse4035.120
3571480129734NonePWD Electrical 2023-24, VOL-6, Page -9, I No 3.8Supplying 4mm thick plastic sheet with necessary nitches for fixing switches, regulators etc, and fixing on existing wooden or metal box using N.F. screws,(I No. 3.8, Page No.9,PWD Electrical SR Vol-06) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Sqm0.490.494800.0FalseNoneNoneFalseNoneFalse2352.00
3571481129734NonePWD Electrical 2023-24, VOL-6, Page -16, INo5.15.8Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuitwith adjustable thermal magnetic release, Micro processor release shall have Earth Fault as per IS/IEC 60947-2 . (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism. 400 A 50 kA (I No. 5.15.8, Page No.16,PWD Electrical SR Vol-06) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Each30505.3230505.321.0FalseNoneNoneFalseNoneFalse30505.320
3571482129734NonePWD Electrical 2023-24, VOL-6, Page -16, INo5.17.1Supplying and fixing regular MCCB distribution Panel confirming to IS/IEC 61439 - 3 and IK09 tested as per IS/IEC 62262 with minimum IP43 protection provided with Polyurethane (PUR) gasket, with suitable earthing system, on wall/wood board/flush mounting using required cl A , bolts, nuts, etc., with provision for fixing of suitable type capacity MCCB's as an incomer for 3 phase Double door with necessary bus bar completely wired to use on 440V 3phase 4 wire powder coated painting etc., complete with a provision for fixing of single/three phase suitable capacity MCB's as outgoings confirming to IS/IEC 60898 - 2. 4 Way (I No. 5.17.1, Page No.16,PWD Electrical SR Vol-06) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Each12553.8612553.861.0FalseNoneNoneFalseNoneFalse12553.860
3571483129734NonePWD Electrical 2023-24, VOL-6, Page -21, INo5.46.1Supplying and fixing of Modular MCB Devices (Tripper) With Breaking capacity of 6kA 16 - 32 A SP (I No. 5.46.1, Page No.21,PWD Electrical SR Vol-06) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Each255.8255.88.0FalseNoneNoneFalseNoneFalse2046.40
3571484129734NonePWD Electrical 2023-24, VOL-6, Page -46, INo11.9.1Supply of LED floodlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate/clear glass material, delivering superior light output Rated life Burning Hrs 50000 hr at Lumen Maintenance of 70percentage, CCT morethan 5500K, IP 66 optical and electrical compartment & impact resistance of complete luminaire morethan IK08. Power Factor morethan 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mauling with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100 V to 270V 50/60Hz application. Compliance to IS 10322/ IEC 60598, LM 79 and LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with W System Power consumption. LED Efficiencymorethan1301m/w, nominal CRI morethan 75. Luminaire manufacturer should have in- house facility accredited by NABL / CPRI and any Government certified agency and Design and Development facility certified by ISO 9001:2008. Housing with supplier word mark / name shall be Engraved / Embossing on the die cast housing / Body part Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer and Cree/Nichia/ Lumileds/Osram make LED Source. (I No. 11.9.1, Page No.46,PWD Electrical SR Vol-06) LED Floodlight 70W ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.Each8225.828225.826.0FalseNoneNoneFalseNoneFalse49354.920
3571485129734NonePWD Electrical 2023-24, VOL-6, Page -542, INo 14.31.1 kV Class Armoured Aluminium Cable with glands/lugs/ferrules :4C x 70 Sq mm (I No. 14.3, Page No.542,PWD Electrical SR Vol-06) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.m658.75658.7526.0FalseNoneNoneFalseNoneFalse17127.50
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17215540710000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17215540710000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17215540710000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17215540710000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17215540710000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17215541340000NoneNoneELIGIBILITYAny discrepancy in the specification and unit of measurement the specification and unit given in Common SR issued by the PWD will prevail.None
17215541420000NoneNoneELIGIBILITYAll rates given in BOQ are inclusive of all taxes like GST etc., Bidder should quote including all taxes etc.None
17215541520000NoneNoneELIGIBILITYTurnover certificate from CA with valid UDIN No. to be furnished along with necessary documents.None
17215541610000NoneNoneELIGIBILITYCorrigendum / modifications / correction, if any, will be published in the e-portal only.None
17215541700000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17215541780000NoneNoneELIGIBILITYTenderers are required to read the Bid Documents carefully before submission of their bid.None
17215541880000NoneNoneELIGIBILITYAny discrepancies observed in the documents uploaded by the tenderer the tender shall liable to rejected.None
17215541970000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt., orders as may be modified from time to time.None
17215551970000NoneNoneELIGIBILITYAs per Karnataka State Government order No.LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27-07-2007, a sum amounting to 1%of the bill amount will be deducted towards Construction Labour Welfare fund.None
17215552220000NoneNoneELIGIBILITYThe Tenderer shall scan Original Work done certificates / Turnover Statements and any other documents specified by the employer and attach the scanned file to the Bid. The Original Documents shall be produced for physical verification within one week from the date of Technical bid opening.None
17215553640000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason or what so ever.None
17215553780000NoneNoneELIGIBILITYThe earnest money deposit will be forfeited if the documents submitted by the tenderer found to be misleading/forged or fake.None
17215553880000NoneNoneELIGIBILITYFinancial values of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2024-25.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneExecuted in any one year in the last five years i.e., 2019-20 to 2023-24, the following minimum quantities of work Earthwork excavation/ Embankment/ earthen shoulders-127 cum, Cement Concrete Plain& Reinforced-57Cum, Steel reinforcement and Structural Steel-6.83 Tonne, All types of Masonry (Stone /Brick /CC block etc,-13.40 Cum, All types of Roof AC, GI sheets etc- 415Sqm Submit Work done Certificate issued by the officer not below the rank of Executive Engineer or EquivalentPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTenderer in his name should have in the last five years i.e., 2019-20 to 2023-24, satisfactory completed, at atleastonesimilarworksuchas Construction of Shed/Building /PEB ofvaluenotlessthanRs.15.00 lakhs as prime contractor. Submit Work done Certificate issued by the officer not below the rank of Executive Engineer or EquivalentPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneClass-III and above Contractor Registration Certificate. Registration certificate issued by the officer not below the rank of chief Engineer or EquivalentCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneUnconditional Liquid assets and or availability of credit facilities of not less than Rs.9.00 Lakhs (Credit lines/ Submit letters of credit/ certificates from banks for meeting the fund requirement etc.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneTenderer in his name should have in the last five years i.e., 2019-20 to 2023-24, achieved in at least two financial years a minimum annual financial turnover of Rs 30.00 lakhs.- Submit Turnover certificate from CA with valid UDIN No. to be furnished along with necessary documentsAND Certified balance sheet issued by Charted accountant (With profit loss statement)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Tenderer in his name should have in the last five years i.e., 2019-20 to 2023-24, achieved in at least two financial years a minimum annual financial turnover of Rs 30.00 lakhs.- Submit Turnover certificate from CA with valid UDIN No. to be furnished along with necessary documentsAND Certified balance sheet issued by Charted accountant With profit loss statementTrueTechnical Bid
Class-III and above Contractor Registration Certificate. Registration certificate issued by the officer not below the rank of chief Engineer or EquivalentTrueTechnical Bid
Tenderer in his name should have in the last five years i.e., 2019-20 to 2023-24, satisfactory completed, at at least one similar work such as Construction of Shed/Building /PEB of value not less than Rs.15.00 lakhs as prime contractor. Submit Work done Certificate issued by the officer not below the rank of Executive Engineer or EquivalentTrueTechnical Bid
Executed in any one year in the last five years i.e., 2019-20 to 2023-24, the following minimum quantities of work Earthwork excavation/ Embankment/ earthen shoulders-127 cum, Cement Concrete Plain& Reinforced-57Cum, Steel reinforcement and Structural Steel-6.83 Tonne, All types of Masonry Stone /Brick /CC block etc,-13.40 Cum, All types of Roof AC, GI sheets etc- 415Sqm Submit Work done Certificate issued by the officer not below the rank of Executive Engineer or EquivalentTrueTechnical Bid
Unconditional Liquid assets and or availability of credit facilities of not less than Rs.9.00 Lakhs Credit lines/ Submit letters of credit/ certificates from banks for meeting the fund requirement etc.TrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
BuildingsTumakuruGubbiTumkurGUBBISWM PLANT GUBBINoneNoneNoneNoneNoneNone
tenderAddressNone
tenderRecallDTONone