1722583979000 | 0 | None | None | Other Works | Construction of Dhobhi Ghata for river near Laxmi temple at 13 No ward 2 Development of Rcc drain From Gram one to Anand Pujeri Ready made Store at 1 no ward | 544215.79 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3673881 | 134370 | None | 001 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work.In all kinds of soils Depth upto 1.5 m .KPWD Common DSR 2023-24 Volume 1 (P No: 5 I.No:1.4.1 ) | Cum | 254.1 | 254.1 | 6.3 | False | None | None | False | None | False | 1600.83 | 0 | 3673882 | 134370 | None | 002 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates. KPWD Common DSR 2023-24 Volume 1 (P No: 15 I.No:2.1.2 ) | Cum | 5947.2 | 5947.2 | 24.619 | False | None | None | False | None | False | 146414.1168 | 0 | 3673883 | 134370 | None | 003 | Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) KPWD Common DSR 2023-24 Volume 2 (P No: 9 I.No:5.2 ) | Cum | 6948.9 | 6948.9 | 7.09 | False | None | None | False | None | False | 49267.701 | 0 | 3673884 | 134370 | None | 004 | Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) KPWD Common DSR 2023-24 Volume 2 (P No: 9 I.No:5.3 ) | Cum | 6515.25 | 6515.25 | 10.89 | False | None | None | False | None | False | 70951.0725 | 0 | 3673885 | 134370 | None | 005 | Construction of rock fill embankment with broken hard rock fragments of size not exceeding 300 mm laid in layers not exceeding 500 mm thick including filling of surface voids with stone spalls, blinding top layer with granular material, rolled with vibratory road roller, all complete as per clause 313. KPWD Common DSR 2023-24 Volume 3 (P No: 9 I.No:3.12 ) | Cum | 153.3 | 153.3 | 30.29 | False | None | None | False | None | False | 4643.457 | 0 | 3673886 | 134370 | None | 006 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.KPWD Common DSR 2023-24 Volume 1 (P No: 7 I.No:1.8 ) | Cum | 497.7 | 497.7 | 61.04 | False | None | None | False | None | False | 30379.608 | 0 | 3673887 | 134370 | None | 007 | Providing and laying flooring with burnt stone slabs 10 cms thick, rough chistle dressed on sand bed 7.5 cms to 8 cms thick and pointed with cement mortar 1:3, including cost of materials, sand, labour, curing complete as per specifications.KPWD Common DSR 2023-24 Volume 2 (P No: 63 I.No:9.26 ) | Sqm | 2488.5 | 2488.5 | 19.2 | False | None | None | False | None | False | 47779.2 | 0 | 3673888 | 134370 | None | 008 | Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14- days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work PWD Common DSR 2023-24 Volume 3(P No: 149 I.No:16.28) | Cum | 7091.7 | 7091.7 | 20.5 | False | None | None | False | None | False | 145379.85 | 0 | 3673889 | 134370 | None | 009 | Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge. PWD Common DSR 2023-24 Volume 3(P No: 44 I.No:8.19.1) | Sqm | 267.75 | 267.75 | 45.0 | False | None | None | False | None | False | 12048.75 | 0 | 3673890 | 134370 | None | 010 | Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery,curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates .KPWD Common DSR 2023-24 Volume 1 (P No: 16 I.No:2.3.1) | Cum | 6639.15 | 6639.15 | 0.99 | False | None | None | False | None | False | 6572.7585 | 0 | 3673891 | 134370 | None | 011 | Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing,polishing complete as per specifications..KPWD Common DSR 2023-24 Volume 3 (P No: 64 I.No:9.34) | Sqm | 1622.25 | 1622.25 | 9.9 | False | None | None | False | None | False | 16060.275 | 0 | 3673892 | 134370 | None | 012 | Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate Cement Concrete Drain Walls Form Works Consider 35% KPWD Common DSR 2023-24 Volume 1 (P No: 111 SI.No : 4) | Cum | 2323.7 | 2323.7 | 0.99 | False | None | None | False | None | False | 2300.463 | 0 | 3673893 | 134370 | None | 013 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.All other type of structures.KPWD Common DSR 2023-24 Volume 1 (P No: 18 I.No : 2.1 h) | t | 82961.55 | 82961.55 | 0.07 | False | None | None | False | None | False | 5807.3085 | 0 | 3673894 | 134370 | None | 014 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-chargePWD Common DSR 2023-24 Volume 2 (P No: 41 I.No:8.1.2) | Sqm | 253.05 | 253.05 | 19.8 | False | None | None | False | None | False | 5010.39 | 0 |
|