noticeInvitingTenderDTO
createdTs1722423244625
version6
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd392000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose31-08-2024 17:30:00
tenderQueryClose22-08-2024 11:00:00
technicalBidOpen02-09-2024 11:00:00
publishedDate01-08-2024 17:11:39
publishedByPostKSPHIDCL_EECNT_CNT_BNG
publishedByUserKPE13762 - SHIVAPRAKASH G
bidValidityPeriod90
noOfCalls1
preBidMeetingDate19-08-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonSHIVAPRAKASH G
splitEmdRequiredYnTrue
emdBankGuarantee292000.00
emdCash100000.00
bgValidityPeriod120
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08025584130
mobileNumber7892672609
tenderSupplierListNone
tenderSchedule
createdTs1722423244649
version11
createdDateNone
modifiedDateNone
tenderNumberKSPHIDCL/2024-25/BD/WORK_INDENT117
titleConstruction of 3 Bay Fire Station at Yeragatti in Belagavi District under K-SAFE-2 Scheme
descriptionConstruction of 3 Bay Fire Station at Yeragatti in Belagavi District under K-SAFE-2 Scheme
categoryWORKS
categoryTextWorks
ecv26128193.76
deptNameKarnataka State Police Housing and Infrastructure Development Corporation Limited
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location7550
locationNameKSPHIDCL Contracts Section Bengaluru
provisionalAmount30000000.0
groupOverheadTotal0.0
fileNumberPHC/CNT/BGM/TND/21/2024-25/WI-117
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17224232450001NoneNoneBuildingsCONSTRUCTION OF 3 BAY FIRE STATION AT YARAGATTI IN BELAGAVI DISTRICT UNDER K-SAFE-2 WORK26128193.76
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3659433133529None1 12 P 8 Vol 1Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools,usage of machinery & other appurtenances required to complete the work.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Cum117.71117.71525.0FalseNoneNoneFalseNoneFalse61797.750
3659434133529None1 14 1 P 8 Vol 1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. In all kinds of soils Depth upto 3 mCum126.38126.38464.72FalseNoneNoneFalseNoneFalse58731.31360
3659435133529None1 15 1 P 8 Vol 1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. In ordinary/soft rock without blasting upto 1.5 m depthCum449.76449.76316.82FalseNoneNoneFalseNoneFalse142492.96320
3659436133529None2 1 2 P 15 Vol 1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.,Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates, including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Foundation & floor bedCum7017.77017.7145.57FalseNoneNoneFalseNoneFalse1021566.5890
3659437133529None2 2 3 P 15 Vol 1Providing and laying in position Cement Concrete for all Foundation works.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes,labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (including cost of providing & removing formwork as per Design & Drawing) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Column footingCum8478.338478.3356.97FalseNoneNoneFalseNoneFalse483010.46010
3659438133529None5 3 P 9 Vol 2Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) as per specifications., ,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Cum7688.07688.041.53FalseNoneNoneFalseNoneFalse319282.640
3659439133529None5 4 P 9 Vol 2Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) as per specifications.,,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Cum7915.977915.9742.48FalseNoneNoneFalseNoneFalse336270.40560
3659440133529None2 5 2 P 16 Vol 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (including cost of providing & removing formwork as per Design & Drawing) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, ,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Column- Ground FloorCum14413.4114413.4127.8FalseNoneNoneFalseNoneFalse400692.7980
3659441133529None2 5 2 P 16 Vol 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (including cost of providing & removing formwork as per Design & Drawing) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, ,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Column- First FloorCum14498.214498.220.13FalseNoneNoneFalseNoneFalse291848.7660
3659442133529None2 4 3 P 17 Vol 1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications..,(including cost of providing & removing formwork as per Design & Drawing) M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates, including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Grade & Plinth beam.Cum11775.4611775.4629.54FalseNoneNoneFalseNoneFalse347847.08840
3659443133529None1 9 P 7 Vol 1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, with all lead and lift,,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Cum329.57329.57240.16FalseNoneNoneFalseNoneFalse79149.53120
3659444133529None1 8 Vol-1Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work,,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Cum587.29587.29587.6FalseNoneNoneFalseNoneFalse345091.6040
3659445133529None6 8 Vol 2Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete,,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. Ground FloorCum9873.599873.59110.72FalseNoneNoneFalseNoneFalse1093203.88480
3659446133529None6 8 Vol 2Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete,,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. First FloorCum9972.339972.3363.11FalseNoneNoneFalseNoneFalse629353.74630
3659447133529None6 8 Vol 2Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete,,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. Terrace FloorCum10071.0610071.0623.95FalseNoneNoneFalseNoneFalse241201.8870
3659448133529None6 15 Vol 2Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete, ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. Ground FloorSqm1279.891279.8924.64FalseNoneNoneFalseNoneFalse31536.48960
3659449133529None6 15 Vol 2Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete, ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. First FloorSqm1292.691292.6927.3FalseNoneNoneFalseNoneFalse35290.4370
3659450133529None2 1 4 P 15 Vol 1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.,(including cost of providing & removing formwork as per Design & Drawing),including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. Mix 1:3:6 (M10) Using 20 mm and down size graded crushed coarse aggregates For coping & window cills. Ground FloorCum8088.018088.0111.13FalseNoneNoneFalseNoneFalse90019.55130
3659451133529None2 1 4 P 15 Vol 1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.,(including cost of providing & removing formwork as per Design & Drawing),including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. Mix 1:3:6 (M10) Using 20 mm and down size graded crushed coarse aggregates For coping & window cills. First FloorCum8165.038165.031.88FalseNoneNoneFalseNoneFalse15350.25640
3659452133529None2 14 P 15 Vol 1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.,(including cost of providing & removing formwork as per Design & Drawing),including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. Mix 1:3:6 (M10) Using 20 mm and down size graded crushed coarse aggregates For coping & window cills. Terrace FloorCum8242.068242.061.14FalseNoneNoneFalseNoneFalse9395.94840
3659453133529None2 5 2 P 16 Vol 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(including cost of providing & removing formwork as per Design & Drawing) M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates, ,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Staircase/Roofslab/Wall Shelves-Ground FloorCum12717.7212717.7240.45FalseNoneNoneFalseNoneFalse514431.7740
3659454133529None2 5 2 P 16 Vol 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(including cost of providing & removing formwork as per Design & Drawing) M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates, ,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Lintel/Roofbeam-Ground FloorCum13565.5613565.5621.95FalseNoneNoneFalseNoneFalse297764.0420
3659455133529None2 5 2 P 16 Vol 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(including cost of providing & removing formwork as per Design & Drawing) M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates, ,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Staircase/Roofslab/Wall Shelves-First FloorCum12802.512802.576.5FalseNoneNoneFalseNoneFalse979391.250
3659456133529None2 5 2 P 16 Vol 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(including cost of providing & removing formwork as per Design & Drawing) M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates, ,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Lintel/Roofbeam-First FloorCum13650.3513650.3522.96FalseNoneNoneFalseNoneFalse313412.0360
3659457133529None2 5 2 P 16 Vol 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(including cost of providing & removing formwork as per Design & Drawing) M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates, ,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Plain Chejja-Ground FloorCum12293.7912293.790.75FalseNoneNoneFalseNoneFalse9220.34250
3659458133529None2 5 2 P 16 Vol 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(including cost of providing & removing formwork as per Design & Drawing) M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates, ,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Plain Chejja-First FloorCum12378.5812378.580.7FalseNoneNoneFalseNoneFalse8665.0060
3659459133529None2 1 6 15 Vol 1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates For Screed concrete with WPC over roof slab. Ground FloorCum7735.087735.0812.37FalseNoneNoneFalseNoneFalse95682.93960
3659460133529None2 1 6 15 Vol 1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates For Screed concrete with WPC over roof slab. First FloorCum7812.437812.4315.5FalseNoneNoneFalseNoneFalse121092.6650
3659461133529None2 11 a 18 Vol 1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening,cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.-Ground Floort110837.22110837.2226.08FalseNoneNoneFalseNoneFalse2890634.69760
3659462133529None2 11 a 18 Vol 1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening,cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.-First Floort111945.6111945.613.64FalseNoneNoneFalseNoneFalse1526937.9840
3659463133529None8 19 1 44 Vol 2Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining,including cost of materials, labour, curing as per specifications.,,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the workSqm315.95315.9566.8FalseNoneNoneFalseNoneFalse21105.460
3659464133529None8 9 P 42 Vol 2Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Outside walls-Ground FloorSqm477.02477.02448.44FalseNoneNoneFalseNoneFalse213914.84880
3659465133529None8 9 P 42 Vol 2Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications,,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Outside walls-First FloorSqm481.79481.79311.87FalseNoneNoneFalseNoneFalse150255.84730
3659466133529None8 9 P 42 Vol 2Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications,,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Outside walls-Terrace FloorSqm486.56486.56101.3FalseNoneNoneFalseNoneFalse49288.5280
3659467133529None8 10 P 43 Vol 2Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications, including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Ceiling Ground FloorSqm261.43261.43415.68FalseNoneNoneFalseNoneFalse108671.22240
3659468133529None8 10 P 43 Vol 2Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications, including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Ceiling First FloorSqm264.04264.04229.71FalseNoneNoneFalseNoneFalse60652.62840
3659469133529None8 10 P 43 Vol 2Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications, including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Ceiling Terrace FloorSqm266.66266.6623.72FalseNoneNoneFalseNoneFalse6325.17520
3659470133529None8 1 2 P 41 Vol 2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials,labour, curing complete as per specifications, including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Inside walls-Ground FloorSqm298.6298.6554.66FalseNoneNoneFalseNoneFalse165621.4760
3659471133529None8 1 2 P 41 Vol 2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials,labour, curing complete as per specifications, including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Inside walls-First FloorSqm301.59301.59369.6FalseNoneNoneFalseNoneFalse111467.6640
3659472133529None8 1 2 P 41 Vol 2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials,labour, curing complete as per specifications, including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Inside walls- Terrace FloorSqm304.57304.5756.58FalseNoneNoneFalseNoneFalse17232.57060
3659473133529None8 51 P 50 Vol 2Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications, including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. Ground FloorSqm123.9123.91017.41FalseNoneNoneFalseNoneFalse126057.0990
3659474133529None8 51 50 Vol 2Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications, including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. First FloorSqm123.9123.9686.14FalseNoneNoneFalseNoneFalse85012.7460
3659475133529None8 51 50 Vol 2Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications, including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. Terrace FloorSqm123.9123.980.3FalseNoneNoneFalseNoneFalse9949.170
3659476133529None8 2 2 P 41 Vol 2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding,including cost of materials, labour, curing complete as per specifications.,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Dado portion Ground FloorSqm345.68345.6852.71FalseNoneNoneFalseNoneFalse18220.79280
3659477133529None8 2 2 P 41 Vol 2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding,including cost of materials, labour, curing complete as per specifications.,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Dado portion First FloorSqm349.14349.1461.74FalseNoneNoneFalseNoneFalse21555.90360
3659478133529None8 16 a 44 Vol 2Providing lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja,facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges,curing, complete as per specifications.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per directions of the Engineer in-charge of the work.-Ground FloorSqm1533.881533.8816.92FalseNoneNoneFalseNoneFalse25953.24960
3659479133529None8 16 a 44 Vol 2Providing lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja,facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges,curing, complete as per specifications.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per directions of the Engineer in-charge of the work.-First FloorSqm1533.881533.8843.22FalseNoneNoneFalseNoneFalse66294.29360
3659480133529None9 24 Vol 2Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, Lakared, River Pink, Orissa Blue or equivalent., including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. Ground FloorSqm3500.173500.17174.72FalseNoneNoneFalseNoneFalse611549.70240
3659481133529None9 24 Vol 2Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, Lakared, River Pink, Orissa Blue or equivalent., including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. First FloorSqm3568.963568.9647.39FalseNoneNoneFalseNoneFalse169133.01440
3659482133529None9 34 Vol 2Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications.,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. Ground FloorSqm1914.251914.2525.21FalseNoneNoneFalseNoneFalse48258.24250
3659483133529None9 34 Vol 2Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications.,., including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. First FloorSqm1933.41933.420.71FalseNoneNoneFalseNoneFalse40040.7140
3659484133529None9 17 2 Vol 2Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade,over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete.,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. Size of Tile 600x600 mm Ground FloorSqm1455.821455.82102.57FalseNoneNoneFalseNoneFalse149323.45740
3659485133529None9 17 2 Vol 2Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade,over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete.,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. Size of Tile 600x600 mm First FloorSqm1470.381470.38109.31FalseNoneNoneFalseNoneFalse160727.23780
3659486133529None9 11 Vol 2Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete.,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. Ground FloorSqm1101.471101.4727.63FalseNoneNoneFalseNoneFalse30433.61610
3659487133529None9 11 Vol 2Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete.,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. First FloorSqm1112.491112.4922.21FalseNoneNoneFalseNoneFalse24708.40290
3659488133529None9 39 Vol 2Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications.,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. Ground FloorSqm1795.311795.3152.71FalseNoneNoneFalseNoneFalse94630.79010
3659489133529None9 39 Vol 2Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications.,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. First FloorSqm1813.261813.2661.74FalseNoneNoneFalseNoneFalse111950.67240
3659490133529None1 23 11 Vol 1Providing and Filling in foundation with granite / trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering,including cost of all materials and labour with all lead and lift complete as per specifications.,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Cum3323.03323.054.71FalseNoneNoneFalseNoneFalse181801.330
3659491133529None9 2 Vol 2Providing and laying 52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per direction of Engineer incharge,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Sqm991.2991.2221.61FalseNoneNoneFalseNoneFalse219659.8320
3659492133529None12 13 1 P100 Vol 2Providing Sal wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves ( excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete as per specifications.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. Ground FloorCum122431.78122431.780.32FalseNoneNoneFalseNoneFalse39178.16960
3659493133529None12 13 1 P100 Vol 2Providing Sal wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves ( excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete as per specifications.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. First FloorCum122431.78122431.780.27FalseNoneNoneFalseNoneFalse33056.58060
3659494133529None12 51 Vol 2Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead, including cost of materials, labour charges, complete as per specifications..,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. Ground FloorNos1258.821258.827.0FalseNoneNoneFalseNoneFalse8811.740
3659495133529None12 51 Vol 2Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead, including cost of materials, labour charges, complete as per specifications..,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. First FloorNos1258.821258.826.0FalseNoneNoneFalseNoneFalse7552.920
3659496133529None12 57 4 Vol 2Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets ( core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 ( part-I) 1991. from manufacturer complete as per spcification.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.- 35 mm thick both side Teak Ground FloorSqm5615.155615.154.92FalseNoneNoneFalseNoneFalse27626.5380
3659497133529None12 57 4 Vol 2Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets ( core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 ( part-I) 1991. from manufacturer complete as per spcification.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.- 35 mm thick both side Teak First FloorSqm5671.35671.36.56FalseNoneNoneFalseNoneFalse37203.7280
3659498133529None12 57 1 P 105 Vol 2Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets ( core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 ( part-I) 1991. from manufacturer complete as per spcification.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.- 30 mm thick both side Teak Ground FloorSqm5009.285009.289.02FalseNoneNoneFalseNoneFalse45183.70560
3659499133529None12 57 1 P 105 Vol 2Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets ( core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 ( part-I) 1991. from manufacturer complete as per spcification.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.- 30 mm thick both side Teak First FloorSqm5059.375059.374.41FalseNoneNoneFalseNoneFalse22311.82170
3659500133529None12 96 P 112 Vol 2Providing and fixing Fiber Glass Reinforced plastic (FRP) Door Frames of cross- section 90 mm x 45 mm having single rebate of 32 mm x 15 mm to receive shutter of 30 mm thickness. The laminate shall be moulded with fire resistant grade unsaturated polyester resin and chopped mat. Door frame laminate shall be 2mm thick and shall be filled with suitable wooden block in all the three legs. The frame shall be covered with fiber glass from all sides. M.S. stay shall be provided at the bottom to steady the frame complete as per spcification.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. Ground Floorm796.68796.6820.4FalseNoneNoneFalseNoneFalse16252.2720
3659501133529None12 96 P 112 Vol 2Providing and fixing Fiber Glass Reinforced plastic (FRP) Door Frames of cross- section 90 mm x 45 mm having single rebate of 32 mm x 15 mm to receive shutter of 30 mm thickness. The laminate shall be moulded with fire resistant grade unsaturated polyester resin and chopped mat. Door frame laminate shall be 2mm thick and shall be filled with suitable wooden block in all the three legs. The frame shall be covered with fiber glass from all sides. M.S. stay shall be provided at the bottom to steady the frame complete as per spcification.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. First Floorm796.68796.6820.4FalseNoneNoneFalseNoneFalse16252.2720
3659502133529None12 97 1 P 112 Vol 2Providing and fixing to existing door frames Glass Fibre Reinforced Plastic (FRP) panelled door shutter of required colour and approved brand and manufacture, made with fire - retardant grade unsaturated polyester resin,moulded to 3 mm thick FRP laminate for forming hollow rails and styles,with wooden frame and suitable blocks of seasoned wood inside at required places for fixing of fittings, cast monolithically with 5 mm thick FRP laminate for panels conforming to IS: 14856, including fixing to frames as per specifications., ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. 30 mm thickness Ground FloorSqm3969.763969.766.97FalseNoneNoneFalseNoneFalse27669.22720
3659503133529None12 97 1 P 112 Vol 2Providing and fixing to existing door frames Glass Fibre Reinforced Plastic (FRP) panelled door shutter of required colour and approved brand and manufacture, made with fire - retardant grade unsaturated polyester resin,moulded to 3 mm thick FRP laminate for forming hollow rails and styles,with wooden frame and suitable blocks of seasoned wood inside at required places for fixing of fittings, cast monolithically with 5 mm thick FRP laminate for panels conforming to IS: 14856, including fixing to frames as per specifications., ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. 30 mm thickness First FloorSqm3969.763969.766.97FalseNoneNoneFalseNoneFalse27669.22720
3659504133529None12 87 P 111 Vol 2Providing and fixing of 2.5 track x 2-panel sliding windows made out of multi chambered UPVC Matching to RAL 9016 sections and with minimum Titanium Dioxide at 6 P H R with TPE Thermo Plastic Elastomer and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having an overall size of 81mm width x 42mm height with reinforcement of 1mm thickness and Sash with overall size of 31mm x 57mm and mesh sash of size with GI reinforcement of 1.5mm thickness. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5mm. Windows shall be provided with 5mm plain float glass, standard hardware and single point locking system with touch lock. Wall thickness of frame and sash shall be of 1.8-2.0mm. Maximum possible size 1519mm x 1519mm The cost is inclusive of all fixtures and separate charges for minor T and P's shall not be made as per specifications., ,including cost and conveyance of all materials, cost of labour, HOM of machinery and equipment's, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc. complete and directions of the Engineer in charge of the work. Ground FloorSqm8116.698116.6919.85FalseNoneNoneFalseNoneFalse161116.29650
3659505133529None12 87 P 111 Vol 2Providing and fixing of 2.5 track x 2-panel sliding windows made out of multi chambered UPVC Matching to RAL 9016 sections and with minimum Titanium Dioxide at 6 P H R with TPE Thermo Plastic Elastomer and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having an overall size of 81mm width x 42mm height with reinforcement of 1mm thickness and Sash with overall size of 31mm x 57mm and mesh sash of size with GI reinforcement of 1.5mm thickness. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5mm. Windows shall be provided with 5mm plain float glass, standard hardware and single point locking system with touch lock. Wall thickness of frame and sash shall be of 1.8-2.0mm. Maximum possible size 1519mm x 1519mm The cost is inclusive of all fixtures and separate charges for minor T and P's shall not be made as per specifications., ,including cost and conveyance of all materials, cost of labour, HOM of machinery and equipment's, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc. complete and directions of the Engineer in charge of the work. First FloorSqm8116.698116.6919.24FalseNoneNoneFalseNoneFalse156165.11560
3659506133529None11 34 B P 86 Vol 2Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Ground FloorKg226.74226.741155.05FalseNoneNoneFalseNoneFalse261896.0370
3659507133529None11 34 B P 86 Vol 2Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.First FloorKg226.74226.74404.14FalseNoneNoneFalseNoneFalse91634.70360
3659508133529None11 28 P 85 Vol 2Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-incharge,(for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts,fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Kg700.04700.04969.26FalseNoneNoneFalseNoneFalse678520.77040
3659509133529None18 7 P 184 Vol 2Design supply & installation of suspended Spider Glazing system designed to withstand the wind pressure as per IS 875 (Part-III). The Suspended System held with Spider Fittings of SS-316 Grade Steel of approved manufacturer with glass panel having 12 mm thick clear toughened glass held together with SS- 316 Grade Stainless steel Spider & bolt assembly with laminated glass fins 21 mm thick. The Glass fins and glass panel assembly shall be connected to Slab/ beams by means of SS- 316 Grade stainless steel brackets & Anchor bolts and at the bottom using SS channel of 50x25x2mm using fastener & anchor bolts, non staining weather sealants of approved make, Teflon/ nylon bushes and separators to prevent bi-metallic contacts, all complete to perform as per specification and approved drawings. The complete system to be designed to accommodate thermal expansion & seismic movements etc. The joints between glass panels (6 to 8 mm) and gaps at the perimeter & in U channel of the assembly to be filled with non staining weather sealant, so as to make the entire system fully water proof & dust proof. The rate shall include all design, Engineering and shop drawing including approval from structural designer, labour, T&P, scaffolding, other incidental charges including wastage, enabling temporary services all fitting fixers nut bolts, washer, Buffer plates, fastener, anchors, SS channel laminated glass etc. all complete. For the purpose of payment, actual elevation area of Glazing including thickness of joints and the portion of Glass panel inside the SS channel shall be measured.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Sqm9852.539852.5344.81FalseNoneNoneFalseNoneFalse441491.86930
3659510133529None7 17 2 P 39 BGM SR18 19Providing, fabricating, assembling and fixing in position aluminium doors using following aluminium mat finish or glossy finish, outer frame plain section 101.6x44.45mm thickness 3.18mm, section weight 2.404 kg/m, door shutters vertical section 44.62x44.45mm thickness 3.18mm, section weight 1.505kg/m, top section 47.62x44.45mm thickness 3.00mm, section weight 1.426kg/m bottom section 114.3x44.45 thickness 3.18mm, section weight 2.646kg/m, door central section 49.91x44.45mm thickness 3.00mm, section weight 1.495 kg/m glazing clips 19x17.3x11mm thickness 0.9mm section weight 0.124kg/m; aluminium sections cut to length joint metredcorners grinded, the shutters pivoted opening arrangement with heavy duty aluminium alloy automatic door closures floor mounted, providing and fixing standard approved accessories, such as aluminium handle for full width or length, tower bolts, lock, pivots: P.V.C. or rubber gasket with 5.5m. thick plain glass for top and bottom panel; aluminium sections treated for removal of any rust and prevention of further rust formation, and coated with greasy materials for non-adherance of mortars or any other sticky materials; the assembled frame fitted with the corner angles, strips and fitted with screws, rawl plugs or teakwood gutties to R.C.C. columns or masonry on sides. beams and flooring in bottom. including cutting, chistling and making good with cement mortar to match the surface; all the frames throughly cleaned free from rust, scale, or dirt including cost of materials, fixtures, labour and HOM of machinery complete as per specifications.using aluminium section powdered coated to a minimum of 60-70 microns with exterior durable pure polyester grade powder of approved quality.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Sqm7706.587706.583.75FalseNoneNoneFalseNoneFalse28899.6750
3659511133529None8 30 P 46 Vol 2Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. Ground FloorSqm215.59215.59482.28FalseNoneNoneFalseNoneFalse103974.74520
3659512133529None8 30 P 46 Vol 2Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. First FloorSqm217.74217.74398.31FalseNoneNoneFalseNoneFalse86728.01940
3659513133529None8 30 P 46 Vol 2Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. Terrace FloorSqm219.9219.9101.3FalseNoneNoneFalseNoneFalse22275.870
3659514133529None8 54 2 8 55 2 Vol 2Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre as per specifications,,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.For Ceiling & Inside walls -Ground FloorSqm201.96201.961007.51FalseNoneNoneFalseNoneFalse203476.71960
3659515133529None8 54 2 8 55 2 Vol 2Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre as per specifications,,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.For Ceiling & Inside walls -First FloorSqm201.96201.96638.39FalseNoneNoneFalseNoneFalse128929.24440
3659516133529None8 54 2 8 55 2 Vol 2Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre as per specifications,,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.For Ceiling & Inside walls -Terrace FloorSqm201.96201.9680.3FalseNoneNoneFalseNoneFalse16217.3880
3659517133529None8 41 P 48 Vol 2Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.-Ground FloorSqm206.91206.9142.78FalseNoneNoneFalseNoneFalse8851.60980
3659518133529None8 41 P 48 Vol 2Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.-First FloorSqm208.98208.9839.09FalseNoneNoneFalseNoneFalse8169.02820
3659519133529None8 3 1 P 41 Vol 2Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications,,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.For FlaggingSqm438.61438.61106.19FalseNoneNoneFalseNoneFalse46575.99590
3659520133529None8 79 P 54 Vol 2Forming groove of uniform size in the top layer of plaster as per approved pattern including repair to the edges of panels and finishing the groove complete as per specifications,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.: 10mm to 15 mm wide and 8 mm deep groove.m64.4364.431260.94FalseNoneNoneFalseNoneFalse81242.36420
3659521133529None8 84 P 55 Vol 2Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete as per specification.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Each588.53588.5310.75FalseNoneNoneFalseNoneFalse6326.69750
3659522133529None8 3 P 63 Vol 3Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.cm1.981.9810000.0FalseNoneNoneFalseNoneFalse19800.00
3659523133529None8 40 P 48 Vol 2Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications, ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Sqm142.48142.4810.6FalseNoneNoneFalseNoneFalse1510.2880
3659524133529None15 2 P 149 Vol 2Providing and Applying PU based Elastomeric Liquid Applied PU Waterproofing Membrane single component, cold applied, water based acrylic PU dispersion with highly elastic and UV resistant water proofing treatment to the Existing Roof surface/Chajjas/Sunken portion of WC:Bathroom applied @ 1.2 l/per m2, having tensile strength greater than 1.5N/mm2, elongation greater than 300% with solid content not less than 60% in 2 coats including surface preparation, priming the surface with water based acrylic primer @0.1 l/m2, and spreading 60 gsm geotextile between two top coats completely as per specification. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Sqm913.14913.14610.65FalseNoneNoneFalseNoneFalse557608.9410
3659525133529None4 1 P 5 Vol 2Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications.,,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Sqm146.2146.2482.37FalseNoneNoneFalseNoneFalse70522.4940
3659526133529None10 2 P 69 Vol 2Providing edge moulding to 18mm thick Granite stone counters, vanities etc including machine polishing to edge to give high gloss finish etc. complete,,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.m406.39406.39105.35FalseNoneNoneFalseNoneFalse42813.18650
3659527133529NoneNSR-3Providing and fixing of Signage boards etc. complete with all lead, lifts, loading, unloading, scaffolding arrangement, including cost and conveyance of all materials, labour, equipment, transportation charges, testing and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and as per the directions of the Engineer in-charge of the work.Each112100.0112100.01.0FalseNoneNoneFalseNoneFalse112100.00
3659528133529None12 68 1 P 106 Vol 2Providing and fixing ISI marked M.S. pressed butt hinges bright finished with necessary screws etc. 125x65x2.12mm, ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Nos68.1468.1448.0FalseNoneNoneFalseNoneFalse3270.720
3659529133529None12 68 2 P 106 Vol 2Providing and fixing ISI marked M.S. pressed butt hinges bright finished with necessary screws etc. 100x58x1.9mm.,,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Nos53.2853.2842.0FalseNoneNoneFalseNoneFalse2237.760
3659530133529None12 72 P 107 Vol 2Providing and fixing ISI marked oxidised M.S. tower bolt black finish, (Barrel type) with necessary screws etc. complete as per specifications.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Nos101.6101.660.0FalseNoneNoneFalseNoneFalse6096.00
3659531133529None12 73 1 P 107 Vol 2Providing and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete :125mm as per specifications.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Nos54.5254.5260.0FalseNoneNoneFalseNoneFalse3271.20
3659532133529None12 58 P 105 Vol 2Providing and fixing bright finished brass hanging type floor door stopper with necessary screws, etc. complete as per specifications.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Nos148.68148.6821.0FalseNoneNoneFalseNoneFalse3122.280
3659533133529None22 15 3 P 218 Vol 2Providing and fixing Aldrops for door shutters with necessary screws, etc. complete as per specifications.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Nos371.7371.730.0FalseNoneNoneFalseNoneFalse11151.00
3659534133529None589 A 30 Vol 2 21 22 SRProviding and fixing teak wood beading for door shutters complete as per specifications.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Nos74.3474.3478.0FalseNoneNoneFalseNoneFalse5798.520
3659535133529None9 20 2 P 62 Vol 2Grouting the joints of flooring tiles having joints of 3 mm width, using epoxy grout mix of 0.70 kg of organic coated filler of desired shade (0.10 kg of hardener and 0.20 kg of resin per kg), including filling / grouting and finishing complete as per specifications, including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. Ground FloorSqm258.95258.9596.22FalseNoneNoneFalseNoneFalse24916.1690
3659536133529None9 20 2 P 62 Vol 2Grouting the joints of flooring tiles having joints of 3 mm width, using epoxy grout mix of 0.70 kg of organic coated filler of desired shade (0.10 kg of hardener and 0.20 kg of resin per kg), including filling / grouting and finishing complete as per specifications, including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. First FloorSqm261.54261.54101.8FalseNoneNoneFalseNoneFalse26624.7720
3659537133529None10 15 1 P 71 Vol 2Providing and fixing of Aluminium composite panel of approved make and colour for wall cladding for Brick/Rcc/stone walls & coloumns/beams with necessary aluminium frame works at required level made out of 50x25x4mm C section or equivalent. The panel should consist of 3mm thick non-halogenated FR grade mineral based polymer ( 2 hrs fire resistance as per ASTM E119-12 and clause B, S1, do as per ENT 13501-1sandwiched between 0.50 skins thick aluminium sheet making a total panel thickness of 4mm. The surfaces will be finished with PVDF based coating on topsides and service coating on reverse sides would be in polyester paint. The system shall be fixed using GI brackets, aluminium L cleats and stainless steel bolts and nuts complete with spring washer and cap nuts and all other necessary accessories, sealing shall be done with necessary rods etc.,complete as per specification. including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Sqm4942.374942.3752.56FalseNoneNoneFalseNoneFalse259770.96720
3659538133529None10 10 1 P 70 Vol 2Providing and fixing in wall lining flat pressed three layer (medium density) particle board or graded wood Pre-laminated one side decorative lamination and other side balancing lamination Grade I, Type II, IS : 12823 marked, including priming coat on unexposed arrangement and screws etc. complete : 12 mm thick, as per specification. including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Sqm1374.051374.0537.44FalseNoneNoneFalseNoneFalse51444.4320
3659539133529None1 6 1 P 6 Vol 1Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Cum599.68599.6832.0FalseNoneNoneFalseNoneFalse19189.760
3659540133529None1 10 P 7 Vol 1Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead and lift, ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.Cum198.24198.2498.46FalseNoneNoneFalseNoneFalse19518.71040
3659541133529None13 32 3 P 122 Vol 2Providing and fixing Chlorinated Polyvinyl Chloride(CPVC)pipes, having thermal stability for hot & cold watersupply,including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. CPVC pipe - 25mmm591.0591.050.0FalseNoneNoneFalseNoneFalse29550.00
3659542133529None13 33 4 P 122 Vol 2Providing and fixing Chlorinated Polyvinyl Chloride(CPVC)pipes, having thermal stability for hot & cold watersupply,including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. External work, including cutting chases and making good the walls etc.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. CPVC pipe - 32mmm460.91460.9190.0FalseNoneNoneFalseNoneFalse41481.90
3659543133529None10 14 9 P 120 Vol 5Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges,handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete.,,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.(PVC pipe of 6Kgs/Sqm -75mm dia )m237.89237.89400.0FalseNoneNoneFalseNoneFalse95156.00
3659544133529None10 14 10 P 120 Vol 5Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges,handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete.,,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.(PVC pipe of 6Kgs/Sqm -90mm dia )m319.66319.6690.0FalseNoneNoneFalseNoneFalse28769.40
3659545133529None10 14 11 P 120 Vol 5Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges,handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete.,,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.(PVC pipe of 6Kgs/Sqm -110mm dia )m443.56443.56261.0FalseNoneNoneFalseNoneFalse115769.160
3659546133529None10 14 13 P 120 Vol 5Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges,handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete.,,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.(PVC pipe of 6Kgs/Sqm -160mm dia )m800.39800.3990.0FalseNoneNoneFalseNoneFalse72035.10
3659547133529NoneNSR-4Providing and fixing in position Pillar cock of Jaquar/Hindware/Parry ware of approved quality 20mm nominal bore including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Each1475.01475.06.0FalseNoneNoneFalseNoneFalse8850.00
3659548133529NoneNSR-5Providing and fixing in position Short body cock/tap of Jaquar/Hindware/Parry ware of approved quality 20mm nominal bore including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Each1475.01475.06.0FalseNoneNoneFalseNoneFalse8850.00
3659549133529NoneNSR-4Providing and fixing in position Long body cock/tap of Jaquar/Hindware/Parry ware of approved quality 20mm nominal bore including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Each1593.01593.04.0FalseNoneNoneFalseNoneFalse6372.00
3659550133529NoneNSR-7Providing and fixing in position Angle stop cock of Jaquar/Hindware/Parry ware of approved quality 20mm nominal bore including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Each1475.01475.06.0FalseNoneNoneFalseNoneFalse8850.00
3659551133529NoneNSR-8Providing and fixing in position Two way bib cock of Jaquar/Hindware/Parry ware of approved quality 20mm nominal bore including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Each1593.01593.02.0FalseNoneNoneFalseNoneFalse3186.00
3659552133529NoneNSR-9Providing and fixing in position Health faucet complete set of Jaquar/Hindware/Parry ware of approved quality 20mm nominal bore including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Each1593.01593.02.0FalseNoneNoneFalseNoneFalse3186.00
3659553133529None13 46 P 124 Vol 2Providing and fixing trap of self cleansing design with screwed down or hinged grating with or without vent arm complete, including cost of cutting and making good the walls and floors: 100mminletand75mmoutlet , Hubless centrifugally cast(spun) iron epoxy coated inside & outside as per IS:15905, including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work. 10.0cms x 7.5cmsNos588.53588.538.0FalseNoneNoneFalseNoneFalse4708.240
3659554133529None13 34 P 123 Vol 2Providing and placing on terrace (at all floor levels ) polyethylene water storagetank, IS:12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittinigs and the base support for tank., including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.l11.1511.151000.0FalseNoneNoneFalseNoneFalse11150.00
3659555133529None16 9 P 191 Vol 5Constructing brick masonry chamber of internal dimension 600x600mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Each6757.516757.515.0FalseNoneNoneFalseNoneFalse33787.550
3659556133529None16 10 191 Vol 5Constructing brick masonry chamber of internal dimension 450x450mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Each5248.45248.422.0FalseNoneNoneFalseNoneFalse115464.80
3659557133529None13 4 1 P 117 Vol 2Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) : ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work. 25mm diaNos680.21680.211.0FalseNoneNoneFalseNoneFalse680.210
3659558133529None13 4 2 P 117 Vol 2Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) : ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work. 32mm diaNos740.92740.921.0FalseNoneNoneFalseNoneFalse740.920
3659559133529None13 4 4 P 117 Vol 2Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) : ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work. 50mm diaNos1059.351059.352.0FalseNoneNoneFalseNoneFalse2118.70
3659560133529None14 3 1 P 131 Vol 2Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : W.C. pan with ISI marked white solid plastic seat and lid, ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Each7405.57405.52.0FalseNoneNoneFalseNoneFalse14811.00
3659561133529None14 1 1 P 131 Vol-2)Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests, ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Pan6051.286051.284.0FalseNoneNoneFalseNoneFalse24205.120
3659562133529None14 7 2 P 132 Vol 2Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Wash basin size 630x450 mm with a single 15mm C.P. brass pillar tap,,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Nos3173.083173.088.0FalseNoneNoneFalseNoneFalse25384.640
3659563133529None37 35 P 269 18 19 SRWall bores in Brick masonry upto 45 em thick. including cost of materials, labour, HOM complete as per specifications.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Nos156.11156.1125.0FalseNoneNoneFalseNoneFalse3902.750
3659564133529None37 36 1 P 269 18 19Wall bores in size stone masonry. including cost of materials, labour, HOM complete as per specifications. upto 45 em thick..,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Nos375.42375.4210.0FalseNoneNoneFalseNoneFalse3754.20
3659565133529None302 A 21 Vol 2 21 22 SRProviding & fixing Indian marble partitions at urnals as per specification .,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Sqm2292.152292.157.5FalseNoneNoneFalseNoneFalse17191.1250
3659566133529None14 32 2 P 136 Vol 2Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing : Rectangular shape 453x357 mm ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Nos1261.31261.38.0FalseNoneNoneFalseNoneFalse10090.40
3659567133529None14 40 2 P 137 Vol 2Providing and fixing PTMT towel rail complete with brackets fixed to wooden cleats with CP brass screws with concealed fittings arrangement of approved quality and colour.600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g. ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Nos592.24592.248.0FalseNoneNoneFalseNoneFalse4737.920
3659568133529NoneNSRProviding 10cms dia PVC cowl with cap of approved 1 st quality and make conforming to ISI specifications and fixing in position as directed ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Nos283.73283.732.0FalseNoneNoneFalseNoneFalse567.460
3659569133529None12 111 P 90 18 19 BGM SRProviding and fixing 7.5 cms to 15.00 cms dia NP grating 100 mm dia.. ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Nos185.85185.858.0FalseNoneNoneFalseNoneFalse1486.80
3659570133529None11 2 6 P 127 Vol VProviding, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work. For Medium Duty GI pipe of 50mm diam723.58723.5835.0FalseNoneNoneFalseNoneFalse25325.30
3659571133529None14 23 P 135 Vol 2Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm or 340x410x265 mm sizes respectively. ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Nos1429.811429.816.0FalseNoneNoneFalseNoneFalse8578.860
3659572133529None17 14 P 177 Vol 2Providing and laying 100mm thick pre-cast cover slabs over Rain water harvesting pit of width not exceeding 1000 mm using M20 concrete reinforced with TMT bars Fe 500 @ 6kg/m2, slabs jointed in CM 1:3 proportion and nicely finished Including providing holes in the Cover slabs wherever necessary for easy drainage of surface water including of labour, materials, scaffolding, usage of machinery, curing, lead and lift charges etc, Complete. ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work. Precast Slab For Chamber RCC CoversSqm1449.631449.6332.15FalseNoneNoneFalseNoneFalse46605.60450
3659573133529None2 2 3 P 15 Vol 1Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work. (including cost of providing & removing formwork as per Design & Drawing) M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates For Sump bottom slab & side RCC WallsCum8635.338635.3369.18FalseNoneNoneFalseNoneFalse597392.12940
3659574133529None2 3 2 P 16 Vol 1Providing and laying in Reinforced cement concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work. (including cost of providing & removing formwork as per Design & Drawing) M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates For Sump RoofslabCum12043.0812043.087.86FalseNoneNoneFalseNoneFalse94658.60880
3659575133529None8 6 2 P 42 Vol 2Providing 20 mm cement plaster with cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Sqm531.53531.53259.98FalseNoneNoneFalseNoneFalse138187.16940
3659576133529None7 3 P 85 Vol VProviding and fixing MS inspection door of size 60 cms x 60 cms, including MS frame made of 50x50x6mm angle, shutters made of 3mm thick MS sheets, with hinges, locking arrangements at top etc. including painting with anticorrosive approved paint etc. complete including all lead and lifts etc.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Each2651.462651.461.0FalseNoneNoneFalseNoneFalse2651.460
3659577133529None7 1 2 P 85 Vol VProviding and fixing MS ladder between landings, 45 cms wide using angle iron of specified sizes, 20mm MS bars at 25 cms. centre to centre, with necessary supports of same angle iron etc. as directed, including hand railing on both sides with 25mm dia. GI pipes with angle iron props at 2 mtrs. intervals and 0.5M heigh, including fixing in ground with CC 1:2:4 and two coats of anticorrosive bituminous paint etc. with all lead and lifts etc. complete with: MS angle of 65 x 65 x 10mm ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.m5948.445948.444.5FalseNoneNoneFalseNoneFalse26767.980
3659578133529None5 1 P 25 18 19 BGMSRProviding and constructing granite I trap I basalt rubble stone masonry in foundation with mud mortar (uncoursed), bond stones at 2m. apart in each course including cost of materials, labour, curing complete as per specifications. ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work. For Soak pit steaning wallCum2899.262899.2611.93FalseNoneNoneFalseNoneFalse34588.17180
3659579133529None1 23 P 11 Vol 1Providing and Filling in foundation with granite / trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work. For Soak pitCum3323.03323.011.55FalseNoneNoneFalseNoneFalse38380.650
3659580133529None1 11 P 7 Vol 1 21 22 SRSupplying and filling in plinth with sand under floors, foundation of Bridges including watering, ramming, consolidating and dressing complete.,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work. For Soak pitCum2697.32697.33.12FalseNoneNoneFalseNoneFalse8415.5760
3659581133529None2 4 3 P 17 Vol 1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates., including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work. For Compound wall Grade beamCum8635.338635.337.76FalseNoneNoneFalseNoneFalse67010.16080
3659582133529None8 37 P 48 Vol 2Painting on G.S. sheet with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :New work (two coats) including a coat of approved steel primer but excluding a coat of mordant solution including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications ,including curing, cost and conveyance of all materials, cost of labour,HOM of machinery and equipments, with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge of the work.For Compound wall GateSqm162.31162.3121.6FalseNoneNoneFalseNoneFalse3505.8960
3659583133529None3 11 P 18 Vol 3Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with 8-10 t smooth wheeled roller, complete as per clause 310. ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Sqm4.964.96302.5FalseNoneNoneFalseNoneFalse1500.40
3659584133529None3 6 P 17 Vol 3Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads,transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Cum610.83610.8390.75FalseNoneNoneFalseNoneFalse55432.82250
3659585133529None4 17 P 26 Vol 3Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Cum3170.63170.637.13FalseNoneNoneFalseNoneFalse117724.3780
3659586133529None4 1 V P 23 Vol 3Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Cum3081.393081.3937.13FalseNoneNoneFalseNoneFalse114412.01070
3659587133529None6 6 P 51 Vol 3Construction of un-reinforced plain cement concrete pavement using RMC M-30 grade with OPC @ 270 kg/m3 and GGBS@ 90 kg/m3 (75:25 proportion) as per approved mix design procedure and thickness as per design, over a prepared sub base. The superplastisiser confirming to IS 9103-1999 Reaffirmed-2008 ,Coarse aggregates and Fine aggregate confirming to IS:383-2016, transported to site, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work). Spreading the concrete with shovels, rackers and compacted using needle, suitable plate vibrator and finished in a continuous operation including provision of separation membrane and Hessian cloth finishing to lines and grades complete including cost of all materials, labour, all lead & lift, loading charges as per specification & direction of Engineer - incharge of the work. (Groove cutting shall be paid seperately) ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Cum8392.998392.9949.5FalseNoneNoneFalseNoneFalse415453.0050
3659588133529None22 8 1 PWD 18 19 BGM SRProviding groove cutting for width of 5mm to 1Omm and depth 80mm-100mm including cost of cutting machine, generator & HOM, including cost of blade, coolant etc., including cleaning of groove & providing sand and hot bitumen fillars, and filler metal etc. , including cost of conveyance of all materials, labour, lead and lift charges and all other incidental charges as per drawing and as per specifications.-for concrete pavement ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.m167.27167.2781.0FalseNoneNoneFalseNoneFalse13548.870
3659589133529None9 32 P 64 Vol 2 21 22 SRProviding and laying heavy duty cobble stones 75mm thick interlock pavers, using cement and course sand for manufacture of blocks of approved size, shape and colour with a minimum compressive strength of 281 kg per m2 over 50mm thick sand bed ( average thickness ) and compacting with plate vibrator having 3 tons compaction force thereby forcing part of sand underneath to come up in between joints, final compaction of paver surface joints into its final level, including cost of materials, labour and Usage charges of machinery complete as per specifications. ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Sqm1418.661418.66427.5FalseNoneNoneFalseNoneFalse606477.150
3659590133529None12 4 P 140 Vol 5Geophysical investigation at site for sinking borewells for supplying drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner or Schlumbergers’s method, including reconnaissance survey of geological formation. Geophysical investigation of existing ground water in the vicinity, its quality, quantity and acceptability of the users, indicating the location of the site, recommended depth of casing pipe required to seal the top unconsolidated formation including an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depth of drilling required to cover full depth of aquifer proposed to be tapped,probable yield and other information required including transportation of instruments and accessories to work site, engaging technical personal and labour required etc. ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Each6551.836551.831.0FalseNoneNoneFalseNoneFalse6551.830
3659591133529None12 2 1 P 139 Vol 5Sinking borewell of 150mm dia. clear, using super fast hydraulic rig of capacity 250 PSIG & above 900 CMF and above, in all strata of earth, including over burden upto 20M, fixing of casing pipes, collars and cap with ncessary cutting, threading and welding including transportation of rig and supporting vehicles, crew charges, cost of consumables, cost of yield test at the final depth with a minimum working of compressor for one hour etc. complete. The cost excludes the cost of casing pipes, collars and caps etc.) for: Up to 0.00 to 50.00 mtrs ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.m382.85382.8550.0FalseNoneNoneFalseNoneFalse19142.50
3659592133529None12 2 2 P 139 Vol 5Sinking borewell of 150mm dia. clear, using super fast hydraulic rig of capacity 250 PSIG & above 900 CMF and above, in all strata of earth, including over burden upto 20M, fixing of casing pipes, collars and cap with ncessary cutting, threading and welding including transportation of rig and supporting vehicles, crew charges, cost of consumables, cost of yield test at the final depth with a minimum working of compressor for one hour etc. complete. The cost excludes the cost of casing pipes, collars and caps etc.) for: Up to 50.00 to 100.00 mtrs ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.m479.49479.4950.0FalseNoneNoneFalseNoneFalse23974.50
3659593133529None12 2 3 P 139 Vol 5Sinking borewell of 150mm dia. clear, using super fast hydraulic rig of capacity 250 PSIG & above 900 CMF and above, in all strata of earth, including over burden upto 20M, fixing of casing pipes, collars and cap with ncessary cutting, threading and welding including transportation of rig and supporting vehicles, crew charges, cost of consumables, cost of yield test at the final depth with a minimum working of compressor for one hour etc. complete. The cost excludes the cost of casing pipes, collars and caps etc.) for: Up to 100.00 to 150.00 mtrs ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.m510.47510.4750.0FalseNoneNoneFalseNoneFalse25523.50
3659594133529None12 32 P 143 Vol 5Supply of ISI mark 175mm nominal bore,plain and steel casing pipe grade of steel Fe 410 of wall thickness conforming to IS 4270-2001 and latest ammendments, electrical resistance welded steel tubes, material and conforming to IS 1387-1993 and manufactured by basic open hearth electric or basic oxygen process in random length of 5-7m both ends.threaded conforming to IS 554-1985 one end fixed with socket conforming to IS 4270-2001 and the other end with screwed pipes all shall be responsibaly free from defects. The tubes shall be responsible straight end should be with ISI marking weighing 25.10kg/m.prices include Collar-Medium duty. ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.m2394.992394.9920.0FalseNoneNoneFalseNoneFalse47899.80
3659595133529None12 33 P 143 Vol 5Providing and fixing MS casing collars as per IS 1239 (part-II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum). The dimensions of caps and colars shall be strictly as per IS 1239 (Part-II) 1982 with all amendments ,including cost and conveyance of all materials, cost of labour,HOM of machinery and equipments with all lead, lifts, loading and unloading and all other incidental charges required for successful completion of work as per approved specification, designs, drawings etc., complete and directions of the Engineer in-charge of the work.Each185.85185.856.0FalseNoneNoneFalseNoneFalse1115.10
3659596133529None12 34 P 143 Vol 5Providing and laying at site of work MS casing caps as per IS 1239 (partII) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum). The dimensions of caps and colars shall be strictly as per IS 1239 (Part-II) 1982 with all amendments including cost of material and labour charges for fixing, if any etc. complete with all lead and lifts and as directed by the Engineer in chargeEach203.2203.21.0FalseNoneNoneFalseNoneFalse203.20
3659597133529NonePage 1 1 2 1 Vol 6Concealed Conduit System Supplying heavy gauge PVC conduit pipe ...... mm dia. mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 19/20 mm dia 2 mm thickm77.8877.88360.0FalseNoneNoneFalseNoneFalse28036.80
3659598133529NonePage 1 1 2 2 Vol 6Concealed Conduit System Supplying heavy gauge PVC conduit pipe ...... mm dia. mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 25 mm dia 2 mm thickm92.0492.04420.0FalseNoneNoneFalseNoneFalse38656.80
3659599133529NonePage 1 1 2 3 Vol 6Concealed Conduit System Supplying heavy gauge PVC conduit pipe 32 mm dia 2.5 mm thick confirming to IS 2509 with suitable size bends,metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary. 32 mm dia 2.5 mm thickm125.08125.08120.0FalseNoneNoneFalseNoneFalse15009.60
3659600133529NonePage 2 1 11 P 1Supplying And Fixing M.S. Rafter Clamp Set made out of M.S. Flat and 14 mm M.S. rod.No187.62187.6212.0FalseNoneNoneFalseNoneFalse2251.440
3659601133529NonePage 3 1 12 Vol 6Supplying And Fixing M.S. Rafter Clamp Set made out of M.S. Flat and 14 mm M.S. rod.No188.8188.811.0FalseNoneNoneFalseNoneFalse2076.80
3659602133529NonePage 1 1 3 1 Vol 6Supplying heavy gauge PVC Conduit Pipe 19/20 mm dia 2 mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. 19/20 mm dia 2 mm thickm80.2480.24220.0FalseNoneNoneFalseNoneFalse17652.80
3659603133529NonePage 1 1 3 2 Vol 6Supplying heavy gauge PVC Conduit Pipe 25 mm dia 2 mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. 25 mm dia 2 mm thickm93.2293.22320.0FalseNoneNoneFalseNoneFalse29830.40
3659604133529NonePage 17 5 19 8 Vol 6Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/single door with powder coated painting Made out of 14 SWG MS enclosure.-8 Way SP & NEach2187.722187.723.0FalseNoneNoneFalseNoneFalse6563.160
3659605133529NonePage 7 3 4 1 Vol 6Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 1-2 WayEach162.84162.8412.0FalseNoneNoneFalseNoneFalse1954.080
3659606133529NonePage 7 3 4 2 Vol 6Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 3 WayEach187.62187.6214.0FalseNoneNoneFalseNoneFalse2626.680
3659607133529NonePage 7 3 4 3 Vol 6Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 4-5 WayEach208.86208.868.0FalseNoneNoneFalseNoneFalse1670.880
3659608133529NonePage 7 3 4 4 Vol 6Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 6 WayEach259.6259.68.0FalseNoneNoneFalseNoneFalse2076.80
3659609133529NonePage 7 3 4 5 Vol 6Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 8 WayEach307.98307.9812.0FalseNoneNoneFalseNoneFalse3695.760
3659610133529NonePage 7 3 4 6 Vol 6Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall. Make - Group "A" materials and as per the directions of Engineer in charge of the work. 10-12 WayEach376.42376.428.0FalseNoneNoneFalseNoneFalse3011.360
3659611133529NonePage 7 3 4 7 Vol 6Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall. Make - Group "A" materials and as per the directions of Engineer in charge of the work. 16 WayEach428.34428.3410.0FalseNoneNoneFalseNoneFalse4283.40
3659612133529NonePage 4 2 2 1 Vol 6Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Short point upto 3Mtr from tapping point to out let via switch boxPoint317.42317.4222.0FalseNoneNoneFalseNoneFalse6983.240
3659613133529NonePage 4 2 2 2 Vol 6Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch boxPoint447.22447.2245.0FalseNoneNoneFalseNoneFalse20124.90
3659614133529NonePage 4 2 2 3 Vol 6Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Long point above 6Mtr upto 10Mtr from tapping point to out let via switch boxPoint654.9654.950.0FalseNoneNoneFalseNoneFalse32745.00
3659615133529NonePage 4 2 3 2 Vol 6Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS- 694:2010 1.5 mm2m30.6830.681600.0FalseNoneNoneFalseNoneFalse49088.00
3659616133529NonePage 4 2 3 3 Vol 6Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 2.5 mm2m49.5649.563200.0FalseNoneNoneFalseNoneFalse158592.00
3659617133529NonePage 4 2 3 4 Vol 6Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 4 mm2m74.3474.34600.0FalseNoneNoneFalseNoneFalse44604.00
3659618133529NonePage 4 2 3 5 Vol 6Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 6 mm2m108.56108.56270.0FalseNoneNoneFalseNoneFalse29311.20
3659619133529NonePage 7 3 5 1 Vol 6Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.. Make - Group "A" materials and as per the directions of Engineer in charge of the work. 1 to 2 ModuleEach161.66161.6612.0FalseNoneNoneFalseNoneFalse1939.920
3659620133529NonePage 7 3 5 2 Vol 6Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.. Make - Group "A" materials and as per the directions of Engineer in charge of the work. 3 ModuleEach189.98189.9814.0FalseNoneNoneFalseNoneFalse2659.720
3659621133529NonePage 7 3 5 3 Vol 6Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 4 ModuleEach206.5206.58.0FalseNoneNoneFalseNoneFalse1652.00
3659622133529NonePage 7 3 5 4 Vol 6Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 6 ModuleEach276.12276.128.0FalseNoneNoneFalseNoneFalse2208.960
3659623133529NonePage 7 3 5 5 Vol 6Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 8 ModuleEach335.12335.1212.0FalseNoneNoneFalseNoneFalse4021.440
3659624133529NonePage 7 3 5 6 Vol 6Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.. Make - Group "A" materials and as per the directions of Engineer in charge of the work. 10-12 ModuleEach405.92405.928.0FalseNoneNoneFalseNoneFalse3247.360
3659625133529NonePage 7 3 5 7 Vol 6Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.. Make - Group "A" materials and as per the directions of Engineer in charge of the work. 16-18 ModuleEach468.46468.4610.0FalseNoneNoneFalseNoneFalse4684.60
3659626133529NonePage 8 3 6 1 Vol 6Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A One Way SwitchEach120.36120.36156.0FalseNoneNoneFalseNoneFalse18776.160
3659627133529NonePage 8 3 6 2 Vol 6Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Two Way SwitchEach195.88195.888.0FalseNoneNoneFalseNoneFalse1567.040
3659628133529NonePage 8 3 6 3 Vol 6Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Three Way socketEach201.78201.7846.0FalseNoneNoneFalseNoneFalse9281.880
3659629133529NonePage 8 3 6 4 Vol 6Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. Stepped Fan Regulator Two ModuleEach421.26421.2619.0FalseNoneNoneFalseNoneFalse8003.940
3659630133529NonePage 8 3 6 10 Vol 6Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6/16A Universal SocketEach278.48278.484.0FalseNoneNoneFalseNoneFalse1113.920
3659631133529NonePage 8 3 6 10 Vol 6Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6/16A Universal SocketEach278.48278.484.0FalseNoneNoneFalseNoneFalse1113.920
3659632133529NonePage 9 3 14 7 Vol 6Supplying And fixing/replacing of 6/16/32A electrical accessories on existing switch board. 6A Batten HolderNo87.3287.3256.0FalseNoneNoneFalseNoneFalse4889.920
3659633133529NonePage 29 6 1 Vol 6Supplying exhaust fan of 1440 RPM of 300 mm (12") size with bracket blades complete for light duty suitable to operate on 230V 50Hz, AC Supply.Each1760.561760.566.0FalseNoneNoneFalseNoneFalse10563.360
3659634133529NonePage 29 6 3 1 Vol 6Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. 48" Sweep (1200 mm) Regular modelEach3521.123521.1219.0FalseNoneNoneFalseNoneFalse66901.280
3659635133529NonePage 30 6 7 2 Vol 6Supplying ......TR split Air conditioners suitable for operation on A/C supply single phase 50 Hz 230 Volts with hermetically sealed compressor with air cooled condenser, motor capacitor and start run capacitors, relay and over load protector internal unit, with one indoor and one outdoor unit The condenser unit will be placed outside the room on the terrace to avoid noise including standard length of suitable size copper tubing covered with insulation tube. (High wall chorded/cordless) suitable capacity 3 core sheathed/ PVC copper cable and a battery operated wireless remote unit. 1.5 Ton capacityEach56265.9456265.941.0FalseNoneNoneFalseNoneFalse56265.940
3659636133529NonePage 31 6 11 Vol 6Installation charges for 1 to 2 Ton capacity window type Air Conditioner with 50 x 75 mm thick teak wood frame of suitable size and allied works complete.Each3163.583163.581.0FalseNoneNoneFalseNoneFalse3163.580
3659637133529NonePage 43 11 4 4 Vol 6Supplying of recess mounting non integrated type LED down light 24 W luminaire comprising of pressure decast extruded aluminium housing, with spring loaded false ceiling clamps, LED of Power COB with CCT 6500 degree K, CRI greater than 70 percentage. efficacy greater than 100 lumen per W, 120 degree beam spread, life greater than 25000 burning hours and Compliance to IS10322 IEC 60598, LM 79 and LM 80. The lamp compartment is enclosed with anti glare opal diffuser which enhances the lighting level. LED's are driven by HF electronic driver integrated in a separate control gear assembly., with PF greater than 0.95, power loss should greater than 5% of lamp Wage, short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electricalNo2044.942044.9410.0FalseNoneNoneFalseNoneFalse20449.40
3659638133529NonePage 44 11 6 3 Vol 6Supplying of recess mounting non integral type ........ LED w luminaire comprising of pressure decast extruded aluminium housing, with spring loaded false ceiling clamps, Power LEDs with CCT 6500 degree K, CRI greater than 70%. efficacy greater than 100 lumen per watt, 120degree beam spread, life greater than 25000 burning hours and Compliance to IS 10322 IEC 60598, LM 79 and LM 80. The lamp compartment is enclosed with anti glare opal diffuser which enhances the lighting level LEDs are driven by HF electronic driver integrated in a separate control gear assembly., with PF greater than 0.95, power loss should greater than 5% of lamp wattage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 volts. BIS Approved and Tested by NABL CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition. LED modular down light 2'x2' 36 WNo5372.545372.549.0FalseNoneNoneFalseNoneFalse48352.860
3659639133529NonePage 42 11 3 2 Vol 6Supplying of 4 feet 20 22 Watt -PVC Batten with integrated LED tube W with high quality diffuser with Life of 25000 burning hours and 70% lumen maintenance with CRI greater than 80. Power Input: 220- 240V@ 50/60Hz & Power factor greater than 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition.-LED light fitting 1 x 4' - 20 22 WEach814.2814.244.0FalseNoneNoneFalseNoneFalse35824.80
3659640133529NonePage 46 11 11 4 Vol 6Supplying & fixing of retrofit type - LED bulb ...... W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degree K, CRI greater than 70%. efficacy greater than 80 lumen per W, life greater than 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF greater than 0.95, power loss should lesser than 5% of lamp Wage., short circuit and open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition.9W, 6500KEach181.72181.7222.0FalseNoneNoneFalseNoneFalse3997.840
3659641133529NonePage 55 13 7 1 Vol 6Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clamps.On wall/ ceiling / Rafter / GirdersEach143.96143.9670.0FalseNoneNoneFalseNoneFalse10077.20
3659642133529NonePage 56 13 10 Vol 6Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing 'S'' hook with fan regulator to the existing board together with supplying and fixing 5 A. ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring.Each201.78201.7822.0FalseNoneNoneFalseNoneFalse4439.160
3659643133529NonePage 56 13 12 Vol 6Extra length of GI pipe of class B 19 mm dia for down rod.m232.46232.469.0FalseNoneNoneFalseNoneFalse2092.140
3659644133529NonePage 56 13 14 Vol 6Fixing one exhaust fan in the nitch already left in the wall with bolts and nuts and 5 A. ceiling rose with sufficient length of 23/0.0076 inch PVC insulated twin core wire.Each580.56580.564.0FalseNoneNoneFalseNoneFalse2322.240
3659645133529NonePage 47 12 2 3 Vol 6Supplying and fixing one of 230 volts Ding dong bell and a flush type bell push with gang box fixed on necessary wooden or rawl plugs using NF screws with Remote. Remote ControledEach1404.21404.22.0FalseNoneNoneFalseNoneFalse2808.40
3659646133529NonePage 16 5 18 4 Vol 6Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898-6-32 A DPEach872.02872.0212.0FalseNoneNoneFalseNoneFalse10464.240
3659647133529NonePage 17 5 20 1 Vol 6Supplying, fixing and wiring Residual current circuit breaker (RCCB) 240/450V upto 300mA sensitivity on existing wood/ panel board.16A-25A 2 poleEach5046.865046.863.0FalseNoneNoneFalseNoneFalse15140.580
3659648133529NonePage 37 9 2 5 Vol 6Supplying, erecting, testing & commissioning of OFF- LINE UPS system suitable for operation on 230V, 50Hz, A/C supply, with all accessories complete and Excluding batteries and wiring complete.Each47079.6447079.641.0FalseNoneNoneFalseNoneFalse47079.640
3659649133529NonePage 37 9 4 4 P 1Supplying, installation, testing & commissioning of 12V 100 AH batteries in poly propylene container for D.G. sets. Low maintenance batteries, plate type.100 AH capacity.Each23756.9423756.9410.0FalseNoneNoneFalseNoneFalse237569.40
3659650133529NonePage 8 3 6 11 Vol 6Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. TV/Telephone SocketEach184.08184.086.0FalseNoneNoneFalseNoneFalse1104.480
3659651133529NonePage 8 3 6 12 Vol 6Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. RJ45/I.O Outlet Cat-6Each397.66397.6612.0FalseNoneNoneFalseNoneFalse4771.920
3659652133529NonePage 35 8 1 Vol 6Supplying and drawing UTP-CAT 6E LAN cable.Mtr44.8444.84800.0FalseNoneNoneFalseNoneFalse35872.00
3659653133529NonePage 35 8 2 2 Vol 6Supplying and drawing PVC flexible one pair telephone unarmoured tinned copper cable. 2 Pairm24.7824.78180.0FalseNoneNoneFalseNoneFalse4460.40
3659654133529NonePage 35 8 3 Vol 6Supplying and drawing PVC insulated gas injected physical foam jelly flooded co-axial TV cable.RG-6.m51.9251.9280.0FalseNoneNoneFalseNoneFalse4153.60
3659655133529NonePage 28 8 4 1 P 1Supplying & Fixing of switch mounting rack with power manager & Cable manager. 4U with 450 mm depthEach3443.243443.241.0FalseNoneNoneFalseNoneFalse3443.240
3659656133529NonePage 35 8 4 1 Vol 6Supplying & Fixing of switch mounting rack with power manager & Cable manager. 4U with 450 mm depthEach5772.565772.562.0FalseNoneNoneFalseNoneFalse11545.120
3659657133529NonePage 35 8 9 5 Vol 6Supplying fixing of Network Switches. 24 port 10/100 SwitchEach5546.05546.012.0FalseNoneNoneFalseNoneFalse66552.00
3659658133529NonePage 35 8 10 1 Vol 6Supplying & fixing of I/O socket with back box. Single I/OEach578.2578.212.0FalseNoneNoneFalseNoneFalse6938.40
3659659133529NonePage 36 8 11 3 Vol 6Supplying & Fixing of ... Mtrs Cat 6 Patch Cable. 3mtrEach390.58390.581.0FalseNoneNoneFalseNoneFalse390.580
3659660133529NonePage 36 8 13 2 Vol 6Supplying and fixing of MDF krone junction box with KRONE Module / Telephone cable termination. 20 Pairm451.94451.941.0FalseNoneNoneFalseNoneFalse451.940
3659661133529NonePage 17 5 7 3 Vol 6Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. 63 AmpsEach473.18473.186.0FalseNoneNoneFalseNoneFalse2839.080
3659662133529NonePage 14 5 12 2 Vol 6Supplying of on load change over switches 4 poles, AC- 23A Duty, 415V, 50Hz, AC Supply. With all accessories. (SM Enclosure Sheet Metal Execution) 100 AEach10070.1210070.121.0FalseNoneNoneFalseNoneFalse10070.120
3659663133529NonePage 16 5 15 9 Vol 6Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuitwith adjustable thermal magnetic release, Micro processor release shall have Earth Fault as per IS/IEC 60947-2 . (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism.100 A 25 kAEach10014.6610014.661.0FalseNoneNoneFalseNoneFalse10014.660
3659664133529NonePage 16 5 18 7 Vol 6Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898-6-32 A TPNEach2026.062026.065.0FalseNoneNoneFalseNoneFalse10130.30
3659665133529NonePage 17 5 21 Vol 6Supplying, fixing and wiring earth leakage relay with core balanced current transformer suitable for single phase 50 Hz AC with latest microcontroller based, digital readout of percentage leakage current, programmable delay/auto/ manual reset facility suitable to mount on DIN rail/ flush mounting on panel board.Each10920.910920.91.0FalseNoneNoneFalseNoneFalse10920.90
3659666133529NonePage 18 5 29 Vol 6Supplying, fixing and wiring 3 Phase Digital Ammeter /VoltmeterEach1681.51681.51.0FalseNoneNoneFalseNoneFalse1681.50
3659667133529NonePage 18 5 34 Vol 6Supplying, fixing and wiring 50/5 to 400/5A 5VA burden Current Transformer Class 0.5 accuracy with Tape Wound.Each663.16663.163.0FalseNoneNoneFalseNoneFalse1989.480
3659668133529NonePage 18 5 38 Vol 6Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440VAC. 50 Hz 12/24V D.C.Each607.7607.73.0FalseNoneNoneFalseNoneFalse1823.10
3659669133529NonePage 19 5 40 1 Vol 6Supplying ......... A rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete-100 A 4 x 30 x 6 mm Aluminium Stripsm2908.72908.70.75FalseNoneNoneFalseNoneFalse2181.5250
3659670133529NonePage 19 5 41 1 Vol 6Supplying and fixing angle iron frame work fabricated out of M.S. angle iron.. and M.S. Flat......with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint-40 x 40 x 6 mmm359.9359.98.0FalseNoneNoneFalseNoneFalse2879.20
3659671133529NonePage 19 5 42 2 Vol 6Fabricating supplying and mounting MS box made out SWG suitable for floor /wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., complete-16 SWGSqm0.510.5156000.0FalseNoneNoneFalseNoneFalse28560.00
3659672133529NonePage 2 1 9 2 Vol 6Supplying PVC flexible conduit pipe mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300 mm using NF screws and on either end of the pipe terminated completely 25 mmm25.9625.9618.0FalseNoneNoneFalseNoneFalse467.280
3659673133529NonePage 54 12 58 2 Vol 6GI/Copper strips for grounding connections, using necessary fixing materials as required.25 x 3 mm GI stripm96.7696.7612.0FalseNoneNoneFalseNoneFalse1161.120
3659674133529NonePage 54 12 60 2 Vol 6Supplying & Fixing Chemical earthling for grounding. Conduits, IC cut-outs & other equipments backfill compound which is non corrosive, thermally conductive, potential to permissible limits, superior Fault conduction capacity, non toxic, weather resistance & capable of achieving ohmic value less than one ohmNo7351.47351.46.0FalseNoneNoneFalseNoneFalse44108.40
3659675133529NoneESR Page 12 32 02 Vol 61.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 Part 1 or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 10 Sqmm, 2 Core, 9 GI Strips - 4 x 0.8 mm.Km93493.7693493.760.08FalseNoneNoneFalseNoneFalse7479.50080
3659676133529NoneESR Page 12 32 05 Vol 61.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975. 4 core 16 sq mmKm167373.56167373.560.09FalseNoneNoneFalseNoneFalse15063.62040
3659677133529NoneESR Page 21 32 11 Vol 6Supplying of 1.1 KV LT UG cable XLPE or Heat resistant PVC insulated, PVC extruded Inner sheath armoured UG LT cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness in average +5% and resistivity 14 Ohms/Kms (Max) as per IS-3975. 50 Sqmm, 3.5 Core, (16 GI Strips - 4 x 0.8 mm)Km211188.14211188.140.21FalseNoneNoneFalseNoneFalse44349.50940
3659678133529NoneESR Page 60 21 05 Vol 6Laying of LT cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff. 2.5 to 25 SqmmKm24645.4824645.480.17FalseNoneNoneFalseNoneFalse4189.73160
3659679133529NoneESR Page 60 21 06 Vol 6Laying of LT cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff. 35 to 95 SqmmKm36744.0236744.020.21FalseNoneNoneFalseNoneFalse7716.24420
3659680133529NoneCSR Page 6 1 6 1 Vol 1Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. In all kinds of soils. Depth upto 1.50mm571.12571.12270.0FalseNoneNoneFalseNoneFalse154202.40
3659681133529NoneCSR Page 95 9 1 1 Vol 5Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used.For :HDPE PE 80 PN 6.0 HDPE Grade PE80-PN6.0, 63mm diam223.02223.0230.0FalseNoneNoneFalseNoneFalse6690.60
3659682133529NoneCSR Page 159 Sl no 39 Vol 4GI pipe iv) 50 mm dia B classm359.9359.98.0FalseNoneNoneFalseNoneFalse2879.20
3659683133529NoneESR Page 36 63 03 Vol 6Supplying and fixing of heavy duty Brass Cable Gland. 45 mm diaEach232.46232.466.0FalseNoneNoneFalseNoneFalse1394.760
3659684133529NoneESR Page 23 35 01 Vol 6Epoxy Terminating Kit (Pothead) suitable for 1.1 kV, LTUG Cable. Up to 4C x 50 SqmmSet382.32382.324.0FalseNoneNoneFalseNoneFalse1529.280
3659685133529NonePage 44 11 7 2 Vol 6Supply of LED pole mounting type post top lantern with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate/ clear glass material, delivering superior light output Rated life Burning Hrs 50000 hr@ Lumen Maintenance of 70%, CCT greater than 5500K, IP 66 optical and electrical compartment & impact resistance of complete luminaire greater than IK08. Power Factor greater than 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/Overload, short circuit/ miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/1 EC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB LED Efficiency greater than1301m/w, nominal CRI greater than 75. Luminaire manufacturer should have in- house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/ Lumileds/Osram make LED Source.. LED Post Top Lantern with 25/30 W for gateNo9111.969111.962.0FalseNoneNoneFalseNoneFalse18223.920
3659686133529NonePage 45 11 8 3 Vol 6Supply of 70 watts LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning hrs. 50000 hr. at Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT greater than 5500K, IP66 optical and electrical compartment and impact resistance of complete luminaire greater than IK08. Power Factor greater than 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 and LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with ........W System Power consumption. LED Efficiency greater than 1301m/w, nominal CRI greater than 75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer and Cree/Nichia/ Lumileds/Osram make LED Source.No7070.567070.568.0FalseNoneNoneFalseNoneFalse56564.480
3659687133529NonePage 55 13 1 1 Vol 6Supplying and Fixing of mm dia class A GI pipe bracket upto 2 ms long bent at suitable angle and fixing to this bracket street light fitting of all capacities to GI or GI or rail or RCC pole / wall using suitable clamps, bolts, and nuts and wiring using suitable capacity wires.Using 25mm dia G.I.PipeEach1154.041154.048.0FalseNoneNoneFalseNoneFalse9232.320
3659688133529NoneCSR page 157 13 40 3 Vol 5Supply and delivery of Centrifugal pumpset at site brand new best make and with discharge duty confirming to ISI standards and its latest amendments. 3 HP, size 50x40 Head 30M, Discharge 198 LPMEach20051.7420051.742.0FalseNoneNoneFalseNoneFalse40103.480
3659689133529NoneCSR page 152 13 13 5 Vol 5Providing,supplying to work site, Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034-2000;3Phase, SS Bowl & Impeller with Low volt Motor as per specifications,as per necessary ammendments and instructions of engineer incharge of work. 5.00 HP - 120 LPM @ 88 m = 14 STG Outlet Dia - 2.00"Each36366.4236366.421.0FalseNoneNoneFalseNoneFalse36366.420
3659690133529NonePage 6 2 6 1 Vol 6Supplying and drawing 3 core flat PVC sheathed submersible pump cable manufactured with electrolytic grade copper with flexible copper with low resistance conductor confirming to13:8130-1984 and virgin grade PVC insulation and powder coating extruded PVC sheathed suitable for working voltage upto 1100 Volts as per IS-694:1990. 3C x 2.5 sq mmm138.06138.06300.0FalseNoneNoneFalseNoneFalse41418.00
3659691133529NoneCSR page 155 13 28 Vol 5Supply and delivery at site 50mm(2”) dia heavy duty unplasticized PVC Column pipes with heavy duty collars,rubber profile ring,vibration control profile ring,freezing and turbulence free leak proof EPDM ring with ISI mark with its latest amendmentsm649.0649.0140.0FalseNoneNoneFalseNoneFalse90860.00
3659692133529NonePage 155 13 23 1 Vol 5Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1ni with Phase selector switch, Isolating switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection Like single Phase preventor, under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no Indoor type NOTE: 1) DOL- Direct Online Starter Upto 3 HP pumpsEach7670.07670.01.0FalseNoneNoneFalseNoneFalse7670.00
3659693133529NonePage 155 13 23 2 Vol 5Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1ni with Phase selector switch, Isolating switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection Like single Phase preventor, under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no Indoor type NOTE: 1) DOL- Direct Online Starter 3 to 6 HP pumpsEach11269.011269.01.0FalseNoneNoneFalseNoneFalse11269.00
3659694133529NoneCSR Page 154 13 24 1 Vol 5Supply and delivery at site of brand new best make gate valve as per IS 778/1984 with ISI Mark and as per its latest amendments 50 mm dia.No1475.01475.02.0FalseNoneNoneFalseNoneFalse2950.00
3659695133529NoneCSR Page 154 13 25 1 Vol 5Supply and delivery at site of brand new best makeNon -return valve as per IS 778/1984 with ISI Mark and as per its latest amendments 50 mm dia.No1475.01475.02.0FalseNoneNoneFalseNoneFalse2950.00
3659696133529NoneCSR Page 155 13 29 Vol 5Supply and delivery at site 50mm(2”) dia heavy duty CI adopter set complete suitable for uPVC Column pipes for Submersible pumpsetsSet1829.01829.01.0FalseNoneNoneFalseNoneFalse1829.00
3659697133529NoneESR Page 158 1 Vol 6Jelly Spreading (20-25 mm) : Supplying and providing jelly in the station yard of uniform thickness of 100 mm including the cost of materials, labour charges, required tools and plants etc., complete. Work shall be carried out as per the instructions of Engineerin- charge of works as per the standard procedure.Cum462.56462.562.0FalseNoneNoneFalseNoneFalse925.120
3659698133529NoneESR Page 158 5 Vol 6Supplying and Providing Pre cast Cable Route/ Joint marker using M15 grade Concrete, MS rods of approved size/shape (as per the approved drawings) to be laid in UG cable works. The rate includes the cost of material, labour charges, loading, unloading, handling, transportation charges, required tools and plants etc., complete. Work shall be carried out as per the instructions of Engineer-in-charge of works as per the standard procedure.No462.56462.568.0FalseNoneNoneFalseNoneFalse3700.480
3659699133529NoneCSR Page 95 11 58 Vol 2Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineerin- charge. (Made of G.I. wire of dia 4 mm).Sqm947.54947.5436.0FalseNoneNoneFalseNoneFalse34111.440
3659700133529NoneCSR Page 96 11 62 Vol 2Providing and fixing RCC precast fencing pole of size 0.15mx0.15mx2.0m casted in M 20 with 20mm down size aggregates making holes for drawing barbed wire at 30 cm c/c using 8 mm dia vertical 4 TMT steel rods and 6 mm dia stirups at 15 cm c/c fixed 1.5 m above Ground level using steel moulding , curing , transportation to work spot including excavation in all types of soil, fixing in plain cement concrete M15 using 20 mm downsize aggregate including aligning to plumb and line providing including cost of all materials, labour,usage charges of machinery complete.Each1280.31280.36.0FalseNoneNoneFalseNoneFalse7681.80
3659701133529NonePage 19 5 41 1 Vol 6Supplying and fixing angle iron frame work fabricated out of M.S. angle iron.. and M.S. Flat......with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. 40 x 40 x 6 mmm359.9359.924.0FalseNoneNoneFalseNoneFalse8637.60
3659702133529NonePage 53 12 56 Vol 6Supplying, fixing, wiring, earth electrode for grounding conduits,I.C. cutouts and other equipment's on the meter board using 40 mm dia 2.90 mm thick GI pipe 2.5m long buried in a pit . The pit should be filled with equal proportion of salt and charcoal 150 mm all round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as perlSI specification 7.3.3. of IS 732 using 12 mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm diaNo4141.84141.84.0FalseNoneNoneFalseNoneFalse16567.20
3659703133529NonePage 54 12 58 2 Vol 6GI/Copper strips for grounding connections, using necessary fixing materials as required.25 x 3 mm GI stripm96.7696.7612.0FalseNoneNoneFalseNoneFalse1161.120
3659704133529NoneBESCOM Cost Data Sheet 25Erection of 3 Phase, 11kV/ 433V, 63 kVA BEE 5 Star Rated Distribution Transformer Centre Using 9 mtr. RCC Pole DPTCNo330834.24330834.241.0FalseNoneNoneFalseNoneFalse330834.240
3659705133529NoneBescom SR 2021 22 CDS 15Providing 2 Pole Structrue at the Tapping Point Using RCC Pole with GOS sytemSet74517.074517.01.0FalseNoneNoneFalseNoneFalse74517.00
3659706133529NoneBescom SR 2021 22 CDS 16Guy Set With No. 15 Strain Insulator Complete set.Set1585.921585.921.0FalseNoneNoneFalseNoneFalse1585.920
3659707133529NoneBescom SR 2023 24 1 01Supplying RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. BESCOM/GM/QS&S/02 Dtd 24.11.2018) as per IS-785 ,as per the directions of Engineer in charge of the work.Each8349.688349.686.0FalseNoneNoneFalseNoneFalse50098.080
3659708133529NoneBescom SR 2023 24 2 02Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth complete ,as per the directions of Engineer in charge of the work.Each1313.341313.346.0FalseNoneNoneFalseNoneFalse7880.040
3659709133529NoneBescom SR 2023 24 7 02Supplying of Rabbit ACSR Conductor (6/3.35 mm Al + 1/3.35 mm St) with 1.5% sag.. as per IS-398 (Part - 2/1996) , Std Wt : 214 kgs/km ,as per the directions of Engineer in charge of the work.Km54556.1254556.120.72FalseNoneNoneFalseNoneFalse39280.40640
3659710133529NoneBescom SR 2023 24 6 01Stringing of conductor squirrel, weasel, binding of conductor on each insulator and dead ending on strain or disc/strain insulator by means of clamps ,as per the directions of Engineer in charge of the work.Km3752.43752.40.72FalseNoneNoneFalseNoneFalse2701.7280
3659711133529NoneBescom SR 2023 24 2 01Supplying & fixing of 11 kV, Horizontal Cross Arm - Mild Steel (MS) (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018)No438.96438.962.0FalseNoneNoneFalseNoneFalse877.920
3659712133529NoneBescom SR 2023 24 2 06Supplying & Fixing LT 4 Pin Cross Arm - with GI pins etc complete.No447.22447.222.0FalseNoneNoneFalseNoneFalse894.440
3659713133529NoneBescom SR 2021 22 6 05Supplying and fixing 11 kV Pin insulators with GI pins etc, complete ,as per the directions of Engineer in charge of the work.Each260.78260.788.0FalseNoneNoneFalseNoneFalse2086.240
3659714133529NoneBescom SR 2023 24 6 09Supplying and fixing of DISC Insulator 45 kN Porcelain etc, complete ,as per the directions of Engineer in charge of the work.No601.8601.87.0FalseNoneNoneFalseNoneFalse4212.60
3659715133529NonePage 45 11 9 3 Vol 6Supply of LED floodlight 120 W luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate/ clear glass material, delivering superior light output Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, CCT greater than 5500K, IP 66 optical and electrical compartment & impact resistance of complete luminaire greater than IK08. Power Factor greater than 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mauling with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100 V to 270V 50/60Hz application. Compliance to IS 10322/ IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with ....... W System Power consumption. LED Efficiency greater than 1301m/w, nominal CRI greater than 75. Luminaire manufacturer should have in- house facility accredited by NABL / CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark / name shall be Engraved / Embossing on the die cast housing / Body part Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/ Lumileds/Osram make LED Source.Each12693.2612693.264.0FalseNoneNoneFalseNoneFalse50773.040
3659716133529NonePage 12 4 6 5 Vol 6Supplying, and fixing of Hot dip Galvanized M.S.Bracket suitable for out door luminaries and mounted on Octagonal pole using necessary bolts, nuts etc., complete. Double Arm Bracket with 1500 mm Standard 40/50 mm diaEach3894.03894.02.0FalseNoneNoneFalseNoneFalse7788.00
3659717133529NonePage 10 4 2 7 Vol 6Fabricating, supplying and erection of 9 m - Top 70 mm and Bottom 155 mm dia ms long hot dip Galvanized Octagonal hot dip Pole with BSEN 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangements, including suitable boards, Bakelite sheet and MCBs as per IS specifications suitable to withstand the wind speed of 47 m/s for .......m Pole in single section and single joint welded as per IS 9595/IS10178AWS having dimensions bottom ..... mm , top.... mm with 3 mm thick, suitable base plate and 4Nos of ..... long J bolts along with template and the Pole shall be hot dip galvanized in single dipping with not less than 65micron as per ASTM-A123 and 153 etc., (excluding foundation) as per drawing appended.Each23010.023010.01.0FalseNoneNoneFalseNoneFalse23010.00
3659718133529NoneDGS and D RatesSolar Street Light System With Mounting Structure & Pole ( MNES Specification) Description of item: 2 X 18 W LED ,PV Module: 120 W,Battery Capacity: 12 V ,100 AHNo40392.5840392.586.0FalseNoneNoneFalseNoneFalse242355.480
3659719133529NoneBWSSB Page 247 21 1 1 Vol 5Water purification plants: Providing, Installation and Commissioning of automatic Water purification plant (RO+UF) with all accessories piping, product water tank on single phase power supply as per the enclosed detailed Technical Specifications including cost of material, loading and unloading and as directed by the Engineer in charge. (Ref- detailed specification enclosed seperatly). Note:- 1.The above rates mentioned are only for the preparation of estimate purpose. 2. All items are to be of BSI /NFS standards,with BSI / NFS mark . 3. Tenders to be invited for procurement. 4. No direct payment should be made under any situation or condition or on any account. 5. After commissioning of plant necessary testing to be done for the satisfactory of Engineer Incharge.For 25 LPH : Cabin TypeEach29500.029500.01.0FalseNoneNoneFalseNoneFalse29500.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17224232460000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17224232460001NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of KarnatakaNone
17224232460001NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of karnataka public procurement portal due to internet connectivity issues and technical glitches at bidder s end.None
17224232460000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17224232460000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17224234450000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contract value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidderNone
17224234540000NoneNoneELIGIBILITYThe tender document is part and parcel of the agreement.None
17224234750000NoneNoneELIGIBILITYThe intending bidders are requested to note that they should abide by the detailed instructions and conditions contained in the Tender documents and further modifications done if anyNone
17224234880000NoneNoneELIGIBILITYThe bidder shall study the Tender document Carefully and quote the rates.None
17224234980000NoneNoneELIGIBILITYDrawings uploaded are only for Tender Purpose onlyNone
17224235100000NoneNoneELIGIBILITYThe bidder shall give an undertaking that they would abide by the provisions of employees provident fund and shall remit PF of labourers to the respective PF offices or else KSPH & IDCL have the right to deduct the work bills and remit the same to respective PF offices.None
17224235330000NoneNoneELIGIBILITYThe contractor shall quote his rates inclusive of PF as per the applicable rate as issued by the PF department from time to time and if any variation occurs it shall be paid / refunded by / to the Corporation against documentary evidenceNone
17224235410000NoneNoneELIGIBILITYThe successful bidder shall give an under taking that they would abide by the provisions of the Employees Provident Fund ActNone
17224235540000NoneNoneELIGIBILITYRemittance towards PF shall be commensurate with the labour component of the work involved.None
17224235680000NoneNoneELIGIBILITYThe Bidder shall remit PF of labourers to Bidders permanent PF code number onlyNone
17224235840000NoneNoneELIGIBILITYThe bidder should maintain register of labourers deployed and wages paid for the workers and shall produce the documents whenever called for by the competent authority. Remittance towards PF shall be commensurate with the labour component of the work involved.None
17224235920000NoneNoneELIGIBILITYThe contractor shall obtain insurance coverage for all the workers deployed for this work.None
17224236070000NoneNoneELIGIBILITYCorrigendum/modification/corrections, if any, will be published in the karnataka public procurement portal and www.ksphc.org web sites only.None
17224236180000NoneNoneELIGIBILITYBounded scanned hard copies are to be submitted duly marking the Page Nos. within 3 days after the last date of submission of the bid documents online to EE(Contracts), KSPH & IDCL, Bangalore.None
17224236290000NoneNoneELIGIBILITYThe rates quoted by the Contractor shall be deemed to be inclusive of all applicable taxes, GST, levies, duties and cess, Building Workers Welfare Cess etc., as applicable as per the latest Notifications of GoK and GoI prevailing as on the date of NIT. The Employer will perform such duties in regard to the deduction of such taxes at source as per applicable law. The Contractor should submit the tax invoice along with RA Bills.None
17224236380000NoneNoneELIGIBILITYFurther details of the work or any clarifications can be obtained from the office of the Executive Engineer(Contracts), KSPH & IDCL, Richmond Road, Bangalore 560025. Ph: 080-25584102 Extn - 130 / 114 / 117None
17224239160000NoneNoneELIGIBILITYThe bidder should furnish the documents relating to registration of GSTNone
17224239250000NoneNoneELIGIBILITYThe bidder should furnish the valid address, phone number & e mail IDNone
17224239460000NoneNoneELIGIBILITYThe intended bidder shall visit the site & quote his offer accordingly and for having visited the site, they should upload the photos while submitting the tender.None
17224240360000NoneNoneELIGIBILITYTenders must be accompanied by Earnest Money Deposit (EMD) of Rs. 3.92 Lakhs (Rupees Three Lakhs Ninety Two Thousand only), which may be paid fully through Karnataka Public Procurement Portal or Out of total EMD amount Rs. 1.00 lakh (Rupees One Lakh only) shall be paid online through Karnataka Public Procurement Portal using any of the following Payment Modes: Credit Card, Direct Debit, National Electronic Fund Transfer (NEFT), Over the Counter (OTC) and the balance amount of Rs. 2.92 Lakhs (Rupees Two Lakhs Ninety Two Thousand only) in the form of Bank Guarantee (BG) only issued from Nationalized/Scheduled Commercial Banks in the Name of MD, KSPH&IDCL, Bengaluru. The scan copy of the Bank Guarantee (BG) to be uploaded at the time of submission of bid documents and the original Bank Guarantee should be submitted to Office of the Executive Engineer (Contracts), KSPH & IDCL, No.59, Gen. K.S. Thimmayya Road, Bangalore 560025 On or before the Last date of receipt of tender and the non-compliance of the same leads to the rejection of the bid.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNone1.3 of Section-3 Qualification Information: Work performed as Prime Contractor (in the same name) on works of similar nature over during the five years (2019-20 to 2023-24)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- The scanned original work experience certificate issued by not below the rank of Executive Engineer
NoneNoneNoneNone1.4 of Section-3 : Quantities of work executed as prime contractor (in the same name) during the last five years (2019-20 to 2023-24)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- The scanned original work experience certificate issued by not below the rank of Executive Engineer
NoneNoneNoneNone1.5 of Section-3 Qualification Information : Information on works for which Tenders have been submitted and works which are yet to be completed as on the date of this Tender : (A) Existing commitments and ongoing works & (B) Works for which Tenders already submittedPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- The scanned original work experience certificate issued by not below the rank of Executive Engineer
NoneNoneNoneNone1.7 of Section-3: Qualification Information: Reports on the financial standing of the tenderer, such as profit and Loss statements and auditors reports for the last five years. (2019-20 to 2023-24)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Profit & Loss Statement from Registered Chartered Accountant
NoneNoneNoneNone3.2- To qualify for award of this contract, each Tender in his/her/their name should have in the last five years i.e. 2019-20 to 2023-24): (b) Satisfactorily completed as prime contractor (at least 90% of the contract value), at least one similar nature of work of value not less than Rs.130.64 LakhsPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work Done certificate issued not below the rank of an Executive Engineer or equivalent.
NoneNoneNoneNoneITT - 3.2 d) The Tenderer or his identified sub-contractor should possess required valid electrical license for executing building electrification works and should have executed similar electrical works totalling Rs.12.37 Lakhs in any one yearPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Workdone certificate issued not below the rank of an Executive Engineer. In case of Sub Contractor licence & Consent letter also to be uploaded.
NoneNoneNoneNone3.2 (e) The Tenderer or his identified subcontractor should possess valid license for executing water supply/sanitary engineering works and should have executed similar water supply/sanitary engineering works totaling Rs.3.26 Lakhs in any one yearPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Workdone certificate issued not below the rank of an Executive Engineer. In case of Sub Contractor licence & Consent letter also to be uploaded.
NoneNoneNoneNoneBe a Class-II & above Civil registered contractor of State PWDs / Central/MES/ Govt. UndertakingsCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Valid Registration Certificate issued by respective Depts
NoneNoneNoneNoneBe Registered with KSPH & IDCLCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Valid Registration Certificate issued by KSPHCL
NoneNoneNoneNoneIncome Tax returns & PANCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Income Tax returns and PAN certificates
NoneNoneNoneNoneBe Registered with GSTCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Valid Registration Certificate issued by Competent Authority
NoneNoneNoneNoneBe Registered with EPF AuthoritiesCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- EPF Registration Certificate
NoneNoneNoneNoneITT 3.2 - To qualify for award of this contract, each Tenderer / company in his / its name should have in the last five years i.e. 2019-20 to 2023-24 (c) Executed in any one year the minimum quantities of work executed (Please refer Tender Document)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Certificate issued from not below the rank of an Executive Engineer or equivalent.
NoneNoneNoneNoneITT 3.3 (c)- Each Tenderer should further demonstrate Liquid assets and /or availability of credit facilities of no less than Rs.71.50 Lakhs (Credit lines/ letter of credit/ certificates from Nationalized / Scheduled banks for meeting the fund requirement etc (Unconditional)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Letter of Credit Certificates from Nationalized / Scheduled banks for meeting the fund requirement
NoneNoneNoneNoneITT 3.2 - To qualify for award of this contract, each Tenderer in his/her/their name should have in the last five years i.e. 2019-20 to 2023-24: (a) Achieved in at least two financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Rs.522.60 Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Attach Certificate from Registered Chartered Accountant with UDIN Number
NoneNoneNoneNone1.8 of Section-3 Qualification Information: Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are Proposed to be deployed on this contract, if awarded.OthersOthers
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Organization Chart & Company Profile
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
KSPH & IDCL Registration CertificateTrueTechnical Bid
Class-II & above Civil registered contractor of State PWDs / Central/MES/Govt. UndertakingsTrueTechnical Bid
Income Tax returns & PANTrueTechnical Bid
EPF Registration CertificateTrueTechnical Bid
Work Done Certificate - ITT 3.2 b Similar nature Work done certificateTrueTechnical Bid
Liquid assets and availability of credit facilitiesTrueTechnical Bid
Turnover Certificate - ITT 3.2 aTrueTechnical Bid
1.3.of Section-3 Qualification InformationTrueTechnical Bid
1.4.of Section-3 Qualification InformationTrueTechnical Bid
1.7.of Section-3 Qualification InformationTrueTechnical Bid
GST Registration CertificateTrueTechnical Bid
Executed minimum quantities of work - ITT 3.2 cTrueTechnical Bid
Work Done Certificate - ITT 3.2 d Electrical Work done certificateTrueTechnical Bid
Work Done Certificate - ITT 3.2 e Water supply /sanitary Work done certificateTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1722490564000
version0
createdDateNone
modifiedDateNone
blockNumberNo. 59, Richmond Road (Gen. K.S.Thimmaiah Road)
streetNone
cityBengaluru
stateKarnataka
pin560025
tenderRecallDTONone