createdTs1722577945012
version8
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee2500.00
emd200000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose26-08-2024 17:30:00
tenderQueryClose21-08-2024 16:30:00
technicalBidOpen28-08-2024 11:00:00
publishedDate02-08-2024 16:39:01
publishedByPostUKPRR_EE_DIV3_JKD
publishedByUserKPE11247 - VISHWANATH G MIKKAL
bidValidityPeriod180
noOfCalls1
preBidMeetingDate23-08-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypePERCENTAGE
denominationTypeTextPercentage
retenderedYnNone
percentageRateTypeTextSingle Rate
contactPersonS B Shegunasi
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9164031043
tenderSupplierListNone
tenderSchedule
createdTs1722577945014
version10
createdDateNone
modifiedDateNone
tenderNumberUKPRR/2024-25/BD/WORK_INDENT28
titleConstruction of Auditorium near Girls High school and PU College, Composite PU College and Government Polytechnic in Bilagi
descriptionConstruction of Auditorium near Girls High school and PU College, Composite PU College and Government Polytechnic in Bilagi
categoryWORKS
categoryTextWorks
ecv10000000.01
deptNameUpper Krishna Rehabilitation and Resettlement
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location5950
locationNameUKPRR Executive Engineer Office Div No 3 Jamkhandi
provisionalAmount10000000.0
groupOverheadTotal277404.37
fileNumberUKPRR/SD5/11
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17225779450001NoneNoneBuildingsConstruction of Auditorium near Girls High school and PU College, Composite PU College and Government Polytechnic in Bilagi9722595.64
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3673068134306Nonecode01Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work with all lead and lift and as directed by Engineer in Charge of workCum86.1486.14659.56FalseNoneNoneFalseNoneFalse56814.49840
3673069134306Nonecode02Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical pecifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including Cost of labour,tools, usage of machinery & other appurtenances required to complete the work. with all lead and lift and as directed by Engineer in Charge of workCum76.776.773.5FalseNoneNoneFalseNoneFalse5637.450
3673070134306Nonecode03Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation,top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. with all lead and lift and as directed by Engineer in Charge of workSqm112.1112.1879.92FalseNoneNoneFalseNoneFalse98639.0320
3673071134306Nonecode04Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse with all lead and lift and as directed by Engineer in Charge of workCum6143.086143.0893.85FalseNoneNoneFalseNoneFalse576528.0580
3673072134306Nonecode05Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with uper plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of achinery, curing and all the other appurtenances required to complete the work as per technical specifications. Rates are includive of Formwork (The cost of steel reinforcement to be paid separately) for Footing M25 Design Mix Using 20 mm nominal size with all lead and lift and as directed by Engineer in Charge of workCum7619.647619.64130.26FalseNoneNoneFalseNoneFalse992534.30640
3673073134306Nonecode06Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Rates are includive of Formwork (The cost of steel reinforcement to be paid separately) for Plinth Beams M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with all lead and lift and as directed by Engineer in Charge of workCum10949.2210949.2227.39FalseNoneNoneFalseNoneFalse299899.13580
3673074134306Nonecode07Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Rates are includive of Formwork (The cost of steel reinforcement to be paid separately) for Lintel and Roof Beams M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with all lead and lift and as directed by Engineer in Charge of workCum11679.1711679.1720.48FalseNoneNoneFalseNoneFalse239189.40160
3673075134306Nonecode08Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Rates are includive of Formwork (The cost of steel reinforcement to be paid separately) for Columns M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with all lead and lift and as directed by Engineer in Charge of workCum12408.8812408.8854.1FalseNoneNoneFalseNoneFalse671320.4080
3673076134306Nonecode09Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Rates are includive of Formwork (The cost of steel reinforcement to be paid separately) for Roof slab and staircase Columns M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with all lead and lift and as directed by Engineer in Charge of workCum10949.2210949.2241.3FalseNoneNoneFalseNoneFalse452202.7860
3673077134306Nonecode10Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Rates are includive of Formwork (The cost of steel reinforcement to be paid separately) for Chajja Columns M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with all lead and lift and as directed by Engineer in Charge of workCum10584.2510584.250.2FalseNoneNoneFalseNoneFalse2116.850
3673078134306Nonecode11Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.(Without Roller Compaction) with all lead and lift and as directed by Engineer in Charge of workCum450.64450.64327.16FalseNoneNoneFalseNoneFalse147431.38240
3673079134306Nonecode12Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.Cum7894.27894.284.72FalseNoneNoneFalseNoneFalse668796.6240
3673080134306Nonecode13Providing Thermo-Mechanically Treated bars of grade Fe-550 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) with all lead and lift and as directed by Engineer in charge of the workKgs97.9497.9419676.46FalseNoneNoneFalseNoneFalse1927112.49240
3673081134306Nonecode14Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm48.3848.38109.36FalseNoneNoneFalseNoneFalse5290.83680
3673082134306Nonecode15Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm123.9123.9109.36FalseNoneNoneFalseNoneFalse13549.7040
3673083134306Nonecode16Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. with all lead and lift and as directed by Engineer in charge of the workNos1752.31752.39.0FalseNoneNoneFalseNoneFalse15770.70
3673084134306Nonecode17Providing and fixing double glazed hermetically sealed glazing in aluminium windows, ventilators and partition etc. with 6 mm thick clear float glass both side, having 12 mm air gap, including providing EPDM gasket, perforated aluminium spacers, desiccants, sealant (Both primary and secondary sealant) etc. as per specifications, drawings and direction of Engineer-in-charge complete including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.Sqm4107.584107.583.6FalseNoneNoneFalseNoneFalse14787.2880
3673085134306Nonecode18Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In ratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.Kgs127.44127.4479.2FalseNoneNoneFalseNoneFalse10093.2480
3673086134306Nonecode19Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding with all lead and lift and as directed by Engineer in charge of the workKgs154.58154.5854.0FalseNoneNoneFalseNoneFalse8347.320
3673087134306Nonecode20Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm251.34251.34864.25FalseNoneNoneFalseNoneFalse217220.5950
3673088134306Nonecode21Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm362.26362.26533.09FalseNoneNoneFalseNoneFalse193117.18340
3673089134306Nonecode22Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge.Sqm97.9497.94864.25FalseNoneNoneFalseNoneFalse84644.6450
3673090134306Nonecode23Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in chargeSqm93.2293.22864.25FalseNoneNoneFalseNoneFalse80565.3850
3673091134306Nonecode24Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargeSqm77.8877.88536.33FalseNoneNoneFalseNoneFalse41769.38040
3673092134306Nonecode25Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 1000x1000 mm with all lead and lift and as directed by Engineer in charge of the workSqm2098.042098.04768.29FalseNoneNoneFalseNoneFalse1611903.15160
3673093134306Nonecode26Providing Honne wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. with all lead and lift and as directed by Engineer in charge of the workCum106663.74106663.741.38FalseNoneNoneFalseNoneFalse147195.96120
3673094134306Nonecode27Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. with all lead and lift and as directed by Engineer in charge of the workSqm5376.085376.0842.06FalseNoneNoneFalseNoneFalse226117.92480
3673095134306Nonecode28Providing and fixing Structural Steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.Kgs120.36120.365263.59FalseNoneNoneFalseNoneFalse633525.69240
3673096134306Nonecode29Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per m2 as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 m or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. with all lead and lift and as directed by Engineer in charge of the workSqm656.08656.08427.5FalseNoneNoneFalseNoneFalse280474.20
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17225779450000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17225779450000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17225779450000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17225779450000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17225779450000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17225779450000NoneNoneELIGIBILITYA valid copy of registration certificate as Class-I & above Civil Registered Contractor of KPWD of state Government (License shall be within the validity period otherwise it will be rejected).None
17225779450000NoneNoneELIGIBILITYThe requisite Earnest Money Deposit in e-cashNone
17225779450000NoneNoneELIGIBILITYValid EPF and ESI Registration CertificateNone
17225779450000NoneNoneELIGIBILITYTechnical staff organization chartNone
17225779450000NoneNoneELIGIBILITYGST Certificate 1-The successful bidder shall furnish at the time of concluding the agreement within 15 days from issue of work order (1) Copy of Income Tax returns filed mentioning PAN and TAN for the financial year 2024-25 (Assessment year 2023-24) and (2) Copy of GST Registration Number/ Certificate, failing which the EMD amount will be forfeited and the contract will be rescinded at his risk and cost and liable for penal action including black listing. 2-The amount put to tender is inclusive of GST(rates are inclusive of 18% GST) and the tenderer should quote the rates including GST. The increase in GST shall not be paid in extended period of contract for which reasons for delay are attributable to the contractor as determined by the authority while granting the extension of time.None
17225779450000NoneNoneELIGIBILITYAs per order of Dept of Mines and Geology GoK vide letter No 2023-24 dt07-11-2023 it is mandatory for the contractor to produce Mineral Deposit Permit (MDP) before submitting the work bill for the quantities (Minerals) executed in the work. If not produced, necessary penalties will be levied as per above order.None
17225779450000NoneNoneELIGIBILITYDefect liability period will be 2 years from the completion of the work(After the issue of Completion Certificate)None
17225779450000NoneNoneELIGIBILITYThe PCC/RCC items, the rates are inclusive of formwork and exclusive of steel reinforcementNone
17225780790000NoneNoneELIGIBILITYThe defect liability period is two years after completion of work. The FSD will be released after satisfactory completion of defect liability period only.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneA valid copy of registration certificate as Class-I & above Civil Registered Contractor of KPWD of state Government (License shall be within the validity period otherwise it will be rejected).Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneValid EPF and ESI Registration CertificatePast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneValid EPF Certificate
NoneNoneNoneNoneTechnical staff organization chartPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Technical staff organization chart
NoneNoneNoneNoneThe intending bidder should have satisfactorily completed (90% of the contract value), as prime Contractor, at least one similar work of such as Road work of value not less than 50% of the amount put to tender, ie., Rs. 50.00 Lakhs during last 5 years reckoned back from 2023-24. The Certificate should be obtained from the officer not below the rank of Executive Engineer of the Concerned Division/Equivalent officer. The cost will be updated to the present value by giving weightage of 10% each year, If the work is completed prior to the year 2023-24. Note-Similar work means: Building work.Workdone Certificate to be uploaded should have following information:1)Date of Agreement Date 2)Agreement period in Months 3)Contract/ Agreement value Rs in Lakhs 4)Amount of work executed Rs in Lakhs 5)% of Fin. Progress w.r.t. Contract value 6)Date of completion of work The workdone certificate issued should have the countersignature of concerned Superintending EngineerPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneThe intending bidder should have executed a minimum quantity of following Items of work (Usually 80% of Peak annual rate of Construction in any one financial year, during the last five financial years reckoned back from 2023-24. Certificate should be obtained from an officer not below the rank of Executive Engineer of the concerned Division/Equivalent. Bidder should produce the work done certificates with yearwise breakup of quantity and it is mandatory. Earth work/Murrum 1697.00 m3 RCC/PCC 588.20 m3 TMT Steel 31.60 Masonry 135.60 m3 The workdone certificate issued should have the countersignature of concerned Superintending EngineerPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneThe bidder should have achieved a minimum financial turnover not less than Rs. 100.00 Lakhs (not less than the estimated amount ie., (Rs. 100.00 Lakhs) in at least two financial years during the last 5 years reckoned back from 2023-24 duly updating the financial turnover at 10% per annum. Audited profit and loss statement certified by a practicing Chartered Accountant along with copies of IT returns filed for the two years indicated above shall be furnished. C A CERTIFICATES SHALL BEAR THE UDI NUMBER.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneEach bidder should furnish liquid assets and or/availability of credit facilities not less than Rs.30.00 Lakhs (credit lines/letter of credit/certificate from the banks for meeting the fund requirement etc) (usually the equivalent of the estimated cash flow for 3 months in the peak construction period.)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneBID CAPACITY:The bidders who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available bid capacity is calculated as under:Assessed available Bid Capacity:(AxNx2.5-B) where A-Maximum value of Civil Engineering works executed in any one year during the last five years (Updated to 2024-25 price level) taking into account the completed as well as works in progress. N-Number of years ie.,0.50 year (06 months) prescribed for completion of works for which bids are invited.B-Value, at 2024-25 price level, of existing commitments and on-going works to be Completed during the next 0.50 year (period of completion of the works for which tenders are invited) Note-1 The statement showing the value of existing commitments and ongoing works as well as the stipulated period of completion remaining for each of the works listed should be countersigned by the employer in charge, not below the rank of Executive Engineer or equivalent. Note-2 Even though the bidders meet the above criteria, they are subject to be disqualified if they have: 1) Made misleading or false representations in the forms, statements and attachments submitted in proof of the qualification requirements, and/or 2) Record of poor performance such as abandoning the works, not properly completing the contract, inordinate delays in completion, litigation history, or financial failures etc, and/or 3) Participated in the previous tender for the same work and had quoted unreasonably high tender prices and could not furnish rational justification. 4) If the bidder/bidders have participated in more than one work, the available tender capacity will be assessed and number of works will be awarded as per his available bid capacity.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- BID CAPACITY
NoneNoneNoneNoneAs per order of Dept of Mines and Geology GoK vide letter No 2023-24 dt07-11-2023 it is mandatory for the contractor to produce Mineral Deposit Permit (MDP) before submitting the work bill for the quantities (Minerals) executed in the work. If not produced, necessary penalties will be levied as per above order.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- MDP
NoneNoneNoneNoneDefect liability period will be 2 years from the completion of the work(After the issue of Completion Certificate)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- DLP
NoneNoneNoneNoneGST Certificate 1-The successful bidder shall furnish at the time of concluding the agreement within 15 days from issue of work order (1) Copy of Income Tax returns filed mentioning PAN and TAN for the financial year 2024-25 (Assessment year 2023-24) and (2) Copy of GST Registration Number/ Certificate, failing which the EMD amount will be forfeited and the contract will be rescinded at his risk and cost and liable for penal action including black listing. 2-The amount put to tender is inclusive of GST(rates are inclusive of 18% GST) and the tenderer should quote the rates including GST. The increase in GST shall not be paid in extended period of contract for which reasons for delay are attributable to the contractor as determined by the authority while granting the extension of timeCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneGST Registration
NoneNoneNoneNoneThe requisite Earnest Money Deposit in e-cashFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- EMD
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Company Registration CertificateTrueTechnical Bid
EPF RegistrationTrueTechnical Bid
ESI RegistrationTrueTechnical Bid
Work done CertificateTrueTechnical Bid
LOCTrueTechnical Bid
Bid CapacityTrueTechnical Bid
Quantities Executed CertificateTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1722578435000
version0
createdDateNone
modifiedDateNone
blockNumberEXECUTIVE ENGINEER, UKP REH DIVN NO-3, JAMKHANDI
streetNone
cityJAMKHANDI
stateKarnataka
pin587301
tenderRecallDTONone