| 1721884409000 | 0 | None | None | Roads | CC drain and slab construction from setu Manjunaths house to Hanumaiahs house Drain Slab and Deck construction from Gowrammas house to Nagammas house at ward no 10 | 1694334.48 | | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
|---|
| 3612211 | 131289 | None | Page No. 12 Item No. 2.19 PWD CSR SR 2023-24 | Dismantling of cement concrete pavement by mechanical meansusing pneumatic tools, breaking to pieces not exceeding 0.02 m3in volume and stock piling at designated locations and disposal ofdismantled materials and stacking serviceable and unserviceablematerials separately(Page No. 12/ Item No. 2.19/PWD CSR VOL-III SR 2023-24) | Cum | 740.57 | 740.57 | 117.6 | False | None | None | False | None | False | 87091.032 | 0 | | 3612212 | 131289 | None | Page No 08 Item No. 1.14.1 PWD | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (Page No. 08/ Item No. 1.14.1/PWD CSR VOL-I SR 2023-24) | Cum | 249.26 | 249.26 | 322.52 | False | None | None | False | None | False | 80391.3352 | 0 | | 3612213 | 131289 | None | Page No 15 Item No. 2.1.2 PWD CSR | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates(Page No. 15/ Item No. 2.1.2/PWD CSR VOL-I SR 2023-24) | Cum | 5833.92 | 5833.92 | 33.8 | False | None | None | False | None | False | 197186.496 | 0 | | 3612214 | 131289 | None | Page No 18 Item No. 2.11 h PWD CSR | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures(Page No. 18/ Item No. 2.11/h/PWD CSR VOL-I SR 2023-24) | Tonne | 81381.33 | 81381.33 | 6.05 | False | None | None | False | None | False | 492357.0465 | 0 | | 3612215 | 131289 | None | Page No. 16 Item No. 2.4.2 PWD CSR | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS
Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Page No. 16/ Item No. 2.4.2/PWD CSR VOL-I SR 2023-24) | Cum | 6828.84 | 6828.84 | 117.96 | False | None | None | False | None | False | 805529.9664 | 0 | | 3612216 | 131289 | None | Page No.7 Item No. 1.10 PWD CSR VOL-I SR 2023-24 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications (Page No.7/ Item No. 1.10/PWD CSR VOL-I SR 2023-24) | Cum | 164.8 | 164.8 | 130.8 | False | None | None | False | None | False | 21555.84 | 0 | | 3612217 | 131289 | None | Bwssb SR23-24 I.no 10.14 page no 120 | Providing and installing at site of work P.V.C. pipes including cost of pipesand specials and labour, including lowering into trenches, laying trueto line, level and perfect linking at joints leak proof including jointingof approved type with all labour charges and all lift charges, handlingcharges including encasing the pipe around to a depth not less than15 cms with gravel or selected earth available from the excavation etc complete.6 Kg/m2: 63mm(weight of pipe -0.662 kg)10.14.8 (Bwssb SR23-24 I.no 10.14 page no 120 Vol v ) | m | 143.17 | 143.17 | 25.0 | False | None | None | False | None | False | 3579.25 | 0 | | 3612218 | 131289 | None | Bwssb SR23-24 I.no 10.14 page no 120 | Providing and installing at site of work P.V.C. pipes including cost of pipesand specials and labour, including lowering into trenches, laying trueto line, level and perfect linking at joints leak proof including jointingof approved type with all labour charges and all lift charges, handlingcharges including encasing the pipe around to a depth not less than15 cms with gravel or selected earth available from the excavation etc complete. 90mm(weight of pipe -1.313 kg)(Bwssb SR23-24 I.no 10.14 page no 120 Vol v ) | m | 265.74 | 265.74 | 25.0 | False | None | None | False | None | False | 6643.5 | 0 |
|