noticeInvitingTenderDTO
createdTs1721630391582
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd23884.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose20-08-2024 17:00:00
tenderQueryClose19-08-2024 17:30:00
technicalBidOpen21-08-2024 17:15:00
publishedDate05-08-2024 15:23:53
publishedByPostPWD_EE_DIV_TUM
publishedByUserKPE13542 - S R HARISH
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonS R Harish
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08162272479
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1721630391619
version5
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/BD/WORK_INDENT11849
titleConstruction of Pure Drinking Water Plant At Dodderi Village Bellavi GP in Tumkur Taluk
descriptionConstruction of Pure Drinking Water Plant At Dodderi Village Bellavi GP in Tumkur Taluk (ST)
categoryWORKS
categoryTextWorks
ecv955376.73
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location1670
locationNamePWD Division Office Tumkuru
provisionalAmount1000000.0
groupOverheadTotalNone
fileNumberAEE/PWD/TMK/SD/ROPLANT/Building/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17216303920000NoneNoneBuildingsConstruction of Pure Drinking Water Plant At Dodderi Village Bellavi GP in Tumkur Taluk955376.73
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3575285129965NoneBWSSB VOL-5 Page no 247 Item no 21.1.9 Water purification plants: Providing, Installation and Commissioning of automatic Water purification plant (RO+UF) with all accessories piping, product water tank on single phase power supply as per the enclosed detailed Technical Specifications including cost of material, loading and unloading and as directed by the Engineer in charge. (Ref- detailed specification enclosed seperatly). Note:- 1.The above rates mentioned are only for the preparation of estimate purpose. 2. All items are to be of BSI /NFS standards,with BSI / NFS mark . 3. Tenders to be invited for procurement. 4. No direct payment should be made under any situation or condition or on any account. 5. After commissioning of plant necessary testing to be done for the satisfactory of Engineer Incharge. Note : Refer the ANNEXURE : F for Detailed Specification of Each components ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Each520380.0520380.01.0FalseNoneNoneFalseNoneFalse520380.00
3575286129965NoneVol.1 Pg No. 8 Item No. 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum120.36120.368.32FalseNoneNoneFalseNoneFalse1001.39520
3575287129965NoneVol.1 Pg No. 15 Item No. 2.1.2Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum6683.526683.523.46FalseNoneNoneFalseNoneFalse23124.97920
3575288129965NoneVol.2 Pg No.9 Item No.5.4Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum7539.027539.028.94FalseNoneNoneFalseNoneFalse67398.83880
3575289129965Nonevol 1 item no 2.4.2 page no 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum7461.147461.145.17FalseNoneNoneFalseNoneFalse38574.09380
3575290129965Nonevol 1 item no 1.9 page no 7Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum313.88313.8819.86FalseNoneNoneFalseNoneFalse6233.65680
3575291129965Nonevol 2 item no 6.8 page no 14Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum9403.429403.4211.34FalseNoneNoneFalseNoneFalse106634.78280
3575292129965Nonevol 1 item no 2.5.1 page no 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum7823.47823.41.16FalseNoneNoneFalseNoneFalse9075.1440
3575293129965Nonevol 1 page no 18 item no 2.11aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Tonne105559.26105559.260.78FalseNoneNoneFalseNoneFalse82336.22280
3575294129965NonePage 111, vol 1Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum3730.573730.571.7FalseNoneNoneFalseNoneFalse6341.9690
3575295129965NonePage 111, vol 1Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum3730.573730.571.46FalseNoneNoneFalseNoneFalse5446.63220
3575296129965NonePage 111, vol 1Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum3520.533520.530.29FalseNoneNoneFalseNoneFalse1020.95370
3575297129965NonePage 111, vol 1Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum4694.044694.040.87FalseNoneNoneFalseNoneFalse4083.81480
3575298129965Nonevol 2 page no 41 item no 8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smoothm rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Sqm284.38284.38101.89FalseNoneNoneFalseNoneFalse28975.47820
3575299129965Nonevol 2 page no 41 item no 8.2.1 Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Sqm348.1348.168.58FalseNoneNoneFalseNoneFalse23872.6980
3575300129965Nonevol 2 page no 45 item no 8.25Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Sqm161.66161.66101.89FalseNoneNoneFalseNoneFalse16471.53740
3575301129965Nonevol 2 page no 46 item no 8.31Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives with pure Acrylic Resin, UV resistant, dirt & pick up resistant, Alkali & Water resistant of required shade: New work (Two coats applied @ 1.43 L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Sqm210.04210.0468.58FalseNoneNoneFalseNoneFalse14404.54320
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17216303930000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17216303930000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17216303930000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17216303930000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17216303930000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17228493960000NoneNoneELIGIBILITYTotal value of civil engineering works executed and payments received in the last five years (year-wise)None
17228494260000NoneNoneELIGIBILITYList of existing commitments and ongoing workNone
17228494420000NoneNoneELIGIBILITYList of works for which tenders already submittedNone
17228494610000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPPP portal due to internet connectivity issues and technical glitches at bidders end.None
17228494760000NoneNoneELIGIBILITYConditional tenders will not be accepted .None
17228494890000NoneNoneELIGIBILITY1.The tenderer should submit proposed methodology and programme of construction backed with equipment and material planning, & deployment duly supported with broad calculation and quality management , plan, proposed to be adopted justifying their capability of execution and completion of the work as per technical specifications and within the stipulated period of completion. 2. The tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs. 3. The cost of the Tender form shall not be refundable.4. 0riginal documents / Certificates for pre qualification shall be produced at the time of opening of bid. 5.Royalty on construction materials and other taxes will be deducted as per prevailing Govt orders. 6.As per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund. 7.Tenderer should follow strictly prevailing rules of labour act .8. If the successful tenderers quoted rates are below the CSR of the work for which tenders are invited, the tenderer should submit difference amount in the form of cash / Bankers cheque / D.D./ Pay order / B.G. / Small Savings instruments pledged to Executive Engineer, PWP&IWTD Division, Tumkur, at the time of agreement. If he / she failed to submit the difference amount (un balanced amount) at time of agreement, action will be taken as per the departmental procedure.None
17228495180000NoneNoneELIGIBILITY1.The employer reserves the rights to reject one or all Tenders without assigning any reasons.2. All the formats prescribes in the bid document shall be filled by the Tenderer in complete manner other wise it will be rejected. 3.The intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Bid document KW-1. 4. In case if the death of a contractor, after executing the agreement / commencement of the work, his legal heir, is an eligible registered contractor and is willing, can execute and complete the work, at the accepted tender rates, irrespective of the cost of the work. 5.The contractors assessed tender capacity will be calculated asper the clauses of Standard document attached. 6. Further particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, PWP&IWTD, Division, Tumkur during office hours on all working days.7. Department will not supply any materials.None
17228495330000NoneNoneELIGIBILITY1.Increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time. 2. MSME and NSIC Certificates are not valid as EMD payment as per GO.295/2019/ Dt. 26-03-2019.None
17228495440000NoneNoneELIGIBILITY1.The contractor should maintain the work for the period of One year after the completion of the work at his own cost. 2.All the terms in the tender include all lead lift, loading, unloading, transportation, labour, hire chares of machinery , curing for concrete works.None
17228495550000NoneNoneELIGIBILITY1.Bidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document and Domicile Certificate. 2.Contractors PWD Registred Class IV and Above can participate in this Tender. 3. The Turnover certificate should be obtained from the Chartered Accountant having UDIN number, if failed to satisfy the condition the tender will be RejectedNone
17228495670000NoneNoneELIGIBILITYThe rates and amount put to tender are inclusive of GST, Hence GST will not be paid separately over the quoted amount.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneDepartment Registration DetailsNoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing workNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker DetailsNoneNone
NoneNoneNoneNone3.1 To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 & 2023-24 a)Achieved in at least two financial years a average financial turnover (in all classes of civil engineering construction works only) of Rs.9.55 LakhsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNone3.2Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value.The available tender capacity will be calculated as under assessed available tender capacity (AxNx2.5-B)Where A Maximum value of civil engineering works executed in any one year during the last five years (updated to 2023-24 price level) taking into account the completed as well as works in progress taking into account the completed as well as ongoing works. N Number of years prescribed for completion of the works for which tenders are invited. BValue, at 2023-24 price level, of existing commitments and on-going works to be completed during the next 4 MonthsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
KPWD Registration CertificateTrueTechnical Bid
Bid Capacity as per Bid DocumentTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone