tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1721378550000 | 0 | None | None | Buildings | Civil Work | 864264.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3551229 | 128485 | None | V-1, P.No.5, I.No 1.4 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 249.26 | 249.26 | 31.79 | False | None | None | False | None | False | 7923.9754 | 0 | 3551230 | 128485 | None | V-1, p.No.11, I.No 1.23 | Providing and Filling in foundation with granite / trap broken metal 100mm. and
down size & with approved sand including hand packing, ramming, watering,
including cost of all materials and labour with all lead and lift complete as per
specifications. ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 2762.46 | 2762.46 | 9.88 | False | None | None | False | None | False | 27293.1048 | 0 | 3551231 | 128485 | None | V-1, P.No 15 I.No 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregate ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 6168.67 | 6168.67 | 5.14 | False | None | None | False | None | False | 31706.9638 | 0 | 3551232 | 128485 | None | V-2, P.No.9,I.No 5.5 | Providing and constructing laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S. 3620/1979 having compressive strength not less than 3.5 N/mm2 for saturated dry samples -For foundation CM 1:6 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 6565.22 | 6565.22 | 8.37 | False | None | None | False | None | False | 54950.8914 | 0 | 3551233 | 128485 | None | V-1, P.No 15. I.No 2.2.1 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.M 20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 6993.66 | 6993.66 | 2.98 | False | None | None | False | None | False | 20841.1068 | 0 | 3551234 | 128485 | None | V-2, P.No.9, I.No.5.6 | Providing and constructing laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S. 3620/1979 having compressive strength not less than 3.5 N/mm2 for saturated dry samples For Basement in CM 1:6 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 6641.44 | 6641.44 | 4.41 | False | None | None | False | None | False | 29288.7504 | 0 | 3551235 | 128485 | None | V-1, P.No 15. I.No 2.3.1 | Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Upto plinth level ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 11071.57 | 11071.57 | 0.62 | False | None | None | False | None | False | 6864.3734 | 0 | 3551236 | 128485 | None | V-1, P.No 15. I.No 2.3.1 | Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 9769.04 | 9769.04 | 2.21 | False | None | None | False | None | False | 21589.5784 | 0 | 3551237 | 128485 | None | V-1, P.No 16. I.No 2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates above plinth level columns ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 11609.13 | 11609.13 | 1.86 | False | None | None | False | None | False | 21592.9818 | 0 | 3551238 | 128485 | None | V-1, P.No 16. I.No 2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 10926.24 | 10926.24 | 1.79 | False | None | None | False | None | False | 19557.9696 | 0 | 3551239 | 128485 | None | V-1, P.No-7 I.No-1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 273.98 | 273.98 | 25.3 | False | None | None | False | None | False | 6931.694 | 0 | 3551240 | 128485 | None | V-2, P.No-17,I.No-6.32 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 1349.3 | 1349.3 | 11.48 | False | None | None | False | None | False | 15489.964 | 0 | 3551241 | 128485 | None | V-2,P.No.17,6.34 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 1137.12 | 1137.12 | 8.82 | False | None | None | False | None | False | 10029.3984 | 0 | 3551242 | 128485 | None | V-1, P.No 16. I.No 2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 10926.24 | 10926.24 | 0.66 | False | None | None | False | None | False | 7211.3184 | 0 | 3551243 | 128485 | None | V-1, P.No 16. I.No 2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 9901.91 | 9901.91 | 0.9 | False | None | None | False | None | False | 8911.719 | 0 | 3551244 | 128485 | None | V-1, P.No 16. I.No 2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 10243.35 | 10243.35 | 2.84 | False | None | None | False | None | False | 29091.114 | 0 | 3551245 | 128485 | None | V-1, P.No 18 I.No 2.11a | Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification Buildings ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Kg | 92140.71 | 92140.71 | 0.71 | False | None | None | False | None | False | 65419.9041 | 0 | 3551246 | 128485 | None | V-2, P.No-41 I.No 8.1.2 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 248.23 | 248.23 | 93.12 | False | None | None | False | None | False | 23115.1776 | 0 | 3551247 | 128485 | None | V-2, P.No-41. I.No 8.2.2 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 287.37 | 287.37 | 57.96 | False | None | None | False | None | False | 16655.9652 | 0 | 3551248 | 128485 | None | V-2, P.No-60 I.No 9.9 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry at 3.3 kg/m2 including pointing the joints with white cement and matching pigment etc., complete. ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 1108.28 | 1108.28 | 18.3 | False | None | None | False | None | False | 20281.524 | 0 | 3551249 | 128485 | None | V-2, P.No-71 I.No10.14 | Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry at 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete. ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 1139.18 | 1139.18 | 52.08 | False | None | None | False | None | False | 59328.4944 | 0 | 3551250 | 128485 | None | V-2, P.No-15, I.No.2.1.6 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 6430.29 | 6430.29 | 3.87 | False | None | None | False | None | False | 24885.2223 | 0 | 3551251 | 128485 | None | V-2, P.No-98 I.No 12.13.1 | Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 101779.45 | 101779.45 | 0.34 | False | None | None | False | None | False | 34605.013 | 0 | 3551252 | 128485 | None | V-2, P.No-105 I.No 12.57.3 | Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed andfastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. -do- 30 mm thick both side commercial ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 3095.15 | 3095.15 | 4.2 | False | None | None | False | None | False | 12999.63 | 0 | 3551253 | 128485 | None | V-2, P.No-104,I.No 12.55.1 | Providing & fixing 30mm thick factory made rigid foam Prelam Panelled Door Shutters made from M.S. tube of 19x19mm, 19 gauge for stiles and 15x15mm for top & bottom rails, covered with heat moulded Prelaminated PVC C Channel of 5mm thick sheet & 30x50mm wide to form stiles & 5mm thick & 75mm wide Prelaminated PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick, 20mm wide cross PVC sheet as gap insertfor top rail & bottom rail, Panelling of 5mm thick PVC sheet Prelaminatedon either side fitted in the M.S. frame, Sealed to the stiles & rails with PVC Designer beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75mm Aluminium hinges -do- with both side prelam ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 2436.98 | 2436.98 | 3.78 | False | None | None | False | None | False | 9211.7844 | 0 | 3551254 | 128485 | None | V-2, P.No-86, I.No 11.34B | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 188.49 | 188.49 | 79.56 | False | None | None | False | None | False | 14996.2644 | 0 | 3551255 | 128485 | None | V-2, P.No.100 I.No12.18 | Providing and fixing in position fully panelled Matti/Nandi wood shutters for doors with, stiles and rails of 35mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures ) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 6773.28 | 6773.28 | 4.2 | False | None | None | False | None | False | 28447.776 | 0 | 3551256 | 128485 | None | V-2, P.No-149,I.No 15.2 | Polyurethane based Single Component for Existing Surface Providing and Applying PU based Elastomeric Liquid Applied PU Waterproofing Membrane single component, cold applied, water based acrylic PU dispersion with highly elastic and UV resistant water proofing treatment to the Existing Roof surface/Chajjas/Sunken portion of WC:Bathroom applied at 1.2 l/per m2, having tensile strength greater than 1.5N/mm2, elongation greater than 300Percent with solid content not less than 60Percent in 2 coats including surface preparation, priming the surface with water based acrylic primer at 0.1 l/m2, and spreading 60 gsm geotextile between two top coats completely as per specification. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 759.11 | 759.11 | 18.9 | False | None | None | False | None | False | 14347.179 | 0 | 3551257 | 128485 | None | V-2, P.No- 104, I.No 12.51 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Nos | 1046.48 | 1046.48 | 4.0 | False | None | None | False | None | False | 4185.92 | 0 | 3551258 | 128485 | None | V-2, P.No- 110 I.No 12.90 | Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) andlead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer framehaving an overall size of 108mm width x 45mmheight with reinforcementof 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 6936.02 | 6936.02 | 1.8 | False | None | None | False | None | False | 12484.836 | 0 | 3551259 | 128485 | None | V-2, P.No-50, I.No.8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 103.0 | 103.0 | 41.34 | False | None | None | False | None | False | 4258.02 | 0 | 3551260 | 128485 | None | V-2, P.No- 46 I.No 8.33.1 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls at 1.25 L/10 m2 over and including one coat of Special primer applied at 0.75 L/10 m2 with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (The gloss should be 50Percent at 60 degree angle with 10 years life). ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 162.74 | 162.74 | 29.54 | False | None | None | False | None | False | 4807.3396 | 0 | 3551261 | 128485 | None | V-2, P.No-46 I.No 8.30 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied at 1.67L/10 m2 over and including priming coat of exterior primer applied at 2.20 kg/10 m2) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 179.22 | 179.22 | 69.42 | False | None | None | False | None | False | 12441.4524 | 0 | 3551262 | 128485 | None | V-2, P.No- 47 I.No 8.33.3 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied at 0.90L/10 m2 over an under coat of primer applied at 0.80 L/10 m2 of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 143.17 | 143.17 | 2.88 | False | None | None | False | None | False | 412.3296 | 0 | 3551263 | 128485 | None | V-2, P.No.123,I.No 13.34 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Ltr | 9.27 | 9.27 | 1000.0 | False | None | None | False | None | False | 9270.0 | 0 | 3551264 | 128485 | None | V-2, P.No.122, I.No 13.31.3 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge.Internal work - Exposed on wall 32 mm nominal dia Pipe ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Mtr | 327.54 | 327.54 | 60.0 | False | None | None | False | None | False | 19652.4 | 0 | 3551265 | 128485 | None | V-2, P.No.122, I.No 13.31.4 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge.Internal work - Exposed on wall 32 mm nominal dia Pipe ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Mtr | 412.0 | 412.0 | 80.0 | False | None | None | False | None | False | 32960.0 | 0 | 3551266 | 128485 | None | V-2, P.No-118 I.No 13.20.2 | Providing and fixing PTMT pillar cock of approved quality and colour.weighing not less than 120 gms 15 mm nominal bore, 125 mm long foam flow, weighing not less than 120 g ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Nos | 323.42 | 323.42 | 8.0 | False | None | None | False | None | False | 2587.36 | 0 | 3551267 | 128485 | None | V-2, P.No-132 I.No.14.5.1 | Providing and fixing white vitreous china flat back half stall urinal of size 580x380x350 mm with white PVC automatic flushing cistern, with fittings, standard size C.P. brass flush pipe, spreaders with unions and clamps (all in C.P. brass) with waste fitting as per IS : 2556 C.I. trap with outlet grating and other couplings in C.P. brass, including painting of fittings and cutting and making good the walls and floors wherever required Single half stall urinal with 5 litre P.V.C. automatic flushing cistern ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 8901.26 | 8901.26 | 2.0 | False | None | None | False | None | False | 17802.52 | 0 | 3551268 | 128485 | None | V-2, P.No-132, I.No 14.6.4 | Providing and fixing one piece construction white vitreous china squatting plate with an integral longitudinal flushing pipe, white P.V.C. automatic flushing cistern, with fittings, standard size G.I. / PVC flush pipe for backand front flush with standard spreader pipes with fittings, G.I clamps and C.P. brass coupling complete, including painting of fittings and cutting andmaking good the walls and floors etc. wherever required Range of four squatting plates with 10 litre P.V.C. automatic flushing cistern ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 15464.42 | 15464.42 | 2.0 | False | None | None | False | None | False | 30928.84 | 0 | 3551269 | 128485 | None | V-2, P.No-136, I.No 14.31 | Providing and fixing 600x450 mm beveled edge mirror of superior glass (of approved quality) complete with 6 mm thick hard board ground fixed to wooden cleats with C.P. brass screws and washers complete. ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 1256.6 | 1256.6 | 2.0 | False | None | None | False | None | False | 2513.2 | 0 | 3551270 | 128485 | None | V-2, P.No- 132 I.No.14.7.3 | White Vitreous China Wash basin size 550x400 mm with a pair of 15 mm C.P. brass pillar taps ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 2951.98 | 2951.98 | 2.0 | False | None | None | False | None | False | 5903.96 | 0 | 3551271 | 128485 | None | V-2, P.No- 117, I.No 13.4.4 | Providing and fixing Brass full way valve gate with C.I. wheel of approved quality 50 mm nominal bore (screwed end) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Mtr | 880.65 | 880.65 | 4.0 | False | None | None | False | None | False | 3522.6 | 0 | 3551272 | 128485 | None | V-2, P.No- 126, I.No. 13.54 | Constructing brick masonry chamber for underground C.I. inspection chamber and bends with bricks in cement mortar 1:4 (1 cement : 4 coarse sand) C.I. cover with frame (light duty) 500X700 mm internal dimensions, total weight of cover with frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg), R.C.C. top slab with 1:1.5:3 mix (1 cement : 1.5 fine sand : 3 graded stone aggregate 20mm nominal size), foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand), finished smooth with a floating coat of neat cement on walls and bed concrete etc. complete as per standard design: Inside dimensions 500x700 mm and 45 cm deep for pipe line with one or two inlets :With common burnt clay (non modular) bricks of class designation 3.5 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Nos | 6466.34 | 6466.34 | 4.0 | False | None | None | False | None | False | 25865.36 | 0 | 3551273 | 128485 | None | V-2, P.No.128, I.No 13.64.2 | Providing and fixing Sewer (SWR) pipes, including all fittings, This includes jointing of pipes & fittings with one step solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 110mm nominal dia pipe ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Mtr | 396.55 | 396.55 | 25.0 | False | None | None | False | None | False | 9913.75 | 0 | 3551274 | 128485 | None | V-2, P.No- 144, I.No. 14.89 | Providing and fixing Towel rail 600mm length made of Stainless steel with all concealed fitting arrangements & all necessary accesories complete - Class Economy ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 1299.86 | 1299.86 | 2.0 | False | None | None | False | None | False | 2599.72 | 0 | 3551275 | 128485 | None | V-2, P.No- 63 I.No. 9.24 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge.Polished Granite stone slab Black, Cat Eye, River Pink or equivalent. ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 2937.56 | 2937.56 | 2.88 | False | None | None | False | None | False | 8460.1728 | 0 | 3551276 | 128485 | None | V-2 , P.125,No. Sl no.13.47 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 75 mm diameter ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | m | 202.91 | 202.91 | 17.5 | False | None | None | False | None | False | 3550.925 | 0 | 3551277 | 128485 | None | V-2,P.No.120, I.No.13.20.2 | 15 mm nominal bore, 125 mm long foam flow, weighing not less than 120 g ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | No | 323.42 | 323.42 | 8.0 | False | None | None | False | None | False | 2587.36 | 0 | 3551278 | 128485 | None | V-2,P.No.120, I.No.13.21.2 | Providing and fixing PTMT, push cock of approved quality and colour. 15 mm nominal bore, 80 mm long, weighing not less than 46 g ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | No | 138.02 | 138.02 | 4.0 | False | None | None | False | None | False | 552.08 | 0 | 3551279 | 128485 | None | V-2,P.No.106, I.No.12.67.2 | Providing and fixing nickel plated M.S. pipe curtain rods with nickel plated brackets, 25mm dia heavy pipe ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Mtr | 454.23 | 454.23 | 3.0 | False | None | None | False | None | False | 1362.69 | 0 | 3551280 | 128485 | None | V-2,P.No.A-18, Sl.226 | Chromium plated brass handles ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | No | 195.7 | 195.7 | 8.0 | False | None | None | False | None | False | 1565.6 | 0 | 3551281 | 128485 | None | V-2,P.No.107, I.No.12.72 | Providing and fixing ISI marked oxidised M.S. tower bolt black finish, (Bar rel type) with necessary screws etc. complete ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 84.46 | 84.46 | 6.0 | False | None | None | False | None | False | 506.76 | 0 |
| 1721378550000 | 0 | None | None | Buildings | Electrical Work | 24464.22 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3551282 | 128486 | None | Volume 6 | Open Conduit System : Supplying heavy gauge PVC conduit pipe ....... dia ....... mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc , and fixing using inverted wood plugs in case of RCC ceiling and RCC wall/ stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws. 25 mm dia 2 mm thick ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Mtr | 83.43 | 83.43 | 5.0 | False | None | None | False | None | False | 417.15 | 0 | 3551283 | 128486 | None | Volume 6 | Concealed Conduit System : Supplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 25 mm dia 2 mm thick ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Mtr | 80.34 | 80.34 | 5.0 | False | None | None | False | None | False | 401.7 | 0 | 3551284 | 128486 | None | Volume 6 | Supplying and fixing PVC/metal conduit Deep junction box 25 mm deep Junction box ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 57.68 | 57.68 | 4.0 | False | None | None | False | None | False | 230.72 | 0 | 3551285 | 128486 | None | Volume 6 | Extra for Groove cutting in brick wall/CC floor to the suitable depth for concealing of Conduit/GI pipe and plastering, finishing upto wall surface complete. upto 50 mm conduit in brick wall ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Mtr | 29.0 | 29.0 | 5.0 | False | None | None | False | None | False | 145.0 | 0 | 3551286 | 128486 | None | Volume 6 | Supplying And Fixing Metal Fan Box with Round Hook. ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | No | 120.51 | 120.51 | 2.0 | False | None | None | False | None | False | 241.02 | 0 | 3551287 | 128486 | None | Volume 6 | Point wiring using Copper wire with switch : Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5 mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Short point upto 3m from tapping point to out let via switch ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Point | 293.55 | 293.55 | 4.0 | False | None | None | False | None | False | 1174.2 | 0 | 3551288 | 128486 | None | Volume 6 | Point wiring using Copper wire with switch : Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5 mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Medium point above 3m upto 6m from tapping point to out let via switch ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Point | 405.82 | 405.82 | 6.0 | False | None | None | False | None | False | 2434.92 | 0 | 3551289 | 128486 | None | Volume 6 | Point wiring using Copper wire with switch : Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5 mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Long point above 6m upto 10m from tapping point to out let via switch ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Point | 587.1 | 587.1 | 2.0 | False | None | None | False | None | False | 1174.2 | 0 | 3551290 | 128486 | None | Volume 6 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 1.0 mm2 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Mtr | 19.57 | 19.57 | 60.0 | False | None | None | False | None | False | 1174.2 | 0 | 3551291 | 128486 | None | Volume 6 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 1.5 mm2 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Mtr | 26.78 | 26.78 | 30.0 | False | None | None | False | None | False | 803.4 | 0 | 3551292 | 128486 | None | Volume 6 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 2.5 mm2 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Mtr | 43.26 | 43.26 | 10.0 | False | None | None | False | None | False | 432.6 | 0 | 3551293 | 128486 | None | Volume 6 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 6 Module ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 226.6 | 226.6 | 2.0 | False | None | None | False | None | False | 453.2 | 0 | 3551294 | 128486 | None | Volume 6 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 6 Module ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 241.02 | 241.02 | 2.0 | False | None | None | False | None | False | 482.04 | 0 | 3551295 | 128486 | None | Volume 6 | SWITCHES, SOCKETS & ACCESSORIES Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A One Way Switch ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 105.06 | 105.06 | 8.0 | False | None | None | False | None | False | 840.48 | 0 | 3551296 | 128486 | None | Volume 6 | SWITCHES, SOCKETS & ACCESSORIES Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Three Way socket ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 176.13 | 176.13 | 2.0 | False | None | None | False | None | False | 352.26 | 0 | 3551297 | 128486 | None | Volume 6 | SWITCHES, SOCKETS & ACCESSORIES Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. Stepped Fan Regulator Two Module ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 367.71 | 367.71 | 2.0 | False | None | None | False | None | False | 735.42 | 0 | 3551298 | 128486 | None | Volume 6 | SWITCHES, SOCKETS & ACCESSORIES Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 16A One Way Switch ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 185.4 | 185.4 | 3.0 | False | None | None | False | None | False | 556.2 | 0 | 3551299 | 128486 | None | Volume 6 | SWITCHES, SOCKETS & ACCESSORIES Extra for supplying 4 mm thick white plastic plate and covering for junction boxes of size ...... mm conduit using necessary machine screws. 110 mm ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | No | 21.63 | 21.63 | 8.0 | False | None | None | False | None | False | 173.04 | 0 | 3551300 | 128486 | None | Volume 6 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and C Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 A SP ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 427.45 | 427.45 | 1.0 | False | None | None | False | None | False | 427.45 | 0 | 3551301 | 128486 | None | Volume 6 | Supplying and fixing regular MCB distribution boards on wall/wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/single door with powder coated painting Made out of 14 SWG MS enclosure. I - Single Door 4 Way SP & N ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 1278.23 | 1278.23 | 1.0 | False | None | None | False | None | False | 1278.23 | 0 | 3551302 | 128486 | None | Volume 6 | Supplying of 1440rpm heavy duty exhaust fan with bracket blades suitable to operate on 230V 50Hz, AC Supply complete. 12 Sweep (300 mm) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 3058.07 | 3058.07 | 1.0 | False | None | None | False | None | False | 3058.07 | 0 | 3551303 | 128486 | None | Volume 6 | Fixing one exhaust fan after making a suitable notch in the wall and finishing with cement mortar and colouring to match the existing wall or brackets, with bolts and nuts and a 5 A, ceiling rose with sufficient length of 23 / 0.0076 inch PVC insulated twin core wire of approved make with wire mesh and wooden frame. ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 728.21 | 728.21 | 2.0 | False | None | None | False | None | False | 1456.42 | 0 | 3551304 | 128486 | None | Volume 6 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. 48" Sweep (1200 mm) Regular model ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 3073.52 | 3073.52 | 1.0 | False | None | None | False | None | False | 3073.52 | 0 | 3551305 | 128486 | None | Volume 6 | Fixing a ceiling /wall mounting fan of all capacities and all types, with necessary clamps and S hook made out of 15mm dia MS rod, with 5 A. ceiling rose of approved quality with necessary length of 23/0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired. ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 324.45 | 324.45 | 2.0 | False | None | None | False | None | False | 648.9 | 0 | 3551306 | 128486 | None | Volume 6 | Supplying of .....feet -PVC Batten with integrated LED tube .... W with high quality diffuser with Life of 25000 burning hours & 70percent lumen maintenance with CRI 80. Power Input: 220-240V at 50/60Hz and Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fitting 1. 4 - 20/22 W ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 710.7 | 710.7 | 2.0 | False | None | None | False | None | False | 1421.4 | 0 | 3551307 | 128486 | None | Volume 6 | Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076 twin twisted PVC insulated wires, required Nos of round blocks and clamps.. LED light On wall/ ceiling / Rafter / Girders ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 122.0 | 122.0 | 2.0 | False | None | None | False | None | False | 244.0 | 0 | 3551308 | 128486 | None | Volume 6 | Supplying & fixing of retrofit type - LED bulb ...... W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degree K, CRI 70Percent. efficacy 80 lumen per W, life 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 and LM 80. The LED are driven by HF electronic driver integrated in the system, with PF 0.95, power loss should 5Percent of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20Percent, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition... 9W, 6500K ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 158.62 | 158.62 | 4.0 | False | None | None | False | None | False | 634.48 | 0 |
|
|
---|