createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1722678044516
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd2260000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose20-08-2024 16:30:00
tenderQueryClose13-08-2024 11:00:00
technicalBidOpen21-08-2024 17:00:00
publishedDate03-08-2024 19:32:36
publishedByPostKUIDFC_EE_SCP_HOD
publishedByUserKPE12295 - RAMYA S R
bidValidityPeriod90
noOfCalls1
preBidMeetingDate13-08-2024 11:30:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonRamya S R
splitEmdRequiredYnTrue
emdBankGuarantee2160000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08025196124
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1722678044541
version4
createdDateNone
modifiedDateNone
tenderNumberKUIDFC/2024-25/WS/WORK_INDENT24
titleConstruction of Faecal Sludge Treatment Plants (FSTP) in 8 ULBs ( in varying FSTP capacities of 3 KLD / 6 KLD / 9 KLD / 12 KLD), with 5 years of Operation and Maintenance (including 1 year Defect liability period) of constructed facilities through tenders on Design, Built, Operate and Transfer (DBOT) model - Package 5 - CALL-3
descriptionConstruction of Faecal Sludge Treatment Plants (FSTP) in 8 ULBs ( in varying FSTP capacities of 3 KLD / 6 KLD / 9 KLD / 12 KLD), with 5 years of Operation and Maintenance (including 1 year Defect liability period) of constructed facilities through tenders on Design, Built, Operate and Transfer (DBOT) model - Package 5
categoryWORKS
categoryTextWorks
ecv264600000.00
deptNameKarnataka Urban Infrastructure Development and Finance Corporation Limited
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location6061
locationNameKUIDFC Managing Director Office Bengaluru
provisionalAmount264600000.0
groupOverheadTotal38890139.0
fileNumberKUIDFC/UWM/08/PKG-5/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17226780450000NoneNoneWater supply/sewage linesConstruction of Faecal Sludge Treatment Plants (FSTP) in 8 ULBs ( in varying FSTP capacities of 3 KLD / 6 KLD / 9 KLD / 12 KLD), with 5 years of Operation and Maintenance (including 1 year Defect liability period) of constructed facilities through tenders on Design, Built, Operate and Transfer (DBOT) model - Package 5 - CALL-3225709861.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3681437134889Nonecode01Design, construction and successful commissioning of 3KLD Faecal Sludge Treatment Plants in ULBs with components including Screening Chamber, Planted Drying Bed, Integrated Settler and Anaerobic Filter, Collection tank, soak pit, drain for PDB outlet, electrical OR solar pumps, activated carbon filters and pressure sand filter and electrical works as per specification -indicative- and drawings-indicative- as per RFP document, CPHEEO manual and relevant IS codes and as per the directions of the Engineer-in-charge of work, with trial run of the FSTP plant for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No5913874.05913874.01.0FalseNoneNoneFalseNoneFalse5913874.00
3681438134889Nonecode02For 3 KLD FSTP - Design and Construction of Site Development works, including Operator room with bath and toilet, sludge storage house, internal roads-3.75m wide- length as per site condition requirements and footpath-2m wide- length as per site condition requirements, LED or solar street lighting, Chainlink fencing, Entry Gate with Cow catcher, Electrical works, landscaping work, parking area development and other appurtenant work items like stain less steel screens, CI covers and FRP baffles for PDB etc in each of the FSTP premises, as per specification-indicative- and drawings-indicative- as per RFP document and as per the direction of the Engineer-in-charge of work with trial run of the facilities created for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No9533659.09533659.01.0FalseNoneNoneFalseNoneFalse9533659.00
3681439134889Nonecode03For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 1st Year-DLP period- excluding power charges, but including manpower cost onlyNo1317597.01317597.01.0FalseNoneNoneFalseNoneFalse1317597.00
3681440134889Nonecode04For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 2nd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1651681.01651681.01.0FalseNoneNoneFalseNoneFalse1651681.00
3681441134889Nonecode05For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 3rd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1816849.01816849.01.0FalseNoneNoneFalseNoneFalse1816849.00
3681442134889Nonecode06For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 4th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1998534.01998534.01.0FalseNoneNoneFalseNoneFalse1998534.00
3681443134889Nonecode07For 3 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 5th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No2198387.02198387.01.0FalseNoneNoneFalseNoneFalse2198387.00
3681444134889Nonecode08Design, construction and successful commissioning of 6KLD Faecal Sludge Treatment Plants in ULBs with components including Screening Chamber, Planted Drying Bed, Integrated Settler and Anaerobic Filter, Collection tank, soak pit, drain for PDB outlet, electrical OR solar pumps, activated carbon filters and pressure sand filter and electrical works as per specification -indicative- and drawings-indicative- as per RFP document, CPHEEO manual and relevant IS codes and as per the directions of the Engineer-in-charge of work, with trial run of the FSTP plant for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No8701441.08701441.05.0FalseNoneNoneFalseNoneFalse43507205.00
3681445134889Nonecode09For 6 KLD FSTP - Design and Construction of Site Development works, including Operator room with bath and toilet, sludge storage house, internal roads-3.75m wide- length as per site condition requirements and footpath-2m wide- length as per site condition requirements, LED or solar street lighting, Chainlink fencing, Entry Gate with Cow catcher, Electrical works, landscaping work, parking area development and other appurtenant work items like stain less steel screens, CI covers and FRP baffles for PDB etc in each of the FSTP premises, as per specification-indicative- and drawings-indicative- as per RFP document and as per the direction of the Engineer-in-charge of work with trial run of the facilities created for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No9407341.09407341.05.0FalseNoneNoneFalseNoneFalse47036705.00
3681446134889Nonecode10For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 1st Year-DLP period- excluding power charges, but including manpower cost onlyNo1317597.01317597.05.0FalseNoneNoneFalseNoneFalse6587985.00
3681447134889Nonecode11For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 2nd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1731092.01731092.05.0FalseNoneNoneFalseNoneFalse8655460.00
3681448134889Nonecode12For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 3rd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1904202.01904202.05.0FalseNoneNoneFalseNoneFalse9521010.00
3681449134889Nonecode13For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 4th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No2094622.02094622.05.0FalseNoneNoneFalseNoneFalse10473110.00
3681450134889Nonecode14For 6 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 5th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No2304084.02304084.05.0FalseNoneNoneFalseNoneFalse11520420.00
3681451134889Nonecode15Design, construction and successful commissioning of 9KLD Faecal Sludge Treatment Plants in ULBs with components including Screening Chamber, Planted Drying Bed, Integrated Settler and Anaerobic Filter, Collection tank, soak pit, drain for PDB outlet, electrical OR solar pumps, activated carbon filters and pressure sand filter and electrical works as per specification -indicative- and drawings-indicative- as per RFP document, CPHEEO manual and relevant IS codes and as per the directions of the Engineer-in-charge of work, with trial run of the FSTP plant for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No10028563.010028563.01.0FalseNoneNoneFalseNoneFalse10028563.00
3681452134889Nonecode16For 9 KLD FSTP - Design and Construction of Site Development works, including Operator room with bath and toilet, sludge storage house, internal roads-3.75m wide- length as per site condition requirements and footpath-2m wide- length as per site condition requirements, LED or solar street lighting, Chainlink fencing, Entry Gate with Cow catcher, Electrical works, landscaping work, parking area development and other appurtenant work items like stain less steel screens, CI covers and FRP baffles for PDB etc in each of the FSTP premises, as per specification-indicative- and drawings-indicative- as per RFP document and as per the direction of the Engineer-in-charge of work with trial run of the facilities created for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No10649232.010649232.01.0FalseNoneNoneFalseNoneFalse10649232.00
3681453134889Nonecode17For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 1st Year-DLP period- excluding power charges, but including manpower cost onlyNo1317597.01317597.01.0FalseNoneNoneFalseNoneFalse1317597.00
3681454134889Nonecode18For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 2nd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1748500.01748500.01.0FalseNoneNoneFalseNoneFalse1748500.00
3681455134889Nonecode19For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 3rd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1923350.01923350.01.0FalseNoneNoneFalseNoneFalse1923350.00
3681456134889Nonecode20For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 4th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No2115685.02115685.01.0FalseNoneNoneFalseNoneFalse2115685.00
3681457134889Nonecode21For 9 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 5th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No2327254.02327254.01.0FalseNoneNoneFalseNoneFalse2327254.00
3681458134889Nonecode22Design, construction and successful commissioning of 12KLD Faecal Sludge Treatment Plants in ULBs with components including Screening Chamber, Planted Drying Bed, Integrated Settler and Anaerobic Filter, Collection tank, soak pit, drain for PDB outlet, electrical OR solar pumps, activated carbon filters and pressure sand filter and electrical works as per specification -indicative- and drawings-indicative- as per RFP document, CPHEEO manual and relevant IS codes and as per the directions of the Engineer-in-charge of work, with trial run of the FSTP plant for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No12153792.012153792.01.0FalseNoneNoneFalseNoneFalse12153792.00
3681459134889Nonecode23For 12 KLD FSTP - Design and Construction of Site Development works, including Operator room with bath and toilet, sludge storage house, internal roads-3.75m wide- length as per site condition requirements and footpath-2m wide- length as per site condition requirements, LED or solar street lighting, Chainlink fencing, Entry Gate with Cow catcher, Electrical works, landscaping work, parking area development and other appurtenant work items like stain less steel screens, CI covers and FRP baffles for PDB etc in each of the FSTP premises, as per specification-indicative- and drawings-indicative- as per RFP document and as per the direction of the Engineer-in-charge of work with trial run of the facilities created for 3 months and Defects Liability Period of 1 year from the date of successful completion of trial run.No12051210.012051210.01.0FalseNoneNoneFalseNoneFalse12051210.00
3681460134889Nonecode24For 12 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 1st Year-DLP period- excluding power charges, but including manpower cost onlyNo1317597.01317597.01.0FalseNoneNoneFalseNoneFalse1317597.00
3681461134889Nonecode25For 12 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 2nd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1798019.01798019.01.0FalseNoneNoneFalseNoneFalse1798019.00
3681462134889Nonecode26For 12 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 3rd year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No1977820.01977820.01.0FalseNoneNoneFalseNoneFalse1977820.00
3681463134889Nonecode27For 12 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 4th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No2175603.02175603.01.0FalseNoneNoneFalseNoneFalse2175603.00
3681464134889Nonecode28For 12 KLD FSTP - Operation and Maintenance of Faecal Sludge Treatment Plants and all other supporting facilities, Infrastructure works under the package built up under this contract for 5th year - excluding power charges, but including manpower cost, all repair cost, establishment cost, consumables and sludge disposal cost .No2393163.02393163.01.0FalseNoneNoneFalseNoneFalse2393163.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17226780460000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17226780460000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17226780460002NoneNoneELIGIBILITYConditional tenders wTenderers are required to read the Bid Documents and Enclosure -1 carefully before submission of their bidill not be acceptedNone
17226780460000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17226780460000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17226781740000NoneNoneELIGIBILITYShould comply all the conditions as per the tender documentNone
17226781980000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason or what so everNone
17226782120000NoneNoneELIGIBILITYBidder should quote inclusive of GSTNone
17226783090001NoneNoneELIGIBILITYTenderers are required to read the Bid Documents and drawings carefully before submission of their bidNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSatisfactorily completed (at least 90% of the contract value), as prime contractor, at least one similar work such as Faecal Sludge Treatment Plant (FSTP) /Sewage Treatment plant(STP)/ UGD project / water supply project/ Building Works/Road Works/any Civil Works of value not less than Rs 11.30 CrorePast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneExecuted in any one year of the last five years (2019-20 to 2023-24) the following minimum quantities of work. (1) Earthwork excavation in all kinds of soil by mechanical OR manual means -10250 Cum, (2) Cement concrete (Including RCC and PCC) - 2982 Cum (3)TMT Steel 204 MTCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneavailability by owning at least 50% of the required/specified key and critical equipment for this work and (b) the remaining 50% can be deployed on lease /hire basis for all works provided, the relevant documents ( commitment agreements etc.) for availability for this work are furnishedCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant Document
NoneNoneNoneNoneLiquid assets and/or availability of credit facilities of not less than Rs.7.45 Crore (credit lines/letter of credit/Certificates from banks) for meeting the fund requirement etc., (equivalent of the estimated cash flow for 3 months in the peak construction period) in the form of unconditional credit lines/ letter of credit/ certificate from any Nationalized Banks/ Scheduled Banks as per the formatCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant Document
NoneNoneNoneNoneTenderers who meet the specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant Document
NoneNoneNoneNoneContractor Registration CertificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant Document
NoneNoneNoneNoneGST CertificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant Documents
NoneNoneNoneNoneAffidavit of CorrectnessCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant Document
NoneNoneNoneNoneAchieved in at least two financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Rs 45.20 Crore. (i)Audited profit and loss account statement/ balance sheets certified by the chartered accountant, (ii) Turnover certificate with UDIN and (iii) IT returns filed for the above indicated 5 years is to be uploaded along with the technical bidFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Company Registration CertificateTrueTechnical Bid
GST CertificateTrueTechnical Bid
PAN CardTrueTechnical Bid
Quantity wise work done certificatesTrueTechnical Bid
Line of creditTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
Water supply/sewage linesDakshina KannadaNoneNoneNoneSulya, Kadaba, Kotekaaru, Mulki, Kinnigola, Bajape, Someswara, MoodabidriNoneNoneNoneNoneNoneNone
tenderAddress
createdTs1722688397000
version0
createdDateNone
modifiedDateNone
blockNumberKUIDFC Bengaluru
streetNone
cityBengaluru
stateKarnataka
pin560038
tenderRecallDTONone