createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1721646042532
version6
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd3684000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose24-08-2024 16:00:00
tenderQueryClose19-08-2024 11:00:00
technicalBidOpen26-08-2024 16:30:00
publishedDate25-07-2024 15:31:56
publishedByPostPWD_EE_DIV_BNG
publishedByUserKPE11205 - R CHANDRASHEKAR
bidValidityPeriod90
noOfCalls1
preBidMeetingDate12-08-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonR CHANDRASHEKAR
splitEmdRequiredYnTrue
emdBankGuarantee3584000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022133370
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1721646042566
version5
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/BD/WORK_INDENT11232
titleCONSTRUCTION OF FARM/AGRI INNOVATION CENTRE AT ELECTRONIC CITY PHASE-1, BENGALURU
descriptionCONSTRUCTION OF FARM/AGRI INNOVATION CENTRE AT ELECTRONIC CITY PHASE-1, BENGALURU
categoryWORKS
categoryTextWorks
ecv368356127.71
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location1667
locationNamePWD Division Office Bengaluru
provisionalAmount480000000.0
groupOverheadTotal0.0
fileNumberPWD/SOUTH/BBC/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17216460430000NoneNoneBuildingsGROUND FLOOR98306833.73
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3579902130185NonePWD SR 2023-24 Vol I Item no 1.12 page no 8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum120.51120.512700.0FalseNoneNoneFalseNoneFalse325377.00
3579903130185NonePWD SR 2023-24 Vol I Item no 1.14.1 page no 8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In all kinds of soils Depth upto 3 m ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum129.39129.393072.0FalseNoneNoneFalseNoneFalse397486.080
3579904130185NonePWD SR 2023-24 Vol II Item no 4.1 page no 5Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm149.68149.683964.45FalseNoneNoneFalseNoneFalse593398.8760
3579905130185NonePWD SR 2023-24 Vol II Item no 1.15.1 page no 8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In ordinary/soft rock without blasting upto 1.5 m depth ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum460.47460.471024.0FalseNoneNoneFalseNoneFalse471521.280
3579906130185NonePWD SR 2023-24 Vol I Item no 2.1.3 page no 15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum7597.057597.05585.16FalseNoneNoneFalseNoneFalse4445489.7780
3579907130185NonePWD SR 2023-24 Vol I Item no 2.2.3 page no 15Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum8680.198680.192065.07FalseNoneNoneFalseNoneFalse17925199.96330
3579908130185NonePWD SR 2023-24 Vol I Item no 2.4.3 page no 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum13663.2713663.27143.04FalseNoneNoneFalseNoneFalse1954394.14080
3579909130185NonePWD SR 2023-24 Vol I Item no 2.3.2 page no 16Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum12329.8212329.82106.28FalseNoneNoneFalseNoneFalse1310413.26960
3579910130185NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum14756.5914756.59142.43FalseNoneNoneFalseNoneFalse2101781.11370
3579911130185NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum13888.5513888.55181.68FalseNoneNoneFalseNoneFalse2523271.7640
3579912130185NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum13020.5213020.52330.58FalseNoneNoneFalseNoneFalse4304323.50160
3579913130185NonePWD SR 2023-24 Vol I Item no 2.11a page no 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workt113476.2113476.2377.23FalseNoneNoneFalseNoneFalse42806626.9260
3579914130185NonePWD SR 2023-24 Vol I Item no 1.9 page no 7Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum337.42337.422308.3FalseNoneNoneFalseNoneFalse778866.5860
3579915130185NonePWD SR 2023-24 Vol II Item no 6.31 page no 17Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum10120.0910120.09295.73FalseNoneNoneFalseNoneFalse2992814.21570
3579916130185NonePWD SR 2023-24 Vol II Item no 6.26 page no 16Providing and laying Autoclaved Aerated Cement blocks masonry with 100 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level in cement mortar 1:4 (1 cement : 4 coarse sand ) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum10854.5510854.558.86FalseNoneNoneFalseNoneFalse96171.3130
3579917130185NonePWD SR 2023-24 Vol II Item no 8.2.1 page no 41Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm374.21374.21484.46FalseNoneNoneFalseNoneFalse181289.77660
3579918130185NonePWD SR 2023-24 Vol II Item no 8.1.2 page no 41Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm305.71305.713263.78FalseNoneNoneFalseNoneFalse997770.18380
3579919130185NonePWD SR 2023-24 Vol II Item no 10.14 page no 71Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm1402.961402.96228.51FalseNoneNoneFalseNoneFalse320590.38960
3579920130185NonePWD SR 2023-24 Vol II Item no 9.7.1 page no 59Providing and fixing 10 mm thick acid and/or alkali resistant tiles of approved make and colour using acid and/or alkali resisting mortar bedding for Bathrooms: Toilet: Chemically exposed areas and joints filled with acid and/or alkali resisting cement as per IS : 4457, complete as per the direction of Engineer-in- Charge.Providing and fixing 10 mm thick acid and/or alkali resistant tiles of approved make and colour using acid and/or alkali resisting mortar bedding for Bathrooms: Toilet: Chemically exposed areas and joints filled with acid and/or alkali resisting cement as per IS : 4457, complete as per the direction of Engineer-in- Charge.In flooring on a bed of 10 mm thick mortar 1:4 (1 acid proof cement : 4 coarse sand) with Acid and alkali resistant tile ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm1580.551580.5593.71FalseNoneNoneFalseNoneFalse148113.34050
3579921130185NonePWD SR 2023-24 Vol II Item no 8.51 page no 43Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm126.85126.855180.13FalseNoneNoneFalseNoneFalse657099.49050
3579922130185NonePWD SR 2023-24 Vol II Item no 8.27 page no 45Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm / K67.2367.235180.13FalseNoneNoneFalseNoneFalse348260.13990
3579923130185NonePWD SR 2023-24 Vol II Item no 8.29 page no 45Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm358.99358.99484.46FalseNoneNoneFalseNoneFalse173916.29540
3579924130185NonePWD SR 2023-24 Vol II Item no 8.54.2 page no 91Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm139.54139.545180.13FalseNoneNoneFalseNoneFalse722835.34020
3579925130185NonePWD SR 2023-24 Vol II Item no 11.34a page no 86Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workKgs213.11213.11938.38FalseNoneNoneFalseNoneFalse199978.16180
3579926130185NonePWD SR 2023-24 Vol II Item no 12.88 page no 110Providing and fixing fixing of 2track x 2panel sliding windows made out of multi chambered UPVC(Matching to RAL9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2 to 2.5 mm Maximum possible size 1819mm x 1819mm (The cost is inclusive of all fixtures and separate charges for minor T and Ps shall not be made) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm6837.226837.2242.52FalseNoneNoneFalseNoneFalse290718.59440
3579927130185NonePWD SR 2023-24 Vol II Item no 12.85 page no 109Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm7254.557254.552.16FalseNoneNoneFalseNoneFalse15669.8280
3579928130185NonePWD SR 2023-24 Vol II Item no 18.4. page no 183Extra for openable side / top hung vision glass panels (IGUs) including providing and supplying at site all accessories and hardwares for the openable panels as specified and of the approved make such as heavy duty stainless steel friction hinges, min 4 -point cremone locking sets with stainless steel plates, handles, buffers etc. including necessary stainless steel screws/ fasteners, nuts, bolts, washers etc. all complete as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer- in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm5274.425274.4267.32FalseNoneNoneFalseNoneFalse355073.95440
3579929130185NonePWD SR 2023-24 Vol II Item no 12.13.2 page no 100Providing Red Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum126342.6126342.61.55FalseNoneNoneFalseNoneFalse195831.030
3579930130185NonePWD SR 2023-24 Vol II Item no 12.57.4 page no 105Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.-do- 35 mm thick both side Teak ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm5748.845748.8495.76FalseNoneNoneFalseNoneFalse550508.91840
3579931130185NonePWD SR 2023-24 Vol II Item no 12.93.1 page no 111Providing & fixing Factory made single extruded Wood Polymer Composite (WPC) solid door/window, clerestory windows & frames /chowkhat of frame Size 62 x 100mm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm890.49890.49207.9FalseNoneNoneFalseNoneFalse185132.8710
3579932130185NonePWD SR 2023-24 Vol II Item no 9.24 page no 63Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm3617.763617.76437.62FalseNoneNoneFalseNoneFalse1583204.13120
3579933130185NonePWD SR 2023-24 Vol II Item no 9.22.2 page no 62Providing and laying Polished Glazed Vitrified tiles with thickness 10 mm in floor with different sizes with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately).Size of Tile 600x600 mm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm1682.031682.031381.86FalseNoneNoneFalseNoneFalse2324329.97580
3579934130185NonePWD SR 2023-24 Vol III Item no 4.17 page no 26Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum3246.093246.0948.27FalseNoneNoneFalseNoneFalse156688.76430
3579935130185NonePWD SR 2023-24 Vol III Item no 6.2.1 page no 49Construction of M40 Grade un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base in recommended proportions, coarse and fine aggregate conforming to IS 383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design transported to site, laid with a slip form paver finisher, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures, curing compound, steel channels, finishing to lines and grades as per drawing ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum11493.8811493.8836.2FalseNoneNoneFalseNoneFalse416078.4560
3579936130185NonePWD SR 2023-24 Vol II Item no 18.2 page no 181Designing, fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for This item includes cost of all inputs of designing, labour for fabricating and installation of aluminium grid, installation of glazed units, T&P, scaffolding and other incidental charges including wastages etc., enabling temporary structures and services, cranes or cradles etc. as described above and as specified. The item includes the cost of getting all the structural and functional design including shop drawings checked by a structural designer, dully approved by Engineer-in-charge. The item also includes the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working structural glazing as specified, cleaning and protection till the handing over of the building for occupation. In the end, the Contractor shall provide a water tight structural glazing having all the performance characteristics etc. all complete as required, as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer- in-Charge. linear as well as curvilinear portions of the building for all heights and all levels, including:(a) Structural analysis & design and preparation of shop drawings for the specified design loads conforming to IS 875 part III (the system must passed the proof test at 1.5 times design wind pressure without any failure), including functional design of the aluminum sections for fixing glazing panels of various thicknesses, aluminium cleats, sleeves and splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc., structural and weather silicone sealants, flashings, fire stop (barrier)-cumsmoke seals, microwave cured EPDM gaskets for water tightness, pressure equalisation & drainage and protection against fire hazard including:(b) Fabricating and supplying serrated M.S. hot dip galvanised / Aluminium alloy of 6005 T5 brackets of required sizes, sections and profiles etc. to accommodate 3 Dimentional movement for achieving perfect verticality and fixing structural glazing system rigidly to the RCC/ masonry/ structural steel framework of building structure using stainless steel anchor fasteners/ bolts, nylon seperator to prevent bimetallic contacts with nuts and washers etc. of stainless steel grade 316, of the required capacity and in required numbers.(c)Providing and filling, two part pump filled, structural silicone sealant and one part weather silicone sealant compatible with the structural silicone sealant of required bite size in a clean and controlled factory / work shop environment, including double sided spacer tape, setting blocks and backer rod, all of approved grade, brand and manufacture, as per the approved sealant design, within and all around the perimeter for holding glass.(d)Providing and fixing in position flashings of solid aluminium sheet 1 mm thick and of sizes, shapes and profiles, as required as per the site conditions, to seal the gap between the building structure and all its interfaces with curtain glazing to make it watertight.(e) Making provision for drainage of moisture/ water that enters the curtain glazing system to make it watertight, by incorporating principles of pressure equalization, providing suitable gutter profiles at bottom (if required), making necessary holes of required sizes and of required numbers etc. complete. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm3405.923405.92469.95FalseNoneNoneFalseNoneFalse1600612.1040
3579937130185NonePWD SR 2023-24 Vol II Item no 18.3 page no 183Providing, assembling and supplying vision glass panels (IGUs) comprising of hermetically-sealed 6-12- 6 mm insulated glass (double glazed) vision panel units of size and shape as required and specified, comprising of an outer heat strengthened float glass 6mm thick, of approved colour and shade with reflective soft coating on surface no 2 of approved colour and shade, an inner Heat strengthned clear float glass 6mm thick, spacer tube 12mm wide, dessicants, including primary seal and secondary seal (structural silicone sealant) etc. all complete for the required performances, as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer-in-Charge. The IGUs shall be assembled in the factory/ workshop of the glass processor. (Payment for fixing of IGU Panels in the curtain glazing is included in cost of item No.18.2)For payment, only the actual area of glass on face 1 of the glass panels (excluding the areas of the grooves and weather silicone sealant) provided and fixed in position, shall be measured in m2.(i) Coloured tinted float glass 6mm thick substrate with reflective soft coating on face no2, plus 12mm Airgap plus 6mm Heat Strengthened clear Glass of approved make having properties as visible Light transmittance (VLT) of 25 to 35 percent Light reflection internal 10 to 15percent, light reflection external 10 to 20 percent, shading coefficient (0.25-0.28) and U value of 3.0 to 3.3 W m2 degree K etc. The properties of performance glass shall be decided by technical sanctioning authority as per the site requirement. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm3860.053860.05187.99FalseNoneNoneFalseNoneFalse725650.79950
3579938130185NonePWD SR 2023-24 Vol II Item no 18.4 page no 183Extra for openable side / top hung vision glass panels (IGUs) including providing and supplying at site all accessories and hardwares for the openable panels as specified and of the approved make such as heavy duty stainless steel friction hinges, min 4 -point cremone locking sets with stainless steel plates, handles, buffers etc. including necessary stainless steel screws/ fasteners, nuts, bolts, washers etc. all complete as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer- in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm5274.425274.42187.99FalseNoneNoneFalseNoneFalse991538.21580
3579939130185NonePWD SR 2023-24 Vol III Item no 11.9 page no 79Extra for providing grilled rolling shutters manufactured out of 8 mm dia M.S. bar instead of laths as per design approved by Engineer- in- charge, (area of grill to be measured) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm782.66782.6625.2FalseNoneNoneFalseNoneFalse19723.0320
3579940130185NonePWD SR 2023-24 Vol II Item no 11.28 page no 85Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workKg716.7716.71381.5FalseNoneNoneFalseNoneFalse990121.050
3579941130185NoneApproved Quotation rateProviding and laying 3.5mm thick imported vinyl flooring of approved quality,colour and design ,laid with an approved adhesive on slab floor,strecting cutting and fixing after cleaning of surface free from mortar drops and other foreign matter complete including cost and conveyance of all materilas ,labour charges transporation all lead and lift,loading and unloading and all other incidental charges tec.,complete as per specification and directions of the engineer in charge of the work. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm2442.62442.6296.37FalseNoneNoneFalseNoneFalse723913.3620
3579942130185NonePWD SR 2023-24 Vol II Item no 9.9 page no 60Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/m2 including pointing the joints with white cement and matching pigment etc., complete ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm1269.681269.68296.37FalseNoneNoneFalseNoneFalse376295.06160
3579943130185NonePWD SR 2023-24 Vol II Item no 2.5.2 page no 16Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum12667.2512667.252.27FalseNoneNoneFalseNoneFalse28754.65750
17216460430000NoneNoneBuildingsFIRST FLOOR34097391.43
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3579944130186NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum14837.3314837.33118.84FalseNoneNoneFalseNoneFalse1763268.29720
3579945130186NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum13969.313969.3174.25FalseNoneNoneFalseNoneFalse2434150.5250
3579946130186NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum13101.2713101.27296.61FalseNoneNoneFalseNoneFalse3885967.69470
3579947130186NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum12667.2512667.253.35FalseNoneNoneFalseNoneFalse42435.28750
3579948130186NonePWD SR 2023-24 Vol I Item no 2.11a page no 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workt114531.8114531.896.74FalseNoneNoneFalseNoneFalse11079806.3320
3579949130186NonePWD SR 2023-24 Vol II Item no 6.31 page no 17Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum10214.2310214.23199.44FalseNoneNoneFalseNoneFalse2037126.03120
3579950130186NonePWD SR 2023-24 Vol II Item no 6.26 page no 16Providing and laying Autoclaved Aerated Cement blocks masonry with 100 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level in cement mortar 1:4 (1 cement : 4 coarse sand ) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum10955.5310955.539.03FalseNoneNoneFalseNoneFalse98928.43590
3579951130186NonePWD SR 2023-24 Vol II Item no 8.2.1 page no 41Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm377.69377.69484.55FalseNoneNoneFalseNoneFalse183009.68950
3579952130186NonePWD SR 2023-24 Vol II Item no 8.1.2 page no 41Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm308.55308.553410.96FalseNoneNoneFalseNoneFalse1052451.7080
3579953130186NonePWD SR 2023-24 Vol II Item no 10.14 page no 71Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm1416.011416.01214.06FalseNoneNoneFalseNoneFalse303111.10060
3579954130186NonePWD SR 2023-24 Vol II Item no 9.7.1 page no 59Providing and fixing 10 mm thick acid and/or alkali resistant tiles of approved make and colour using acid and/or alkali resisting mortar bedding for Bathrooms: Toilet: Chemically exposed areas and joints filled with acid and/or alkali resisting cement as per IS : 4457, complete as per the direction of Engineer-in- Charge.In flooring on a bed of 10 mm thick mortar 1:4 (1 acid proof cement : 4 coarse sand) with Acid and alkali resistant tile ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm1595.251595.2588.53FalseNoneNoneFalseNoneFalse141227.48250
3579955130186NonePWD SR 2023-24 Vol II Item no 8.30 page no 46Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm222.77222.77484.55FalseNoneNoneFalseNoneFalse107943.20350
3579956130186NonePWD SR 2023-24 Vol II Item no 8.51 page no 43Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm127.85127.854955.93FalseNoneNoneFalseNoneFalse633615.65050
3579957130186NonePWD SR 2023-24 Vol II Item no 8.27 page no 45Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm67.8667.864955.93FalseNoneNoneFalseNoneFalse336309.40980
3579958130186NonePWD SR 2023-24 Vol II Item no 8.29 page no 45Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm362.32362.32484.55FalseNoneNoneFalseNoneFalse175562.1560
3579959130186NonePWD SR 2023-24 Vol II Item no 8.54.2 page no 50Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm140.64140.644955.93FalseNoneNoneFalseNoneFalse697001.99520
3579960130186NonePWD SR 2023-24 Vol II Item no 11.34A page no 86Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workKgs215.09215.091379.7FalseNoneNoneFalseNoneFalse296759.6730
3579961130186NonePWD SR 2023-24 Vol II Item no 12.88 page no 110Providing & fixing of of 2track x 2panel sliding windows made out of multi chambered UPVC(Matching to RAL9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2 to 2.5 mm Maximum possible size 1819mm x 1819mm (The cost is inclusive of all fixtures and separate charges for minor T and Ps shall not be made) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm6900.826900.8263.9FalseNoneNoneFalseNoneFalse440962.3980
3579962130186NonePWD SR 2023-24 Vol II Item no 12.85 page no 109Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm7322.047322.041.8FalseNoneNoneFalseNoneFalse13179.6720
3579963130186NonePWD SR 2023-24 Vol II Item no 12.13.2 page no 100Providing Red Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum127517.88127517.881.63FalseNoneNoneFalseNoneFalse207854.14440
3579964130186NonePWD SR 2023-24 Vol II Item no 12.57.4 page no 105Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.do- 35 mm thick both side Teak ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm5802.325802.3299.72FalseNoneNoneFalseNoneFalse578607.35040
3579965130186NonePWD SR 2023-24 Vol II Item no 12.93.1 page no 111Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Clerestory windows & other Frames/ Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibres (wood powder/rice husk/ wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-InCharge. (Fixtures shall be paid for separately)Size 62 x 100mm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workRmtr898.77898.77219.15FalseNoneNoneFalseNoneFalse196965.44550
3579966130186NonePWD SR 2023-24 Vol II Item no 9.24 page no 63Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm3651.423651.42283.86FalseNoneNoneFalseNoneFalse1036492.08120
3579967130186NonePWD SR 2023-24 Vol II Item no 9.22.2 page no 62Providing and laying Polished Glazed Vitrified tiles with thickness 10 mm in floor with different sizes with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately).Size of Tile 600x600 mm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm1697.681697.681579.63FalseNoneNoneFalseNoneFalse2681706.25840
3579968130186NonePWD SR 2023-24 Vol II Item no 18.2 page no 181fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels, including:(a) Structural analysis & design and preparation of shop drawings for the specified design loads conforming to IS 875 part III (the system must passed the proof test at 1.5 times design wind pressure without any failure), including functional design of the aluminum sections for fixing glazing panels of various thicknesses, aluminium cleats, sleeves and splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc., structural and weather silicone sealants, flashings, fire stop (barrier)-cumsmoke seals, microwave cured EPDM gaskets for water tightness, pressure equalisation & drainage and protection against fire hazard including:(b) Fabricating and supplying serrated M.S. hot dip galvanised / Aluminium alloy of 6005 T5 brackets of required sizes, sections and profiles etc. to accommodate 3 Dimentional movement for achieving perfect verticality and fixing structural glazing system rigidly to the RCC/ masonry/ structural steel framework of building structure using stainless steel anchor fasteners/ bolts, nylon seperator to prevent bimetallic contacts with nuts and washers etc. of stainless steel grade 316, of the required capacity and in required numbers.(c)Providing and filling, two part pump filled, structural silicone sealant and one part weather silicone sealant compatible with the structural silicone sealant of required bite size in a clean and controlled factory / work shop environment, including double sided spacer tape, setting blocks and backer rod, all of approved grade, brand and manufacture, as per the approved sealant design, within and all around the perimeter for holding glass.(d)Providing and fixing in position flashings of solid aluminium sheet 1 mm thick and of sizes, shapes and profiles, as required as per the site conditions, to seal the gap between the building structure and all its interfaces with curtain glazing to make it watertight.(e) Making provision for drainage of moisture/ water that enters the curtain glazing system to make it watertight, by incorporating principles of pressure equalization, providing suitable gutter profiles at bottom (if required), making necessary holes of required sizes and of required numbers etc. complete.This item includes cost of all inputs of designing, labour for fabricating and installation of aluminium grid, installation of glazed units, T&P, scaffolding and other incidental charges including wastages etc., enabling temporary structures and services, cranes or cradles etc. as described above and as specified. The item includes the cost of getting all the structural and functional design including shop drawings checked by a structural designer, dully approved by Engineer-in-charge. The item also includes the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working structural glazing as specified, cleaning and protection till the handing over of the building for occupation. In the end, the Contractor shall provide a water tight structural glazing having all the performance characteristics etc. all complete as required, as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer- in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm3437.613437.61445.27FalseNoneNoneFalseNoneFalse1530664.60470
3579969130186NonePWD SR 2023-24 Vol II Item no 18.3 page no 183Providing, assembling and supplying vision glass panels (IGUs) comprising of hermetically-sealed 6-12- 6 mm insulated glass (double glazed) vision panel units of size and shape as required and specified, comprising of an outer heat strengthened float glass 6mm thick, of approved colour and shade with reflective soft coating on surface no 2 of approved colour and shade, an inner Heat strengthned clear float glass 6mm thick, spacer tube 12mm wide, dessicants, including primary seal and secondary seal (structural silicone sealant) etc. all complete for the required performances, as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer-in-Charge. The IGUs shall be assembled in the factory/ workshop of the glass processor. (Payment for fixing of IGU Panels in the curtain glazing is included in cost of item No.18.2)For payment, only the actual area of glass on face no 1 of the glass panels (excluding the areas of the grooves and weather silicone sealant) provided and fixed in position, shall be measured in m2.(i) Coloured tinted float glass 6mm thick substrate with reflective soft coating on face no 2, + 12mm Airgap + 6mm Heat Strengthened clear Glass of approved make having properties as visible Light transmittance (VLT) of 25 to 35 percent, Light reflection internal 10 to 15percent, light reflection external 10 to 20 percent, shading coefficient (0.25-0.28) and U value of 3.0 to 3.3 W/ m2 degree K etc. The properties of performance glass shall be decided by technical sanctioning authority as per the site requirement. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm3895.953895.95178.11FalseNoneNoneFalseNoneFalse693907.65450
3579970130186NonePWD SR 2023-24 Vol II Item no 18.4 page no 183Extra for openable side / top hung vision glass panels (IGUs) including providing and supplying at site all accessories and hardwares for the openable panels as specified and of the approved make such as heavy duty stainless steel friction hinges, min 4 -point cremone locking sets with stainless steel plates, handles, buffers etc. including necessary stainless steel screws/ fasteners, nuts, bolts, washers etc. all complete as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer- in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm5323.495323.49178.11FalseNoneNoneFalseNoneFalse948166.80390
3579971130186NonePWD SR 2023-24 Vol II Item no 11.28 page no 85Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workKg723.37723.37691.5FalseNoneNoneFalseNoneFalse500210.3550
17216460430000NoneNoneBuildingsSECOND FLOOR33520663.72
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3579972130187NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum14918.0814918.08114.95FalseNoneNoneFalseNoneFalse1714833.2960
3579973130187NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum14050.0514050.05179.94FalseNoneNoneFalseNoneFalse2528165.9970
3579974130187NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum13182.0113182.01289.43FalseNoneNoneFalseNoneFalse3815269.15430
3579975130187NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum12667.2512667.251.98FalseNoneNoneFalseNoneFalse25081.1550
3579976130187NonePWD SR 2023-24 Vol I Item no 2.11a page no 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workt115587.4115587.496.56FalseNoneNoneFalseNoneFalse11161119.3440
3579977130187NonePWD SR 2023-24 Vol II Item no 6.31 page no 17Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum10308.3710308.37153.48FalseNoneNoneFalseNoneFalse1582128.62760
3579978130187NonePWD SR 2023-24 Vol II Item no 6.26 page no 16Providing and laying Autoclaved Aerated Cement blocks masonry with 100 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level in cement mortar 1:4 (1 cement : 4 coarse sand ) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum11056.511056.518.6FalseNoneNoneFalseNoneFalse205650.90
3579979130187NonePWD SR 2023-24 Vol II Item no 8.2.1 page no 41Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm381.17381.17404.81FalseNoneNoneFalseNoneFalse154301.42770
3579980130187NonePWD SR 2023-24 Vol II Item no 8.1.2 page no 41Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm311.4311.42128.41FalseNoneNoneFalseNoneFalse662786.8740
3579981130187NonePWD SR 2023-24 Vol II Item no 10.14 page no 71Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm1429.061429.06149.14FalseNoneNoneFalseNoneFalse213130.00840
3579982130187NonePWD SR 2023-24 Vol II Item no 9.7.1 page no 59Providing and fixing 10 mm thick acid and/or alkali resistant tiles of approved make and colour using acid and/or alkali resisting mortar bedding for Bathrooms: Toilet: Chemically exposed areas and joints filled with acid and/or alkali resisting cement as per IS : 4457, complete as per the direction of Engineer-in- Charge.In flooring on a bed of 10 mm thick mortar 1:4 (1 acid proof cement : 4 coarse sand) with Acid and alkali resistant tile ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm1609.961609.9694.67FalseNoneNoneFalseNoneFalse152414.91320
3579983130187NonePWD SR 2023-24 Vol II Item no 8.51 page no 43Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm128.85128.853887.13FalseNoneNoneFalseNoneFalse500856.70050
3579984130187NonePWD SR 2023-24 Vol II Item no 8.27 page no 45Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm68.2968.293887.13FalseNoneNoneFalseNoneFalse265452.10770
3579985130187NonePWD SR 2023-24 Vol II Item no 8.29 page no 45Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm364.65364.65404.81FalseNoneNoneFalseNoneFalse147613.96650
3579986130187NonePWD SR 2023-24 Vol II Item no 8.54.2 page no 50Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm141.74141.743887.13FalseNoneNoneFalseNoneFalse550961.80620
3579987130187NonePWD SR 2023-24 Vol II Item no 11.34A page no 86Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workKgs217.07217.071089.58FalseNoneNoneFalseNoneFalse236515.13060
3579988130187NonePWD SR 2023-24 Vol II Item no 12.88 page no 110Providing & fixing of of 2track x 2panel sliding windows made out of multi chambered UPVC(Matching to RAL9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2 to 2.5 mm Maximum possible size 1819mm x 1819mm (The cost is inclusive of all fixtures and separate charges for minor T and Ps shall not be made) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm6964.426964.4249.72FalseNoneNoneFalseNoneFalse346270.96240
3579989130187NonePWD SR 2023-24 Vol II Item no 12.85 page no 109Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm7389.527389.522.16FalseNoneNoneFalseNoneFalse15961.36320
3579990130187NonePWD SR 2023-24 Vol II Item no 12.13.2 page no 100Providing Red Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum128693.2128693.21.38FalseNoneNoneFalseNoneFalse177596.6160
3579991130187NonePWD SR 2023-24 Vol II Item no 12.57.4 page no 105Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.do- 35 mm thick both side Teak ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm5855.85855.884.6FalseNoneNoneFalseNoneFalse495400.680
3579992130187NonePWD SR 2023-24 Vol II Item no 12.93.1 page no 111Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Clerestory windows & other Frames/ Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibres (wood powder/rice husk/ wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-InCharge. (Fixtures shall be paid for separately)Size 62 x 100mm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workRmtr907.05907.05184.05FalseNoneNoneFalseNoneFalse166942.55250
3579993130187NonePWD SR 2023-24 Vol II Item no 9.24 page no 63Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm3685.073685.07307.08FalseNoneNoneFalseNoneFalse1131611.29560
3579994130187NonePWD SR 2023-24 Vol II Item no 9.22.2 page no 62Providing and laying Polished Glazed Vitrified tiles with thickness 10 mm in floor with different sizes with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately).Size of Tile 600x600 mm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm1713.321713.321543.88FalseNoneNoneFalseNoneFalse2645160.48160
3579995130187NonePWD SR 2023-24 Vol II Item no 18.2 page no 181fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels, including:(a) Structural analysis & design and preparation of shop drawings for the specified design loads conforming to IS 875 part III (the system must passed the proof test at 1.5 times design wind pressure without any failure), including functional design of the aluminum sections for fixing glazing panels of various thicknesses, aluminium cleats, sleeves and splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc., structural and weather silicone sealants, flashings, fire stop (barrier)-cumsmoke seals, microwave cured EPDM gaskets for water tightness, pressure equalisation & drainage and protection against fire hazard including:(b) Fabricating and supplying serrated M.S. hot dip galvanised / Aluminium alloy of 6005 T5 brackets of required sizes, sections and profiles etc. to accommodate 3 Dimentional movement for achieving perfect verticality and fixing structural glazing system rigidly to the RCC/ masonry/ structural steel framework of building structure using stainless steel anchor fasteners/ bolts, nylon seperator to prevent bimetallic contacts with nuts and washers etc. of stainless steel grade 316, of the required capacity and in required numbers.(c)Providing and filling, two part pump filled, structural silicone sealant and one part weather silicone sealant compatible with the structural silicone sealant of required bite size in a clean and controlled factory / work shop environment, including double sided spacer tape, setting blocks and backer rod, all of approved grade, brand and manufacture, as per the approved sealant design, within and all around the perimeter for holding glass.(d)Providing and fixing in position flashings of solid aluminium sheet 1 mm thick and of sizes, shapes and profiles, as required as per the site conditions, to seal the gap between the building structure and all its interfaces with curtain glazing to make it watertight.(e) Making provision for drainage of moisture/ water that enters the curtain glazing system to make it watertight, by incorporating principles of pressure equalization, providing suitable gutter profiles at bottom (if required), making necessary holes of required sizes and of required numbers etc. complete.This item includes cost of all inputs of designing, labour for fabricating and installation of aluminium grid, installation of glazed units, T&P, scaffolding and other incidental charges including wastages etc., enabling temporary structures and services, cranes or cradles etc. as described above and as specified. The item includes the cost of getting all the structural and functional design including shop drawings checked by a structural designer, dully approved by Engineer-in-charge. The item also includes the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working structural glazing as specified, cleaning and protection till the handing over of the building for occupation. In the end, the Contractor shall provide a water tight structural glazing having all the performance characteristics etc. all complete as required, as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer- in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm2886.382886.38613.27FalseNoneNoneFalseNoneFalse1770130.26260
3579996130187NonePWD SR 2023-24 Vol II Item no 18.3 page no 183Providing, assembling and supplying vision glass panels (IGUs) comprising of hermetically-sealed 6-12- 6 mm insulated glass (double glazed) vision panel units of size and shape as required and specified, comprising of an outer heat strengthened float glass 6mm thick, of approved colour and shade with reflective soft coating on surface no 2 of approved colour and shade, an inner Heat strengthned clear float glass 6mm thick, spacer tube 12mm wide, dessicants, including primary seal and secondary seal (structural silicone sealant) etc. all complete for the required performances, as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer-in-Charge. The IGUs shall be assembled in the factory/ workshop of the glass processor. (Payment for fixing of IGU Panels in the curtain glazing is included in cost of item No.18.2)For payment, only the actual area of glass on face no 1 of the glass panels (excluding the areas of the grooves and weather silicone sealant) provided and fixed in position, shall be measured in m2.(i) Coloured tinted float glass 6mm thick substrate with reflective soft coating on face no 2, + 12mm Airgap + 6mm Heat Strengthened clear Glass of approved make having properties as visible Light transmittance (VLT) of 25 to 35 percent, Light reflection internal 10 to 15percent, light reflection external 10 to 20 percent, shading coefficient (0.25-0.28) and U value of 3.0 to 3.3 W/ m2 degree K etc. The properties of performance glass shall be decided by technical sanctioning authority as per the site requirement. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm3931.863931.86178.11FalseNoneNoneFalseNoneFalse700303.58460
3579997130187NonePWD SR 2023-24 Vol II Item no 18.4 page no 183Extra for openable side / top hung vision glass panels (IGUs) including providing and supplying at site all accessories and hardwares for the openable panels as specified and of the approved make such as heavy duty stainless steel friction hinges, min 4 -point cremone locking sets with stainless steel plates, handles, buffers etc. including necessary stainless steel screws/ fasteners, nuts, bolts, washers etc. all complete as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer- in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm5372.555372.55178.11FalseNoneNoneFalseNoneFalse956904.88050
3579998130187NonePWD SR 2023-24 Vol II Item no 11.28 page no 85Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workKg730.04730.04691.5FalseNoneNoneFalseNoneFalse504822.660
3579999130187NonePWD SR 2023-24 Vol II Item no 28.28 page no 220Providing & supplying Carpet/Mat of 800+ gsm with stain proof, flexible and super absorbent fibre of good quality as per direction of Engineer in charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm1808.941808.94370.42FalseNoneNoneFalseNoneFalse670067.55480
3580000130187NonePage no.183 Item No 18.4 Vol II SR 2023-24Extra for openable side / top hung vision glass panels (IGUs) including providing and supplying at site all accessories and hardwares for the openable panels as specified and of the approved make such as heavy duty stainless steel friction hinges, min 4 -point cremone locking sets with stainless steel plates, handles, buffers etc. including necessary stainless steel screws/ fasteners, nuts, bolts, washers etc. all complete as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer- in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm5372.555372.554.32FalseNoneNoneFalseNoneFalse23209.4160
17216460430000NoneNoneBuildingsTHIRD FLOOR35162351.19
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3580001130188NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum14998.8314998.83114.92FalseNoneNoneFalseNoneFalse1723665.54360
3580002130188NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum14130.814130.8182.49FalseNoneNoneFalseNoneFalse2578729.6920
3580003130188NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum13262.7613262.76278.11FalseNoneNoneFalseNoneFalse3688506.18360
3580004130188NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum12667.2512667.253.35FalseNoneNoneFalseNoneFalse42435.28750
3580005130188NonePWD SR 2023-24 Vol I Item no 2.11a page no 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workt116642.98116642.9890.02FalseNoneNoneFalseNoneFalse10500201.05960
3580006130188NonePWD SR 2023-24 Vol II Item no 6.31 page no 17Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum10402.5110402.51260.21FalseNoneNoneFalseNoneFalse2706837.12710
3580007130188NonePWD SR 2023-24 Vol II Item no 6.26 page no 16Providing and laying Autoclaved Aerated Cement blocks masonry with 100 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level in cement mortar 1:4 (1 cement : 4 coarse sand ) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum11157.4711157.4737.9FalseNoneNoneFalseNoneFalse422868.1130
3580008130188NonePWD SR 2023-24 Vol II Item no 8.2.1 page no 41Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm384.65384.65474.69FalseNoneNoneFalseNoneFalse182589.50850
3580009130188NonePWD SR 2023-24 Vol II Item no 8.1.2 page no 41Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm314.24314.244038.88FalseNoneNoneFalseNoneFalse1269177.65120
3580010130188NonePWD SR 2023-24 Vol II Item no 10.14 page no 71Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm1442.111442.11207.34FalseNoneNoneFalseNoneFalse299007.08740
3580011130188NonePWD SR 2023-24 Vol II Item no 9.7.1 page no 59Providing and fixing 10 mm thick acid and/or alkali resistant tiles of approved make and colour using acid and/or alkali resisting mortar bedding for Bathrooms: Toilet: Chemically exposed areas and joints filled with acid and/or alkali resisting cement as per IS : 4457, complete as per the direction of Engineer-in- Charge.In flooring on a bed of 10 mm thick mortar 1:4 (1 acid proof cement : 4 coarse sand) with Acid and alkali resistant tile ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm1624.661624.6683.22FalseNoneNoneFalseNoneFalse135204.20520
3580012130188NonePWD SR 2023-24 Vol II Item no 8.29 page no 468.29 Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm367.48367.48474.71FalseNoneNoneFalseNoneFalse174446.43080
3580013130188NonePWD SR 2023-24 Vol II Item no 8.54.2 page no 43Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm142.84142.845706.34FalseNoneNoneFalseNoneFalse815093.60560
3580014130188NonePWD SR 2023-24 Vol II Item no 8.27 page no 45Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm68.8268.825706.34FalseNoneNoneFalseNoneFalse392710.31880
3580015130188NonePWD SR 2023-24 Vol II Item no 11.34A page no 86Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workKgs219.06219.061379.7FalseNoneNoneFalseNoneFalse302237.0820
3580016130188NonePWD SR 2023-24 Vol II Item no 12.88 page no 110Providing & fixing of of 2track x 2panel sliding windows made out of multi chambered UPVC(Matching to RAL9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2 to 2.5 mm Maximum possible size 1819mm x 1819mm (The cost is inclusive of all fixtures and separate charges for minor T and Ps shall not be made) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm7028.027028.0263.9FalseNoneNoneFalseNoneFalse449090.4780
3580017130188NonePWD SR 2023-24 Vol II Item no 12.85 page no 109Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm7457.07457.01.8FalseNoneNoneFalseNoneFalse13422.60
3580018130188NonePWD SR 2023-24 Vol II Item no 12.13.2 page no 100Providing Red Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum129868.4129868.41.83FalseNoneNoneFalseNoneFalse237659.1720
3580019130188NonePWD SR 2023-24 Vol II Item no 12.57.4 page no 105Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.do- 35 mm thick both side Teak ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm5909.275909.27112.32FalseNoneNoneFalseNoneFalse663729.20640
3580020130188NonePWD SR 2023-24 Vol II Item no 12.93.1 page no 111Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Clerestory windows & other Frames/ Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibres (wood powder/rice husk/ wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-InCharge. (Fixtures shall be paid for separately)Size 62 x 100mm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workRmtr915.34915.34243.6FalseNoneNoneFalseNoneFalse222976.8240
3580021130188NonePWD SR 2023-24 Vol II Item no 9.24 page no 63Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm3718.723718.72307.75FalseNoneNoneFalseNoneFalse1144436.080
3580022130188NonePWD SR 2023-24 Vol II Item no 9.22.2 page no 62Providing and laying Polished Glazed Vitrified tiles with thickness 10 mm in floor with different sizes with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately).Size of Tile 600x600 mm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm1728.971728.971570.71FalseNoneNoneFalseNoneFalse2715710.46870
3580023130188NonePWD SR 2023-24 Vol II Item no 18.2 page no 181fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels, including:(a) Structural analysis & design and preparation of shop drawings for the specified design loads conforming to IS 875 part III (the system must passed the proof test at 1.5 times design wind pressure without any failure), including functional design of the aluminum sections for fixing glazing panels of various thicknesses, aluminium cleats, sleeves and splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc., structural and weather silicone sealants, flashings, fire stop (barrier)-cumsmoke seals, microwave cured EPDM gaskets for water tightness, pressure equalisation & drainage and protection against fire hazard including:(b) Fabricating and supplying serrated M.S. hot dip galvanised / Aluminium alloy of 6005 T5 brackets of required sizes, sections and profiles etc. to accommodate 3 Dimentional movement for achieving perfect verticality and fixing structural glazing system rigidly to the RCC/ masonry/ structural steel framework of building structure using stainless steel anchor fasteners/ bolts, nylon seperator to prevent bimetallic contacts with nuts and washers etc. of stainless steel grade 316, of the required capacity and in required numbers.(c)Providing and filling, two part pump filled, structural silicone sealant and one part weather silicone sealant compatible with the structural silicone sealant of required bite size in a clean and controlled factory / work shop environment, including double sided spacer tape, setting blocks and backer rod, all of approved grade, brand and manufacture, as per the approved sealant design, within and all around the perimeter for holding glass.(d)Providing and fixing in position flashings of solid aluminium sheet 1 mm thick and of sizes, shapes and profiles, as required as per the site conditions, to seal the gap between the building structure and all its interfaces with curtain glazing to make it watertight.(e) Making provision for drainage of moisture/ water that enters the curtain glazing system to make it watertight, by incorporating principles of pressure equalization, providing suitable gutter profiles at bottom (if required), making necessary holes of required sizes and of required numbers etc. complete.This item includes cost of all inputs of designing, labour for fabricating and installation of aluminium grid, installation of glazed units, T&P, scaffolding and other incidental charges including wastages etc., enabling temporary structures and services, cranes or cradles etc. as described above and as specified. The item includes the cost of getting all the structural and functional design including shop drawings checked by a structural designer, dully approved by Engineer-in-charge. The item also includes the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working structural glazing as specified, cleaning and protection till the handing over of the building for occupation. In the end, the Contractor shall provide a water tight structural glazing having all the performance characteristics etc. all complete as required, as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer- in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm3500.973500.97445.27FalseNoneNoneFalseNoneFalse1558876.91190
3580024130188NonePWD SR 2023-24 Vol II Item no 18.3 page no 183Providing, assembling and supplying vision glass panels (IGUs) comprising of hermetically-sealed 6-12- 6 mm insulated glass (double glazed) vision panel units of size and shape as required and specified, comprising of an outer heat strengthened float glass 6mm thick, of approved colour and shade with reflective soft coating on surface no 2 of approved colour and shade, an inner Heat strengthned clear float glass 6mm thick, spacer tube 12mm wide, dessicants, including primary seal and secondary seal (structural silicone sealant) etc. all complete for the required performances, as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer-in-Charge. The IGUs shall be assembled in the factory/ workshop of the glass processor. (Payment for fixing of IGU Panels in the curtain glazing is included in cost of item No.18.2)For payment, only the actual area of glass on face no 1 of the glass panels (excluding the areas of the grooves and weather silicone sealant) provided and fixed in position, shall be measured in m2.(i) Coloured tinted float glass 6mm thick substrate with reflective soft coating on face no 2, + 12mm Airgap + 6mm Heat Strengthened clear Glass of approved make having properties as visible Light transmittance (VLT) of 25 to 35 percent, Light reflection internal 10 to 15percent, light reflection external 10 to 20 percent, shading coefficient (0.25-0.28) and U value of 3.0 to 3.3 W/ m2 degree K etc. The properties of performance glass shall be decided by technical sanctioning authority as per the site requirement. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm3967.773967.77178.11FalseNoneNoneFalseNoneFalse706699.51470
3580025130188NonePWD SR 2023-24 Vol II Item no 18.4 page no 183Extra for openable side / top hung vision glass panels (IGUs) including providing and supplying at site all accessories and hardwares for the openable panels as specified and of the approved make such as heavy duty stainless steel friction hinges, min 4 -point cremone locking sets with stainless steel plates, handles, buffers etc. including necessary stainless steel screws/ fasteners, nuts, bolts, washers etc. all complete as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer- in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm5421.625421.62178.11FalseNoneNoneFalseNoneFalse965644.73820
3580026130188NonePWD SR 2023-24 Vol II Item no 11.28 page no 85Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workKg736.7736.7691.5FalseNoneNoneFalseNoneFalse509428.050
3580027130188NonePWD SR 2023-24 Vol II Item no 8.51 page no 438.51 Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm129.85129.855706.34FalseNoneNoneFalseNoneFalse740968.2490
17216460430000NoneNoneBuildingsFOURTH FLOOR35301906.92
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3580028130189NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum15079.5815079.58114.92FalseNoneNoneFalseNoneFalse1732945.33360
3580029130189NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum14211.5414211.54175.13FalseNoneNoneFalseNoneFalse2488867.00020
3580030130189NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum13343.5113343.51275.0FalseNoneNoneFalseNoneFalse3669465.250
3580031130189NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum12667.2512667.253.71FalseNoneNoneFalseNoneFalse46995.49750
3580032130189NonePWD SR 2023-24 Vol I Item no 2.11a page no 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workt117698.57117698.5788.87FalseNoneNoneFalseNoneFalse10459871.91590
3580033130189NonePWD SR 2023-24 Vol II Item no 6.31 page no 17Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum10496.6510496.65259.38FalseNoneNoneFalseNoneFalse2722621.0770
3580034130189NonePWD SR 2023-24 Vol II Item no 6.26 page no 16Providing and laying Autoclaved Aerated Cement blocks masonry with 100 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level in cement mortar 1:4 (1 cement : 4 coarse sand ) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum11258.4411258.4438.23FalseNoneNoneFalseNoneFalse430410.16120
3580035130189NonePWD SR 2023-24 Vol II Item no 8.2.1 page no 41Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm388.13388.13474.69FalseNoneNoneFalseNoneFalse184241.42970
3580036130189NonePWD SR 2023-24 Vol II Item no 8.1.2 page no 41Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm317.08317.084204.56FalseNoneNoneFalseNoneFalse1333181.88480
3580037130189NonePWD SR 2023-24 Vol II Item no 10.14 page no 71Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm1455.161455.16207.34FalseNoneNoneFalseNoneFalse301712.87440
3580038130189NonePWD SR 2023-24 Vol II Item no 9.7.1 page no 59Providing and fixing 10 mm thick acid and/or alkali resistant tiles of approved make and colour using acid and/or alkali resisting mortar bedding for Bathrooms: Toilet: Chemically exposed areas and joints filled with acid and/or alkali resisting cement as per IS : 4457, complete as per the direction of Engineer-in- Charge.In flooring on a bed of 10 mm thick mortar 1:4 (1 acid proof cement : 4 coarse sand) with Acid and alkali resistant tile ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm1639.361639.3683.22FalseNoneNoneFalseNoneFalse136427.53920
3580039130189NonePWD SR 2023-24 Vol II Item no 8.51 page no 43Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm130.85130.855851.58FalseNoneNoneFalseNoneFalse765679.2430
3580040130189NonePWD SR 2023-24 Vol II Item no 8.27 page no 45Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm69.3569.355851.58FalseNoneNoneFalseNoneFalse405807.0730
3580041130189NonePWD SR 2023-24 Vol II Item no 8.29 page no 45Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm370.31370.31474.69FalseNoneNoneFalseNoneFalse175782.45390
3580042130189NonePWD SR 2023-24 Vol II Item no 8.54.2 page no 50Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm143.94143.945851.58FalseNoneNoneFalseNoneFalse842276.42520
3580043130189NonePWD SR 2023-24 Vol II Item no 11.34A page no 86Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workKgs221.04221.041379.7FalseNoneNoneFalseNoneFalse304968.8880
3580044130189NonePWD SR 2023-24 Vol II Item no 12.88 page no 110Providing & fixing of of 2track x 2panel sliding windows made out of multi chambered UPVC(Matching to RAL9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2 to 2.5 mm Maximum possible size 1819mm x 1819mm (The cost is inclusive of all fixtures and separate charges for minor T and Ps shall not be made) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm7091.627091.6263.9FalseNoneNoneFalseNoneFalse453154.5180
3580045130189NonePWD SR 2023-24 Vol II Item no 12.85 page no 109Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm7524.497524.491.8FalseNoneNoneFalseNoneFalse13544.0820
3580046130189NonePWD SR 2023-24 Vol II Item no 12.13.2 page no 100Providing Red Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum131043.7131043.71.87FalseNoneNoneFalseNoneFalse245051.7190
3580047130189NonePWD SR 2023-24 Vol II Item no 12.57.4 page no 105Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.do- 35 mm thick both side Teak ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm5962.755962.75115.56FalseNoneNoneFalseNoneFalse689055.390
3580048130189NonePWD SR 2023-24 Vol II Item no 12.93.1 page no 111Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Clerestory windows & other Frames/ Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibres (wood powder/rice husk/ wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-InCharge. (Fixtures shall be paid for separately)Size 62 x 100mm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workRmtr923.62923.62249.3FalseNoneNoneFalseNoneFalse230258.4660
3580049130189NonePWD SR 2023-24 Vol II Item no 9.24 page no 63Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm3752.383752.38307.75FalseNoneNoneFalseNoneFalse1154794.9450
3580050130189NonePWD SR 2023-24 Vol II Item no 9.22.2 page no 62Providing and laying Polished Glazed Vitrified tiles with thickness 10 mm in floor with different sizes with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately).Size of Tile 600x600 mm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm1744.621744.621570.71FalseNoneNoneFalseNoneFalse2740292.08020
3580051130189NonePWD SR 2023-24 Vol II Item no 18.2 page no 181fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels, including:(a) Structural analysis & design and preparation of shop drawings for the specified design loads conforming to IS 875 part III (the system must passed the proof test at 1.5 times design wind pressure without any failure), including functional design of the aluminum sections for fixing glazing panels of various thicknesses, aluminium cleats, sleeves and splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc., structural and weather silicone sealants, flashings, fire stop (barrier)-cumsmoke seals, microwave cured EPDM gaskets for water tightness, pressure equalisation & drainage and protection against fire hazard including:(b) Fabricating and supplying serrated M.S. hot dip galvanised / Aluminium alloy of 6005 T5 brackets of required sizes, sections and profiles etc. to accommodate 3 Dimentional movement for achieving perfect verticality and fixing structural glazing system rigidly to the RCC/ masonry/ structural steel framework of building structure using stainless steel anchor fasteners/ bolts, nylon seperator to prevent bimetallic contacts with nuts and washers etc. of stainless steel grade 316, of the required capacity and in required numbers.(c)Providing and filling, two part pump filled, structural silicone sealant and one part weather silicone sealant compatible with the structural silicone sealant of required bite size in a clean and controlled factory / work shop environment, including double sided spacer tape, setting blocks and backer rod, all of approved grade, brand and manufacture, as per the approved sealant design, within and all around the perimeter for holding glass.(d)Providing and fixing in position flashings of solid aluminium sheet 1 mm thick and of sizes, shapes and profiles, as required as per the site conditions, to seal the gap between the building structure and all its interfaces with curtain glazing to make it watertight.(e) Making provision for drainage of moisture/ water that enters the curtain glazing system to make it watertight, by incorporating principles of pressure equalization, providing suitable gutter profiles at bottom (if required), making necessary holes of required sizes and of required numbers etc. complete.This item includes cost of all inputs of designing, labour for fabricating and installation of aluminium grid, installation of glazed units, T&P, scaffolding and other incidental charges including wastages etc., enabling temporary structures and services, cranes or cradles etc. as described above and as specified. The item includes the cost of getting all the structural and functional design including shop drawings checked by a structural designer, dully approved by Engineer-in-charge. The item also includes the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working structural glazing as specified, cleaning and protection till the handing over of the building for occupation. In the end, the Contractor shall provide a water tight structural glazing having all the performance characteristics etc. all complete as required, as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer- in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm3532.653532.65445.27FalseNoneNoneFalseNoneFalse1572983.06550
3580052130189NonePWD SR 2023-24 Vol II Item no 18.3 page no 183Providing, assembling and supplying vision glass panels (IGUs) comprising of hermetically-sealed 6-12- 6 mm insulated glass (double glazed) vision panel units of size and shape as required and specified, comprising of an outer heat strengthened float glass 6mm thick, of approved colour and shade with reflective soft coating on surface no 2 of approved colour and shade, an inner Heat strengthned clear float glass 6mm thick, spacer tube 12mm wide, dessicants, including primary seal and secondary seal (structural silicone sealant) etc. all complete for the required performances, as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer-in-Charge. The IGUs shall be assembled in the factory/ workshop of the glass processor. (Payment for fixing of IGU Panels in the curtain glazing is included in cost of item No.18.2)For payment, only the actual area of glass on face no 1 of the glass panels (excluding the areas of the grooves and weather silicone sealant) provided and fixed in position, shall be measured in m2.(i) Coloured tinted float glass 6mm thick substrate with reflective soft coating on face no 2, + 12mm Airgap + 6mm Heat Strengthened clear Glass of approved make having properties as visible Light transmittance (VLT) of 25 to 35 percent, Light reflection internal 10 to 15percent, light reflection external 10 to 20 percent, shading coefficient (0.25-0.28) and U value of 3.0 to 3.3 W/ m2 degree K etc. The properties of performance glass shall be decided by technical sanctioning authority as per the site requirement. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm4003.684003.68178.11FalseNoneNoneFalseNoneFalse713095.44480
3580053130189NonePWD SR 2023-24 Vol II Item no 18.4 page no 183Extra for openable side / top hung vision glass panels (IGUs) including providing and supplying at site all accessories and hardwares for the openable panels as specified and of the approved make such as heavy duty stainless steel friction hinges, min 4 -point cremone locking sets with stainless steel plates, handles, buffers etc. including necessary stainless steel screws/ fasteners, nuts, bolts, washers etc. all complete as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer- in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm5470.685470.68178.11FalseNoneNoneFalseNoneFalse974382.81480
3580054130189NonePWD SR 2023-24 Vol II Item no 11.28 page no 85Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workKg743.37743.37691.5FalseNoneNoneFalseNoneFalse514040.3550
17216460430000NoneNoneBuildingsFIFTH FLOOR22979270.05
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3580055130190NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum15160.3215160.32114.95FalseNoneNoneFalseNoneFalse1742678.7840
3580056130190NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum14292.2914292.29109.36FalseNoneNoneFalseNoneFalse1563004.83440
3580057130190NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum13424.2613424.26278.29FalseNoneNoneFalseNoneFalse3735837.31540
3580058130190NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum12990.2412990.242.55FalseNoneNoneFalseNoneFalse33125.1120
3580059130190NonePWD SR 2023-24 Vol I Item no 2.11a page no 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workt118754.17118754.1784.0FalseNoneNoneFalseNoneFalse9975350.280
3580060130190NonePWD SR 2023-24 Vol II Item no 6.31 page no 17Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum10590.810590.855.72FalseNoneNoneFalseNoneFalse590119.3760
3580061130190NonePWD SR 2023-24 Vol II Item no 8.2.1 page no 41Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm391.61391.61482.52FalseNoneNoneFalseNoneFalse188959.65720
3580062130190NonePWD SR 2023-24 Vol II Item no 8.1.2 page no 41Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm319.93319.93463.61FalseNoneNoneFalseNoneFalse148322.74730
3580063130190NonePWD SR 2023-24 Vol II Item no 8.51 page no 43Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm131.85131.85463.61FalseNoneNoneFalseNoneFalse61126.97850
3580064130190NonePWD SR 2023-24 Vol II Item no 8.27 page no 45Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm69.8869.88463.61FalseNoneNoneFalseNoneFalse32397.06680
3580065130190NonePWD SR 2023-24 Vol II Item no 8.29 page no 45Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm373.14373.14482.52FalseNoneNoneFalseNoneFalse180047.51280
3580066130190NonePWD SR 2023-24 Vol II Item no 8.54.2 page no 50Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm145.04145.04463.61FalseNoneNoneFalseNoneFalse67241.99440
3580067130190NonePWD SR 2023-24 Vol II Item no 11.34A page no 86Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workKgs223.02223.021039.5FalseNoneNoneFalseNoneFalse231829.290
3580068130190NonePWD SR 2023-24 Vol II Item no 12.88 page no 110Providing & fixing of of 2track x 2panel sliding windows made out of multi chambered UPVC(Matching to RAL9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2 to 2.5 mm Maximum possible size 1819mm x 1819mm (The cost is inclusive of all fixtures and separate charges for minor T and Ps shall not be made) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm7155.237155.2347.7FalseNoneNoneFalseNoneFalse341304.4710
3580069130190NonePWD SR 2023-24 Vol II Item no 12.85 page no 109Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm7591.977591.971.8FalseNoneNoneFalseNoneFalse13665.5460
3580070130190NonePWD SR 2023-24 Vol II Item no 18.2 page no 181fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels, including:(a) Structural analysis & design and preparation of shop drawings for the specified design loads conforming to IS 875 part III (the system must passed the proof test at 1.5 times design wind pressure without any failure), including functional design of the aluminum sections for fixing glazing panels of various thicknesses, aluminium cleats, sleeves and splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc., structural and weather silicone sealants, flashings, fire stop (barrier)-cumsmoke seals, microwave cured EPDM gaskets for water tightness, pressure equalisation & drainage and protection against fire hazard including:(b) Fabricating and supplying serrated M.S. hot dip galvanised / Aluminium alloy of 6005 T5 brackets of required sizes, sections and profiles etc. to accommodate 3 Dimentional movement for achieving perfect verticality and fixing structural glazing system rigidly to the RCC/ masonry/ structural steel framework of building structure using stainless steel anchor fasteners/ bolts, nylon seperator to prevent bimetallic contacts with nuts and washers etc. of stainless steel grade 316, of the required capacity and in required numbers.(c)Providing and filling, two part pump filled, structural silicone sealant and one part weather silicone sealant compatible with the structural silicone sealant of required bite size in a clean and controlled factory / work shop environment, including double sided spacer tape, setting blocks and backer rod, all of approved grade, brand and manufacture, as per the approved sealant design, within and all around the perimeter for holding glass.(d)Providing and fixing in position flashings of solid aluminium sheet 1 mm thick and of sizes, shapes and profiles, as required as per the site conditions, to seal the gap between the building structure and all its interfaces with curtain glazing to make it watertight.(e) Making provision for drainage of moisture/ water that enters the curtain glazing system to make it watertight, by incorporating principles of pressure equalization, providing suitable gutter profiles at bottom (if required), making necessary holes of required sizes and of required numbers etc. complete.This item includes cost of all inputs of designing, labour for fabricating and installation of aluminium grid, installation of glazed units, T&P, scaffolding and other incidental charges including wastages etc., enabling temporary structures and services, cranes or cradles etc. as described above and as specified. The item includes the cost of getting all the structural and functional design including shop drawings checked by a structural designer, dully approved by Engineer-in-charge. The item also includes the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working structural glazing as specified, cleaning and protection till the handing over of the building for occupation. In the end, the Contractor shall provide a water tight structural glazing having all the performance characteristics etc. all complete as required, as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer- in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm3564.343564.34443.21FalseNoneNoneFalseNoneFalse1579751.13140
3580071130190NonePWD SR 2023-24 Vol II Item no 18.3 page no 183Providing, assembling and supplying vision glass panels (IGUs) comprising of hermetically-sealed 6-12- 6 mm insulated glass (double glazed) vision panel units of size and shape as required and specified, comprising of an outer heat strengthened float glass 6mm thick, of approved colour and shade with reflective soft coating on surface no 2 of approved colour and shade, an inner Heat strengthned clear float glass 6mm thick, spacer tube 12mm wide, dessicants, including primary seal and secondary seal (structural silicone sealant) etc. all complete for the required performances, as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer-in-Charge. The IGUs shall be assembled in the factory/ workshop of the glass processor. (Payment for fixing of IGU Panels in the curtain glazing is included in cost of item No.18.2)For payment, only the actual area of glass on face no 1 of the glass panels (excluding the areas of the grooves and weather silicone sealant) provided and fixed in position, shall be measured in m2.(i) Coloured tinted float glass 6mm thick substrate with reflective soft coating on face no 2, + 12mm Airgap + 6mm Heat Strengthened clear Glass of approved make having properties as visible Light transmittance (VLT) of 25 to 35 percent, Light reflection internal 10 to 15percent, light reflection external 10 to 20 percent, shading coefficient (0.25-0.28) and U value of 3.0 to 3.3 W/ m2 degree K etc. The properties of performance glass shall be decided by technical sanctioning authority as per the site requirement. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm4039.584039.58178.28FalseNoneNoneFalseNoneFalse720176.32240
3580072130190NonePWD SR 2023-24 Vol II Item no 18.4 page no 183Extra for openable side / top hung vision glass panels (IGUs) including providing and supplying at site all accessories and hardwares for the openable panels as specified and of the approved make such as heavy duty stainless steel friction hinges, min 4 -point cremone locking sets with stainless steel plates, handles, buffers etc. including necessary stainless steel screws/ fasteners, nuts, bolts, washers etc. all complete as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer- in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm5519.755519.75178.11FalseNoneNoneFalseNoneFalse983122.67250
3580073130190NonePWD SR 2023-24 Vol II Item no page no 9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm3786.033786.0371.99FalseNoneNoneFalseNoneFalse272556.29970
3580074130190NonePWD SR 2023-24 Vol II Item no 11.28 page no 84Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge,(for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workKg750.04750.04691.5FalseNoneNoneFalseNoneFalse518652.660
17216460430000NoneNoneBuildingsSIXTH FLOOR23057932.6
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3580075130191NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum15241.0715241.07114.95FalseNoneNoneFalseNoneFalse1751960.99650
3580076130191NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum14373.0414373.04109.12FalseNoneNoneFalseNoneFalse1568386.12480
3580077130191NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum13505.013505.0278.29FalseNoneNoneFalseNoneFalse3758306.450
3580078130191NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum12667.2512667.252.23FalseNoneNoneFalseNoneFalse28247.96750
3580079130191NonePWD SR 2023-24 Vol I Item no 2.11a page no 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workt119809.76119809.7683.86FalseNoneNoneFalseNoneFalse10047246.47360
3580080130191NonePWD SR 2023-24 Vol II Item no 6.31 page no 17Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum10684.9410684.9453.16FalseNoneNoneFalseNoneFalse568011.41040
3580081130191NonePWD SR 2023-24 Vol II Item no 8.2.1 page no 41Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm395.09395.09484.06FalseNoneNoneFalseNoneFalse191247.26540
3580082130191NonePWD SR 2023-24 Vol II Item no 8.1.2 page no 41Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm322.77322.77465.15FalseNoneNoneFalseNoneFalse150136.46550
3580083130191NonePWD SR 2023-24 Vol II Item no 8.51 page no 43Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm132.85132.85465.15FalseNoneNoneFalseNoneFalse61795.17750
3580084130191NonePWD SR 2023-24 Vol II Item no 8.27 page no 45Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm70.4170.41465.15FalseNoneNoneFalseNoneFalse32751.21150
3580085130191NonePWD SR 2023-24 Vol II Item no 8.29 page no 45Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm375.97375.97484.06FalseNoneNoneFalseNoneFalse181992.03820
3580086130191NonePWD SR 2023-24 Vol II Item no 8.54.2 page no 50Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm146.14146.14465.15FalseNoneNoneFalseNoneFalse67977.0210
3580087130191NonePWD SR 2023-24 Vol II Item no 11.34A page no 86Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workKgs225.0225.0975.24FalseNoneNoneFalseNoneFalse219429.00
3580088130191NonePWD SR 2023-24 Vol II Item no 12.88 page no 110Providing & fixing of of 2track x 2panel sliding windows made out of multi chambered UPVC(Matching to RAL9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2 to 2.5 mm Maximum possible size 1819mm x 1819mm (The cost is inclusive of all fixtures and separate charges for minor T and Ps shall not be made) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm7218.837218.8341.4FalseNoneNoneFalseNoneFalse298859.5620
3580089130191NonePWD SR 2023-24 Vol II Item no 12.85 page no 109Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm7659.467659.465.04FalseNoneNoneFalseNoneFalse38603.67840
3580090130191NonePWD SR 2023-24 Vol II Item no 18.2 page no 181fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels, including:(a) Structural analysis & design and preparation of shop drawings for the specified design loads conforming to IS 875 part III (the system must passed the proof test at 1.5 times design wind pressure without any failure), including functional design of the aluminum sections for fixing glazing panels of various thicknesses, aluminium cleats, sleeves and splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc., structural and weather silicone sealants, flashings, fire stop (barrier)-cumsmoke seals, microwave cured EPDM gaskets for water tightness, pressure equalisation & drainage and protection against fire hazard including:(b) Fabricating and supplying serrated M.S. hot dip galvanised / Aluminium alloy of 6005 T5 brackets of required sizes, sections and profiles etc. to accommodate 3 Dimentional movement for achieving perfect verticality and fixing structural glazing system rigidly to the RCC/ masonry/ structural steel framework of building structure using stainless steel anchor fasteners/ bolts, nylon seperator to prevent bimetallic contacts with nuts and washers etc. of stainless steel grade 316, of the required capacity and in required numbers.(c)Providing and filling, two part pump filled, structural silicone sealant and one part weather silicone sealant compatible with the structural silicone sealant of required bite size in a clean and controlled factory / work shop environment, including double sided spacer tape, setting blocks and backer rod, all of approved grade, brand and manufacture, as per the approved sealant design, within and all around the perimeter for holding glass.(d)Providing and fixing in position flashings of solid aluminium sheet 1 mm thick and of sizes, shapes and profiles, as required as per the site conditions, to seal the gap between the building structure and all its interfaces with curtain glazing to make it watertight.(e) Making provision for drainage of moisture/ water that enters the curtain glazing system to make it watertight, by incorporating principles of pressure equalization, providing suitable gutter profiles at bottom (if required), making necessary holes of required sizes and of required numbers etc. complete.This item includes cost of all inputs of designing, labour for fabricating and installation of aluminium grid, installation of glazed units, T&P, scaffolding and other incidental charges including wastages etc., enabling temporary structures and services, cranes or cradles etc. as described above and as specified. The item includes the cost of getting all the structural and functional design including shop drawings checked by a structural designer, dully approved by Engineer-in-charge. The item also includes the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working structural glazing as specified, cleaning and protection till the handing over of the building for occupation. In the end, the Contractor shall provide a water tight structural glazing having all the performance characteristics etc. all complete as required, as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer- in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm3596.023596.02443.21FalseNoneNoneFalseNoneFalse1593792.02420
3580091130191NonePWD SR 2023-24 Vol II Item no 18.3 page no 183Providing, assembling and supplying vision glass panels (IGUs) comprising of hermetically-sealed 6-12- 6 mm insulated glass (double glazed) vision panel units of size and shape as required and specified, comprising of an outer heat strengthened float glass 6mm thick, of approved colour and shade with reflective soft coating on surface no 2 of approved colour and shade, an inner Heat strengthned clear float glass 6mm thick, spacer tube 12mm wide, dessicants, including primary seal and secondary seal (structural silicone sealant) etc. all complete for the required performances, as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer-in-Charge. The IGUs shall be assembled in the factory/ workshop of the glass processor. (Payment for fixing of IGU Panels in the curtain glazing is included in cost of item No.18.2)For payment, only the actual area of glass on face no 1 of the glass panels (excluding the areas of the grooves and weather silicone sealant) provided and fixed in position, shall be measured in m2.(i) Coloured tinted float glass 6mm thick substrate with reflective soft coating on face no 2, + 12mm Airgap + 6mm Heat Strengthened clear Glass of approved make having properties as visible Light transmittance (VLT) of 25 to 35 percent, Light reflection internal 10 to 15percent, light reflection external 10 to 20 percent, shading coefficient (0.25-0.28) and U value of 3.0 to 3.3 W/ m2 degree K etc. The properties of performance glass shall be decided by technical sanctioning authority as per the site requirement. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm4039.584039.58177.28FalseNoneNoneFalseNoneFalse716136.74240
3580092130191NonePWD SR 2023-24 Vol II Item no 18.4 page no 183Extra for openable side / top hung vision glass panels (IGUs) including providing and supplying at site all accessories and hardwares for the openable panels as specified and of the approved make such as heavy duty stainless steel friction hinges, min 4 -point cremone locking sets with stainless steel plates, handles, buffers etc. including necessary stainless steel screws/ fasteners, nuts, bolts, washers etc. all complete as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer- in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm5568.815568.81177.28FalseNoneNoneFalseNoneFalse987238.63680
3580093130191NonePWD SR 2023-24 Vol II Item no page no 9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm3786.033786.0371.99FalseNoneNoneFalseNoneFalse272556.29970
3580094130191NonePWD SR 2023-24 Vol II Item no 11.28 page no 84Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge,(for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workKg756.7756.7691.5FalseNoneNoneFalseNoneFalse523258.050
17216460430000NoneNoneBuildingsTerrace Floor- Head Room9931717.14
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3580095130192NonePWD SR 2023-24 Vol I Item no 2.1.3 page no 15Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately). Mix 1:2:4 Using 40 mm nominal size graded crushed coarse aggregates. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum8317.378317.3793.75FalseNoneNoneFalseNoneFalse779753.43750
3580096130192NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum15321.8215321.8254.94FalseNoneNoneFalseNoneFalse841780.79080
3580097130192NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum14453.814453.880.67FalseNoneNoneFalseNoneFalse1165988.0460
3580098130192NonePWD SR 2023-24 Vol I Item no 2.5.2 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum13585.813585.838.7FalseNoneNoneFalseNoneFalse525770.460
3580099130192NonePWD SR 2023-24 Vol I Item no 2.11a page no 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workt120865.4120865.417.41FalseNoneNoneFalseNoneFalse2104266.6140
3580100130192NonePWD SR 2023-24 Vol II Item no 6.31 page no 17Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum10779.0810779.0819.43FalseNoneNoneFalseNoneFalse209437.52440
3580101130192NonePWD SR 2023-24 Vol II Item no 6.26 page no 16Providing and laying Autoclaved Aerated Cement blocks masonry with 100 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level in cement mortar 1:4 (1 cement : 4 coarse sand ) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum11561.3611561.3624.0FalseNoneNoneFalseNoneFalse277472.640
3580102130192NonePWD SR 2023-24 Vol II Item no 8.5.2 page no 42Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm398.57398.57614.8FalseNoneNoneFalseNoneFalse245040.8360
3580103130192NonePWD SR 2023-24 Vol II Item no 8.1.2 page no 41Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm325.62325.62114.78FalseNoneNoneFalseNoneFalse37374.66360
3580104130192NonePWD SR 2023-24 Vol II Item no 8.29 page no 46Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm378.8378.8614.8FalseNoneNoneFalseNoneFalse232886.240
3580105130192NonePWD SR 2023-24 Vol II Item no 8.51 page no 43Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm133.85133.85114.78FalseNoneNoneFalseNoneFalse15363.3030
3580106130192NonePWD SR 2023-24 Vol II Item no 8.27 page no 45Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm70.9470.94114.78FalseNoneNoneFalseNoneFalse8142.49320
3580107130192NonePWD SR 2023-24 Vol II Item no 8.54.2 page no 50Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm147.24147.24114.78FalseNoneNoneFalseNoneFalse16900.20720
3580108130192NonePWD SR 2023-24 Vol II Item no 12.13.2 page no 100Providing Red Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum134569.6134569.60.19FalseNoneNoneFalseNoneFalse25568.2240
3580109130192NonePWD SR 2023-24 Vol II Item no 12.57.4 page no 105Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.do- 35 mm thick both side Teak ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm6123.196123.1914.4FalseNoneNoneFalseNoneFalse88173.9360
3580110130192NonePWD SR 2023-24 Vol II Item no 12.93.1 page no 111Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Clerestory windows & other Frames/ Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibres (wood powder/rice husk/ wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-InCharge. (Fixtures shall be paid for separately)Size 62 x 100mm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workRmtr754.65754.6525.2FalseNoneNoneFalseNoneFalse19017.180
3580111130192NonePWD SR 2023-24 Vol II Item no 9.24 page no 63Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm3853.343853.3414.7FalseNoneNoneFalseNoneFalse56644.0980
3580112130192NonePWD SR 2023-24 Vol II Item no 11.28 page no 85Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workKg756.7756.7738.75FalseNoneNoneFalseNoneFalse559012.1250
3580113130192NonePWD SR 2023-24 Vol II Item no 15.1 page no 149Polyurethane based Single Component for New Surface Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation,making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm1103.851103.851847.87FalseNoneNoneFalseNoneFalse2039771.29950
3580114130192NonePWD SR 2023-24 Vol II Item no 18.2 page no 181Designing, fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels, including:(a) Structural analysis & design and preparation of shop drawings for the specified design loads conforming to IS 875 part III(the system must passed the proof test at 1.5 times design wind pressure without any failure), including functional design of the aluminum sections for fixing glazing panels of various thicknesses, aluminium cleats, sleeves and splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc.,structural and weather silicone sealants, flashings, fire stop (barrier)-cumsmoke seals, microwave cured EPDM gaskets for water tightness, pressure equalisation & drainage and protection against fire hazard including:(b)Fabricating and supplying serrated M.S. hot dip galvanised / Aluminium alloy of 6005 T5 brackets of required sizes, sections and profiles etc. to accommodate 3 Dimentional movement for achieving perfect verticality and fixing structural glazing system rigidly to the RCC/ masonry/ structural steel framework of building structure using stainless steel anchor fasteners/ bolts, nylon seperator to prevent bimetallic contacts with nuts and washers etc. of stainless steel grade 316, of the required capacity and in required numbers.(c)Providing and filling, two part pump filled, structural silicone sealant and one part weather silicone sealant compatible with the structural silicone sealant of required bite size in a clean and controlled factory / work shop environment, including double sided spacer tape, setting blocks and backer rod, all of approved grade, brand and manufacture, as per the approved sealant design, within and all around the perimeter for holding glass.(d)Providing and fixing in position flashings of solid aluminium sheet 1 mm thick and of sizes, shapes and profiles, as required as per the site conditions, to seal the gap between the building structure and all its interfaces with curtain glazing to make it watertight.(e) Making provision for drainage of moisture/ water thatenters the curtain glazing system to make it watertight, by incorporating principles of pressure equalization, providing suitable gutter profiles at bottom (if required), making necessary holes of required sizes and of required numbers etc. complete. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm3627.73627.7118.18FalseNoneNoneFalseNoneFalse428721.5860
3580115130192NonePWD SR 2023-24 Vol II Item no 18.3 page no 183Providing, assembling and supplying vision glass panels (IGUs) comprising of hermetically-sealed 6-12- 6 mm insulated glass (double glazed) vision panel units of size and shape as required and specified, comprising of an outer heat strengthened float glass 6mm thick, of approved colour and shade with reflective soft coating on surface no 2 of approved colour and shade, an inner Heat strengthned clear float glass 6mm thick, spacer tube 12mm wide, dessicants, including primary seal and secondary seal (structural silicone sealant) etc. all complete for the required performances, as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer-in-Charge. The IGUs shall be assembled in the factory/ workshop of the glass processor.(Payment for fixing of IGU Panels in the curtain glazing is included in cost of item No.18.2)For payment, only the actual area of glass on face no 1 of the glass panels (excluding the areas of the grooves and weather silicone sealant) provided and fixed in position, shall be measured in m2.(i)Coloured tinted float glass 6mm thick substrate with reflective soft coating on face 2, + 12mm Airgap + 6mm Heat Strengthened clear Glass of approved make having properties as visible Light transmittance (VLT) of 25 to 35 percent, Light reflection internal 10 to 15percent, light reflection external 10 to 20 perc, shading coefficient (0.25-0.28) and U value of 3.0 to 3.3 W/m2 degree K etc. The properties of performance glass shall be decided by technical sanctioning authority as per the site requirement ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm4111.44111.423.64FalseNoneNoneFalseNoneFalse97193.4960
3580116130192NonePWD SR 2023-24 Vol II Item no 18.4 page no 183Extra for openable side / top hung vision glass panels (IGUs) including providing and supplying at site all accessories and hardwares for the openable panels as specified and of the approved make such as heavy duty stainless steel friction hinges, min 4 -point cremone locking sets with stainless steel plates, handles, buffers etc. including necessary stainless steel screws/ fasteners, nuts, bolts, washers etc. all complete as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer- in-Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm5617.875617.8723.64FalseNoneNoneFalseNoneFalse132806.44680
3580117130192NonePWD SR 2023-24 Vol II Item no 2.1.4 page no 15Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately). Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum8321.458321.452.96FalseNoneNoneFalseNoneFalse24631.4920
17216460430000NoneNoneBuildingsWater Supply and Sanitary Works17454598.8
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3580118130193NonePWD SR 2023-24 Vol II Item no 10.1.8 page no 113Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr740.8740.81600.0FalseNoneNoneFalseNoneFalse1185280.00
3580119130193NonePWD SR 2023-24 Vol II Item no 13.32.2 page no 122Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr480.76480.763500.0FalseNoneNoneFalseNoneFalse1682660.00
3580120130193NonePWD SR 2023-24 Vol II Item no 13.32.3 page no 122Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr605.07605.072200.0FalseNoneNoneFalseNoneFalse1331154.00
3580121130193NonePWD SR 2023-24 Vol II Item no 13.1.1 page no 117Making connection of G.I. distribution branch with G.I. main of following sizes by providing and fixing tee, including cutting and threading the pipe etc. complete : ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNo771.25771.25500.0FalseNoneNoneFalseNoneFalse385625.00
3580122130193NonePWD SR 2023-24 Vol II Item no 13.4.1 page no 117Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) 25 mm nominal bore ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNo696.41696.41324.0FalseNoneNoneFalseNoneFalse225636.840
3580123130193NonePWD SR 2023-24 Vol II Item no 13.11.2 page no 119Providing and fixing G.I. Union in existing G.I. pipe line, cutting and threading the pipe and making long screws, including excavation, refilling the earth or cutting of wall and making good the same complete wherever required : 20 mm nominal bore ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSet716.7716.7600.0FalseNoneNoneFalseNoneFalse430020.00
3580124130193NonePWD SR 2023-24 Vol II Item no13.6.1.1 page no 115Providing and fixing gun metal non- return valve of approved quality (screwed end) : 25 mm nominal bore Horizontal ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNo786.47786.47360.0FalseNoneNoneFalseNoneFalse283129.20
3580125130193NonePWD SR 2023-24 Vol II Item no 13.51 page no 125Constructing masonry Chamber 30x30x50 cm inside, in brick work in cement mortar 1:4 (1 cement :4 coarse sand) with C. I. surface box 100x100 x75 mm (inside) with hinged cover fixed in cement concrete slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), i/c necessary excavation, foundation concrete 1:5:10 ( 1 cement : 5 fine sand : 10 graded stone aggregate 40mm nominal size ) and inside plastering with cement mortar 1:3 (1 cement 3 coarse sand) 12mm thick, finished with a floating coat of neat cement complete as per standard design : With common burnt clay (non modular) bricks of class designation 3.5 ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach2164.062164.06180.0FalseNoneNoneFalseNoneFalse389530.80
3580126130193NonePWD SR 2023-24 Vol II Item no 14.1.1 page no 131Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach6195.356195.35175.0FalseNoneNoneFalseNoneFalse1084186.250
3580127130193NonePWD SR 2023-24 Vol II Item no 13.10.5 page no 119Providing and fixing G.I. Union in G.I. pipe including cutting and threading the pipe and making long screws etc. complete (New work) :40 mm nominal bore ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNos645.67645.67600.0FalseNoneNoneFalseNoneFalse387402.00
3580128130193NonePWD SR 2023-24 Vol II Item no 10.1.6 page no 113Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For: PVC pipes 90mm dia., 6 kg/sqcm & class 3 ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr372.94372.94900.0FalseNoneNoneFalseNoneFalse335646.00
3580129130193NonePWD SR 2023-24 Vol II Item no 10.1.7 page no 113Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For: PVC pipes 110mm dia., 6 kg/sqcm & class 3 ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr521.35521.351500.0FalseNoneNoneFalseNoneFalse782025.00
3580130130193NonePWD SR 2023-24 Vol II Item no 14.31 page no 136Providing and fixing 600x450 mm beveled edge mirror of superior glass (of approved quality) complete with 6 mm thick hard board ground fixed to wooden cleats with C.P. brass screws and washers complete. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach1547.571547.57294.0FalseNoneNoneFalseNoneFalse454985.580
3580131130193NonePWD SR 2023-24 Vol II SL no 1062 page no A44White vitreous china purpose closet(Anglo indian WC) suitable for use as squatting pan or European type water closet as per manufacturers specifications ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach3805.53805.5294.0FalseNoneNoneFalseNoneFalse1118817.00
3580132130193NonePWD SR 2023-24 Vol II Item no 14.7A page no 133Providing and fixing wash basin with C.I. brackets, 15 mm dia CP Brass single hole basin mixer of approved quality and make, including painting of fittings and brackets, cutting and making good the walls wherever required: using White Vitreous China Wash basin size 550x400 mm with a 15 mm CP Brass single hole basin mixer ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach5227.495227.49224.0FalseNoneNoneFalseNoneFalse1170957.760
3580133130193NonePWD SR 2023-24 Vol II Item no 14.5.4 page no 132Range of four half stall urinals with 10 litre P.V.C. automatic flushing cistern ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach24060.9124060.9177.0FalseNoneNoneFalseNoneFalse1852690.070
3580134130193NonePWD SR 2023-24 Vol II Item no 14.85 page no 144Providing and fixing Liquid soap dispenser made of Stainless steel with all concealed fitting arrangements & all necessary accesories complete - Class Premium ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach4839.334839.3370.0FalseNoneNoneFalseNoneFalse338753.10
3580135130193NonePWD SR 2023-24 Vol II Item no 13.14 page no 119roviding and fixing C.P. brass long body bib cock of approved quality conforming to IS standards and weighing not less than 690 g. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach1073.151073.15112.0FalseNoneNoneFalseNoneFalse120192.80
3580136130193NonePWD SR 2023-24 Vol II Item no 14.63B page no 141Providing and fixing Single lever sink mixer with swivel spout top outlet wall mountable made of Stainless steel with all concealed fitting arrangements & all necessary accesories complete - Class ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach7350.967350.9670.0FalseNoneNoneFalseNoneFalse514567.20
3580137130193NonePWD SR 2023-24 Vol II SL no 910 page no A39Stainless steel sink - with drain board bowl depth 250 mm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach4693.454693.45147.0FalseNoneNoneFalseNoneFalse689937.150
3580138130193NonePWD SR 2023-24 Vol II Item no 14.39 page no 137Providing and fixing PTMT towel ring trapezoidal shape 215 mm long, 200 mm wide with minimum distances of 37 mm from wall face with concealed fittings arrangement of approved quality and colour, weighing not less than 88 g. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach247.36247.36420.0FalseNoneNoneFalseNoneFalse103891.20
3580139130193NonePWD SR 2023-24 Vol II SL no 137 page no 14.39UPVC pipe IS 16098 SN 8 - 315mm dia ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workm2359.412359.41500.0FalseNoneNoneFalseNoneFalse1179705.00
3580140130193NonePWD SR 2023-24 Vol II Item no 13.40 page no 124Providing and fixing square-mouth S.W. gully trap class SP-1 complete with C.I. grating brick masonry chamber with water tight C.I. cover 180 x 150 mm size P type & With Non Modular common burnt clay bricks of designation 3.5 & frame of 300 x300 mm size (inside) the weight of cover to be not less than 4.50 kg and frame to be not less than 2.70 kg as per standard design: ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach3407.193407.1950.0FalseNoneNoneFalseNoneFalse170359.50
3580141130193NonePWD SR 2023-24 Vol II Item no 13.55 page no 127Constructing brick masonry chamber for underground C.I. inspection chamber and bends with bricks in cement mortar 1:4 (1 cement : 4 coarse sand) C.I. cover with frame (light duty) 600X850 mm internal dimensions, total weight of cover with frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg), R.C.C. top slab with 1:1.5:3 mix (1 cement : 1.5 fine sand : 3 graded stone aggregate 20 mm nominal size), foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand), finished smooth with a floating coat of neat cement on walls and bed concrete etc.complete as per standard design: Inside dimensions 600x 850 mm and 45 cm deep for pipe line with three or more inlets : With common burnt clay (non modular) bricks of class designation 3.5 ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach9388.179388.1750.0FalseNoneNoneFalseNoneFalse469408.50
3580142130193NonePWD SR 2023-24 Vol II Item no 13.52 page no 126Constructing brick masonry manhole in cement mortar 1:4 ( 1 cement : 4 coarse sand ) with R.C.C. top slab with 1:1.5:3 mix (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size), foundation concrete 1:4:8 mix (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand) finished with floating coat of neat cement and making channels in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement complete as per standard design : Inside size 90x80 cm and 45 cm deep including C.I. cover with frame (light duty) 455x610 mm internal dimensions, total weight of cover and frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg)With common burnt clay (non modular) bricks of class designation 3.5 ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNos13402.9713402.9745.0FalseNoneNoneFalseNoneFalse603133.650
3580143130193NonePWD SR 2023-24 Vol II SL no 427 page no A25Gunmetal non-return valve-vertical (screwed end) 80 mm dia ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNos4122.634122.6340.0FalseNoneNoneFalseNoneFalse164905.20
17216460430000NoneNoneBuildingsFire Works22186385.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3580144130194NonePWD Ele SR 2023-24 Item Code.15.85.6 Pg No.88Supply, installation, testing & commissioning of diesel engine driven pump,horizontal mounted, Horizontal spiltcase centrifugal single stage pump,capable of delivering required flow at required head when running at 1800 RPM with adequate BHP automatic diesel engine driven pumpset having the residential silencer system and other accessories like fuel tank, necessary radiator cooling system, flanges, neoprene gaskets (16.0 kg/sqcm), 200 litres fuel storage tank with piping, valves as per detailed specification and two separate starting mechanisms (automatic starting by battery power, electric starting motor as well as manual starting by electric start motor) common bed plate with anti vibration pads, necessary foundation, foundation bolts etc., ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNos792813.0792813.04.0FalseNoneNoneFalseNoneFalse3171252.00
3580145130194NonePWD Ele SR 2023-24 Item Code.15.82.6 Pg No.88Supply, installation, testing and commissioning of diesel engine driven pump,horizontal mounted, Horizontal spiltcase centrifugal single stage pump,capable of delivering required flow at required head when running at 1800RPM with adequate BHP automatic diesel engine driven pumpset having theresidential silencer system and other accessories like fuel tank, necessary radiator cooling system, flanges, neoprene gaskets (16.0 kg/sqcm), 200 litres fuel storage tank with piping, valves as per detailed specification and two separate starting mechanisms (automatic starting by battery power, electric starting motor as well as manual starting by electric start motor) common bed plate with anti vibration pads, necessary foundation, foundation bolts etc., 2280 LPM at 120m head MWC. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNos843553.0843553.08.0FalseNoneNoneFalseNoneFalse6748424.00
3580146130194NonePWD Ele SR 2023-24 Item Code.15.85.6 Pg No.88Supply, Installation, testing and commisioning electrically driven jockey pump of capacity 180.0 Lpm at required head end suction type bronze impeller pump oupled to electrical driven motor with suitable HP with all the necessary accessories, operating on 3Ph 50Hz, 400/440 V AC supply including foundation, foundation bolts, anti vibration pad,etc. complete. Including cost of materials, labour, usage charges of machinery complete as per specifications. Control panle is excluded. Required GA drawingfor the pump/ foundation shall be submitted by the contractor. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNos158563.0158563.03.0FalseNoneNoneFalseNoneFalse475689.00
3580147130194NonePWD Ele SR 2023-24 Item Code.15.80.3 Pg No.87Supply, installation, testing & commissioning of diesel engine driven pump, horizontal mounted, Horizontal spiltcase centrifugal single stage pump, capable of delivering required flow at required head when running at 1800 RPM with adequate BHP automatic diesel engine driven pumpset having the residential silencer system and other accessories like fuel tank, necessary radiator cooling system, flanges, neoprene gaskets (16.0 kg/sqcm), 200 litres fuel storage tank with piping, valves as per detailed specification and two separate starting mechanisms (automatic starting by battery power, electric starting motor as well as manual starting by electric start motor) common bed plate with anti vibration pads, necessary foundation, foundation bolts etc., complete in all respects as per the detailed specifdication. Control panel excluded. Required GA drawingfor the pump shall be submitted by the contractor. Required GA drawingfor the pump/ foundation shall be submitted by the contractor. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNo868923.0868923.01.0FalseNoneNoneFalseNoneFalse868923.00
3580148130194NonePWD Ele SR 2023-24 Item Code.2.6.4 Pg No.7Supplyinganddrawing3coreflatPVCsheathedsubmersiblepumpcablemanufacturedwithelectrolyticgradecopperwithflexiblecopperwithlowresistanceconductorconfirmingto13:8130-1984andvirgingradePVCinsulationandpowdercoatingextrudedPVCsheathedsuitable for working voltage upto 1100 Volts as per IS-694:1990.3C x 10 mm2 ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workm524.0524.0260.0FalseNoneNoneFalseNoneFalse136240.00
3580149130194NonePWD Ele SR 2023-24 Item Code.2.5.21 Pg No.6SupplyinganddrawingFlexibleMulticoreCablemanufacturedwithelectrolyticgradeflexiblecopperwithlowconductorconfirmingtoIS8130-1984and(Virgin)PVCinsulationsheathedsuitableforworking voltage upto 1100 Volts as per IS-694:19902C x 6 mm2 ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workm249.0249.0150.0FalseNoneNoneFalseNoneFalse37350.00
3580150130194NonePWD Ele SR 2023-24 Item Code.2.5.7 Pg No.6SupplyinganddrawingFlexibleMulticoreCablemanufacturedwithelectrolyticgradeflexiblecopperwithlowconductorconfirmingtoIS8130-1984and(Virgin)PVCinsulationsheathedsuitableforworking voltage upto 1100 Volts as per IS-694:19902C x 2.5 mm2 ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workm104.0104.0240.0FalseNoneNoneFalseNoneFalse24960.00
3580151130194NonePWD Ele SR 2023-24 Item Code.2.5.8 Pg No.6SupplyinganddrawingFlexibleMulticoreCablemanufacturedwithelectrolyticgradeflexiblecopperwithlowconductorconfirmingtoIS8130-1984and(Virgin)PVCinsulationsheathedsuitableforworking voltage upto 1100 Volts as per IS-694:19903C x 2.5 mm2 ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workm143.0143.01800.0FalseNoneNoneFalseNoneFalse257400.00
3580152130194NonePWD Ele SR 2023-24 Item Code.12.58.11 Pg No.55GI/Copper strips for grounding connections, using necessary fixing materials as required. 600 x 600 x 3 mm Copper plate ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach9414.09414.06.0FalseNoneNoneFalseNoneFalse56484.00
3580153130194NonePWD Ele SR 2023-24 Item Code.12.127.1 Pg No.94Supplying,installing,testingandcommissioningofPN16CIbutterflyvalvesofconfirmingtoIS13039withnecessarynuts&boltsetc.,complete-etc.,completeasperspecificaitonwithallleadandlift,loadingunloading,labour,hirechargesofmachineriesandallsuchincidentalchargesnecessaryforsuccessfulcompletionofworkandasperdirectionsoftheEngineer-in-charge of the work200mm Dia CI butterfly valves ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach20296.020296.06.0FalseNoneNoneFalseNoneFalse121776.00
3580154130194NonePWD Ele SR 2023-24 Item Code.12.127.2 Pg No.94Supplying,installing,testingandcommissioningofPN16CIbutterflyvalvesofconfirmingtoIS13039withnecessarynuts&boltsetc.,complete-etc.,completeasperspecificaitonwithallleadandlift,loadingunloading,labour,hirechargesofmachineriesandallsuchincidentalchargesnecessaryforsuccessfulcompletionofworkandasperdirectionsoftheEngineer-in-charge of the work150mm dia CI butterfly valves ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach15856.015856.012.0FalseNoneNoneFalseNoneFalse190272.00
3580155130194NonePWD Ele SR 2023-24 Item Code.12.127.3 Pg No.94Supplying,installing,testingandcommissioningofPN16CIbutterflyvalvesofconfirmingtoIS13039withnecessarynuts&boltsetc.,complete-etc.,completeasperspecificaitonwithallleadandlift,loadingunloading,labour,hirechargesofmachineriesandallsuchincidentalchargesnecessaryforsuccessfulcompletionofworkandasperdirectionsoftheEngineer-in-charge of the work100mm dia CI butterfly valves ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach11417.011417.06.0FalseNoneNoneFalseNoneFalse68502.00
3580156130194NonePWD Ele SR 2023-24 Item Code.12.127.4 Pg No.94Supplying,installing,testingandcommissioningofPN16CIbutterflyvalvesofconfirmingtoIS13039withnecessarynuts&boltsetc.,complete-etc.,completeasperspecificaitonwithallleadandlift,loadingunloading,labour,hirechargesofmachineriesandallsuchincidentalchargesnecessaryforsuccessfulcompletionofworkandasperdirectionsoftheEngineer-in-charge of the work80mm dia CI butterfly valves ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach8880.08880.06.0FalseNoneNoneFalseNoneFalse53280.00
3580157130194NonePWD Ele SR 2023-24 Item Code.12.130.2 Pg No 95Supplying,installing,testingandcommissioningapprovedmake.C.I.GatevalvesasperIS:780/14846withflanges,bolts,nuts,washers,gasketsetc.complete-etc.,completeasperspecificaitonwithallleadandlift,loadingunloading,labour,hirechargesofmachineriesandallsuchincidentalchargesnecessaryforsuccessfulcompletionofworkandasperdirectionsofthe Engineer-in-charge of the work 200mm Dia C.I. Gate valves ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach50344.050344.06.0FalseNoneNoneFalseNoneFalse302064.00
3580158130194NonePWD Ele SR 2023-24 Item Code.12.130.3Pg No.95Supplying,installing,testingandcommissioningapprovedmake.C.I.GatevalvesasperIS:780/14846withflanges,bolts,nuts,washers,gasketsetc.complete-etc.,completeasperspecificaitonwithallleadandlift,loadingunloading,labour,hirechargesofmachineriesandallsuchincidentalchargesnecessaryforsuccessfulcompletionofworkandasperdirectionsofthe Engineer-in-charge of the work150mm Dia C.I. Gate valves ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach33679.033679.048.0FalseNoneNoneFalseNoneFalse1616592.00
3580159130194NonePWD Ele SR 2023-24 Item Code.12.130.1 Pg No.95Supplying,installing,testingandcommissioningapprovedmake.C.I.GatevalvesasperIS:780/14846withflanges,bolts,nuts,washers,gasketsetc.complete-etc.,completeasperspecificaitonwithallleadandlift,loadingunloading,labour,hirechargesofmachineriesandallsuchincidentalchargesnecessaryforsuccessfulcompletionofworkandasperdirectionsofthe Engineer-in-charge of the work250mm Dia C.I. Gate valves ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach24736.024736.012.0FalseNoneNoneFalseNoneFalse296832.00
3580160130194NonePWD Ele SR 2023-24 Item Code.15.126 Pg No.94Supplying Installing, testing and commissioning of Gun metal BALL VALVE SIZE OF 19/20mm dia including cost of materials, labour, usage charges of machinery complete as per specifications. Complete19/20mm dia ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach1205.01205.084.0FalseNoneNoneFalseNoneFalse101220.00
3580161130194NonePWD Ele SR 2023-24 Item Code.15.96.1 Pg No.90Supplying Installing, testing and commissioning of hydraulically operated sprinkler Gong Valve with water meter gong bell and trims as required, pressure gauges drain Valve, ball Valves check valve, strainer etc. including cost of materials, labour, usage charges of machinery complete as per specifications.100 mm dia. complete ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workm69768.069768.01.0FalseNoneNoneFalseNoneFalse69768.00
3580162130194NonePWD Ele SR 2023-24 Item Code.15.127.3 Pg No.94Supplying,installing,testingandcommissioningofPN16CIbutterflyvalvesofconfirmingtoIS13039withnecessarynuts&boltsetc.,complete-etc.,completeasperspecificaitonwithallleadandlift,loadingunloading,labour,hirechargesofmachineriesandallsuchincidentalchargesnecessaryforsuccessfulcompletionofworkandasperdirectionsoftheEngineer-in-charge of the work100mm dia CI butterfly valves ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach11417.011417.024.0FalseNoneNoneFalseNoneFalse274008.00
3580163130194NonePWD Ele SR 2023-24 Item Code.15.127.4 Pg No.94Supplying,installing,testingandcommissioningofPN16CIbutterflyvalvesofconfirmingtoIS13039withnecessarynuts&boltsetc.,complete-etc.,completeasperspecificaitonwithallleadandlift,loadingunloading,labour,hirechargesofmachineriesandallsuchincidentalchargesnecessaryforsuccessfulcompletionofworkandasperdirectionsoftheEngineer-in-charge of the work80mm dia CI butterfly valves ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach8880.08880.0120.0FalseNoneNoneFalseNoneFalse1065600.00
3580164130194NonePWD Ele SR 2023-24 Item Code.15.128.3 Pg No.90Supplyinginstalling,testingandcommissioningofPN16CI"NonReturnValve"confirmingtoIS13039withnecessaryboltsandnutsetccompleteincludescostofallmaterialslabourchargeswithallleadliftloadingandunloadingtransportationetccomplete.-etc.,completeasperspecificaitonwithallleadandlift,loadingunloading,labour,hirechargesofmachineriesandallsuchincidentalchargesnecessaryforsuccessfulcompletionofworkand as per directions of the Engineer-in-charge of the work100 mm Dia CI Non Return Valve ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach9032.09032.024.0FalseNoneNoneFalseNoneFalse216768.00
3580165130194NonePWD Ele SR 2023-24 Item Code.15.128.4 Pg No.95Supplyinginstalling,testingandcommissioningofPN16CI"NonReturnValve"confirmingtoIS13039withnecessaryboltsandnutsetccompleteincludescostofallmaterialslabourchargeswithallleadliftloadingandunloadingtransportationetccomplete.-etc.,completeasperspecificaitonwithallleadandlift,loadingunloading,labour,hirechargesofmachineriesandallsuchincidentalchargesnecessaryforsuccessfulcompletionofworkand as per directions of the Engineer-in-charge of the work80 mm Dia CI Non Return Valve ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach6977.06977.024.0FalseNoneNoneFalseNoneFalse167448.00
3580166130194NonePWD Ele SR 2023-24 Item Code.15.119 Pg No.93SupplyingandfixingofFireductShutterfabricatedoutofM.S.sheetandframe,doorshallbefixedwith4mmthickGlass,suitableRubberbeadingandLockingarrangement.Rateshallbeincludesallfastenersetc,andcompleteshuttershallbepowdercoatedofapprovedcolourbothinsideandoutside ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm15856.015856.0128.0FalseNoneNoneFalseNoneFalse2029568.00
3580167130194NonePWD Ele SR 2023-24 Item Code.15.123 Pg No.94Supplying Installing, testing and commissioning of 150mm dia 4 way Fire brigade inlet connection with Non retrn valve of 4 nos. 63 mm dia. including cost of materials, labour, usage charges of machinery complete as per specifications. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNo48203.048203.01.0FalseNoneNoneFalseNoneFalse48203.00
3580168130194NonePWD Ele SR 2023-24 Item Code.15.1 Pg No.61Providing ABC Powder based MAP 50, 1Kg Supply, installation of 1kg Fire Extinguisher Mono Ammonium Phosphate Powder 50, Stored Pressure Type, Pressure Gauge, Gross Weight 2.3 Kg,empty weight 1.3 Kg, Can Height 298mm, Diameter 86.50mm,Discharge Time less than 8 Secs, Controllable discharge mechanism (Squeeze grip with easy snap safety seal), Rangeminimum 2 meters,applicable on Class A, 8,C and electrically started Fire, A Rating 1A, 8Rating 88, Can construction: Deep drawn & Co., Mig welded, valveConstruciton: Forging and Machining, Internal Coating of Can: Epoxy powder coating, External Coating of Can: Epoxy Polyster power coating,Sheet metal thickness: 1.60mm, 5 years Warranty with installation systemetc., including cost of supporting materials like MS stand & accessaries if it is fixing n floor / MS brackets & accessories if it is fixing on wall,labour, usage charges of machinery complete as per specifications. complete. IS 15683 Approved. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNo1712.01712.0144.0FalseNoneNoneFalseNoneFalse246528.00
3580169130194NonePWD Ele SR 2023-24 Item Code.15.2 Pg No.61Providing ABC Powder based MAP 50, 1Kg Supply, installation of 1kg Fire Extinguisher Mono Ammonium Phosphate Powder 50, Stored Pressure Type, Pressure Gauge, Gross Weight 2.3 Kg,empty weight 1.3 Kg, Can Height 298mm, Diameter 86.50mm,Discharge Time less than 8 Secs, Controllable discharge mechanism (Squeeze grip with easy snap safety seal), Rangeminimum 2 meters,applicable on Class A, 8,C and electrically started Fire, A Rating 1A, 8Rating 88, Can construction: Deep drawn & Co., Mig welded, valveConstruciton: Forging and Machining, Internal Coating of Can: Epoxy powder coating, External Coating of Can: Epoxy Polyster power coating,Sheet metal thickness: 1.60mm, 5 years Warranty with installation systemetc., including cost of supporting materials like MS stand & accessaries if it is fixing n floor / MS brackets & accessories if it is fixing on wall,labour, usage charges of machinery complete as per specifications. complete. IS 15683 Approved. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNo2664.02664.0144.0FalseNoneNoneFalseNoneFalse383616.00
3580170130194NonePWD Ele SR 2023-24 Item Code.15.3 Pg No.62Supply,installationof4kgFireExtinguisherMonoAmmoniumPhosphatePowder50,StoredPressureType,PressureGauge,GrossWeight6.9Kg,emptyweight2.9Kg,CanHeight440MM,Diameter140MM,DischargeTimelessthan13Sees,Controllabledischargemechanism(Squeezegripwitheasysnapsafetyseal),Rangeminimum4meters,applicableonClassA,8,CandelectricallystartedFire,ARating2A,8Rating218,Canconstruction:Deepdrawn&Co.,Migwelded,valve Construciton:ForgingandMechining,InternalCoatingofCan:Epoxypowdercoating,ExternalCoatingofCan:EpoxyPolysterpowercoating,Sheetmetalthickness:1.60MM,5yearsWarrantywithinstallationsystemwithSuperiorqualityEPDMRubberHosepipeetc.,includingcostofsupportingmaterialslikeMSstand&accessariesifitisfixingnfloor/MSbrackets&accessoriesifitisfixingonwall,labour,usagechargesofmachinerycomplete as per specifications. complete IS 15683, CE Approved. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach3362.03362.06.0FalseNoneNoneFalseNoneFalse20172.00
3580171130194NonePWD Ele SR 2023-24 Item Code.15.87 Pg No.89SupplyingInstalling,testingandcommissioningofGunmetalBranchpipesizeof63mmdiax19mmdiaasperIS903completeincludingcostofmaterials,labour,usagechargesofmachinerycompleteasperspecifications. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach5708.05708.02.0FalseNoneNoneFalseNoneFalse11416.00
3580172130194NonePWD Ele SR 2023-24 Item Code.15.95 Pg No.90SupplyingInstallingofConsealedType,StandardResponseStandardCoverage,Sprinkler,K5.6(80),1/2”NPT,68DegreeC,Chromefinish,ULlisted. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach1015.01015.0930.0FalseNoneNoneFalseNoneFalse943950.00
3580173130194NonePWD Ele SR 2023-24 Item Code.15.96.2 Pg No.90SupplyingInstalling,testingandcommissioningofhydraulicallyoperatedsprinklerGongValvewithwatermetergongbellandtrimsasrequired,pressuregaugesdrainValve,ballValvescheckvalve,straineretc.includingcostofmaterials,labour,usagechargesofmachinerycompleteasperspecifications.150 mm dia. complete ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workm88795.088795.01.0FalseNoneNoneFalseNoneFalse88795.00
3580174130194NonePWD Ele SR 2023-24 Item Code.15.108.1 Pg No.92SupplyingInstalling,testingandcommissioningofP.A.SystemconsolepanelwithpushbuttonwithspeakerandindictoronAccomdatedinM.S.Cabinetwithpaintingincludingcostofmaterials,labour,usagechargesof machinery complete as per specifications ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach44398.044398.05.0FalseNoneNoneFalseNoneFalse221990.00
3580175130194NonePWD Ele SR 2023-24 Item Code.15.109 Pg No.93P.A.Systemamplifier250WRMSoutputwithcompletewiringandcontrols accessable form front ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach44715.044715.05.0FalseNoneNoneFalseNoneFalse223575.00
3580176130194NonePWD Ele SR 2023-24 Item Code.15.107 Pg No.92SupplyingInstalling,testingandcommissioningofPublicaddresssystem(Twowaycomminicationtype)asperrequirementofFireForceauthorityandwhichGenerallycompriseofSupplyingInstalling,testingandcommissioningofApprovedmake6W.wallmountedspeakerwithtalkbackfacilitywithstoreenamelpaintedM.S.Sheethosingetc.completeincludingcostofmaterials,labour,usagechargesofmachinerycompleteasperspecifications. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach3108.03108.090.0FalseNoneNoneFalseNoneFalse279720.00
3580177130194NonePWD Ele SR 2023-24 Item Code.23.11.1 Pg No.47Telephone Instrument Push Button Telephone ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNo760.0760.01800.0FalseNoneNoneFalseNoneFalse1368000.00
17216460430000NoneNoneBuildingsRoad Work2993548.49
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3580178130195NonePWD SR-2023-24 - Vol. 1 - Page No. 7 - Item No.1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum601.27601.27337.5FalseNoneNoneFalseNoneFalse202928.6250
3580179130195NonePWD SR-2023-24 - Vol. 3 - Page No. 17 - Item No. 3Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm133.19133.19168.75FalseNoneNoneFalseNoneFalse22475.81250
3580180130195NonePWD SR-2023-24 - Vol. 3 - Page No. 26 - Item No. 4Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum3246.093246.09281.25FalseNoneNoneFalseNoneFalse912962.81250
3580181130195NonePWD SR-2023-24 - Vol. 3 - Page No. 52 - Item No. 6Providing and laying 100mm thick factory made precast M -40 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Traffic Axle load repetitions more than 10MSA upto 20MSA for Industrial Streets, Bus & Truck parking of approved shape and colour, laid in required pattern and including over 40mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (WMM/WBM Base to be paid separately as per relevant technical specification) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm1649.051649.051125.0FalseNoneNoneFalseNoneFalse1855181.250
17216460430000NoneNoneBuildingsCC Drain Work5290606.29
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3580182130196NonePWD SR-2023-24 - Vol. 1 - Page No. 8 - Item No. 1.Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum129.39129.39723.45FalseNoneNoneFalseNoneFalse93607.19550
3580183130196NonePWD SR-2023-24 - Vol. 1 - Page No. 7 - Item No. 1.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum337.42337.4226.5FalseNoneNoneFalseNoneFalse8941.630
3580184130196NonePWD SR-2023-24 - Vol. 1 - Page No. 15 - Item No. 2Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum7886.267886.26111.3FalseNoneNoneFalseNoneFalse877740.7380
3580185130196NonePWD SR-2023-24 - Vol. 1 - Page No. 16 - Item No. 2Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum10632.1210632.12275.6FalseNoneNoneFalseNoneFalse2930212.2720
3580186130196NonePWD SR-2023-24 - Vol. 1 - Page No. 18 - Item No. 2Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and echnical specification. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workt100225.45100225.4513.77FalseNoneNoneFalseNoneFalse1380104.44650
17216460430000NoneNoneBuildingsCulverts(2nos)684057.12
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3580187130197NonePWD SR-2023-24 - Vol. 1 - Page No. 8 - Item No. 1.Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum129.39129.39105.0FalseNoneNoneFalseNoneFalse13585.950
3580188130197NonePWD SR-2023-24 - Vol. 1 - Page No. 15 - Item No. 2Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum7886.267886.267.5FalseNoneNoneFalseNoneFalse59146.950
3580189130197NonePWD SR-2023-24 - Vol. 1 - Page No. 16 - Item No. 2Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum10632.1210632.1232.8FalseNoneNoneFalseNoneFalse348733.5360
3580190130197NonePWD SR-2023-24 - Vol. 1 - Page No. 18 - Item No. 2Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and echnical specification. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workt100225.45100225.452.62FalseNoneNoneFalseNoneFalse262590.6790
17216460430000NoneNoneBuildingsUG Sump Tank5187704.67
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3580191130198NonePWD SR-2023-24 - Vol. 1 - Page No. 8 - Item No. 1.Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth forb reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum120.51120.5171.02FalseNoneNoneFalseNoneFalse8558.62020
3580192130198NonePWD SR-2023-24 - Vol. 1 - Page No. 8 - Item No. 1.Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3m ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum129.39129.39710.23FalseNoneNoneFalseNoneFalse91896.65970
3580193130198NonePWD SR-2023-24 - Vol. 1 - Page No. 8 - Item No. 1.Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.(In all kinds of soils Depth 3m-6m) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum148.41148.41345.53FalseNoneNoneFalseNoneFalse51280.10730
3580194130198NonePWD SR-2023-24 - Vol. 1 - Page No. 15 - Item No. 2Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. 2.1.2 Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum7184.787184.7835.51FalseNoneNoneFalseNoneFalse255131.53780
3580195130198NonePWD SR-2023-24 - Vol. 1 - Page No. 15 - Item No. 2Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregate as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. 2.2.3 M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum8278.338278.3368.27FalseNoneNoneFalseNoneFalse565161.58910
3580196130198NonePWD SR-2023-24 - Vol. 1 Page No. 69 Item No. 2.3.2Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. 2.3.2 M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates 6480 ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum9041.879041.8788.24FalseNoneNoneFalseNoneFalse797854.60880
3580197130198NonePWD SR-2023-24 - Vol. 1 Page No.69 Item No. 2.3.2Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. 2.3.2 M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCable Km12329.8212329.8243.01FalseNoneNoneFalseNoneFalse530305.55820
3580198130198NonePWD SR-2023-24 - Vol. 1 Page No. 69 -Item No.2.3.2Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. 2.3.2 M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum13151.8113151.814.95FalseNoneNoneFalseNoneFalse65101.45950
3580199130198NonePWD SR-2023-24 - Vol. 2 Page No.13 - Item No.6.7 Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum10415.6510415.657.6FalseNoneNoneFalseNoneFalse79158.940
3580200130198NonePWD SR-2023-24 - Vol. 1 Page No. 18 -Item No. 2.11Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification a. Buildings t 89457.00 ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workt113476.2113476.222.45FalseNoneNoneFalseNoneFalse2547540.690
3580201130198NonePWD SR-2023-24 - Vol. 2 Page No. 43 -Item No. 8.108.10 Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm267.65267.65486.97FalseNoneNoneFalseNoneFalse130337.52050
3580202130198NonePWD SR-2023-24 -Vol. 2 Page No. 43 -Item No.8.1.1 8.1.1 Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm323.47323.4730.56FalseNoneNoneFalseNoneFalse9885.24320
3580203130198NonePWD SR-2023-24 - Vol. 2 -Page No. 43 -Item No.8.518.51 Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm126.85126.8515.28FalseNoneNoneFalseNoneFalse1938.2680
3580204130198NonePWD SR-2023-24 - Vol. 2 - Page No. 45 Item No.8.27Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm67.2367.2315.28FalseNoneNoneFalseNoneFalse1027.27440
3580205130198NonePWD SR-2023-24 - Vol. 2 Page No. 45 Item No.8.288.28 Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm112.9112.915.28FalseNoneNoneFalseNoneFalse1725.1120
3580206130198NonePWD SR-2023-24 - Vol. 2 Page No. 45 Item No.8.29 8.29 Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm358.99358.9915.28FalseNoneNoneFalseNoneFalse5485.36720
3580207130198NonePWD SR-2023-24 Vol. 2 Page No. 77 -Item No.11.5.1 11.5.1 Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in- Charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm5680.345680.342.52FalseNoneNoneFalseNoneFalse14314.45680
3580208130198NonePWD SR-2023-24 - Vol. 2 Page No. 48 -Item No.8.40 8.40 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work afte thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSqm145.88145.885.04FalseNoneNoneFalseNoneFalse735.23520
3580209130198NonePWD SR-2023-24 - Vol. 5 Page No. 85 -Item No.7.3 7.3 Providing and fixing MS inspection door of size 60 cms x 60 cms, including MS frame made of 50x50x6mm angle, shutters made of 3mm thick MS sheets, with hinges, locking arrangements at top etc. including painting with anticorrosive approved paint etc. complete including all lead and lifts etc. Each 2140 ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNo2714.592714.594.0FalseNoneNoneFalseNoneFalse10858.360
3580210130198NonePWD SR-2023-24 Vol. 5 Page No. 88 -Item No.7.12.1 7.12 Ladder inside the container: Providing anodized aluminium ladder using 65mm x 32mm x 3.0mm ‘C’ section for ladder side channel x 25mm dia., flutal pipe for Rungs at 250mm c/c ladder fixed at an angle of 70 degrees to horizontal including necessary 25mm dia., G.I. shutters with necessary G.I. fasteners for bracing the ladders to the Tank walls to prevent buckling of the ladder with necessary (M-15) bed for embedding the ladder bottom complete 7.12.1 aluminium ladder MTR 5100 ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNo.6469.356469.353.0FalseNoneNoneFalseNoneFalse19408.050
17216460430000NoneNoneBuildingsRain water Recharge pits208989.09
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3580211130199NonePage no.8 Item No 1.12 Vol 1 SR 2023-24PWDEarth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils&upto depth notexceeding 300mmasper drawingand technical specifications,includingsettingout, shoring,strutting,barricading, cautionlights,removalofstumpsandotherdeleteriousmatterincluding dressingofexcavatedsurfaces,disposingofforlevellingtheexcavated earthorsorting&stackingtheselected earthforreuseinaradius of 50m andlift upto1.5 m includingcost of labour, tools, usage of machinery & other appurtenances required to complete the work ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum120.51120.512.94FalseNoneNoneFalseNoneFalse354.29940
3580212130199NonePage no.9 Item No 1.16 Vol I SR 2023-24 PWDEarth work in surface excavation for stripping, seating of bund, Road way by manual means for lowering & levelling the ground for all works other than foundation & depth in Ordinary rock and soft rock upto 300mm depth as per drawing and technical specifications, including setting out, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work.(V-1,/P.No.9 /I-1.16) In Hard Rock ( requiring blasting) Depth exceeding 3 m, but not exceeding 4.5 m ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum702.75702.7537.24FalseNoneNoneFalseNoneFalse26170.410
3580213130199NonePage no.15 Item No 2.1.3 Vol I SR 2023-24Providing and laying in position plain cement concrete for levelling courseforallworksinfoundation.The granite/trap/basalt crushed gradedcoarseaggregates andfineaggregates asperrelevantIS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead &lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the otherappurtenancesrequired to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately (Mix1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum7597.057597.050.41FalseNoneNoneFalseNoneFalse3114.79050
3580214130199NonePage no.9 Item No 5.4 Vol I SR 2023-24PWDProviding Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1cement :6 coarses and :12 graded stone aggregate 20 mm nominal size)upto plinth level with : (Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum8104.458104.4518.86FalseNoneNoneFalseNoneFalse152849.9270
3580215130199NonePage no.A14 SL No 077 Vol I SR 202-24PWDBoulder 50 mm to 200 mm (V-2,/P.No.A-14, SL.NO-077) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum844.82844.826.6FalseNoneNoneFalseNoneFalse5575.8120
3580216130199NoneP.No.A-40, SL.NO-64 of PWD SR 2023-24Sand - M-Sand (V-1,/P.No.A-40, SL.NO-64) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum1872.311872.317.48FalseNoneNoneFalseNoneFalse14004.87880
3580217130199NoneVOl I P.No.A-38, SL.NO-4 of PWD SR 2023-2420mm downsize (V-1,/P.No.A-38, SL.NO-4) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum1690.911690.911.87FalseNoneNoneFalseNoneFalse3162.00170
3580218130199NonePWD SR 2023-24 V-1 P.No.A-40, SL.NO-80Stone Boulders 300mm (V-1,/P.No.A-40, SL.NO-80) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workCum1046.511046.513.59FalseNoneNoneFalseNoneFalse3756.97090
17216460430000NoneNoneBuildingsInternal electrification works & external electrification works, DG Works, Transformers works, lifts etc.21992171.47
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3580219130200Nonecode1POINT  WIRING  USING  COPPER  WIRE  WITHOUT SWITCH Supplying & Wiring adopting loop system in existing pvc conduit/casting caping using copper Pvc insulated multi stand 2x1.5Sqmm copper wire confirming to the GTP without switch shall be fixed on existing plastic sheet/ Gang box, the other end of the wires shall be terminated with sufficient loose length in a wood / pvc round block complete for each outlet. GROUP A Short point upto 3Mts from tapping point to out let via switch box ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach361.52361.5225.0FalseNoneNoneFalseNoneFalse9038.00
3580220130200Nonecode2POINT  WIRING  USING  COPPER  WIRE  WITHOUT SWITCH Supplying & Wiring adopting loop system in existing pvc conduit/casting caping using copper Pvc insulated multi stand 2x1.5Sqmm copper wire confirming to the GTP without switch shall be fixed on existing plastic sheet/ Gang box, the other end of the wires shall be terminated with sufficient loose length in a wood / pvc round block complete for each outlet. GROUP A Medium point above 3M & upto 6M from tapping point to out let via switch box ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach499.79499.7925.0FalseNoneNoneFalseNoneFalse12494.750
3580221130200Nonecode3POINT  WIRING  USING  COPPER  WIRE  WITHOUT SWITCH Supplying & Wiring adopting loop system in existing pvc conduit/casting caping using copper Pvc insulated multi stand 2x1.5Sqmm copper wire confirming to the GTP without switch shall be fixed on existing plastic sheet/ Gang box, the other end of the wires shall be terminated with sufficient loose length in a wood / pvc round block complete for each outlet. GROUP A Long point above 6M & upto 10M from tapping point to out let via switch box ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach723.05723.0525.0FalseNoneNoneFalseNoneFalse18076.250
3580222130200Nonecode4POINT  WIRING  USING  COPPER  WIRE  WITHOUT SWITCH Supplying & Wiring adopting loop system in existing pvc conduit/casting caping using copper Pvc insulated multi stand 2x1.5Sqmm copper wire confirming to the GTP without switch shall be fixed on existing plastic sheet/ Gang box, the other end of the wires shall be terminated with sufficient loose length in a wood / pvc round block complete for each outlet. GROUP A Two outlet in a row, above 3 mtr upto 6mtr from tapping point to outlet via switch box ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach898.1898.125.0FalseNoneNoneFalseNoneFalse22452.50
3580223130200Nonecode5POINT  WIRING  USING  COPPER  WIRE  WITHOUT SWITCH Supplying & Wiring adopting loop system in existing pvc conduit/casting caping using copper Pvc insulated multi stand 2x1.5Sqmm copper wire confirming to the GTP without switch shall be fixed on existing plastic sheet/ Gang box, the other end of the wires shall be terminated with sufficient loose length in a wood / pvc round block complete for each outlet. GROUP A Three outlet in a row, above 3 mtr upto 6mtr from tapping point to outlet via switch box ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach1312.91312.925.0FalseNoneNoneFalseNoneFalse32822.50
3580224130200Nonecode6Wiring for lighting or power circuit using one of FRLS PVC insulated 1100V grade, multtis and copper conductor single core cable in consealed system of wiring.(group A materials). With specified IS-694:1990 1.0sqmm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr24.124.1750.0FalseNoneNoneFalseNoneFalse18075.00
3580225130200Nonecode7Wiring for lighting or power circuit using one of FRLS PVC insulated 1100V grade, multtis and copper conductor single core cable in consealed system of wiring.(group A materials). With specified IS-694:1990 1.5 Sqmm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr32.9832.981200.0FalseNoneNoneFalseNoneFalse39576.00
3580226130200Nonecode8Wiring for lighting or power circuit using one of FRLS PVC insulated 1100V grade, multtis and copper conductor single core cable in consealed system of wiring.(group A materials). With specified IS-694:1990 2.5 Sqmm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr53.2853.284800.0FalseNoneNoneFalseNoneFalse255744.00
3580227130200Nonecode9Wiring for lighting or power circuit using one of FRLS PVC insulated 1100V grade, multtis and copper conductor single core cable in consealed system of wiring.(group A materials). With specified IS-694:1990 4 Sqmm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr79.9279.923200.0FalseNoneNoneFalseNoneFalse255744.00
3580228130200Nonecode10Wiring for lighting or power circuit using one of FRLS PVC insulated 1100V grade, multtis and copper conductor single core cable in consealed system of wiring.(group A materials). With specified IS-694:1990 6 Sqmm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr116.7116.71000.0FalseNoneNoneFalseNoneFalse116700.00
3580229130200Nonecode11Supplying and flush mounting power coated metal box suitable for mounting modular switch plates. The boxshould be firmly flush mounted after due groove cutting in bricks/ stone/c.c wall. 1-3Way ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach201.69201.6950.0FalseNoneNoneFalseNoneFalse10084.50
3580230130200Nonecode12Supplying and flush mounting power coated metal box suitable for mounting modular switch plates. The boxshould be firmly flush mounted after due groove cutting in bricks/ stone/c.c wall. 4-5Way ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach224.52224.5250.0FalseNoneNoneFalseNoneFalse11226.00
3580231130200Nonecode13Supplying and flush mounting power coated metal box suitable for mounting modular switch plates. The boxshould be firmly flush mounted after due groove cutting in bricks/ stone/c.c wall. 6 Way ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach279.07279.0750.0FalseNoneNoneFalseNoneFalse13953.50
3580232130200Nonecode14Supplying and flush mounting power coated metal box suitable for mounting modular switch plates. The boxshould be firmly flush mounted after due groove cutting in bricks/ stone/c.c wall. 8 Way ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach331.08331.0870.0FalseNoneNoneFalseNoneFalse23175.60
3580233130200Nonecode15Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box 1 to 3 Module ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach204.23204.2350.0FalseNoneNoneFalseNoneFalse10211.50
3580234130200Nonecode16Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box 4 Module ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach221.99221.9950.0FalseNoneNoneFalseNoneFalse11099.50
3580235130200Nonecode17Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box 6 Module ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach296.83296.8350.0FalseNoneNoneFalseNoneFalse14841.50
3580236130200Nonecode18Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box 8 Module ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach360.25360.2560.0FalseNoneNoneFalseNoneFalse21615.00
3580237130200Nonecode19Supplying and fixing of metal clad industrial plugs and sockets Plugs 2 pole + earth 250V - 16 Amps ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach251.16251.169.0FalseNoneNoneFalseNoneFalse2260.440
3580238130200Nonecode20Supplying and fixing of metal clad industrial plugs and sockets Plugs 3 pole + earth 440V - 32 Amps ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach328.54328.5410.0FalseNoneNoneFalseNoneFalse3285.40
3580239130200Nonecode21Supplying and fixing of metal clad industrial plugs and sockets Socket 2 pole + earth 250V - 16 Amps ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach254.97254.979.0FalseNoneNoneFalseNoneFalse2294.730
3580240130200Nonecode22Supplying and fixing of metal clad industrial plugs and sockets Socket 3 pole + earth 440V - 32 Amps ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach320.93320.9310.0FalseNoneNoneFalseNoneFalse3209.30
3580241130200Nonecode23Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A One Way Switch ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach129.39129.39250.0FalseNoneNoneFalseNoneFalse32347.50
3580242130200Nonecode24Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Three Way socket ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach216.91216.9190.0FalseNoneNoneFalseNoneFalse19521.90
3580243130200Nonecode25Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 16A One Way Switch ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach228.33228.3340.0FalseNoneNoneFalseNoneFalse9133.20
3580244130200Nonecode26Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 32A DP Switch ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach413.53413.5342.0FalseNoneNoneFalseNoneFalse17368.260
3580245130200Nonecode27Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6/16A Universal Socket ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach299.37299.3748.0FalseNoneNoneFalseNoneFalse14369.760
3580246130200Nonecode28Concealed conduit System: Supplying 20/25/32mm dia 2mm 2.5mm thick heavy gauge PVC conduit pipe with suitable size bends, Metal / PVC juction boxes adhesive paste etc., and runnning before connecting the slab. The conduite should be tied to the reinforcement rod by using binding wires and unused ways of juction boxes and pipes ends should be covered using PVC end enclosures. run with 18 SWG GI fish wire wherever necessary. 19/20mm dia 2mm thick ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr83.7283.722900.0FalseNoneNoneFalseNoneFalse242788.00
3580247130200Nonecode29Concealed conduit System: Supplying 20/25/32mm dia 2mm 2.5mm thick heavy gauge PVC conduit pipe with suitable size bends, Metal / PVC juction boxes adhesive paste etc., and runnning before connecting the slab. The conduite should be tied to the reinforcement rod by using binding wires and unused ways of juction boxes and pipes ends should be covered using PVC end enclosures. run with 18 SWG GI fish wire wherever necessary. 25mm dia 2mm thick ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr98.9498.943500.0FalseNoneNoneFalseNoneFalse346290.00
3580248130200Nonecode30Concealed conduit System: Supplying 20/25/32mm dia 2mm 2.5mm thick heavy gauge PVC conduit pipe with suitable size bends, Metal / PVC juction boxes adhesive paste etc., and runnning before connecting the slab. The conduite should be tied to the reinforcement rod by using binding wires and unused ways of juction boxes and pipes ends should be covered using PVC end enclosures. run with 18 SWG GI fish wire wherever necessary. 32mm dia 2.5mm thick ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr130.66130.662100.0FalseNoneNoneFalseNoneFalse274386.00
3580249130200Nonecode31Open Conduit System Supplying heavy gauge PVC conduit pipe ....... dia ....... mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc , and fixing using inverted wood plugs in case of RCC ceiling and RCC wall/ stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws. 19/20 mm dia 2 mm thick ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr87.5387.53100.0FalseNoneNoneFalseNoneFalse8753.00
3580250130200Nonecode32Open Conduit System Supplying heavy gauge PVC conduit pipe ....... dia ....... mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc , and fixing using inverted wood plugs in case of RCC ceiling and RCC wall/ stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws. 25 mm dia 2 mm thick ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr102.75102.75250.0FalseNoneNoneFalseNoneFalse25687.50
3580251130200Nonecode33Open Conduit System Supplying heavy gauge PVC conduit pipe ....... dia ....... mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc , and fixing using inverted wood plugs in case of RCC ceiling and RCC wall/ stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws. 32 mm dia 2.5 mm thick ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr134.46134.46150.0FalseNoneNoneFalseNoneFalse20169.00
3580252130200Nonecode34Groove cutting : Supplying ..... dia 2mm/2.5thick heavy gauage PVC conduit pipe with bends, Metal juctions boxes adhesive paste etc. and bracing U or J hooks and cement plastering up to the surface of the brick level and run with 18 SWG GI fish wire run through out the conduit wherever necessary. 25mm dia 2.5mm thick ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr100.21100.21500.0FalseNoneNoneFalseNoneFalse50105.00
3580253130200Nonecode35Supplying heavy gauge PVC Conduit Pipe .... dia ....... mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. 19/20 mm dia 2 mm thick ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr86.2186.21200.0FalseNoneNoneFalseNoneFalse17242.00
3580254130200Nonecode36Supplying heavy gauge PVC Conduit Pipe .... dia ....... mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. 25 mm dia 2 mm thick ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr100.21100.21600.0FalseNoneNoneFalseNoneFalse60126.00
3580255130200Nonecode37Supplying heavy gauge PVC Conduit Pipe .... dia ....... mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. 32 mm dia 2.5 mm thick ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr125.58125.58200.0FalseNoneNoneFalseNoneFalse25116.00
3580256130200Nonecode38Supplying exhaust fan of 1440 RPM of 300 mm (12") size with bracket blades complete for light duty suitable to operate on 230V 50Hz, AC Supply. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach1892.61892.635.0FalseNoneNoneFalseNoneFalse66241.00
3580257130200Nonecode39Supplying of 1440rpm heavy duty exhaust fan with bracket blades suitable to operate on 230V 50Hz, AC Supply complete. 15" Sweep (450 mm) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach5639.755639.7528.0FalseNoneNoneFalseNoneFalse157913.00
3580258130200Nonecode40Fixing one exhaust fan in the nitch already left in the wall with bolts and nuts and 5 A. ceiling rose with sufficient length of 23/0.0076 inch PVC insulated twin core wire. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach624.1624.163.0FalseNoneNoneFalseNoneFalse39318.30
3580259130200Nonecode41Fabricating supplying and mounting MS box made out 14 SWG suitable for Floor/wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged fronth cover, equipped with tamper proof locking arrangemnets, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 2 coats of red oxide primer paint and finally finished with approved colour enameled metal paint etc. complete 14SWg ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workSq CM0.630.631268250.0FalseNoneNoneFalseNoneFalse798997.50
3580260130200Nonecode42Supplying, fixing and wiring 1000/5A to 1600/5A 15VA Burden class 1 Current Transformer ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach1065.541065.5437.0FalseNoneNoneFalseNoneFalse39424.980
3580261130200Nonecode43Supplying, fixing and wiring 50/5 to 400/5 Amps 5VA burden current transformer. Class 0.5 acurrcy with tape wound. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach712.9712.926.0FalseNoneNoneFalseNoneFalse18535.40
3580262130200Nonecode44Supplying and fixing of LED type panel board indicating lamp. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach653.28653.28160.0FalseNoneNoneFalseNoneFalse104524.80
3580263130200Nonecode45Supplying of multi function digital meter with three line back light LCD type display for voltage, Current, frequency, Power, power factor, kVA, kWH, kVAR suitable for 3 phase, 4 wire LT network with IP 54 degree of protection and completely wired as required with communication Port and Class 0.5s accuracy ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach11816.0811816.082.0FalseNoneNoneFalseNoneFalse23632.160
3580264130200Nonecode46Supplying of multi function digital meter with three line back light LCD type display for voltage, Current, frequency, Power, power factor, kVA, kWH, kVAR suitable for 3 phase, 4 wire LT network with IP 54 degree of protection and completely wired as required with communication Port and Class 0.5s accuracy LT ACB 1600 Amps ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach302815.0302815.04.0FalseNoneNoneFalseNoneFalse1211260.00
3580265130200Nonecode47Supplying…… Amps rated 3 phase with neutral bus bar using required capacity electronic aluminum strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S. flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cabels as per IS specification with necessary bolts, nuts, and washers etc , complete. 400 A 4 x 50 x 10 mm Aluminium Strips ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr5638.485638.484.0FalseNoneNoneFalseNoneFalse22553.920
3580266130200Nonecode48Supplying…… Amps rated 3 phase with neutral bus bar using required capacity electronic aluminum strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S. flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cabels as per IS specification with necessary bolts, nuts, and washers etc , complete. 600 A 4 x 75 x 10 mm Aluminium Strips ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr6679.656679.6512.0FalseNoneNoneFalseNoneFalse80155.80
3580267130200Nonecode49Supplying…… Amps rated 3 phase with neutral bus bar using required capacity electronic aluminum strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S. flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cabels as per IS specification with necessary bolts, nuts, and washers etc , complete. 1000 A double run of 4 x 60 x 10 mm Aluminium Strips ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr13420.7313420.736.0FalseNoneNoneFalseNoneFalse80524.380
3580268130200Nonecode50Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 A SP ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach426.22426.22166.0FalseNoneNoneFalseNoneFalse70752.520
3580269130200Nonecode51Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 A DP ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach937.42937.423.0FalseNoneNoneFalseNoneFalse2812.260
3580270130200Nonecode52Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 40 A DP ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach1344.611344.6128.0FalseNoneNoneFalseNoneFalse37649.080
3580271130200Nonecode53Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 50-63 A TPN ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach3917.133917.13105.0FalseNoneNoneFalseNoneFalse411298.650
3580272130200Nonecode54Supplying and fixing angle iron frame work fabricated out of M.S. angle iron.. and M.S. Flat......with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. 75 x 75 x 6 mm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr704.02704.02113.0FalseNoneNoneFalseNoneFalse79554.260
3580273130200Nonecode55Supplying and fixing angle iron frame work fabricated out of M.S. angle iron.. and M.S. Flat......with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. 75 x 150 x 75 x 6 mm C channel ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr1174.631174.6369.0FalseNoneNoneFalseNoneFalse81049.470
3580274130200Nonecode56Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuitwith adjustable thermal magnetic release, Micro processor release shall have Earth Fault as per IS/IEC 60947-2 . (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism. 4P - 100Amps 25kA- ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach10765.7610765.767.0FalseNoneNoneFalseNoneFalse75360.320
3580275130200Nonecode57Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuitwith adjustable thermal magnetic release, Micro processor release shall have Earth Fault as per IS/IEC 60947-2 . (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism. 400 A 36 kA ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach35792.035792.016.0FalseNoneNoneFalseNoneFalse572672.00
3580276130200Nonecode58Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuitwith adjustable thermal magnetic release, Micro processor release shall have Earth Fault as per IS/IEC 60947-2 . (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism. 250 A 36 kA ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach29866.8329866.839.0FalseNoneNoneFalseNoneFalse268801.470
3580277130200Nonecode59Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuitwith adjustable thermal magnetic release, Micro processor release shall have Earth Fault as per IS/IEC 60947-2 . (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism. 4P- 800Amps 50kA- ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach62119.7162119.712.0FalseNoneNoneFalseNoneFalse124239.420
3580278130200Nonecode60Supplying & Fixing of Rotary handle for MCCB ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach4754.344754.3425.0FalseNoneNoneFalseNoneFalse118858.50
3580279130200Nonecode61Supplying and fixing trivictor meter suitable for operation, LT operation and CT operated dual source meter in polycorbonate body in class 0.5 acuuracy as per IS 14697 and completely wired ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach5568.725568.725.0FalseNoneNoneFalseNoneFalse27843.60
3580280130200Nonecode62Supplying, Fixing and wiring 0 to 600 volts 96x96mm AC volt meter on exixting pannel board ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach573.36573.364.0FalseNoneNoneFalseNoneFalse2293.440
3580281130200Nonecode63Supplying, fixing and wiring rotary selector switch suitable for volt meter ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach202.96202.9694.0FalseNoneNoneFalseNoneFalse19078.240
3580282130200Nonecode64Supplying and fixing of 3phase digital ammeter voltmeter ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach1807.611807.614.0FalseNoneNoneFalseNoneFalse7230.440
3580283130200Nonecode65Supplying & fixing regular MCB distribution boards on wall/woodenboard/flush mounting using required clamps, bolts,nuts etc., with provision for fixing suitable type capacity MECB's single pahse/ 3 phase / single door with powder coated painting etc., complete. 8 Way TP&N (Double door) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach6223.266223.2642.0FalseNoneNoneFalseNoneFalse261376.920
3580284130200Nonecode66Fixing a shunt capacitor of ... kVAR capacity with necessary clamps, bolts, and nuts on existing wooden or metal board including banking of more than one capacitor. 11 to 20 kVAR ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach436.63436.6310.0FalseNoneNoneFalseNoneFalse4366.30
3580285130200Nonecode67Supplying, fixing and wiring heavy duty low voltage capacitors conforming to IS 2834. 3 phase, 400/440 V grade, for power factorimprovement of rotating machineries like induction motor. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workKvar608.88608.88500.0FalseNoneNoneFalseNoneFalse304440.00
3580286130200Nonecode68Supply and fixing of 3-pole Capacitor switching contactor with NO/NC contacts and inbuilt damping resistor to protect the contactor and capacitor from highest inrush current , fixed on existing wood/panel board using necessary bolts, nuts, washers and wiring etc., complete with AC 690V Rating operational voltage, 50HZ frequency and as per IS 60947-4-1. 12.5 KVAR ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach3679.823679.822.0FalseNoneNoneFalseNoneFalse7359.640
3580287130200Nonecode69Supply and fixing of 3-pole Capacitor switching contactor with NO/NC contacts and inbuilt damping resistor to protect the contactor and capacitor from highest inrush current , fixed on existing wood/panel board using necessary bolts, nuts, washers and wiring etc., complete with AC 690V Rating operational voltage, 50HZ frequency and as per IS 60947-4-1. 22 KVAR ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach5807.195807.191.0FalseNoneNoneFalseNoneFalse5807.190
3580288130200Nonecode70Supply and fixing of 3-pole Capacitor switching contactor with NO/NC contacts and inbuilt damping resistor to protect the contactor and capacitor from highest inrush current , fixed on existing wood/panel board using necessary bolts, nuts, washers and wiring etc., complete with AC 690V Rating operational voltage, 50HZ frequency and as per IS 60947-4-1. 30 KVAR ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach6677.386677.383.0FalseNoneNoneFalseNoneFalse20032.140
3580289130200Nonecode71Supply and fixing of 3-pole Capacitor switching contactor with NO/NC contacts and inbuilt damping resistor to protect the contactor and capacitor from highest inrush current , fixed on existing wood/panel board using necessary bolts, nuts, washers and wiring etc., complete with AC 690V Rating operational voltage, 50HZ frequency and as per IS 60947-4-1. 50 KVAR ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach19112.4919112.498.0FalseNoneNoneFalseNoneFalse152899.920
3580290130200Nonecode72Supplying, fixing and wiring Automatic Power Factor controller circuit unit fully, static units controlled by 14 stage microprocessor operation, relays LED display, self programming function for power stages and operating logic checking facility for healthy and efficient of each individual capacitor bank, measurement of network harmonics with indication when limit values are exceeded, Comprehensive displays with large, three phase LED display, Long term memory for settings, protection for over voltage, power factor correction fault and no voltage, to connect/ disconnect banks, with automatic recognition or with standard programs ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach27450.3427450.341.0FalseNoneNoneFalseNoneFalse27450.340
3580291130200Nonecode73Supplying and fixing HRC fuse units base on existing switch / panel board. 6 to 16 A ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach417.34417.346.0FalseNoneNoneFalseNoneFalse2504.040
3580292130200Nonecode74Supplying and fixing HRC fuse units base on existing switch / panel board. 32 to 63 A ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach776.32776.3236.0FalseNoneNoneFalseNoneFalse27947.520
3580293130200Nonecode75Supplying and fixing HRC fuse link on existing switch fuse base with W loss as per IS-13703. upto 63 A ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach369.13369.1342.0FalseNoneNoneFalseNoneFalse15503.460
3580294130200Nonecode76Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40 mm dia 2.90 mm thick GI pipe 2.5m long buried in a pit . The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per lSI specification 7.3.3. of IS 732 using 12 mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach4452.444452.4418.0FalseNoneNoneFalseNoneFalse80143.920
3580295130200Nonecode77Supplying fixing and wiring earth electrode for grounding of lifts, transformers, DG sets etc. using 40 mm dia 2.9 mm thick 2.5m long GI pipe with GI funnel with mesh and suitable size reducer fixed on the top of the earth electrode.The funnel should be enclosed in a CC chamber of 400x400x400 mm with a cast iron cover. The earth electrode shall have staggered holes of 12 mm dia and the electrode should be covered 150 mm all-round with alternate layers of salt and charcoal from the bottom of the CC chamber. The connection from the electrode is to be established through GI strip using GI bolts and nuts. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach5398.745398.7414.0FalseNoneNoneFalseNoneFalse75582.360
3580296130200Nonecode78Supplying and running of GI/Cu strips for grounding connections,using necessary fixing materials as required. GI Strip 25 x 6 mm GI strip ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr162.37162.37100.0FalseNoneNoneFalseNoneFalse16237.00
3580297130200Nonecode79Supplying and running of GI/Cu strips for grounding connections,using necessary fixing materials as required. GI Strip 40 x 6 mm GI strip ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr229.6229.6165.0FalseNoneNoneFalseNoneFalse37884.00
3580298130200Nonecode80Supplying and running of GI/Cu strips for grounding connections,using necessary fixing materials as required. GI Strip 50 x 6 mm GI strip ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr276.53276.53150.0FalseNoneNoneFalseNoneFalse41479.50
3580299130200Nonecode81Supplying and running of GI/Cu strips for grounding connections,using necessary fixing materials as required. GI Strip 8SWG GI wire ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr31.7131.71550.0FalseNoneNoneFalseNoneFalse17440.50
3580300130200Nonecode82Supplying and running of GI/Cu strips for grounding connections,using necessary fixing materials as required. Cu. Strip 25x3mm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr723.05723.0528.0FalseNoneNoneFalseNoneFalse20245.40
3580301130200Nonecode83Supplying and running of GI/Cu strips for grounding connections,using necessary fixing materials as required. Cu. Strip 25 x 6 mm Copper strip ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr1395.351395.3533.0FalseNoneNoneFalseNoneFalse46046.550
3580302130200Nonecode84Supplying and running of GI/Cu strips for grounding connections,using necessary fixing materials as required. Cu. Strip 40 x 6 mm Copper strip ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr2084.152084.1548.0FalseNoneNoneFalseNoneFalse100039.20
3580303130200Nonecode85Supplying and running of GI/Cu strips for grounding connections,using necessary fixing materials as required. Cu. Strip 50 x 6 mm Copper strip ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr2751.382751.3835.0FalseNoneNoneFalseNoneFalse96298.30
3580304130200Nonecode86Supplying and running of GI/Cu strips for grounding connections,using necessary fixing materials as required. Cu. Strip 600 x 600 x 3 mm Copper plate ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach9413.549413.544.0FalseNoneNoneFalseNoneFalse37654.160
3580305130200Nonecode87Fixing of all types of indoor light fittings on call and ceiling and rafters On wall/ ceiling ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach154.76154.76600.0FalseNoneNoneFalseNoneFalse92856.00
3580306130200Nonecode88Supplying & Fixing of 25x6mm GI strip for grounding of LA system ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr162.37162.37320.0FalseNoneNoneFalseNoneFalse51958.40
3580307130200Nonecode89Supplying, erecting, testing & commissioning of ON-LINE UPS system suitable for operation on 230V, 50Hz, A/C supply, with isolation transformer all accessories complete and Excluding batteriesand wiring complete. 5KVA ON LINE UPS ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach86743.8486743.841.0FalseNoneNoneFalseNoneFalse86743.840
3580308130200Nonecode90Supplying, installation, testing & commissioning of 12V DC, AH batteries in poly propylene container for U.P.S. Sealed maintenance free batteries.-4x150AH ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach20162.8120162.814.0FalseNoneNoneFalseNoneFalse80651.240
3580309130200Nonecode91Providing and laying of reinforced cement concrete pipe NP2 including pointing ends, fixing collars with cement mortar 1:2 including cost of materials,labour,HOM complete as per specifications. 150mm dia ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr495.98495.98180.0FalseNoneNoneFalseNoneFalse89276.40
3580310130200Nonecode92Supply of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part- 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 4 core 10Sqmm(exact measurement as per site) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr149.69149.6975.0FalseNoneNoneFalseNoneFalse11226.750
3580311130200Nonecode93Supply of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part- 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 35 Sqmm, 3.5 Core, (14 GI Strips - 4 x 0.8 mm) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr195.43195.4350.0FalseNoneNoneFalseNoneFalse9771.50
3580312130200Nonecode94Supply of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part- 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 50 Sqmm, 3.5 Core, (16 GI Strips - 4 x 0.8 mm) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr227.03227.0340.0FalseNoneNoneFalseNoneFalse9081.20
3580313130200Nonecode95Supply of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part- 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 95 Sqmm, 3.5 Core, (21 GI Strips - 4 x 0.8 mm) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr473.42473.4250.0FalseNoneNoneFalseNoneFalse23671.00
3580314130200Nonecode96Supply of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part- 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 3.5core 400Sqmm(exact measurement as per site) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr1843.131843.13700.0FalseNoneNoneFalseNoneFalse1290191.00
3580315130200Nonecode97Supply of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part- 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 3.5core 240Sqmm(exact measurement as per site) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr1094.721094.72412.0FalseNoneNoneFalseNoneFalse451024.640
3580316130200Nonecode98Supply of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part- 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 3.5core 120Sqmm(exact measurement as per site) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr579.7579.775.0FalseNoneNoneFalseNoneFalse43477.50
3580317130200Nonecode99Labour charges for laying of 1.1kV class UG cables in existing trench GI pipe/stoneware pipe/on wall/on pole as required. In existing trench 120qmm to 240sqmm(exact measurement as per site) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr41.8641.86505.0FalseNoneNoneFalseNoneFalse21139.30
3580318130200Nonecode100Labour charges for laying of 1.1kV class UG cables in existing trench GI pipe/stoneware pipe/on wall/on pole as required. In existing trench 240sqmm(exact measurement as per site) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr43.3443.34800.0FalseNoneNoneFalseNoneFalse34672.00
3580319130200Nonecode101Labour charges for laying of 1.1kV class UG cables in existing trench GI pipe/stoneware pipe/on wall/on pole as required. In existing trench 4 core 10Sqmm(exact measurement as per site) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr26.4626.4675.0FalseNoneNoneFalseNoneFalse1984.50
3580320130200Nonecode102Labour charges for laying of 1.1kV class UG cables in existing trench GI pipe/stoneware pipe/on wall/on pole as required. In existing trench 35 to 95sqmm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr39.4939.49140.0FalseNoneNoneFalseNoneFalse5528.60
3580321130200Nonecode103Digging of treanch of 0.6m deep x 0.50 mtr wide refiling the trench to the required ground level and consolidating etc., complete In soil (ordinary) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr96.4196.41600.0FalseNoneNoneFalseNoneFalse57846.00
3580322130200Nonecode104Providing and filling sand in excavated trench to cover already laid UG cable to a depthh of 150mm all- around the cable ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr126.85126.85200.0FalseNoneNoneFalseNoneFalse25370.00
3580323130200Nonecode105Supplying and fixing of heavy duty cable glands suitable for UG cable of 1.1 kV class (Metal Only) 25 mm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNo100.21100.2160.0FalseNoneNoneFalseNoneFalse6012.60
3580324130200Nonecode106Supplying and fixing of heavy duty cable glands suitable for UG cable of 1.1 kV class (Metal Only) 32 mm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNo120.51120.5164.0FalseNoneNoneFalseNoneFalse7712.640
3580325130200Nonecode107Supplying and fixing of heavy duty cable glands suitable for UG cable of 1.1 kV class (Metal Only) 40 mm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNo187.74187.7480.0FalseNoneNoneFalseNoneFalse15019.20
3580326130200Nonecode108Supplying and fixing of heavy duty cable glands suitable for UG cable of 1.1 kV class (Metal Only) 45 mm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNo249.89249.8958.0FalseNoneNoneFalseNoneFalse14493.620
3580327130200Nonecode109Supplying and fixing of class A GI pipe 80mm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr872.73872.73100.0FalseNoneNoneFalseNoneFalse87273.00
3580328130200Nonecode110Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the following sizes. 400 Sq.mm long barrel ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach1094.721094.7236.0FalseNoneNoneFalseNoneFalse39409.920
3580329130200Nonecode111Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the following sizes. 240 Sq.mm long barrel ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach450.32450.3260.0FalseNoneNoneFalseNoneFalse27019.20
3580330130200Nonecode112Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the following sizes. 120Sq.mm long barrel ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach177.59177.5928.0FalseNoneNoneFalseNoneFalse4972.520
3580331130200Nonecode113Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the following sizes. 1.5 sqmm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach1.521.5240.0FalseNoneNoneFalseNoneFalse60.80
3580332130200Nonecode114Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the following sizes. 2.5sqmm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach2.032.0348.0FalseNoneNoneFalseNoneFalse97.440
3580333130200Nonecode115Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the following sizes. 4sqmm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach3.553.5548.0FalseNoneNoneFalseNoneFalse170.40
3580334130200Nonecode116Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the following sizes. 6 sqmm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach3.553.5556.0FalseNoneNoneFalseNoneFalse198.80
3580335130200Nonecode117Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the following sizes. 10sqmm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach10.1510.1536.0FalseNoneNoneFalseNoneFalse365.40
3580336130200Nonecode118Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the following sizes. 16sqmm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach15.7815.7836.0FalseNoneNoneFalseNoneFalse568.080
3580337130200Nonecode119Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the following sizes. 25 sqmm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach25.3725.3748.0FalseNoneNoneFalseNoneFalse1217.760
3580338130200Nonecode120Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the following sizes. 35sqmm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach40.5940.5956.0FalseNoneNoneFalseNoneFalse2273.040
3580339130200Nonecode121Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the following sizes. 50sqmm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach76.1176.1148.0FalseNoneNoneFalseNoneFalse3653.280
3580340130200Nonecode122Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the following sizes. 70sqmm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach120.51120.5160.0FalseNoneNoneFalseNoneFalse7230.60
3580341130200Nonecode123Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the following sizes. 95sqmm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach183.93183.9348.0FalseNoneNoneFalseNoneFalse8828.640
3580342130200Nonecode124Constructing water tight 450x450x750mm(depth) size brick masonary inspection chamber ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNos5652.445652.4410.0FalseNoneNoneFalseNoneFalse56524.40
3580343130200Nonecode1252 mm thick perforated cable GI tray with on existing MS angle support using necessary GI bolts/nuts and washer or welding as required. 600 x 50 mm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr1189.851189.8530.0FalseNoneNoneFalseNoneFalse35695.50
3580344130200Nonecode1262 mm thick perforated cable GI tray with on existing MS angle support using necessary GI bolts/nuts and washer or welding as required. 750 x 50 mm ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr1491.761491.7660.0FalseNoneNoneFalseNoneFalse89505.60
3580345130200Nonecode127Supplying of recess mounting non integral type ........ LED w luminaire comprising of pressure decast/extruded aluminium housing, with spring loaded false ceiling clamps, Power LEDs with CCT 6500 degree K, CRI higherthan 70%. efficacy 100 lumen per W, 120degree beam spread, life higherthan 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The lamp compartment is enclosed with anti glare opal diffuser which enhances the lighting level LEDs are driven by HF electronic driver integrated in a separate control gear assembly., with PF higherthan 0.95, power loss should lesser than 5% of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition. LED modular down light 1'x1' 24W ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach4683.34683.320.0FalseNoneNoneFalseNoneFalse93666.00
3580346130200Nonecode128Supplying of recess mounting non integral type ........ LED w luminaire comprising of pressure decast/extruded aluminium housing, with spring loaded false ceiling clamps, Power LEDs with CCT 6500 degree K, CRI higherthan 70%. efficacy higherthan 100 lumen per W, 120degree beam spread, life higherthan 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The lamp compartment is enclosed with anti glare opal diffuser which enhances the lighting level LEDs are driven by HF electronic driver integrated in a separate control gear assembly., with PF higherthan 0.95, power loss should lesserthan 5% of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition. LED modular down light 2'x2' 40-42W ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach6166.186166.1824.0FalseNoneNoneFalseNoneFalse147988.320
3580347130200Nonecode129Supplying of recess mounting non integral type ........ LED w luminaire comprising of pressure decast/extruded aluminium housing, with spring loaded false ceiling clamps, Power LEDs with CCT 6500 degree K, CRI higherthan 70%. efficacy higherthan 100 lumen per W, 120degree beam spread, life higherthan 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The lamp compartment is enclosed with anti glare opal diffuser which enhances the lighting level LEDs are driven by HF electronic driver integrated in a separate control gear assembly., with PF higherthan 0.95, power loss should lesserhan 5% of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition. LED modular down light 1'x4' 34-36W ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach7481.617481.6112.0FalseNoneNoneFalseNoneFalse89779.320
3580348130200Nonecode130Supplyingof.....feet-PVC Batten with integrated LEDtube....W with high quality diffuser with Life of 25000 burning hours & 70%lumen maintenance with CRI higherthan 80.PowerInput:220-240V@50/60Hz & Powerfactor higherthan 0.9 along with CE approved. 2years Warranty against any manufacturing defect working understand electrical condition LED light fitting 1 x 4' - 20/22 W(lights to individual bay) ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNos875.27875.27240.0FalseNoneNoneFalseNoneFalse210064.80
3580349130200Nonecode131Supplying and fixing of LED Bulkhead of 10W with IP65 protection and IK08 impact resistance suitable for surface and wall mounting applications. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNos1068.081068.0830.0FalseNoneNoneFalseNoneFalse32042.40
3580350130200Nonecode132Fixing halogen/metal halide /SVL/IL/LED floodlight fitting over existing pole / wall ceiling including clamps, bolts, nuts and wiring using suitable capacity wires. ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach205.5205.5676.0FalseNoneNoneFalseNoneFalse138918.00
3580351130200Nonecode133Design, supplying, erecting testing and commissioning of - Passenger/ Bed-cum-passenger hospital lift with speed of 1mtr per second, variable voltage variable frequency drive, with or without machine room for the available well size, operating at 415 V 3 phase 50 cycles AC supply, powder coated / Stainless Steel car entrance doors enclosures with suitable colour vinyl flooring, LED car illumination, emergency light, intercom and fan as desired by the user, central opening / side opening door with or without attendant operation, 7 segment display buttons, call register indicator, fireman drive, SS handrails inside car, full length infrared curtain in car door, automatic rescue device with batteries, voice announcing in regional/ international languages, Braille buttons with one year warranty and maintenance with necessary scaffolding and minor civil works like fixing of guide rail, counter weight etc.,The total product and services shall adhere to IS 14665/2016 (with latest amendments) part/section 1 to 5 with regards to general guidelines of fire safety rated doors, MRLL beams, pressure switch, manual change over for doors during emergency, ARD of 10 times with sufficient battery back up and standard dimensions of chair car and door openings for all sizes and capacities of lifts including fitness certificate and duly observing all other safety norms prescribed and adhere to CPWD specifications, PCB Norms, National Electricity Code (NEC), NBC-2016, IEC and Karnataka State Lifts, Escalators and Passengers Conveyers Act 2012 and Rules 2014. The Supplier shall be registered in Government Electrical Inspectorate in the State of Karnataka. 1.5m/s Speed as per SR Recommendations for more than 6 Stops (GF + 6UFs) D With Out Machine Room-SS Finish 1.5m/s Capacity 6 Passengers ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workJob2337032.02337032.02.0FalseNoneNoneFalseNoneFalse4674064.00
3580352130200Nonecode134Design, supplying, erecting testing and commissioning of - Passenger/ Bed-cum-passenger hospital lift with speed of 1mtr per second, variable voltage variable frequency drive, with or without machine room for the available well size, operating at 415 V 3 phase 50 cycles AC supply, powder coated / Stainless Steel car entrance doors enclosures with suitable colour vinyl flooring, LED car illumination, emergency light, intercom and fan as desired by the user, central opening / side opening door with or without attendant operation, 7 segment display buttons, call register indicator, fireman drive, SS handrails inside car, full length infrared curtain in car door, automatic rescue device with batteries, voice announcing in regional/ international languages, Braille buttons with one year warranty and maintenance with necessary scaffolding and minor civil works like fixing of guide rail, counter weight etc.,The total product and services shall adhere to IS 14665/2016 (with latest amendments) part/section 1 to 5 with regards to general guidelines of fire safety rated doors, MRLL beams, pressure switch, manual change over for doors during emergency, ARD of 10 times with sufficient battery back up and standard dimensions of chair car and door openings for all sizes and capacities of lifts including fitness certificate and duly observing all other safety norms prescribed and adhere to CPWD specifications, PCB Norms, National Electricity Code (NEC), NBC-2016, IEC and Karnataka State Lifts, Escalators and Passengers Conveyers Act 2012 and Rules 2014. The Supplier shall be registered in Government Electrical Inspectorate in the State of Karnataka. 1.5m/s Speed as per SR Recommendations for more than 6 Stops (GF + 6UFs) D With Out Machine Room-SS Finish 1.5m/s Capacity 15 Passengers ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workJob3105964.03105964.01.0FalseNoneNoneFalseNoneFalse3105964.00
3580353130200Nonecode135Supplying, erection, testing and commissioning of AMF Panel suitable for 500kVA DG set ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach727184.0727184.02.0FalseNoneNoneFalseNoneFalse1454368.00
3580354130200Nonecode136Supplying & Fixing of MS pipe with 200mm Dia with collar for DG exhaust of ESCOM SR ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workMtr3171.253171.2580.0FalseNoneNoneFalseNoneFalse253700.00
3580355130200Nonecode137Supplying of multi function digital meter with three line back light LCD type display for voltage, Current, frequency, Power, power factor, kVA, kWH, kVAR suitable for 3 phase, 4 wire LT network with IP 54 degree of protection and completely wired as required with communication Port and Class 0.5s accuracy LT ACB 1600 Amps ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach378517.86378517.861.0FalseNoneNoneFalseNoneFalse378517.860
3580356130200Nonecode138Supplying of multi function digital meter with three line back light LCD type display for voltage, Current, frequency, Power, power factor, kVA, kWH, kVAR suitable for 3 phase, 4 wire LT network with IP 54 degree of protection and completely wired as required with communication Port and Class 0.5s accuracy LT ACB 1250 Amps ---- Including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workEach302815.05302815.052.0FalseNoneNoneFalseNoneFalse605630.10
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17216460440000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17216460440000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17216460440000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17216460440000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17216460440000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17216460990000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union Territory.None
17216461100000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17216461160000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17216461210000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17216461310000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17216461370000NoneNoneELIGIBILITYConditional tenders will not be acceptedNone
17216461420000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17216461470000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing KPPP Portal.None
17216461530000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17216461590000NoneNoneELIGIBILITYMaterials like bitumen, steel, cement etc., required for the work shell be procured by the tenderer themselves and should got tested by the quality control authority before use on the work.None
17216461640000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labor welfare fund.None
17216461690000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original, Submit the original document at the time of technical bid opening or next day and the Executive Engineer reserves the right to verify the original documents before approval.None
17216461750000NoneNoneELIGIBILITYIf any, additional information required, the same may be obtained from the office of the Executive Engineer, PWD, Bangalore Division, BANGALORE during office hours on all working days. It may be noted that if any of the dates mentioned above happened to be a General Holiday, the next working day will be considered.None
17216461800000NoneNoneELIGIBILITYThe employer reserves the rights to Reject or accept any or all the tenders without assigning any reasons.None
17216461850000NoneNoneELIGIBILITYThe contractors assessed available tender capacity shall be more than the tender value, it will be calculated as per the STD tender document Attached.None
17216461920000NoneNoneELIGIBILITYThe Tender processing fee shall not be refundable.None
17216462000000NoneNoneELIGIBILITYTenderer who qualifies in the technical bid such tenderers financial bid will be opened.None
17216462080000NoneNoneELIGIBILITYContractor should establish a fully functional laboratory at site at no extra cost in order to carry out all the required tests for the materials being used in the project.None
17216462140000NoneNoneELIGIBILITYContractor should take all precautions to ensure that no damage is caused to the existing similar structures which have been constructed by other agencies during project execution. If any damage is caused, it has to be rectified at his own risk and cost.None
17216462190000NoneNoneELIGIBILITYContractor should carryout additional test required to test the suitability of materials before using the same to the work.None
17216462240000NoneNoneELIGIBILITYFormation levels and other data furnished are bare minimum, the contractor should make all efforts to validate and to get additional data if required at his own cost. Contractor should execute the project with least impact to the environment.None
17216462290000NoneNoneELIGIBILITYWhen Structure constructed disputes arising on account of damages to the existing bunds, Structure and other private properties, if any, has to be resolved by the contractor. All precautions should be taken by the contractor so that there are no damages to such public /private properties.None
17216462350000NoneNoneELIGIBILITYContractor should take all precautionary measures to avoid any damage to the utilities during excavation as well as utility shifting. To that extent the contractor should indemnify the client.None
17216462400000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act.None
17216462450000NoneNoneELIGIBILITYThe Bidder shall not furnish any fake/fabricated/false information or withhold facts etc., if the bidder is found to have violated any of these above (found either during evaluation or after awarding the tender), the tender shall be rejected and action as per rules and regulations shall be taken against the Bidder.None
17216462510000NoneNoneELIGIBILITYIf the Successful Bidder has quoted lesser rates than the estimated rates then he should without fail remit the Unbalanced Tender Amount along with the Security Deposit within the stipulated time as that shall be specified in the Letter of Acceptance, failing which the tender of the Successful Bidder shall be rejected.None
17216462610000NoneNoneELIGIBILITYAll the items of work as Maintained in the Bill of Quantity (BOQ) are including lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.None
17216462670000NoneNoneELIGIBILITYTerms and condition of Contract as per Approved STD KW-4.None
17216462740000NoneNoneELIGIBILITYUploaded original BG or EMD to be submitted to The Executive Engineer, PWD Bangalore Division, Bangalore before the date of opening of the tender otherwise tender will be rejected for non submission of EMD.None
17216462810000NoneNoneELIGIBILITYThe Defect liability period of the work is 24 Months from the date of completion of work.None
17216462910000NoneNoneELIGIBILITYContractor shall be Class-INone
17216462980000NoneNoneELIGIBILITYProgress of Work will be reviewed monthly / at the end of the each Milestone. In case the Progress achieved falls short by more than 10% of the Cumulative Programmed, the Reasons for such Shortfall shall be examined and a Record made thereof apportioning the Responsibilities for the Delay between the Contractor and the Employer.None
17216463040000NoneNoneELIGIBILITYThe increase in GST shall not be paid in the extended period of contract for which the Contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17216463170000NoneNoneELIGIBILITYThe Rates to be quoted inclusive of Taxes and GSTNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNone3.2 (b) Mandating satisfactory completion as a prime contractor for at least one similar work to an extent of 50% of the cost of the work, such as Building work of value not less than Rs. 1842 LakhsPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNone3.2(c) Executed in any one year, the following minimum quantities of work usually 80 percent of the peak annual rate of construction Earth work excavation / Embankment----------9171.00 Cum, RCC /PCC------6295.00 Cum, TMT FE 550 / 550D Steel -----780.00 Tonne, M.S./Stainless steel------11561.00 Kgs, Cement plaster-------18010.00 Sqm, Ceramic glazed wall tiles /alkali resistant tiles /Glazed Vitrified tiles/ Vinly/Polished Granite stone flooring ------9194.00 Sqm, Vision glass panels (IGUs) -------2049.00 Sqm, PAINTAINING (EXTERNAL & INTERNAL) / PRIMER / PUTTY---------67452.00 Sqm, Unitized system of structural glazing-----2739.00 Sqm & Autoclaved Aerated Cement Block masonry /Cement blocks masonry/BBM---1153.00 CumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNone3.2(d) The Tenderer or his identified sub-contractor should possess required valid electrical license for executing building electrification works and should have executed similar electrical works totaling Rs.110 lakhs (usually not less than 50% of the electrical works) in any one year and the Tenderer or his identified sub contractor should possess required experience regarding firefighting works for executing building Fire Works and should have executed similar firefighting works amounting Rs.111 lakhs usually not less than 50% of the fireworks in any one yearPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNone3.2(e)The Tenderer or his identified sub-contractor should possess valid license for executing water supply/sanitary engineering works and should have executed similar water supply/sanitary engineering works totaling Rs. 87.00 lakhs in any one year.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNone3.3 (a) Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded Owned: Self loading weigh batch concrete mixer-- 02 No, Transit mixer------03 Nos, Tippers /HGV------ 03 Nos, Steel shuttering sheets & jacks -----3000.00 Sqm, Water tankers ------ 03 Nos, Needle/Plate/ Pin vibrator--------06 Nos ,Excavators ------02 Nos & Building Material Hoister -----------01 Nos, Lease/Hired/Rented: Self loading weigh batch concrete mixer ------------- 04 No, Tippers /HGV------------- 02 Nos, Steel shuttering sheets & jacks -------- 1300.00 Sqm, Vibratory Roller -----------01 Nos, Water tankers -------- 02 Nos, Needle/Plate/ Pin vibrator -----03 Nos, Excavators -----------02 No, Transit mixer-------- 01 Nos, Tower Crane of 50M boom length ---01 Nos & Diesel Generators --- 02 NosCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Invoice, bills, RC issued by RTO
NoneNoneNoneNone3.2(a) To qualify for award of this contract, each Tenderer in his name should have in the last five years 2019-20 to 2023-24 (a)achieved in at least two financial years a Minimum financial turn over (in all classes of civil engineering construction works only of Rs.4912.00 lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNone3.3(b)Liquid assets and /or availability of credit facilities of no less than Rs. 614.00 Lakhs (Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc. (usually the equivalent of the estimated cash flow for three months in peak construction period).Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate with UDIN from CATrueTechnical Bid
Work Done Certificate for Similar nature work, duly attested by the Officer Not below the rank of E.E.TrueTechnical Bid
Banker Certificate - Line of Credit in the prescribed formTrueTechnical Bid
Existing Commitments work details - B-Value - should be furnished duly attested by the concerned Executive Engineer as per Standard Tender DocumentsTrueTechnical Bid
Income Tax Balance sheets and Annual Turnover Certificate issued by the CA with Membership No. with UDIN - 2018-19 to 2022-23TrueTechnical Bid
GST Certificate, Pan Card & Tin CertificateTrueTechnical Bid
KPWD Registration Certificate-CLASS-ITrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1721893659000
version0
createdDateNone
modifiedDateNone
blockNumberO/o The Executive Engineer, PWD, Annex Building, 2nd Floor, K.R Circle, Bangalore
streetNone
cityBangalore
stateKARNATAKA
pin560001
tenderRecallDTONone