createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1721740106866
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd2868000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose07-08-2024 16:30:00
tenderQueryClose29-07-2024 17:00:00
technicalBidOpen09-08-2024 11:30:00
publishedDate24-07-2024 19:08:56
publishedByPostKIADB_CE_HOD_BNG
publishedByUserKPE10847 - VEERABADRAIAH B R
bidValidityPeriod90
noOfCalls1
preBidMeetingDate30-07-2024 12:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonTechnical Assistant
splitEmdRequiredYnTrue
emdBankGuarantee2768000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022265383
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1721740106904
version4
createdDateNone
modifiedDateNone
tenderNumberKIADB/2024-25/OW/WORK_INDENT154
titleSupplying, laying, testing and commissioning of dual water supply pipe line networks for supplying potable & recycled water and UGD Network with suitable pipe lines, construction of chambers, etc. at Phase-3 of Dharwad Industrial node at Dharwad Taluk and District (2nd call)
descriptionSupplying, laying, testing and commissioning of dual water supply pipe line networks for supplying potable & recycled water and UGD Network with suitable pipe lines, construction of chambers, etc. at Phase-3 of Dharwad Industrial node at Dharwad Taluk and District (2nd call)
categoryWORKS
categoryTextWorks
ecv286784750.12
deptNameKarnataka Industrial Areas Development Board
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location5699
locationNameKIADB Head Office Bangalore
provisionalAmount286786000.0
groupOverheadTotalNone
fileNumber197/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17217401070000NoneNoneOther WorksSupplying, laying, testing and commissioning of dual water supply pipe line networks for supplying potable & recycled water and UGD Network with suitable pipe lines, construction of chambers, etc. at Phase-3 of Dharwad Industrial node at Dharwad Taluk and District (2nd call)286784750.12
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3592579130821Nonecode01WATER SUPPLY : Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.all kinds of soil. Depth upto 1.50m -10% of total quantity complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum321.53321.5324594.97FalseNoneNoneFalseNoneFalse7908020.70410
3592580130821Nonecode02Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata.. Ordinary/soft rock (without requiring blasting) Depth upto 1.50 m complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum562.51562.516148.74FalseNoneNoneFalseNoneFalse3458727.73740
3592581130821Nonecode03Manufacturing, providing, trasporting, rolling, lowering, laying, jointing and commissioning of ERW (Electric Resistance Welded)/ SAW (Submerged Arc Welded) MS pipes of Outer dia (Fe-410 grade) conforming to IS 3589-2001 with latest amendments, including perfect linking and welding of joints to correct position, cost of the pipes, conveyance, lead, lift charges, cost of all labour and giving satisfactory hydraulic test as per IS 3589-2001 with latest amendments for test pressure and working pressure both at factory and site etc. complete as per detailed specifications inside with CM 1:1.5 lining of minimum 10mm thick for pipes upto 610mm OD and with minimum 12mm thick beyond 610mm OD and out side with minimum 25mm thick coating in CM 1:3 over 50 x 50mm weld mesh of 13 gauge, including loading and unloading of pipes for the following diameters and specified thickness of plate as noted below, including bailing out of water wherever necessary. (Contractor will make his own arrangements for procuring water for testing). 273mm Dia 5.6mm thick complete with all lead and lift etc, as per specification and as per directed by the Engineer in Chargem6222.266222.26751.0FalseNoneNoneFalseNoneFalse4672917.260
3592582130821Nonecode04Manufacturing, providing, trasporting, rolling, lowering, laying, jointing and commissioning of ERW (Electric Resistance Welded)/ SAW (Submerged Arc Welded) MS pipes of Outer dia (Fe-410 grade) conforming to IS 3589-2001 with latest amendments, including perfect linking and welding of joints to correct position, cost of the pipes, conveyance, lead, lift charges, cost of all labour and giving satisfactory hydraulic test as per IS 3589-2001 with latest amendments for test pressure and working pressure both at factory and site etc. complete as per detailed specifications inside with CM 1:1.5 lining of minimum 10mm thick for pipes upto 610mm OD and with minimum 12mm thick beyond 610mm OD and out side with minimum 25mm thick coating in CM 1:3 over 50 x 50mm weld mesh of 13 gauge, including loading and unloading of pipes for the following diameters and specified thickness of plate as noted below, including bailing out of water wherever necessary. (Contractor will make his own arrangements for procuring water for testing). 457mm Dia 5.6mm thick complete with all lead and lift etc, as per specification and as per directed by the Engineer in Chargem10446.0110446.0130.47FalseNoneNoneFalseNoneFalse318289.92470
3592583130821Nonecode05Manufacturing, providing, trasporting, rolling, lowering, laying, jointing and commissioning of ERW (Electric Resistance Welded)/ SAW (Submerged Arc Welded) MS pipes of Outer dia (Fe-410 grade) conforming to IS 3589-2001 with latest amendments, including perfect linking and welding of joints to correct position, cost of the pipes, conveyance, lead, lift charges, cost of all labour and giving satisfactory hydraulic test as per IS 3589-2001 with latest amendments for test pressure and working pressure both at factory and site etc. complete as per detailed specifications inside with CM 1:1.5 lining of minimum 10mm thick for pipes upto 610mm OD and with minimum 12mm thick beyond 610mm OD and out side with minimum 25mm thick coating in CM 1:3 over 50 x 50mm weld mesh of 13 gauge, including loading and unloading of pipes for the following diameters and specified thickness of plate as noted below, including bailing out of water wherever necessary. (Contractor will make his own arrangements for procuring water for testing). 508mm Dia 5.6mm Thick complete with all lead and lift etc, as per specification and as per directed by the Engineer in Chargem11609.4311609.434093.0FalseNoneNoneFalseNoneFalse47517396.990
3592584130821Nonecode06Manufacturing, providing, trasporting, rolling, lowering, laying, jointing and commissioning of ERW (Electric Resistance Welded)/ SAW (Submerged Arc Welded) MS pipes of Outer dia (Fe-410 grade) conforming to IS 3589-2001 with latest amendments, including perfect linking and welding of joints to correct position, cost of the pipes, conveyance, lead, lift charges, cost of all labour and giving satisfactory hydraulic test as per IS 3589-2001 with latest amendments for test pressure and working pressure both at factory and site etc. complete as per detailed specifications inside with CM 1:1.5 lining of minimum 10mm thick for pipes upto 610mm OD and with minimum 12mm thick beyond 610mm OD and out side with minimum 25mm thick coating in CM 1:3 over 50 x 50mm weld mesh of 13 gauge, including loading and unloading of pipes for the following diameters and specified thickness of plate as noted below, including bailing out of water wherever necessary. (Contractor will make his own arrangements for procuring water for testing). complete with all lead and lift etc, as per specification and as per directed by the Engineer in Chargem12761.712761.7499.0FalseNoneNoneFalseNoneFalse6368088.30
3592585130821Nonecode07Providing coal taring two coats to the outer surface of M.S pipes as per AWWA specifications including the cost of coal tar etc.complete for: Outside of 660mm dia pipes complete with all lead and lift etc, as per specification and as per directed by the Engineer in Chargem2288.432288.435374.0FalseNoneNoneFalseNoneFalse12298022.820
3592586130821Nonecode08Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For HDPE Grade PE100-PN10.0, 125mm dia pipes complete with all lead and lift etc, as per specification and as per directed by the Engineer in Chargem903.23903.23404.0FalseNoneNoneFalseNoneFalse364904.920
3592587130821Nonecode09Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For HDPE Grade PE100-PN10.0, 160mm dia pipes complete with all lead and lift etc, as per specification and as per directed by the Engineer in Chargem1431.051431.051418.0FalseNoneNoneFalseNoneFalse2029228.90
3592588130821Nonecode10Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For Grade PE 100 PN 10.0 140mm dia pipes complete with all lead and lift etc, as per specification and as per directed by the Engineer in Chargem1116.341116.34874.0FalseNoneNoneFalseNoneFalse975681.160
3592589130821Nonecode11Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For HDPE Grade PE100-PN10.0, 110mm dia pipes complete with all lead and lift etc, as per specification and as per directed by the Engineer in Chargem688.88688.8817264.0FalseNoneNoneFalseNoneFalse11892824.320
3592590130821Nonecode12Providing bedding for the pipeline trenches in black cotton and rock reaches including watering and consolidation by punners etc. complete with all lead and lift with: M -Sand (DR) complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum2387.142387.145458.09FalseNoneNoneFalseNoneFalse13029224.96260
3592591130821Nonecode13Providing and fixing of Single/ Double chamber triple function tamper proof (Both the orifces to be housed in the single chamber) Air valves with Body and cover in Ductile cast iron of grade GGG 40/ 50. All internal parts such as float, shell with appurtenances., all cover bolts of austenitic alloy / SS 304 steel, DN 50 float of HOSTAFLON / SS 304 and gaskers and seals of EPDM. Epoxy powder coating (EP-P) inside and outside colour blue RAL5005. The valves should be designed for all the three functions i.e., 1. Large orifice for venting of large air volumes on start up. 2. Large orifice for intake of large air volumes. 3. Small orifice for discharge of pressurized air during operation.For PN 10.0 etc. complete For PN 10.0, For TP Air Valves of 100 mm dia. complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeEach45940.8845940.8838.0FalseNoneNoneFalseNoneFalse1745753.440
3592592130821Nonecode14Providing and fixing DI Resilient seated soft sealing SLUICE VALVE of variouis dia. with body bonnet of Ductile Iron (DI) conforming ti IS-1865 with the latest amendments and of grade GGG 40/50, shaft of stainless steel, wedge fully rubber lined with EDPM seals of NBR and the valves should be vacum tight and 100% leak proof with face to face dimensions as per IS 14846-2000 with the latest amendments only. The stem sealing should be with toroidal sealing rings (minimum 2 " O " rings). Body and bonnet should be coated with Electrostatically applied Epoxy Powder Coating with minimum coating thickness of 250 micron both inside and outside. The rate is inclusive of cost of valves, T.P set, galvanized bolts & nuts and rubber insertions etc. but excluding earth work. For PN-10: (Note: TP set should be considered only for DI pipes estimate. For MS pipes estimates, TP sets cost of corresponding dia shall be deducted from the SR rates of valves and provision for corresponding dia MS flanges should be made in the estimate.) etc. complete For PN-16 100mm dia complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeEach15432.9815432.9864.0FalseNoneNoneFalseNoneFalse987710.720
3592593130821Nonecode15Providing and fixing DI Resilient seated soft sealing SLUICE VALVE of variouis dia. with body bonnet of Ductile Iron (DI) conforming ti IS-1865 with the latest amendments and of grade GGG 40/50, shaft of stainless steel, wedge fully rubber lined with EDPM seals of NBR and the valves should be vacum tight and 100% leak proof with face to face dimensions as per IS 14846-2000 with the latest amendments only. The stem sealing should be with toroidal sealing rings (minimum 2 " O " rings). Body and bonnet should be coated with Electrostatically applied Epoxy Powder Coating with minimum coating thickness of 250 micron both inside and outside. The rate is inclusive of cost of valves, T.P set, galvanized bolts & nuts and rubber insertions etc. but excluding earth work. For PN-10: (Note: TP set should be considered only for DI pipes estimate. For MS pipes estimates, TP sets cost of corresponding dia shall be deducted from the SR rates of valves and provision for corresponding dia MS flanges should be made in the estimate.) etc. complete For PN-16 450mm dia complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeEach276103.72276103.7210.0FalseNoneNoneFalseNoneFalse2761037.20
3592594130821Nonecode16Providing & Fixing sluice valves/ Butterfly Valves (labour charges only) conforming to relevant ISS with latest amendments as detailed below for the following diameter and types with two Each of MJ collars, two flanged spigots, conveying to work site, loading, unloading, stacking with appurtenances. with all lead and lifts, aligning, fixing and testing with appurtenances. etc. complete. For sluice valve with accessories 100mm dia complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeEach573.66573.6664.0FalseNoneNoneFalseNoneFalse36714.240
3592595130821Nonecode17Providing & Fixing sluice valves/ Butterfly Valves (labour charges only) conforming to relevant ISS with latest amendments as detailed below for the following diameter and types with two Each of MJ collars, two flanged spigots, conveying to work site, loading, unloading, stacking with appurtenances. with all lead and lifts, aligning, fixing and testing with appurtenances. etc. complete. For sluice valve with accessories 450mm dia complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeEach4580.584580.5810.0FalseNoneNoneFalseNoneFalse45805.80
3592596130821Nonecode18Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum198.24198.2430381.06FalseNoneNoneFalseNoneFalse6022741.33440
3592597130821Nonecode19Valve Chamber :Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m. complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum126.38126.38540.83FalseNoneNoneFalseNoneFalse68350.09540
3592598130821Nonecode20Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. - In ordinary/soft rock without blasting upto 1.5 m depth complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum449.76449.7647.03FalseNoneNoneFalseNoneFalse21152.21280
3592599130821Nonecode21Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work-In Hard Rock ( requiring blasting) In Hard Rock complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum686.41686.4123.51FalseNoneNoneFalseNoneFalse16137.49910
3592600130821Nonecode22Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 Using 40 mm nominal size graded crushed coarse aggregates complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum7627.287627.2842.84FalseNoneNoneFalseNoneFalse326752.67520
3592601130821Nonecode23Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum8179.078179.07149.52FalseNoneNoneFalseNoneFalse1222934.54640
3592602130821Nonecode24Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification For all other type of structures complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeTonne97894.6397894.637.48FalseNoneNoneFalseNoneFalse732251.83240
3592603130821Nonecode25Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum329.57329.57209.66FalseNoneNoneFalseNoneFalse69097.64620
3592604130821Nonecode26Recycle water supply : Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.all kinds of soil. Depth upto 1.50m -10% of total quantity complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum321.53321.5319208.53FalseNoneNoneFalseNoneFalse6176118.65090
3592605130821Nonecode27Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata.. Ordinary/soft rock (without requiring blasting) Depth upto 1.50 m complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum562.51562.514802.13FalseNoneNoneFalseNoneFalse2701246.14630
3592606130821Nonecode28Manufacturing, providing, trasporting, rolling, lowering, laying, jointing and commissioning of ERW (Electric Resistance Welded)/ SAW (Submerged Arc Welded) MS pipes of Outer dia (Fe-410 grade) conforming to IS 3589-2001 with latest amendments, including perfect linking and welding of joints to correct position, cost of the pipes, conveyance, lead, lift charges, cost of all labour and giving satisfactory hydraulic test as per IS 3589-2001 with latest amendments for test pressure and working pressure both at factory and site etc. complete as per detailed specifications inside with CM 1:1.5 lining of minimum 10mm thick for pipes upto 610mm OD and with minimum 12mm thick beyond 610mm OD and out side with minimum 25mm thick coating in CM 1:3 over 50 x 50mm weld mesh of 13 gauge, including loading and unloading of pipes for the following diameters and specified thickness of plate as noted below, including bailing out of water wherever necessary. (Contractor will make his own arrangements for procuring water for testing). 273mm Dia 5.6mm thick complete with all lead and lift etc, as per specification and as per directed by the Engineer in Chargem6222.266222.261331.0FalseNoneNoneFalseNoneFalse8281828.060
3592607130821Nonecode29Providing coal taring two coats to the outer surface of M.S pipes as per AWWA specifications including the cost of coal tar etc.complete for: Outside of 660mm dia pipes complete with all lead and lift etc, as per specification and as per directed by the Engineer in Chargem2288.432288.431331.0FalseNoneNoneFalseNoneFalse3045900.330
3592608130821Nonecode30Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For HDPE Grade PE100-PN10.0, 280mm dia pipes pipes complete with all lead and lift etc, as per specification and as per directed by the Engineer in Chargem4098.614098.61480.0FalseNoneNoneFalseNoneFalse1967332.80
3592609130821Nonecode31Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For HDPE Grade PE100-PN10.0, 250mm dia pipes pipes complete with all lead and lift etc, as per specification and as per directed by the Engineer in Chargem3296.983296.98225.0FalseNoneNoneFalseNoneFalse741820.50
3592610130821Nonecode32Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For HDPE Grade PE100-PN10.0, 225mm dia pipes pipes complete with all lead and lift etc, as per specification and as per directed by the Engineer in Chargem2715.892715.891134.0FalseNoneNoneFalseNoneFalse3079819.260
3592611130821Nonecode33Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For HDPE Grade PE100-PN10.0, 125mm dia pipes pipes complete with all lead and lift etc, as per specification and as per directed by the Engineer in Chargem903.23903.23590.0FalseNoneNoneFalseNoneFalse532905.70
3592612130821Nonecode34Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For HDPE Grade PE100-PN10.0, 180mm dia pipes pipes complete with all lead and lift etc, as per specification and as per directed by the Engineer in Chargem1784.161784.16524.0FalseNoneNoneFalseNoneFalse934899.840
3592613130821Nonecode35Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For HDPE Grade PE100-PN10.0, 160mm dia pipes pipes pipes complete with all lead and lift etc, as per specification and as per directed by the Engineer in Chargem1431.051431.05522.0FalseNoneNoneFalseNoneFalse747008.10
3592614130821Nonecode36Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For HDPE Grade PE100-PN10.0, 140mm dia pipes pipes pipes pipes complete with all lead and lift etc, as per specification and as per directed by the Engineer in Chargem1116.341116.34254.0FalseNoneNoneFalseNoneFalse283550.360
3592615130821Nonecode37Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For HDPE Grade PE100-PN10.0, 110mm dia pipes pipes pipes complete with all lead and lift etc, as per specification and as per directed by the Engineer in Chargem688.88688.8818522.0FalseNoneNoneFalseNoneFalse12759435.360
3592616130821Nonecode38Providing bedding for the pipeline trenches in black cotton and rock reaches including watering and consolidation by punners etc. complete with all lead and lift with: M -Sand (DR) complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum2387.142387.142742.82FalseNoneNoneFalseNoneFalse6547495.33480
3592617130821Nonecode39Providing and fixing of Single/ Double chamber triple function tamper proof (Both the orifces to be housed in the single chamber) Air valves with Body and cover in Ductile cast iron of grade GGG 40/ 50. All internal parts such as float, shell with appurtenances., all cover bolts of austenitic alloy / SS 304 steel, DN 50 float of HOSTAFLON / SS 304 and gaskers and seals of EPDM. Epoxy powder coating (EP-P) inside and outside colour blue RAL5005. The valves should be designed for all the three functions i.e., 1. Large orifice for venting of large air volumes on start up. 2. Large orifice for intake of large air volumes. 3. Small orifice for discharge of pressurized air during operation.For PN 10.0 etc. complete For PN 10.0, For TP Air Valves of 100 mm dia. complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeEach45940.8845940.8825.0FalseNoneNoneFalseNoneFalse1148522.00
3592618130821Nonecode40Providing and fixing DI Resilient seated soft sealing SLUICE VALVE of variouis dia. with body bonnet of Ductile Iron (DI) conforming ti IS-1865 with the latest amendments and of grade GGG 40/50, shaft of stainless steel, wedge fully rubber lined with EDPM seals of NBR and the valves should be vacum tight and 100% leak proof with face to face dimensions as per IS 14846-2000 with the latest amendments only. The stem sealing should be with toroidal sealing rings (minimum 2 " O " rings). Body and bonnet should be coated with Electrostatically applied Epoxy Powder Coating with minimum coating thickness of 250 micron both inside and outside. The rate is inclusive of cost of valves, T.P set, galvanized bolts & nuts and rubber insertions etc. but excluding earth work. For PN-10: (Note: TP set should be considered only for DI pipes estimate. For MS pipes estimates, TP sets cost of corresponding dia shall be deducted from the SR rates of valves and provision for corresponding dia MS flanges should be made in the estimate.) etc. complete For PN-16 100mm dia complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeEach15432.9815432.9859.0FalseNoneNoneFalseNoneFalse910545.820
3592619130821Nonecode41Providing and fixing DI Resilient seated soft sealing SLUICE VALVE of variouis dia. with body bonnet of Ductile Iron (DI) conforming ti IS-1865 with the latest amendments and of grade GGG 40/50, shaft of stainless steel, wedge fully rubber lined with EDPM seals of NBR and the valves should be vacum tight and 100% leak proof with face to face dimensions as per IS 14846-2000 with the latest amendments only. The stem sealing should be with toroidal sealing rings (minimum 2 " O " rings). Body and bonnet should be coated with Electrostatically applied Epoxy Powder Coating with minimum coating thickness of 250 micron both inside and outside. The rate is inclusive of cost of valves, T.P set, galvanized bolts & nuts and rubber insertions etc. but excluding earth work. For PN-10: (Note: TP set should be considered only for DI pipes estimate. For MS pipes estimates, TP sets cost of corresponding dia shall be deducted from the SR rates of valves and provision for corresponding dia MS flanges should be made in the estimate.) etc. complete For PN-16 450mm dia complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeEach276103.72276103.725.0FalseNoneNoneFalseNoneFalse1380518.60
3592620130821Nonecode42Providing & Fixing sluice valves/ Butterfly Valves (labour charges only) conforming to relevant ISS with latest amendments as detailed below for the following diameter and types with two Each of MJ collars, two flanged spigots, conveying to work site, loading, unloading, stacking with appurtenances. with all lead and lifts, aligning, fixing and testing with appurtenances. etc. complete. For sluice valve with accessories 100mm dia complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeEach573.66573.6659.0FalseNoneNoneFalseNoneFalse33845.940
3592621130821Nonecode43Providing & Fixing sluice valves/ Butterfly Valves (labour charges only) conforming to relevant ISS with latest amendments as detailed below for the following diameter and types with two Each of MJ collars, two flanged spigots, conveying to work site, loading, unloading, stacking with appurtenances. with all lead and lifts, aligning, fixing and testing with appurtenances. etc. complete. For sluice valve with accessories 450mm dia complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeEach4580.584580.585.0FalseNoneNoneFalseNoneFalse22902.90
3592622130821Nonecode44Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum198.24198.2423673.07FalseNoneNoneFalseNoneFalse4692949.39680
3592623130821Nonecode45Valve Chamber :Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m. complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum126.38126.38429.77FalseNoneNoneFalseNoneFalse54314.33260
3592624130821Nonecode46Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. - In ordinary/soft rock without blasting upto 1.5 m depth complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum449.76449.7637.37FalseNoneNoneFalseNoneFalse16807.53120
3592625130821Nonecode47Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work-In Hard Rock ( requiring blasting) In Hard Rock complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum686.41686.4118.69FalseNoneNoneFalseNoneFalse12829.00290
3592626130821Nonecode48Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 Using 40 mm nominal size graded crushed coarse aggregates complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum7627.287627.2834.04FalseNoneNoneFalseNoneFalse259632.61120
3592627130821Nonecode49Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum8179.078179.07118.82FalseNoneNoneFalseNoneFalse971837.09740
3592628130821Nonecode50Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification For all other type of structures complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeTonne97894.6397894.635.94FalseNoneNoneFalseNoneFalse581494.10220
3592629130821Nonecode51Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum329.57329.57166.61FalseNoneNoneFalseNoneFalse54909.65770
3592630130821Nonecode52UGD: Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed,removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.All kinds of soils. Depth upto 1.50 m.complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum324.62324.6224960.0FalseNoneNoneFalseNoneFalse8102515.20
3592631130821Nonecode53Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata.Depth exceeding 1.5 m, but not exceeding 3 m . DEPTH 1.5m to 3.00m complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum690.12690.121248.0FalseNoneNoneFalseNoneFalse861269.760
3592632130821Nonecode54Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata.Depth exceeding 1.5 m, but not exceeding 3 m 3.0 to 4.5m complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum784.29784.291248.0FalseNoneNoneFalseNoneFalse978793.920
3592633130821Nonecode55Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specification, including setting out, construction of shoring, strutting, cost of blasting materials, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata. Hard rock (requiring blasting)3.0m to 4.5m complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum1028.371028.37624.0FalseNoneNoneFalseNoneFalse641702.880
3592634130821Nonecode56Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specification, including setting out, construction of shoring, strutting, cost of blasting materials, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata. Hard rock (requiring blasting)4.5m to 6.0m complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum1079.791079.79624.0FalseNoneNoneFalseNoneFalse673788.960
3592635130821Nonecode57Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the complete in the following strata.In all kinds of soils Depth upto 3 m complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum126.38126.381148.31FalseNoneNoneFalseNoneFalse145123.41780
3592636130821Nonecode58Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the complete in the following strata.Depth exceeding 1.5 m, but not exceeding 3 m complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum526.58526.58430.62FalseNoneNoneFalseNoneFalse226755.87960
3592637130821Nonecode59Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the complete in the following strata.Depth exceeding 1.5 m, but not exceeding 3 m Depth 3.0 to 4.5m complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum573.66573.66430.62FalseNoneNoneFalseNoneFalse247029.46920
3592638130821Nonecode60Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring,strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete complete in the following strata.Depth exceeding 3m, but not exceeding 4.5m complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum880.93880.93861.23FalseNoneNoneFalseNoneFalse758683.34390
3592639130821Nonecode61DWC (Doub. Wall Corrug) pipe SN 8, 800mm complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeMtr10122.6310122.63500.0FalseNoneNoneFalseNoneFalse5061315.00
3592640130821Nonecode62DWC (Doub. Wall Corrug) pipe SN 8, 600mm complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeMtr5880.295880.291700.0FalseNoneNoneFalseNoneFalse9996493.00
3592641130821Nonecode63DWC (Doub. Wall Corrug) pipe SN 8, 400mm complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeMtr2727.042727.041600.0FalseNoneNoneFalseNoneFalse4363264.00
3592642130821Nonecode64DWC (Doub. Wall Corrug) pipe SN 8, 350mm complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeMtr2727.042727.04200.0FalseNoneNoneFalseNoneFalse545408.00
3592643130821Nonecode65DWC (Doub. Wall Corrug) pipe SN 8, 300mm complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeMtr1414.941414.941000.0FalseNoneNoneFalseNoneFalse1414940.00
3592644130821Nonecode66DWC (Doub. Wall Corrug) pipe SN 8, 250mm complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeMtr1054.391054.391800.0FalseNoneNoneFalseNoneFalse1897902.00
3592645130821Nonecode67DWC (Doub. Wall Corrug) pipe SN 8, 200mm complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeMtr678.97678.9714000.0FalseNoneNoneFalseNoneFalse9505580.00
3592646130821Nonecode68Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the chamber and brick masonry in C.M 1:4 plaster with bricks of approved quality and CM plaster 1:3 proportion 12mm thick inside and outside except for the conical surface outside where the thickness of plaster shall be 20 mm thick, with 1 to 6 slope in the concrete towards the central drain, finished smooth and fixing of pipes in CC 1:2:4 with graded metal of 20 mm and down size including Providing and fixing SFRC Machinehole frame and cover confoming to IS 12592(Part-I): 1988 & IS 12592(Part-II) :1991 with latest amendments in CC 1:2:4, Providing and fixing of plastic foot steps staggered at 30cms apart as directed, watering, curing,barricading,danger lighting, pouring tar over M.H. frame and cover, cost of tar, shoring,strutting, dewatering, engraving Machinehole No. on the inner and outer conical surface etc. as per the drawing with all lead and lift for various diameters and depths noted below. With Laterite Bricks & Medium Dutycover and frame.For 1.2m dia With Table Moulded Bricks & Medium Duty cover and frame.For 1.5m dia (PWD vol 5 SR 2023-24, Pg No 201, Item No16.42.1 )Constructing Table Moulded Bricks Machinehole 1.5 m internal dia. , 1.0 M depth & Medium duty SFRC cover & frame Manhole of 1.00m depthcomplete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeNo36166.4136166.41162.0FalseNoneNoneFalseNoneFalse5858958.420
3592647130821Nonecode69Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the chamber and brick masonry in C.M 1:4 plaster with bricks of approved quality and CM plaster 1:3 proportion 12mm thick inside and outside except for the conical surface outside where the thickness of plaster shall be 20 mm thick, with 1 to 6 slope in the concrete towards the central drain, finished smooth and fixing of pipes in CC 1:2:4 with graded metal of 20 mm and down size including Providing and fixing SFRC Machinehole frame and cover confoming to IS 12592(Part-I): 1988 & IS 12592(Part-II) :1991 with latest amendments in CC 1:2:4, Providing and fixing of plastic foot steps staggered at 30cms apart as directed, watering, curing,barricading,danger lighting, pouring tar over M.H. frame and cover, cost of tar, shoring,strutting, dewatering, engraving Machinehole No. on the inner and outer conical surface etc. as per the drawing with all lead and lift for various diameters and depths noted below. With Laterite Bricks & Medium Dutycover and frame.For 1.2m dia With Table Moulded Bricks & Medium Duty cover and frame.For 1.5m dia (PWD vol 5 SR 2023-24, Pg No 201, Item No16.42.1 )Constructing Table Moulded Bricks Machinehole 1.5 m internal dia. , 1.0 M depth & Medium duty SFRC cover & frame Manhole of 2.00m depthcomplete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeNo69620.6569620.65169.0FalseNoneNoneFalseNoneFalse11765889.850
3592648130821Nonecode70Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the chamber and brick masonry in C.M 1:4 plaster with bricks of approved quality and CM plaster 1:3 proportion 12mm thick inside and outside except for the conical surface outside where the thickness of plaster shall be 20 mm thick, with 1 to 6 slope in the concrete towards the central drain, finished smooth and fixing of pipes in CC 1:2:4 with graded metal of 20 mm and down size including Providing and fixing SFRC Machinehole frame and cover confoming to IS 12592(Part-I): 1988 & IS 12592(Part-II) :1991 with latest amendments in CC 1:2:4, Providing and fixing of plastic foot steps staggered at 30cms apart as directed, watering, curing,barricading,danger lighting, pouring tar over M.H. frame and cover, cost of tar, shoring,strutting, dewatering, engraving Machinehole No. on the inner and outer conical surface etc. as per the drawing with all lead and lift for various diameters and depths noted below. With Laterite Bricks & Medium Dutycover and frame.For 1.2m dia With Table Moulded Bricks & Medium Duty cover and frame.For 1.5m dia (PWD vol 5 SR 2023-24, Pg No 201, Item No16.42.1 )Constructing Table Moulded Bricks Machinehole 1.5 m internal dia. , 1.0 M depth & Medium duty SFRC cover & frame Manhole of 1.00m depthcomplete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeNo104712.85104712.85244.0FalseNoneNoneFalseNoneFalse25549935.40
3592649130821Nonecode71Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the chamber and brick masonry in C.M 1:4 plaster with bricks of approved quality and CM plaster 1:3 proportion 12mm thick inside and outside except for the conical surface outside where the thickness of plaster shall be 20 mm thick, with 1 to 6 slope in the concrete towards the central drain, finished smooth and fixing of pipes in CC 1:2:4 with graded metal of 20 mm and down size including Providing and fixing SFRC Machinehole frame and cover confoming to IS 12592(Part-I): 1988 & IS 12592(Part-II) :1991 with latest amendments in CC 1:2:4, Providing and fixing of plastic foot steps staggered at 30cms apart as directed, watering, curing,barricading,danger lighting, pouring tar over M.H. frame and cover, cost of tar, shoring,strutting, dewatering, engraving Machinehole No. on the inner and outer conical surface etc. as per the drawing with all lead and lift for various diameters and depths noted below. With Laterite Bricks & Medium Dutycover and frame.For 1.2m dia With Table Moulded Bricks & Medium Duty cover and frame.For 1.5m dia (PWD vol 5 SR 2023-24, Pg No 201, Item No16.42.1 )Constructing Table Moulded Bricks Machinehole 1.5 m internal dia. , 1.0 M depth & Medium duty SFRC cover & frame Manhole of 1.00m depthcomplete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeNo144629.71144629.7174.0FalseNoneNoneFalseNoneFalse10702598.540
3592650130821Nonecode72Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications.complete with all lead and lift etc, as per specification and as per directed by the Engineer in ChargeCum198.24198.2423489.54FalseNoneNoneFalseNoneFalse4656566.40960
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17217401090000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17217401090000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17217401090000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17217401090000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17217401090000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17217401220000NoneNoneELIGIBILITYAll terms and conditions are as per bid document.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer whether his name should have in the last five years period 2019-2020 to 2023-24. The Tenderer should have satisfactorily completed as a prime contractor for at least one similar nature of work of Supplying, laying, testing and commissioning of water supply pipe line networks and UGD Network with suitable pipe lines, construction of chambers or executed the work of water supply pipeline in a Residential or industrial Layout of value not less than Rs.1433.93 lakhs (50% of amount put tender)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneExecuted in any one financial year, the following minimum quantities of work (80% quantity of work put to tender): Certificates of proof shall be issued from competent authority not below the rank of Executive Engineer in Government/Public Sectors/ Government Undertaking Organizations only will be considered for bid evaluation. (Quantities executed and work done certificates/work quantity certificates issued under Joint Venture/consortium/ private firms/private organizations/private individuals /partial turnkey shall not be considered for bid evaluation) (1) Earthwork Excavation & Embankment: 69941 cum, (2) PCC/RCC: 276 cum, (3) MS/DI/HDPE/DWC/PVC pipes : 55771 Rmts.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneEach Tenderer should further demonstrate: Availability by owning at least 50% of the required / specified critical equipment for this work and remaining 50% can be deployed on lease / hire basis the following key and critical equipment for this work in good working conditionCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant Document
NoneNoneNoneNoneTenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under: Assessed available tender capacity (AxNx1.5 - B), Where, A: Maximum value of Civil Engineering works executed in any one year during the last five years (updated to 2024-25 price level) taking into account the completed as well as works in progress, N: Number of years prescribed for completion of the works for which tenders are invited. B: Value, at 2024-25 price level, of existing commitments and on-going works to be completed during the next 11 monthsCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bid capacity of tender
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer whether his name should have in the last five years period 2019-2020 to 2023-24. Achieved in at least two financial years a minimum financial turnover of Rs.5735.72 Lakhs. (Civil Contract works)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneEach Tenderer should further demonstrate: liquid assets and /or availability of credit facilities of not less than Rs.860.36 lakhs (Credit lines/ letter of credit/ certificates from banks for permitting the fund requirement etc - equivalent of the estimated cash flow for the months in the peak construction period)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Company Registration CertificateTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1721827723000
version0
createdDateNone
modifiedDateNone
blockNumberNo.49, 5th Floor, Khanija Bhavan, Race Course Road
streetNone
cityBengaluru
stateKarnataka
pin560001
tenderRecallDTONone