createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1720523932548
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee710.00
emd70500.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose13-08-2024 16:00:00
tenderQueryClose30-07-2024 16:00:00
technicalBidOpen15-08-2024 11:00:00
publishedDate29-07-2024 19:19:18
publishedByPostTP_CO_BRGN
publishedByUserKPE17117 - SANAND TADAKAR
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonM A Mahajan
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber7349042203
tenderSupplierListNone
tenderSchedule
createdTs1720523932583
version4
createdDateNone
modifiedDateNone
tenderNumberDMA/2024-25/RD/WORK_INDENT21333
titleConstruction of Road and drain in ward no 08,14,15,07 & 09 of boragaon TP
descriptionConstruction of Road and drain in ward no 08,14,15,07 & 09 of boragaon TP
categoryWORKS
categoryTextWorks
ecv2820000.00
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2508
locationNameDMA Town Panchayat Boregoan
provisionalAmount2820000.0
groupOverheadTotal438012.36
fileNumberBRG/15thfin/24-25/01
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17205239330000NoneNoneRoadsConstruction of Road and drain in ward no 08,14,15,07 & 09 of boragaon TP2381987.64
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3497875124951Nonecode01Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m. PWD SR Vol 1 P No 8 I No 1.14.1Cum107.1107.1146.25FalseNoneNoneFalseNoneFalse15663.3750
3497876124951Nonecode02Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work PWD SR Vol 3 P No 17, I No 3.1Cum89.2589.25146.25FalseNoneNoneFalseNoneFalse13052.81250
3497877124951Nonecode03Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates. PWD SR Vol 1 P No 15 I No 2.1.3Cum6288.456288.4519.5FalseNoneNoneFalseNoneFalse122624.7750
3497878124951Nonecode04M20 DrainProviding and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technicalspecifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(PWD CSR 2021-22 VOL-1 P.NO. 17 I.NO 2.4.2)Cum6639.156639.1541.25FalseNoneNoneFalseNoneFalse273864.93750
3497879124951Nonecode05As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate as per table below For Drain form works Consider 35% PWD SR Vol 2 P No A-7 I NO 22-2Cum2323.72323.726.4FalseNoneNoneFalseNoneFalse61345.680
3497880124951Nonecode06As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate as per table below For Drain form works Consider 20% PWD SR Vol 2 P No A-7 I NO 22-2Cum1327.831327.831.3499FalseNoneNoneFalseNoneFalse1792.4377170
3497881124951Nonecode07Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures. PWD SR Vol 1 P No 18, I No 2.11 hTonne82961.5582961.552.6118FalseNoneNoneFalseNoneFalse216678.976290
3497882124951Nonecode08Construction of Embankment Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, preading,grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (PWD CSR 2021-22 VOL-1 P.NO. 7 I.NO 1.8)Cum497.7497.7140.6FalseNoneNoneFalseNoneFalse69976.620
3497883124951Nonecode09Compacting original ground supporting embankment: Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. [PWD Common DSR 2023-24 Volume 3, P No: 17 I.No:3.7]Cum110.25110.25116.8FalseNoneNoneFalseNoneFalse12877.20
3497884124951Nonecode10Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work PWD SR Vol 3 P No 17, I No 3.1Cum89.2589.2542.0FalseNoneNoneFalseNoneFalse3748.50
3497885124951Nonecode11Construction of Embankment Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, preading,grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (PWD CSR 2021-22 VOL-1 P.NO. 7 I.NO 1.8)Cum497.7497.7112.2FalseNoneNoneFalseNoneFalse55841.940
3497886124951Nonecode12Construction of granular sub-base using crusher run spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and mpacting with vibratory roller to achieve the desired density, complete as per clause 401 PWD SR 2023-24 Vol 2 P No 23 I NO 4.3Cum2418.152418.15124.36FalseNoneNoneFalseNoneFalse300721.1340
3497887124951Nonecode13Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine ggregates conforming to IS:383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous eration including construction joints, , primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work.PWD SR 2023-24 VOL-3 P NO-1438 I NO -16.27Cum6692.76692.7184.35FalseNoneNoneFalseNoneFalse1233799.2450
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17205239350000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17205239350000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17205239350000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17205239350000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17205239350000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17205240750000NoneNoneELIGIBILITYContractor Registration CertificateNone
17205240780000NoneNoneELIGIBILITYAnnual Turnover CertificateNone
17205240830000NoneNoneELIGIBILITYPAN Card and GST RegistrationNone
17205240890000NoneNoneELIGIBILITYSimilar Nature of work done Certificate counter signed by EENone
17205240940000NoneNoneELIGIBILITYLine of credit Certificate cost 30% of Estimate amount from Nationalised bankNone
17205241030000NoneNoneELIGIBILITYwork done cost of 80% of Estimate AmountNone
17205241110000NoneNoneELIGIBILITYAadhar Card or Address Proof Document For CommunicationNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneProposals for subcontracting components of works amounting to more than 20% of the contract price (for each, the qualifications and experience of the identified sub-contractor in the relevant fields should be attached)NoneNone
NoneNoneNoneNoneContractor Registration CertificateOthersContractor Registration Certificate
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneAnnual Turnover CertificateOthersAnnual Turnover Certificate
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneSimilar Nature of work done Certificate counter signed by EEOthersSimilar Nature of work done Certificate counter signed by EE
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneSatisfactory Performance Certificate
NoneNoneNoneNoneLine of credit Certificate cost 30% of Estimate amount from Nationalised bankOthersLine of credit Certificate cost 30% of Estimate amount from Nationalised bank
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateFalseTechnical Bid
Company Registration CertificateFalseTechnical Bid
Reserved Category CertificateFalseTechnical Bid
Small Scale Industries CertificateFalseTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone