createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1721297117797
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd928000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose09-08-2024 16:00:00
tenderQueryClose08-08-2024 17:30:00
technicalBidOpen12-08-2024 11:00:00
publishedDate22-07-2024 13:47:33
publishedByPostPWD_EE_DIV_KLR
publishedByUserKPE15402 - RAMAMURTHY K L
bidValidityPeriod90
noOfCalls1
preBidMeetingDate06-08-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonRamamurthy K.L.
splitEmdRequiredYnTrue
emdBankGuarantee828000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08152222022
mobileNumber9901202424
tenderSupplierListNone
tenderSchedule
createdTs1721297117833
version9
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/RD/WORK_INDENT11708
titleCONSTRUCTION OF FOUR LANES ROAD FROM NH-75 TO NH-75 VIA NARASAPURA TOWN LIMIT AT CH 2.35 TO 3.20 KM IN KOLAR TALUK
descriptionCONSTRUCTION OF FOUR LANES ROAD FROM NH-75 TO NH-75 VIA NARASAPURA TOWN LIMIT AT CH 2.35 TO 3.20 KM IN KOLAR TALUK
categoryWORKS
categoryTextWorks
ecv61882728.07
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1672
locationNamePWD Division Office Kolar
provisionalAmount70000000.0
groupOverheadTotal0.0
fileNumberAEE/PWD/KLR/5054/NH75/NARASAPURA/KOLAR/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17212971180000NoneNoneRoadsIMPROVEMENTS TO ROAD39826220.24
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3541907127871NoneVol-3,P. No:9 I.No:2.5(II BClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer In area of light jungle ( Vol-3,P. No:9 / I.No:2.5(II B) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.100 Sqm463.74463.7414.58FalseNoneNoneFalseNoneFalse6761.32920
3541908127871NoneVol-1,P. No:5 I.No:1.1Earth work in surface excavation for stripping, seating of bund, Road way, by manual means for lowering & leveling the ground for all works other than foundation & depth in all kinds of soil not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading,caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. ( Vol-1,P. No:5 / I.No:1.1) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Cum107.38107.382490.0FalseNoneNoneFalseNoneFalse267376.20
3541909127871NoneVol-3,P. No:15 I.No:3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead ( Vol-3,P. No:15 / I.No:3.5) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Sqm7.087.085301.56FalseNoneNoneFalseNoneFalse37535.04480
3541910127871NoneVol-1,P. No:8 I.No:1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ( Vol-1,P. No:8 / I.No:1.14.1) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Cum120.36120.361197.76FalseNoneNoneFalseNoneFalse144162.39360
3541911127871NoneVol-3,P. No:23 I.No:4.1 A vConstruction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material ( Vol-3,P. No:23 / I.No:4.1 A v) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Cum2934.662934.661152.2FalseNoneNoneFalseNoneFalse3381315.2520
3541912127871NoneVol-3,P. No:26 I.No:4.17Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density ( Vol-3,P. No:26 / I.No:4.17) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Cum3019.623019.622900.16FalseNoneNoneFalseNoneFalse8757381.13920
3541913127871NoneVol-3,P. No: 31 I.No:5.1A(i)Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90 kg per m2 using mechanical means. ( Vol-3,P. No: 31 / I.No:5.1A(i) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Sqm48.3848.3811210.62FalseNoneNoneFalseNoneFalse542369.79560
3541914127871NoneVol-3,P. No:32 I.No:5.10CProviding and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. ( Vol-3,P. No:32 / I.No:5.10C) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Cum10359.2210359.22560.54FalseNoneNoneFalseNoneFalse5806757.17880
3541915127871NoneVol-3,P. No: 43 I.No:5.33Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on Granular Surface. ( Vol-3,P. No: 43 / I.No:5.33) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Sqm17.717.711210.62FalseNoneNoneFalseNoneFalse198427.9740
3541916127871NoneVol-3,P. No:36 I.No:5.14CProviding and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.2 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. ( Vol-3,P. No:36/ I.No:5.14C) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Cum12538.6812538.68336.31FalseNoneNoneFalseNoneFalse4216883.47080
3541917127871NoneVol 1 P.7 I.No.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Cum140.42140.42260.51FalseNoneNoneFalseNoneFalse36580.81420
3541918127871NoneVol-1, P.15 I.No. 2.1.3Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates (Vol-1, P.15/2.1.3) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Cum7067.027067.0245.0FalseNoneNoneFalseNoneFalse318015.90
3541919127871NoneVol-1, P.15 2.2.1Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Vol-1, P.15/2.2.1) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Cum7418.667418.661050.0FalseNoneNoneFalseNoneFalse7789593.00
3541920127871NoneVol-1, P.8 2.11hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening,cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (Vol-1, P.8/2.11h) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.MT93232.9893232.985.25FalseNoneNoneFalseNoneFalse489473.1450
3541921127871NoneVol-3 P 66 8.10Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces(Vol-3/P 66 /8.10) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Sqm128.62128.62637.5FalseNoneNoneFalseNoneFalse81995.250
3541922127871NoneVol-3 P 52 6.8.3Providing and laying 100mm thick factory made precast M -40 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Traffic Axle load repetitions more than10MSA upto 20MSA for Industrial Streets, Bus & Truck parking of approved shape and colour, laid in required pattern and including over 40mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. WMM/WBM Base to be paid separately as per relevant technical specification)(Vol-3/P 52/6.8.3) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Sqm1534.01534.01650.0FalseNoneNoneFalseNoneFalse2531100.00
3541923127871NoneVol-3,P. No:67 - I.No:8.16(ii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast) ( Vol-3,P. No:67 / I.No:8.16(ii) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Nos3453.863453.862.0FalseNoneNoneFalseNoneFalse6907.720
3541924127871NoneVol-3,P. No:54 - I.No:8.5( iv)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary,mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 60 cm equilateral triangle ( Vol-3,P. No:54 / I.No:8.5( iv) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Each4200.84200.810.0FalseNoneNoneFalseNoneFalse42008.00
3541925127871NoneVol-3,P. No:55 - I.No:8.7Direction and Place Identification Signs upto 0.9 m2 Size Board.Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing ( Vol-3,P. No:55 / I.No:8.7) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Sqm9520.249520.242.7FalseNoneNoneFalseNoneFalse25704.6480
3541926127871NoneVol-3,P. No:67 - I.No:8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level,uniform and free from streaks and holes. ( Vol-3,P. No:67 / I.No:8.15) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Sqm625.4625.4340.8FalseNoneNoneFalseNoneFalse213136.320
3541927127871NoneVol-3 P.No.74 I.No. 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lensface and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside without nails and using epoxy resin based adhesive as permanufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. ( Vol-3 P.No.74 I.No. 8.43) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Each430.7430.7176.0FalseNoneNoneFalseNoneFalse75803.20
3541928127871NoneVol-3,P. No:67 I.No:8.17Supplying and installation of delineators (road way indicators,hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings. ( Vol-3,P. No:67 / I.No:8.17) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Each2384.782384.788.0FalseNoneNoneFalseNoneFalse19078.240
3541929127871NoneVol-3,P. No:91 I.No:10.53rd, 4th,5th years Maintaince Third Year Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth ontinuous surface, all as per clause 3004.2 ( Vol-3,P. No:91 / I.No:10.5) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Sqm502.68502.6857.46FalseNoneNoneFalseNoneFalse28883.99280
3541930127871NoneVol-3,P. No:91 I.No:10.53rd, 4th,5th years Maintaince Fourth Year Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth ontinuous surface, all as per clause 3004.2 ( Vol-3,P. No:91 / I.No:10.5) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Sqm502.68502.68114.91FalseNoneNoneFalseNoneFalse57762.95880
3541931127871NoneVol-3,P. No:91 I.No:10.53rd, 4th,5th years Maintaince Fourth Year Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth ontinuous surface, all as per clause 3004.2 ( Vol-3,P. No:91 / I.No:10.5) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Sqm502.68502.68172.36FalseNoneNoneFalseNoneFalse86641.92480
3541932127871NoneVol-3,P. No: 31 I.No:5.3(i)Sixth year Maintenance Tack coat on Bituminous surface Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom ( Vol-3,P. No: 31 / I.No:5.3(i) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Sqm14.1614.1611210.62FalseNoneNoneFalseNoneFalse158742.37920
3541933127871NoneVol-3,P. No:36 I.No:5.14CProviding and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.2 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. ( Vol-3,P. No:36/ I.No:5.14C) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Cum12538.6812538.68336.31FalseNoneNoneFalseNoneFalse4216883.47080
3541934127871NoneVol-3,P. No:67 I.No:8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level,uniform and free from streaks and holes. ( Vol-3,P. No:67 / I.No:8.15) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Sqm625.4625.4340.8FalseNoneNoneFalseNoneFalse213136.320
3541935127871NoneVol-3 P.No.74 I.No. 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lensface and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside without nails and using epoxy resin based adhesive as permanufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. ( Vol-3 P.No.74 I.No. 8.43) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Each430.7430.7176.0FalseNoneNoneFalseNoneFalse75803.20
17212971180000NoneNoneRoadsESTIMATE FOR RCC SIDE DRAIN19236056.68
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3541936127872NoneVol-1, P 8 - 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (Vol-1, P 8/1.14.1) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Cum120.36120.364030.0FalseNoneNoneFalseNoneFalse485050.80
3541937127872NoneVol-1, P.15 2.1.3Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates (Vol-1, P.15/2.1.3) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Cum7067.027067.02310.0FalseNoneNoneFalseNoneFalse2190776.20
3541938127872NoneVol-1, P.15 - 2.2.1Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Vol-1, P.15/2.2.1) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Cum7418.667418.661255.5FalseNoneNoneFalseNoneFalse9314127.630
3541939127872NoneVol-1, P.111 - 4Add Centering charges for Rcc drain (Vol-1, P.111/4) 35 Percent ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Cum2596.532596.53837.0FalseNoneNoneFalseNoneFalse2173295.610
3541940127872NoneVol-1, P.8 -2.11hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening,cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (Vol-1, P.8/2.11h) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.MT93232.9893232.9854.41FalseNoneNoneFalseNoneFalse5072806.44180
17212971180000NoneNoneRoadsElectrification Works Estimate2820451.15
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3541941127873None4.2.7Fabricating, supplying and erection of ms long hot dip Galvanized Octagonal hot dip Pole with BSEN 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangements, including suitable boards, Bakelite sheet and MCBs as per IS specifications suitable to withstand the wind speed of 47 m-s for m Pole in single section and single joint welded as per IS 9595- IS10178AWS having dimensions bottom mm, top mm with 3 mm thick, suitable base plate and 4Nos of long J bolts along with template and the Pole shall be hot dip galvanized in single dipping with not less than 65micron as per ASTM-A123 and 153 etc., (excluding foundation) as per drawing appended. 9 m - Top 70 mm and Bottom 155 mm dia 9 m - Top 70 mm and Bottom 155 mm dia ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Each23700.323700.332.0FalseNoneNoneFalseNoneFalse758409.60
3541942127873None4.6.5Supplying and fixing of Hot dip Galvanized M.S.Bracket suitable for out door luminaries and mounted on Octagonal pole using necessary bolts, nuts etc., complete. Double Arm Bracket with 1500 mm Standard 40-50 mm dia ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Each4010.824010.8232.0FalseNoneNoneFalseNoneFalse128346.240
3541943127873None11.8.4Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT greater than 5500K, IP66 optical and electrical compartment and impact resistance of complete luminaire greater than IK08. Power Factor greater than0.9 with mains, Surge Protection- Min 5KV along with Over voltage- Overload, short circuit- miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50-60Hz application. Compliance to IS 10322-IEC 60598, LM 79 and LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with W System Power consumption. LED Efficiencygreater than1301m-w, nominal CRI greater than75. Luminaire manufacturer should have in-house facility accredited by NABL-CPRI and any Government certified agency and Design and Development facility certified by ISO 9001-2008. Housing with supplier word mark -name shall be Engraved - Embossing on the die cast housing- Body part. Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer and Cree-Nichia- Lumileds-Osram make LED Source. (Make - Philips - Bajaj - Havells - Panasonic - Syska) LED Streetlight 90 W ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Nos10768.4410768.4464.0FalseNoneNoneFalseNoneFalse689180.160
3541944127873None13.5Fixing halogen-metal halide -SVL-IL-LED flood light fitting over existing pole - wall ceiling including clamp, bolts, nuts and wiring using suitable capacity wires. ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Each245.51245.5164.0FalseNoneNoneFalseNoneFalse15712.640
3541945127873None1.1.4Supplying heavy gauge PVC conduit pipe dia mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc and fixing using inverted wood plugs in case of RCC ceiling and RCC wall- stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws. (Make - VIP - Nandi - VI plast) 40 mm dia 2.5 mm thick ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Mtr181.09181.0940.0FalseNoneNoneFalseNoneFalse7243.60
3541946127873None2.3.4Wiring for lighting-power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694-confirming to latest amendments. (Make - Havells - Finolex - Anchor - Polycab - V-Gaurd) 4 mm2 ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Mtr76.5776.5750.0FalseNoneNoneFalseNoneFalse3828.50
3541947127873None2.5.8Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS 8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100V as per IS-694-2010 (Make -V-Gaurd - Universal - Polycab - Finolex) - 3C x 2.5 mm2 ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Mtr137.34137.34460.0FalseNoneNoneFalseNoneFalse63176.40
3541948127873None5.42.1Fabricating supplying and mounting MS box made out WG suitable for floor -wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamp with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., complete. - 14 SWG. ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Sq CM0.610.6150000.0FalseNoneNoneFalseNoneFalse30500.00
3541949127873None5.41.1Supplying and fixing angle iron frame work fabricated out of M.S. angle iron.. and M.S. Flat with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. 40 x 40 x 6 mm ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Mtr370.7370.74.0FalseNoneNoneFalseNoneFalse1482.80
3541950127873None5.41.3Supplying and fixing angle iron frame work fabricated out of M.S. angle iron and M.S. Flat with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. 75 x 75 x 6 mm ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Mtr674.55674.552.0FalseNoneNoneFalseNoneFalse1349.10
3541951127873None5.40.1Supplying A rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic-FRP-DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete 100 A 4 x 30 x 6 mm Aluminium Strips ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.m2995.962995.962.0FalseNoneNoneFalseNoneFalse5991.920
3541952127873None5.47Supplying and fixing Microprocessor based Electronic timer (without contactor, Din Mounting using necessary bolts, nuts and washers etc) 3-120 sec setting. (Make - ABB - Indo Asian - Havells - Schinder) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Sqm2813.652813.652.0FalseNoneNoneFalseNoneFalse5627.30
3541953127873None5.13.3Supply and fixing of 4pole power contactor with NO-NC contacts on existing wood-panel board using necessary bolts, nuts, washers and wiring etc., complete with AC-3 Rating and as per IS-13947. (Make - ABB - Indo Asian - Havells - Schinder ) - 60 A ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Each7231.637231.632.0FalseNoneNoneFalseNoneFalse14463.260
3541954127873None5.7.3Supplying and fixing of Porcelain fuse channel with cut out on existing wooden-panel using necessary nuts, bolts and washers. - 63 A ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Each487.38487.3812.0FalseNoneNoneFalseNoneFalse5848.560
3541955127873None3.9Supplying and fixing hylum plastic sheet 3mm thick with necessary nitches for fixing switches, regulators etc., and fixing on existing wood or metal box using N. F. screws. ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Sq CM0.430.434500.0FalseNoneNoneFalseNoneFalse1935.00
3541956127873None5.27Supplying, fixing and wiring rotary selector switch suitable for Ammeter ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Each243.08243.084.0FalseNoneNoneFalseNoneFalse972.320
3541957127873None5.28Supplying, fixing and wiring rotary selector switch suitable for Voltmeter ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Each194.46194.464.0FalseNoneNoneFalseNoneFalse777.840
3541958127873None5.30Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 20A single phase Class-1 Accuracy with Temper Proof Energy Meter. ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Each1677.251677.252.0FalseNoneNoneFalseNoneFalse3354.50
3541959127873None5.21Supplying, fixing and wiring earth leakage relay with core balanced current transformer suitable for single phase 50 Hz AC with latest micro controller based, digital readout of percentage leakage current, programmable delay-auto- manual reset facility suitable to mount on DIN rail- flush mounting on panel board. (Make - ABB - Indo Asian - Havells - Schinder ) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Each11248.5311248.532.0FalseNoneNoneFalseNoneFalse22497.060
3541960127873None5.18.4Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON- OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. (Make - ABB - Indo Asian - Havells - Schinder ) 6-32 A DP ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Each898.18898.1832.0FalseNoneNoneFalseNoneFalse28741.760
3541961127873None5.18.7Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and C Type curve, indicator ON- OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. (Make - ABB - Indo Asian - Havells - Schinder ) 6-32 A TPN ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Each2086.842086.842.0FalseNoneNoneFalseNoneFalse4173.680
3541962127873None5.18.8Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and C Type curve, indicator ON- OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. (Make - ABB - Indo Asian - Havells - Schinder ) 40 A TPN ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Each3699.683699.682.0FalseNoneNoneFalseNoneFalse7399.360
3541963127873None5.38Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230-440VAC. 50 Hz 12-24V D.C. ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Each625.93625.936.0FalseNoneNoneFalseNoneFalse3755.580
3541964127873NoneESCOM SR 2023-24 (Sl.No.-249 Item No.-35.01)Making and fixing of Epoxy Terminating Kit (Pothead) suitable for 1.1 kV, LTUG Cable as per BESCOM specification (BESCOM SR Page - 445) Up to 4C x 50 Sqmm ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Set393.79393.792.0FalseNoneNoneFalseNoneFalse787.580
3541965127873NoneESCOM SR 2023-24 (Sl.No.197 Item No - 32)Supplying of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 as per BESCOM specification. (Page - 443) (Make -V-Gaurd - Universal - Polycab - Finolex) 16 Sqmm, 4 Core, (11 GI Strips - 4 x 0.8 mm) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Km172394.77172394.770.95FalseNoneNoneFalseNoneFalse163775.03150
3541966127873NoneESCOM SR 2023-24 (Sl.No.197 Item No - 32)Supplying of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 as per BESCOM specification. (Page - 443) (Make -V-Gaurd - Universal - Polycab - Finolex) 25 Sqmm, 3.5 Core, (12 GI Strips - 4 x 0.8 mm) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Km169607.85169607.850.08FalseNoneNoneFalseNoneFalse13568.6280
3541967127873NoneESCOM SR 2023-24 (CDS-19)Labour charges for Laying of XLPE UG Cable Using Conventional Laying with Excavation of Soil (Page - 365) a) Cable trench excavation, 1000x 0.6x1 is equals to 600, Ordinary soil (Extracted from Vol-1, PWD SR Sl No. 1.17.1) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Cum318.43318.43618.0FalseNoneNoneFalseNoneFalse196789.740
3541968127873NoneESCOM SR 2023-24 (CDS-19)Labour charges for Laying of XLPE UG Cable Using Conventional Laying with Excavation of Soil (Page - 365) c) Refilling and consolidation (Extracted from Vol-1, PWD SR Sl No. 1.10) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Cum194.46194.46618.0FalseNoneNoneFalseNoneFalse120176.280
3541969127873NoneESCOM SR 2023-24 (Sl.No.-174 Item No.-Laying of Cabel in existing trench -GI Pipe-Stone ware -RCC Hume pipe using wooden-Aluminium rollersas directed by the departmental Staff. 2.5 to m25 Sqmm ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Km25384.8425384.841.03FalseNoneNoneFalseNoneFalse26146.38520
3541970127873NoneESCOM SR 2023-24 (CDS-1)Supplying and Fixing of Spiral Earth Electrode as per BESCOM Specification. (Page - 347) (239 and 93) ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Nos403.51403.5132.0FalseNoneNoneFalseNoneFalse12912.320
3541971127873None12.57Supplying fixing and wiring earth electrode for grounding of lifts, transformers, DG sets etc. using 40 mm dia 2.9 mm thick 2.5m long GI pipe with GI funnel with mesh and suitable size reducer fixed on the top of the earth electrode.The funnel should be enclosed in a CC chamber of 400x400x400 mm with a cast iron cover. The earth electrode shall have staggered holes of 12 mm dia and the electrode should be covered 150 mm all-round with alternate layers of salt and charcoal from the bottom of the CC chamber. The connection from the electrode is to be established through GI strip using GI bolts and nuts. ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Nos5172.745172.744.0FalseNoneNoneFalseNoneFalse20690.960
3541972127873NoneESCOM SR 2023-24 (Sl.No.-60 Item No.-8.01)Supplying of Guy Wire and GI Wire as per BESCOM Specification. (Page-435-436) 8 SWG GI Wire(4.064 mm Dia), Std Wt- 131 Kg-KM ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.MT91203.6291203.620.04FalseNoneNoneFalseNoneFalse3648.14480
3541973127873Nonecivil SR Vol 1 Page No.-5 Item No.- 1.4Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings and bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting and stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools and other appurtenaces required to complete the work. (Page-78) In all kinds of soils Depth upto 1.5 m ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Cum294.13294.139.17FalseNoneNoneFalseNoneFalse2697.17210
3541974127873Nonecivil SR Vol 1 Page No.-18 Item No.- 2.11Supplying, fitting and placing TMT FE 550-550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping-welding joints, tying with binding wire - soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. (Page - 91) All other type of structures ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.MT96029.9796029.970.655FalseNoneNoneFalseNoneFalse62899.630350
3541975127873NoneVol 1 Page No.-15 Item No.- 2.1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite-trap-basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead and lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. (Page. - 88) Mix 1-3-6 Using 40 mm nominal size graded crushed coarse aggregates ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Cum7279.037279.031.02FalseNoneNoneFalseNoneFalse7424.61060
3541976127873NoneVol 1 Page No.-15 Item No.- 2.2Providing and laying in position Cement Concrete for all Foundation works. The granite-trap-basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead and lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (Page. - 88) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Cum7641.227641.2225.09FalseNoneNoneFalseNoneFalse191718.20980
3541977127873NoneBWSSB SR 2023-24 Page - 113 Sl.No.-10.1Providing PVC ringtite pipes conforming to IS 4985-2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead and lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For- (Page-164) PVC pipes 63mm dia., 6 kg-sqcm and class 3 ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.m195.68195.68950.0FalseNoneNoneFalseNoneFalse185896.00
3541978127873NoneESCOM SR 2023-24 (Sl.No.-469 Item No.-60.01)Supplying of Aluminium End Terminal (Lug) as per BESCOM specification (Page - 457) 16 sqmm ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.Nos2.432.43256.0FalseNoneNoneFalseNoneFalse622.080
3541979127873NoneBWSSB SR 2023-24 Page - 127 Sl.No.-11.1Providing, Laying and Fixing of GI pipes conforming to IS 1239-1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For- Heavy Duty GI Pipe etc. complete. (Page - 178) Medium Duty GI pipe of 40mm dia - For Medium Duty GI pipe- ---- with all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges and all other incidental charges (Rates are inclusive of GST 18 percent) complete as per standard technical detailed specification and directions of the Engineer in charge of the work.m593.12593.1210.0FalseNoneNoneFalseNoneFalse5931.20
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17212971190000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17212971190000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17212971190001NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders The departments shall not be responsible for non-accessibility of e Procurement portal due to internet connectivity issues and technical glitches at bidders endNone
17212971190000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17212971190000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17212980600000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17212980680000NoneNoneELIGIBILITYConditional tenders will not be acceptedNone
17212980820000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costsNone
17212980940000NoneNoneELIGIBILITYThe tender processing fees shall not be refundable.None
17212981040000NoneNoneELIGIBILITYContractors Should be registered KPWD Class-1 civil contractorNone
17212981110000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt. orders.None
17212981190000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17212981280000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Executive Engineer reserves the right to verify the documents before approval.None
17212981360000NoneNoneELIGIBILITYThe employer reserves the rights to Reject or accept any or all the tenders without assigning any reasons.None
17212981430000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents KW-4 K.P.W.D. and further orders thereon.None
17212981540000NoneNoneELIGIBILITYIn the case of the death of the contractor after executing the agreement / commencement of the work, his legal heir, if is an eligible registered contractor and is willing can execute and compete the work at the accepted tender rates irrespective of the cost of the workNone
17212981740000NoneNoneELIGIBILITYContractor should carry out additional test required to test the suitability of materialsNone
17212981830000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity. Contractor should indemnify the client to that extent.None
17212981960000NoneNoneELIGIBILITYFormation levels and other data furnished are bare minimum the contractor should make all efforts to validate and to get additional data if required at his own costNone
17212982020000NoneNoneELIGIBILITYMaterials like steel cement etc., required for the work shell be procured by the tenderer themselves and should get tested by the quality control authority before use on the work at their own cost.None
17212982090000NoneNoneELIGIBILITYThe contractors assessed available tender capacity will be calculated as per the clause 3.6 of STD tender document Attached.None
17212982190000NoneNoneELIGIBILITYAll the items in the tender including all lead, lifts, loading unloading, transportation, labour, hire charges of machinery curing for concrete works, cost and conveyance of all material and all other such incidental charges (Inclusive of GST) necessary for successful completion of works as per the detailed technical specification and direction of Engineer - in charge of this work.None
17212982320000NoneNoneELIGIBILITYAll precautions should be taken by the contractor so that there are no damages to such public/private propertiesNone
17212982460000NoneNoneELIGIBILITYContractor should take all precautions to ensure that no damage is caused to the existing canal CD works and other similar structures which have been constructed by other agencies during project execution. If any damage is caused, it has to be rectified at his own risk and cost.None
17212982530000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act & The contractor should employ only registered labourers as per Govt. Circular No. PWD/198/BMS/2009/ Dated: 24-06-2009None
17212982640000NoneNoneELIGIBILITYContractor should adhere to HSE (Health safety environment) policy applicable for similar projects. Contractor to that extent should submit HSE document defining all the procedure including the policies before execution of the project.None
17212982780000NoneNoneELIGIBILITYContractor should take all precautionary measures to ensure that no damages caused to the existing structures which have been constructed by other agencies during project execution If any damages caused it has to be rectified at his own risk & costNone
17212983130001NoneNoneELIGIBILITYThe Defects Liability Period for this project shall be total 5 years (Five) (Initial 2 years DLP without any financial implications and subsequent 3 years DLP nominal maintenance should be carried out as per BOQ) & after 5th year Resurfacing.None
17212983260000NoneNoneELIGIBILITYWithin 20 days of the letter of acceptance, the successful tenderers shall deliver to the Employer a Security deposit in any of the forms given below for an amount equivalent to 5% of the Contract price plus additional security for unbalanced tenders in accordance with Clause 25.5 of ITT and Clause 44 of the Conditions of Contract.None
17212983340000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, PWD Division, Kolar during office hours on all working days.None
17212983410000NoneNoneELIGIBILITYThe Bankers certificate should be in prescribed format which is enclosed separatelyNone
17212983490000NoneNoneELIGIBILITYThe units specifications against the item codes in BOQ to be referred as per uni SR 2023-24 vol.1,2,3,5,6. The description in uni SR 2023-24 vol1,2,3,5,6 are final.None
17212983570000NoneNoneELIGIBILITYThe contractor shall be solely responsible for the safety of their staff and the general public on the site and shall observe all the precautionary and safety measures through the execution of the work.None
17212983640000NoneNoneELIGIBILITYAll Item Rates are inclusive of GST. Hence GST will not be paid separatelyNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSatisfactorily completed (at least 50%) as prime contractor at-least one such similar work of value not less than Rs. Rs. 310.00 Lakhs (50% of estimated cost of tender)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work (Earth work Excavation, Embankment & Earthen shoulders 6390.00 cum, Granular Sub-Base (GSB), Wet mix macadam (WMM) 3242.00 cum, Reinforced Cement Concrete (RCC) 2129.00 cum, Bituminous Base and Surface Course (DBM/BM/BC/SDBC) 718.00 cum, Plain Cement Concrete (PCC) 21.00 cum, Steel 49.00 MT etc) (50% of peak rate of construction)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneOwning the following key and critical equipment for this work (Hot mix plant/Batch Mix Plant (minimum capacity of 40/60 TPH 1 No. Static road roller 1 No. Vibratory road roller 1 No. Mechanical Paver finisher 1 No. Tippers 2 Nos.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- own machinery details
NoneNoneNoneNoneAchieved in at least two financial years a minimum FINANCIAL TURNOVER (in all classes of civil engineering construction works only) of Rs. 1238.00 LAKHSFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. 206.00 Lakhs (estimated cash flow for 3 months of peak construction period)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearOthersNot Required
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- not required
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearOthersNot Required
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- not required
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)OthersNot Required
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- not required
NoneNoneNoneNoneList of existing commitments and ongoing worksOthersB value certificate
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- B value certificate
NoneNoneNoneNoneList of works for which tenders already submittedOthersNot Required
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- not required
NoneNoneNoneNoneBanker Details for referenceOthersBanker details
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bank phone Number, mail ID etc.,
NoneNoneNoneNoneConstruction equipment on hire or lease by the tenderer and equipment proposed to be deployed on this contract, if awarded Wet Mix Plant or Pugmill 1 No. Truck mounted Bitumen Sprayer 1 No. Motor Grader 1 No. Excavator 0.90 cum Bucket capacity 1 No. Tipper Trucks 2 No. Self-Loading Concrete mixer 2m3 capacity 1 No. Water tanker 2 NosOthersequipment on hire or lease
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- equipment on hire or lease
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditors reports for the last five yearsOthersprofit and loss statements and auditors reports for the last five years
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- profit & loss statement
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedOthersNot Required
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- not required
NoneNoneNoneNoneList of Financial Resources with CertificatesOthersNot Required
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- not required
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
PWD Registration CertificateTrueTechnical Bid
Work done certificate issued by not below the rank of Executive EngineerTrueTechnical Bid
GST certifkcateTrueTechnical Bid
Line of creditTrueTechnical Bid
B value certificateTrueTechnical Bid
own & lease equipmentsTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
RoadsKolarKolarKolarKOLARNH75-NH75 VIA NARASAPURANoneNoneNoneNoneNoneNone
RoadsKolarKolarKolarKOLARNH-75 TO NH-75 VIA NARASAPURANoneNoneNoneNoneNoneNone
tenderAddress
createdTs1721366789000
version0
createdDateNone
modifiedDateNone
blockNumberO/o Executive Engineer, PWD Division, near court circle, Kolar
streetNone
cityKolar
stateKarnataka
pin563101
tenderRecallDTONone