1722498881000 | 0 | None | None | ELIGIBILITY | Tenders from Joint ventures are not acceptable. | None |
1722498881000 | 0 | None | None | ELIGIBILITY | Bidders shall not be under a declaration of ineligibility for
corrupt and fraudulent practices issued by Government of Karnataka
| None |
1722498881000 | 0 | None | None | ELIGIBILITY | Bidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document. | None |
1722498881000 | 0 | None | None | ELIGIBILITY | It shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission. | None |
1722498881000 | 0 | None | None | ELIGIBILITY | EMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection. | None |
1722498962000 | 0 | None | None | ELIGIBILITY | The bid shall be technically evaluated based on the specifications indicated in Section-5 titled Contract Data and Scope of work in bid document. | None |
1722498968000 | 0 | None | None | ELIGIBILITY | The intending bidders are advised to visit the site of work before submission of the tenders. | None |
1722498973000 | 0 | None | None | ELIGIBILITY | The Bidder shall not be under Corporate Debt Restructuring (CDR) / Strategic Debt Restructuring (SDR) or Bureau of Industrial and Financial Reconstruction (BIFR) in the last 5 Years prior to bid submission date. In this regard, the Bidder shall submit along with Bid, a certificate from their Statutory Auditor with a declaration that, the Bidder is not under CDR / SDR or BIFR. | None |
1722498978000 | 0 | None | None | ELIGIBILITY | During technical evaluation, if the employer finds that any certificates / information furnished is false, such bidders will be disqualified and barred from participation in the bid. | None |
1722498985000 | 0 | None | None | ELIGIBILITY | The necessary certificates / documents in support of eligibility criteria fulfilled as stipulated shall be scanned and attached to e-tender document. The Original certificates/documents shall be produced on or before stipulated date and time for verification. Scanned signature of the bidder/authorized representative of the bidder shall be attached while uploading bid document. | None |
1722498989000 | 0 | None | None | ELIGIBILITY | The Technical bid will be opened first and there after the financial bids of those qualified in technical bid will be assessed on payment of tender processing fee. The financial bid will be opened subjected to the conditions that Electronic EMD payment is confirmed in the E-tender portal | None |
1722498994000 | 0 | None | None | ELIGIBILITY | If any bidder fails to satisfy the conditions mentioned above, such bids will be rejected and their financial bids will not be opened. | None |
1722499000000 | 0 | None | None | ELIGIBILITY | For laying M.S. pipeline, the contractor shall engage only those agencies who have done similar job. | None |
1722499005000 | 0 | None | None | ELIGIBILITY | The bidder should enclose the detailed methodology of execution of the scheme as per the scope of work. | None |
1722499010000 | 0 | None | None | ELIGIBILITY | The Bidder shall be responsible for successful performance of the contract | None |
1722499015000 | 0 | None | None | ELIGIBILITY | The Bidder to participate in the tender under single bid basis only. Any violation will attract disqualification of the bid. | None |
1722499019000 | 0 | None | None | ELIGIBILITY | The contractor/authorized signatory should attach his/her scanned signature to the Schedule-B before uploading and submitting their tenders. | None |
1722499023000 | 0 | None | None | ELIGIBILITY | If any of the dates mentioned above happen to be a general holiday, the next working day holds good. | None |
1722499031000 | 0 | None | None | ELIGIBILITY | The diameters of the pressure distribution network and thickness of the pressure distribution network shall not be less than the figures indicated in the enclosed schematic diagram. Further any discrepancies in the above shall not account to financial implications to the employer. | None |
1722499036000 | 0 | None | None | ELIGIBILITY | Conditional tenders are liable to be rejected. The officer competent to accept the tender shall have the right to reject any or all the tenders without assigning any reason whatsoever. | None |
1722499040000 | 0 | None | None | ELIGIBILITY | Corrigendum will be published in the web site/ newspapers of all modifications /corrections if any. | None |
1722499045000 | 0 | None | None | ELIGIBILITY | The intending bidders should note that, if any of lands either in part/ parts or in whole required for the work is not acquired by the Nigam, it shall be the responsibility of the bidder to take the possession of such land and start the work by obtaining consent of the land owners before commencement of work at no extra cost to the Nigam and no claim / delays whatsoever relating to on account of non-availability of land would be entertained. | None |
1722499084000 | 0 | None | None | ELIGIBILITY | If the percentage quoted by the contractor for the work is below ninety percent of the updated recast estimated amount put to tender, then the contractor shall furnish an additional performance security in the form of Bank Guarantee for an amount equivalent to the difference between the cost as per quoted percentage and 90% of the updated cost put to tender. In case of contractor quoting above 125% of updated cost put to tender, then the over and above 125percentage of the updated cost put to tender will be withheld during the progress of work. The additional performance will be released proportionately to the bill amount till the contractor achieves progress of the entire cost of the work as per agreement. The withheld amount in the later case will be released only after entire work contracted is fully completed and so certified by the Executive Engineer. (If BG submitted while issuing fresh BG or extending any existing BG, claim period of a minimum one year from the date of expiry of validity period of BG is to be specified invariably) | None |
1722499125000 | 0 | None | None | ELIGIBILITY | They should abide by the directions of Government towards recovery of 1% (or as modified by the Government from time to time) Cess from the contractors bill under the provisions of building and other constructions worker welfare cess Act 1996. | None |
1722499132000 | 0 | None | None | ELIGIBILITY | The intending bidders are advised to visit the site of work, make themselves familiar with local situation about the availability of construction materials, work men, land required for construction activities, etc and shall upload along with bid with details of references for visit of different parts of the scheme in the form of photographs of site. | None |
1722499136000 | 0 | None | None | ELIGIBILITY | The contractor is responsible for any damages due to natural calamity the government or Nigam will not give any compensation for until the completion of maintenance period. | None |
1722499140000 | 0 | None | None | ELIGIBILITY | The work proposed as per the scope of work is providing pipe distribution network off taking from the delivery chamber of Alawandi-Betageri lift irrigation scheme situated near Betageri village, Koppal Taluk & Koppal District. If any additions/alteration involved for during execution, it is the responsibility of the agency to deliver the goods as per contemplated scope of the work without causing any damages to existing infrastructure. If any damages occur during execution, the same shall be restored to the original condition at no extra cost. | None |
1722499144000 | 0 | None | None | ELIGIBILITY | The intending bidder/firm/company are advised to visit the work site before submission of the tenders. | None |
1722499149000 | 0 | None | None | ELIGIBILITY | The contractor should mention their recent correct portal address & mail address in declaration forms. | None |
1722499153000 | 0 | None | None | ELIGIBILITY | The tender processing charges paid by the bidder/firm/company are not refundable even if the tender is cancelled. | None |
1722499159000 | 0 | None | None | ELIGIBILITY | All materials like steel, cement, MS pipe etc., required for successful completion of the above work should be procured by the contractor only. No supply of any materials shall be made by KNNL. | None |
1722499164000 | 0 | None | None | ELIGIBILITY | The intending bidder should note that if they happen to be lowest bidder and awarded with the work, during the current financial year i.e., 2024-25, they should start only the Jack well work. Only after 50% completion of the Jack well work, the remaining works should be started by the agency. | None |
1722499169000 | 0 | None | None | ELIGIBILITY | The bidder/firm/company shall send the authorization letter for their representation duly attending their signature. | None |
1722499174000 | 0 | None | None | ELIGIBILITY | Maintenance period/Defect liability period for this work is 24 months from the date of completion of work. | None |
1722499178000 | 0 | None | None | ELIGIBILITY | The bidder/firm/company shall adhere to accepted execution plan submitted by him under any circumstances without linking to the pending payment of the work & also land acquisition problems if any. | None |
1722499183000 | 1 | None | None | ELIGIBILITY | The amount put to tender is inclusive of GST. GST will be paid to the tendered amount separately as per prevailing rates. The contractor shall quote the rates including GST. | None |
1722499187000 | 0 | None | None | ELIGIBILITY | Other terms and conditions as per Bid document & Tender Notification. | None |
1722499192000 | 0 | None | None | ELIGIBILITY | Incomplete tender documents will be rejected. | None |
1722499197000 | 0 | None | None | ELIGIBILITY | Tenders will be opened on the due date in presence of the contractor or their Authorized representatives. | None |
1722499201000 | 0 | None | None | ELIGIBILITY | The contractor should furnish the name of the individual /firm with address and Telephone numbers with place of registration, year of incorporation etc. | None |
1722499205000 | 0 | None | None | ELIGIBILITY | Royalty on construction materials and other taxes will be deducted as per prevailing Government orders. | None |
1722499214000 | 0 | None | None | ELIGIBILITY | The tenderer has to make his own arrangement for procurement of all materials required for the work. There is no departmental supply of materials. Contractor should procure only ISI mark materials and submit necessary quality control certificates from the authorized quality control authority, before execution. | None |
1722499221000 | 0 | None | None | ELIGIBILITY | Sub leasing of work in any form is prohibited | None |
1722499225000 | 0 | None | None | ELIGIBILITY | No quarries are approved by KNNL for materials. The quarries considered are for the estimate purpose only. The intending bidders shall visit the site, identify the quarries, ascertain availability for the quantity and quality of the materials required for the work and shall quote his rates accordingly. No extra claim whatsoever will be entertained in this regard. | None |
1722499230000 | 0 | None | None | ELIGIBILITY | On account of restrictions on sand mining and scarcity of availability of sand, as an alternative the use of manufactured sand (M-sand) may be allowed during the execution of work at no cost/implication with the written approval from the competent authority. | None |
1722499242000 | 0 | None | None | ELIGIBILITY | The rates include all leads and lifts and work shall be carried out as per the instruction of Engineer-in-charge.All specifications are as per relevant IS codes in vogue and Indian Road Congress. The rates for the specification in the Schedule B include all lead and lifts irrespective of the distance and height, no extra claim will be entertained for additional lead and lifts. | None |
1722499247000 | 0 | None | None | ELIGIBILITY | If Nigam wishes to engage third party inspecting agency for the said work, apart from the Quality control authorities and field tests of Nigam, the contractor should co-operate with the third party and quality control authorities. | None |
1722499251000 | 0 | None | None | ELIGIBILITY | The validity period of EMD shall be for a minimum period of 180 days from the date of opening of the tenders. | None |
1722499255000 | 0 | None | None | ELIGIBILITY | The contractor should have capacity of deploying centralized batching plant along with the transit mixture during execution of concrete works for structures. | None |
1722499259000 | 0 | None | None | ELIGIBILITY | EMD of the unsuccessful bidders will be refunded only after the acceptance of tenders by the competent authority (clause 21 of the Formal Tender Notice). | None |
1722499267000 | 0 | None | None | ELIGIBILITY | EMD amount and Amount put to tender will be as mentioned in the e-portal. | None |
1722499273000 | 0 | None | None | ELIGIBILITY | The Earnest Money Deposit. (E-cash). The Earnest Money Deposit of Lowest bidder will be transferred to CAO, KNNL, Account Dharwad and will be converted into security deposit and same will be refunded after maintenance period of the work. | None |
1722499281000 | 0 | None | None | ELIGIBILITY | Land Acquisition if any of the lands (either in part/parts or in whole) required for the work is not at acquired by the department it shall be the responsibility of the contractor to take possession of such land and start the work by the consent of the owners before commencement of work at no extra cost to the department and no claims whatsoever elating to non- availability of land would be entertained | None |
1722499286000 | 0 | None | None | ELIGIBILITY | The contractor shall make his own land arrangements for depositing the excavated stuff. | None |
1722499290000 | 0 | None | None | ELIGIBILITY | The payment of bills of this work will be made as and when the letter of credit is received under the same head of account from KNNL/Government of Karnataka. | None |
1722499297000 | 0 | None | None | ELIGIBILITY | The contractors should adhere to the accepted action plan submitted by him under any circumstances without linking to the pending bill payment of the work. | None |
1722499301000 | 0 | None | None | ELIGIBILITY | Typographical errors if any will not be the ground for any claims by the bidder/firm/company. | None |
1722499307000 | 0 | None | None | ELIGIBILITY | Further information can be had from the office of the Executive Engineer, Office of the Executive Engineer, KNNL No-01, T R Division, Munirabad during office hours. Contact Phone. No- 08371-262174 | None |
1722501288000 | 0 | None | None | ELIGIBILITY | Bidder should be quote the price inclusive GST | None |