tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1722854570000 | 0 | None | None | Buildings | ESTIMATE FOR CONSTRUCTIONS OF TOILETS | 1092576.25 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3693138 | 135763 | None | PWD CSR Vol-1 Pg No- 8 No- 1.14.1 | Earth work excavation for Foundation by mechanical means for all works and depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery and other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m (PWD CSR Vol-1 Pg No- 8 No- 1.14.1) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Cum | 123.97 | 123.97 | 27.56 | False | None | None | False | None | False | 3416.6132 | 0 | 3693139 | 135763 | None | Vol-1,P. No-15 - I.No-2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite-trap-basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead and lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1-3-6 Using 40 mm nominal size graded crushed coarse aggregates ( Vol-1,P. No-15 - I.No-2.1.3) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Cum | 7279.03 | 7279.03 | 7.96 | False | None | None | False | None | False | 57941.0788 | 0 | 3693140 | 135763 | None | Vol-2,P. No-9- I.No-5.4 | Providing Size Stone masonry with hard stone in foundation and plinth with Cement mortar 1-6 (1 cement - 6 coarse sand). ( Vol-2,P. No-9- I.No-5.4) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Cum | 7765.19 | 7765.19 | 21.63 | False | None | None | False | None | False | 167961.0597 | 0 | 3693141 | 135763 | None | Vol-2,P. No-44 - I.No-8.19.1 | Providing Flush- Ruled pointing- Pointing on stone work with cementmortar 1-3 (1 cement - 3 fine sand) after raking joints to depth nicely lining,including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge. ( Vol-2,P. No-44 - I.No-8.19.1) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 309.93 | 309.93 | 9.84 | False | None | None | False | None | False | 3049.7112 | 0 | 3693142 | 135763 | None | Vol-1,P.NO- 15-I.NO.2.2.1 | Providing and laying in position Cement Concrete for all Foundation works.The granite-trap-basalt crushed graded coarse aggregates and fine aggregatesas per relevant IS Codes machine mixed with super plasticizers laid in finishedlayers, well compacted using needle vibrators, including all lead and lifts, costof all materials, quality confirming to the requirements of relevant IS codes,labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesVol-1,P.NO- 15-I.NO.2.2.1) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Cum | 7641.22 | 7641.22 | 11.78 | False | None | None | False | None | False | 90013.5716 | 0 | 3693143 | 135763 | None | Vol-1,P.NO- 111-I.NO. ADDENDUN-1 SL.NO-2 | Centering charges Plinth Beams of Buildings,RCC Roof Slab @50% Percentage on finished rate of concrete per m3 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Cum | 3820.61 | 3820.61 | 11.78 | False | None | None | False | None | False | 45006.7858 | 0 | 3693144 | 135763 | None | Vol-2,P. No-13 - I.No-6.2 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1-6 (1 cement - 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery and other incidental charges complete as per the direction of engineer incharge of work. ( Vol-2,P. No-13 - I.No-6.2) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Cum | 9696.46 | 9696.46 | 22.92 | False | None | None | False | None | False | 222242.8632 | 0 | 3693145 | 135763 | None | Vol-1,P. No-18 - I.No-2.11a | Supplying, fitting and placing TMT FE 550 - 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping-welding joints, tying with binding wire - soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.. ( Vol-1,P. No-18 - I.No-2.11a) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | MT | 108726.04 | 108726.04 | 0.78 | False | None | None | False | None | False | 84806.3112 | 0 | 3693146 | 135763 | None | Vol-1,P. No-7 - I.No-1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.. ( Vol-1,P. No-7 - I.No-1.9) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Cum | 323.3 | 323.3 | 27.56 | False | None | None | False | None | False | 8910.148 | 0 | 3693147 | 135763 | None | Vol-2,P. No-41 - I.No-8.1.1 | Providing 12 mm cement plaster with cement mortar 1-4 (1 cement- 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ( Vol-2,P. No-41 - I.No-8.1.1) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 309.93 | 309.93 | 135.17 | False | None | None | False | None | False | 41893.2381 | 0 | 3693148 | 135763 | None | Vol-2,P. No-42 - I.No-8.2.1 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1-4 (1 cement- 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ( Vol-2,P. No-42 - I.No-8.2.1) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 358.54 | 358.54 | 73.23 | False | None | None | False | None | False | 26255.8842 | 0 | 3693149 | 135763 | None | PWD CSR Vol-2 Pg No-43 No- 8.10 | Providing 6 mm cement plaster with cement mortar 1-3 (1 cement - 3 fine sand) on concrete surface - ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding,including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(PWD CSR Vol-2 Pg No-43 No- 8.10) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 256.45 | 256.45 | 22.97 | False | None | None | False | None | False | 5890.6565 | 0 | 3693150 | 135763 | None | Vol-2,P. No-150 - I.No-8.32 | Finishing walls with 100% Premium acrylic emulsion paint having VOC less than 50 g-L and UV resistance as per IS 15489-2004, Alkali and fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives, New work (Two coats applied @ 1.43 L- 10 m². Over and including priming coat of exterior primer applied @ 0.90 L-10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ( Vol-2,P. No-150 - I.No-8.32) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 189.6 | 189.6 | 208.41 | False | None | None | False | None | False | 39514.536 | 0 | 3693151 | 135763 | None | PWD CSR Vol-2 Pg No-50 No- 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (PWD CSR Vol-2 Pg No-50 No- 8.51) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 121.54 | 121.54 | 22.97 | False | None | None | False | None | False | 2791.7738 | 0 | 3693152 | 135763 | None | Vol-2,P. No-60- I.No-9.9 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS - 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1-4 (1 Cement - 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg-m2 including pointing the joints with white cement and matching pigment etc., complete.. ( Vol-2,P. No-60- I.No-9.9) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 1307.77 | 1307.77 | 22.48 | False | None | None | False | None | False | 29398.6696 | 0 | 3693153 | 135763 | None | Vol-2,P. No-65- I.No-9.38 | Providing skirting, dadooing, rises of steps with white glazed tiles 6mm thick on 10mm thick cement plaster 1-3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. ( Vol-2,P. No-65- I.No-9.38) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 1691.84 | 1691.84 | 6.75 | False | None | None | False | None | False | 11419.92 | 0 | 3693154 | 135763 | None | Vol-2,P. No-70- I.No-10.8 | Providing and fixing granite stone slab with table rubbed, edges rounded and polished, of size 75x50 cm deep and 1.8 cm thick, fixed in urinal partitions by cutting a chase of appropriate width with chase cutter and embedding the stone in the chase with epoxy grout or with cement concrete 1-2-4(1 cement - 2 coarse sand - 4 graded stone aggregate 6 mm nominal size)as per direction of Engineer-in- charge and finished smooth. ( Vol-2,P. No-70- I.No-10.8) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 3389.75 | 3389.75 | 1.8 | False | None | None | False | None | False | 6101.55 | 0 | 3693155 | 135763 | None | PWD CSR Vol-2 Pg No-77 No-11.5.1 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-inCharge.(PWD CSR Vol-2 Pg No-77 No-11.5.1) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Mtr | 5442.56 | 5442.56 | 4.0 | False | None | None | False | None | False | 21770.24 | 0 | 3693156 | 135763 | None | PWD CSR Vol-2 Pg No-108 No-12.83.1) | Providing and fixing factory made uPVC door frame made of uPVC extruded sections having an overall dimension as below (tolerance + or - 1mm), with wall thickness 2.0 mm ( 0.2 mm), corners of the door frame to be Jointed with galvanized brackets and stainless steel screws, joints mitred and Plastic welded. The hinge side vertical of the frames reinforced by galvanized M.S. tube of size 19 X 19 mm and 1mm (+ or - 0.1 mm) wall thickness and 3 nos. stainless steel hinges fixed to the frame complete as per manufacturer’s specification and direction of Engineer- in-charge 48x40 mm PVC Extruded section(PWD CSR Vol-2 Pg No-108 No-12.83.1) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Mtr | 240.65 | 240.65 | 7.5 | False | None | None | False | None | False | 1804.875 | 0 | 3693157 | 135763 | None | PWD CSR Vol-2 Pg No-104 No-12.53 | Providing and fixing 30mm thick factory made rigid foam Panelled Door Shutters made from M.S. tube of 19 gauge thickness, size 19x19mm for stiles and 15x15mm for top and bottom rails, covered with heat moulded PVC C channel of 5mm thick sheet and 30 x 50mm wide to form stiles and 5mm thick and 75mm wide PVC Sheets for top rail, lock rail and bottom rail on either side and 5mm thick 20mm wide PVC sheet as gap insert for top rail and bottom rail, Panelling of 5mm thick PVC sheet fitted in the M.S. Frame, Sealed to the stiles and rails with 5x30mm PVC sheet beading on either side and joined together with solvent cement adhesive etc., Complete as per manufacturers specification and direction of Engineer-in-charge fixed to frames with 3 nos of 75 mm Aluminium hinges(PWD CSR Vol-2 Pg No-104 No-12.53) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 1930.06 | 1930.06 | 7.5 | False | None | None | False | None | False | 14475.45 | 0 | 3693158 | 135763 | None | PWD CSR Vol-2 Pg No-109 No-12.85) | Providing and fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6 PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm. Maximum possible size is 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor TandP is shall not be made).(PWD CSR Vol-2 Pg No-109 No-12.85) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 6950.87 | 6950.87 | 3.24 | False | None | None | False | None | False | 22520.8188 | 0 | 3693159 | 135763 | None | PWD CSR Vol-2 Pg No-218, I.No-22.15.3 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Aldrop 16mm dia, 200mm(PWD CSR Vol-2 Pg No-218, I.No-22.15.3) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Nos. | 364.62 | 364.62 | 7.0 | False | None | None | False | None | False | 2552.34 | 0 | 3693160 | 135763 | None | PWD CSR Vol-2 Pg No-219 I.No-22.15.5 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge.SS Tower Bolts 150x10mm(PWD CSR Vol-2 Pg No-219 I.No-22.15.5) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Nos. | 145.85 | 145.85 | 12.0 | False | None | None | False | None | False | 1750.2 | 0 | 3693161 | 135763 | None | PWD CSR Vol-2 Pg No-218 I.No-22.15.1 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge.SS Handles 200mm(PWD CSR Vol-2 Pg No-218 I.No-22.15.1) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Nos. | 546.93 | 546.93 | 7.0 | False | None | None | False | None | False | 3828.51 | 0 | 3693162 | 135763 | None | PWD CSR Vol-2 Pg No-131 I.No-14.1 | Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS - 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required- White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests(PWD CSR Vol-2 Pg No-131 I.No-14.1) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Nos. | 5936.01 | 5936.01 | 3.0 | False | None | None | False | None | False | 17808.03 | 0 | 3693163 | 135763 | None | PWD CSR Vol-2 Pg No-131 I.No-14.2.1) | Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever), conforming to IS - 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required - W.C. pan with ISI marked white solid plastic seat and lid(PWD CSR Vol-2 Pg No-131 I.No-14.2.1) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Nos. | 5880.11 | 5880.11 | 2.0 | False | None | None | False | None | False | 11760.22 | 0 | 3693164 | 135763 | None | PWD CSR Vol-2 Pg No-132 I.No-14.7.2 | Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require- White Vitreous China Washbasin size 630x450 mm with a single 15 mm C.P. brass pillar tap(PWD CSR Vol-2 Pg No-132 I.No-14.7.2) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Nos. | 3112.64 | 3112.64 | 2.0 | False | None | None | False | None | False | 6225.28 | 0 | 3693165 | 135763 | None | PWD CSR Vol-2 Pg No-135 I.No-14.24 | Providing and fixing white vitreous china squatting plate urinal with integral rim longitudinal flush pipe.(PWD CSR Vol-2 Pg No-135 I.No-14.24) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Nos. | 3445.66 | 3445.66 | 3.0 | False | None | None | False | None | False | 10336.98 | 0 | 3693166 | 135763 | None | Vol-2,P. No-122 - I.No-13.32.3 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply, including all CPVC plain and brass threaded fittings, i-c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. 25 mm nominal dia pipes ( Vol-2,P. No-122 - I.No-13.32.3) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Mtr | 579.75 | 579.75 | 40.0 | False | None | None | False | None | False | 23190.0 | 0 | 3693167 | 135763 | None | Vol-2,P. No-122 - I.No-13.32.2 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply, including all CPVC plain and brass threaded fittings, i-c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc.c.20 mm nominal dia pipes. ( Vol-2,P. No-122 - I.No-13.32.2) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Mtr | 460.64 | 460.64 | 80.0 | False | None | None | False | None | False | 36851.2 | 0 | 3693168 | 135763 | None | Vol-2,P. No-117 - I.No-13.2.2 | Providing and fixing brass bib cock of approved quality 20 mm nominal bore. ( Vol-2,P. No-117 - I.No-13.2.2) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Nos. | 370.7 | 370.7 | 5.0 | False | None | None | False | None | False | 1853.5 | 0 | 3693169 | 135763 | None | Vol-5,P. No-191 - I.No-16.8 | Constructing brick masonry chamber of internal dimension 600x450mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1-6, bed concrete 150mm thick with 1-3-6, plastering 12 mm thick with cement mortar 1-4, CC 1-2-4 coping 75mm thk for fixing CI cover and frame etc. excluding the cost of CI frame and cover. ( Vol-5,P. No-191 - I.No-16.8) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Each | 5822.98 | 5822.98 | 2.0 | False | None | None | False | None | False | 11645.96 | 0 | 3693170 | 135763 | None | Vol-5,P. No-192 - I.No-16.15.6 | Providing and constructing "WIRE CUT BRICK MACHINEHOLE CHAMBERS" using Portland-Pozzolana cement, conical in shape at top, with CC 1-3-6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15M alround the chamber.Construct Brick masonry in CM 1-4, 340 mm thick, with wirecut bricks of approved quality, plaster inside and out side with CM 1-3, 12mm thick, except for the conical surface outside where the plaster thickness shall be 20mm. Slope inside to be 1-6 in the concrete towards central drain and finished smooth. Fixing of pipes in CC 1-2-4 with graded metal of 20mm and down size. Providing and fixing SFRC Machinehole frame and cover (Heavy Duty) conforming to IS-12592 with latest amendment, in CC 1-2-4. Providing and fixing footsteps made of 12mm dia. steel bars (Fe-500) with 3mm thick plastic encapsulation (IS-10910). The footsteps shall be fixed 30cms apart and on CC block embeded to masonry wall. The whole works include watering, curing, barricading, danger lighting, pouring tar over MH frame and cover, cost of tar, shoring, strutting, de-watering, engraving Machinehole number with flow direction on the inner conical surface etc. as per the drawing etc. as per technical specifications and for the following diameters and depth etc. for 1.2mm dia. Constructing Brick Masonry Circular Machinehole 1.2 m internal dia. , 1.5M depth and SFRC cover and frame. ( Vol-5,P. No-192 - I.No-16.15.6) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Each | 46648.27 | 46648.27 | 1.0 | False | None | None | False | None | False | 46648.27 | 0 | 3693171 | 135763 | None | Vol-2,P. No-123 I.No-13.34 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS - 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. ( Vol-2,P. No-123 I.No-13.34) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Ltr | 10.94 | 10.94 | 1000.0 | False | None | None | False | None | False | 10940.0 | 0 |
| 1722854570000 | 0 | None | None | Buildings | ESTIMATE FOR BUILDING MAINTENANCE | 1117205.81 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3693172 | 135764 | None | PWD CSR Vol-2 Pg No- 193 - I.No- 19.61 | Dismantling weather proof course and removing and conveying the debris to adistance to the appropriate disposal area as per direction of Engineer-in-charge.(PWD CSR Vol-2 Pg No- 193 - I.No- 19.61) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Cum | 700.07 | 700.07 | 28.12 | False | None | None | False | None | False | 19685.9684 | 0 | 3693173 | 135764 | None | PWD CSR Vol-1 Pg No- 16- I.No-2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works - super structure works of bridges upto 3.50 m height. The granite-trap-basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead - lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(PWD CSR Vol-1 Pg No- 16- I.No-2.5.1) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Cum | 8058.1 | 8058.1 | 28.12 | False | None | None | False | None | False | 226593.772 | 0 | 3693174 | 135764 | None | PWD CSR Vol-2 Pg No- 149 -I.No- 15.1 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace-Chajjas-Sunken portion of WC-Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg-m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g-m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation,making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. (PWD CSR Vol-2 Pg No- 149 -I.No- 15.1) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 992.98 | 992.98 | 281.18 | False | None | None | False | None | False | 279206.1164 | 0 | 3693175 | 135764 | None | PWD CSR Vol-2 Pg No- 206 -I.No- 20.88 | Repairs to plaster in patches of 2.5 m2 and less in walls, ceilings 10 to 20mm thick in cement mortar 1-3 including cutting the patches in proper shape and replastering the surface of the wall including disposal of rubbish with a lead of 50m including curing cost of materials, labour, complete as per specification.. (PWD CSR Vol-2 Pg No- 206 -I.No- 20.88) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 484.94 | 484.94 | 15.5 | False | None | None | False | None | False | 7516.57 | 0 | 3693176 | 135764 | None | Vol-2,P. No-189- I.No-19.24 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge.. ( Vol-2,P. No-189- I.No-19.24) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 219.99 | 219.99 | 176.52 | False | None | None | False | None | False | 38832.6348 | 0 | 3693177 | 135764 | None | Vol-2,P. No-60 - I.No-9.12.1 | Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS- 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1-4 (1 cement - 4 coarse sand), jointing with grey cement slurry @ 3.3 kg- m2 including grouting the joints with white cement and matching pigments etc., complete..Size of Tile 500x00 mm ( Vol-2,P. No-60 - I.No-9.12.1) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 1315.06 | 1315.06 | 92.0 | False | None | None | False | None | False | 120985.52 | 0 | 3693178 | 135764 | None | Vol-2,P. No-64 - I.No-9.31 | Providing and laying Polished Sadarahalli Grey Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 20 mm thick stone slab over 20 mm (average) thick base of cement mortar 1-4 (1 cement - 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ( Vol-2,P. No-64 - I.No-9.31) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 2534.11 | 2534.11 | 80.04 | False | None | None | False | None | False | 202830.1644 | 0 | 3693179 | 135764 | None | Vol-2,P. No-50 - I.No-8.54.2 | Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g-L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. ( Vol-2,P. No-50 - I.No-8.54.2) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 133.69 | 133.69 | 497.06 | False | None | None | False | None | False | 66451.9514 | 0 | 3693180 | 135764 | None | PWD CSR Vol-2 Pg No-53 No- 8.74.1 | Finishing walls with Acrylic Smooth exterior paint of required shade -Old work (Two coat applied @ 1.67 ltr- 10 m²) on existing cement paint surface including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials,labour complete as per specifications and as per directions of Engineerin-charge (PWD CSR Vol-2 Pg No-53 No- 8.74.1) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 127.62 | 127.62 | 852.75 | False | None | None | False | None | False | 108827.955 | 0 | 3693181 | 135764 | None | PWD CSR vol-2 Pg No-207 I.No- 20.104 | Repairing and fixing shutters (panelled or glazed) to doors, windows, ventilators and cupboards. (PWD CSR vol-2 Pg No-207 I.No- 20.104) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 1185.02 | 1185.02 | 7.56 | False | None | None | False | None | False | 8958.7512 | 0 | 3693182 | 135764 | None | PWD CSR vol-2 Pg No-85 I.No- 11.29.1 | Providing - fixing fly proof wire gauze to windows, clerestory windows - doors with M.S. Flat 15x3 mm and nuts - bolts complete. Galvanised M.S. Wire gauze with 0.63 mm dia wire and 1.4 mm aperture on both sides including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (PWD CSR vol-2 Pg No-85 I.No- 11.29.1) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 834.98 | 834.98 | 41.58 | False | None | None | False | None | False | 34718.4684 | 0 | 3693183 | 135764 | None | PWD CSR vol-2 Pg No-55 I.No- 8.84 | Providing wall black boards in 12mm thick with CM 1-3 and applied with primer - two coats of acrylic emulsion black paint including finishing etc.,complete.. (PWD CSR vol-2 Pg No-55 I.No- 8.84) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 577.32 | 577.32 | 4.5 | False | None | None | False | None | False | 2597.94 | 0 |
| 1722854570000 | 0 | None | None | Buildings | ESTIMATE FOR SUMP WORK | 155932.61 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3693184 | 135765 | None | Vol-1,P. No-8 - I.No-1.14.1 | Earth work excavation for Foundation by mechanical means for all works - depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting - stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery - other appurtenaces required to complete the work, In all kinds of soils Depth upto 3 m ( Vol-1,P. No-8 - I.No-1.14.1) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Cum | 123.97 | 123.97 | 25.92 | False | None | None | False | None | False | 3213.3024 | 0 | 3693185 | 135765 | None | Vol-21,P.No-5 -I.No-4.1 | Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. - Lindane 20% E.C. @ 3.19 l-m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ( Vol-21,P.No-5 -I.No-4.1) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 143.42 | 143.42 | 5.46 | False | None | None | False | None | False | 783.0732 | 0 | 3693186 | 135765 | None | Vol-1,P. No-15 - I.No-2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite-trap-basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead - lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1-3-6 Using 40 mm nominal size graded crushed coarse aggregates ( Vol-1,P. No-15 - I.No-2.1.3) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Cum | 7279.03 | 7279.03 | 0.82 | False | None | None | False | None | False | 5968.8046 | 0 | 3693187 | 135765 | None | Vol-1,P. No-16- I.No-2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works - super structure works of bridges upto 3.50 m height. The granite-trap-basalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed withsuper plasticisers laid in layers, well compacted using needle vibrators. Thecost includes all lead - lifts, cost of all materials, quality confirming to therequirements of relevant IS codes , labour, Usage charges of machinery, curingand all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates . ( Vol-1,P. No-16- I.No-2.5.2) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Cum | 8316.98 | 8316.98 | 5.05 | False | None | None | False | None | False | 42000.749 | 0 | 3693188 | 135765 | None | Vol-1,P. No-111- I.No-ADDENDUM-1 sl.no-3 | Centering charges @5% Percentage on finished rate of concrete per m3 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Cum | 415.85 | 415.85 | 5.05 | False | None | None | False | None | False | 2100.0425 | 0 | 3693189 | 135765 | None | Vol-1,P.NO- 18-I.NO.2.11h | Supplying, fitting and placing TMT FE 550 - 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening,cutting, bending, hooking, laping-welding joints, tying with binding wire - soft annealed steel wire and other ancilary operations complete as per drawing and technical specification(Vol-1,P.NO- 18-I.NO.2.11h) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | MT | 96029.97 | 96029.97 | 0.4 | False | None | None | False | None | False | 38411.988 | 0 | 3693190 | 135765 | None | Vol-2,P.NO- 150-I.NO.15.6 | Providing and laying water proofing treatment to the Water tanks - Liquid Retaining structures with two component acrylic polymer modified cementitious waterproofing membrane with minimum elongation of 50% applied @ 1.5 kg-m2 for internal side waterproofing in two layers with waiting period of 4-6 hrs per layer and food grade epoxy coating in two coats certified by CFTRI Mysuru, including surface preparation completely as per specification.(Vol-2,P.NO- 150-I.NO.15.6) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Sqm | 616.21 | 616.21 | 21.65 | False | None | None | False | None | False | 13340.9465 | 0 | 3693191 | 135765 | None | COMMON SR Vol 5 Pg No. 221 Item No.18.3 | Providing - fixing 455x610 mm cast iron cover with frame weight to be not less 38kgs (weight of cover 23 kgs and weight of frame 15 kgs)and necessary locking arrangements with M.S flats 32x6 mm etc - painting with two or more coats with black Japan paint etc. complete as directed by the engineer-in-charge. (WATER SUPPLY AND UGD WORKS COMMON SR Volume - Vol-5 Pg No- 221 - I.No- 18.3) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Each | 2384.61 | 2384.61 | 1.0 | False | None | None | False | None | False | 2384.61 | 0 | 3693192 | 135765 | None | COMMON SR Volume - V P. No-113 I.No-10.1.6 | Providing PVC ringtite pipes conforming to IS 4985-2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead - lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For- PVC pipes 90mm dia., 6 kg-sqcm - class 3 (WATER SUPPLY AND UGD WORKS COMMON SR Volume - V P. No-113 - I.No-10.1.6) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Mtr | 357.33 | 357.33 | 120.0 | False | None | None | False | None | False | 42879.6 | 0 | 3693193 | 135765 | None | Vol-1,P. No-7 - I.No-1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.. ( Vol-1,P. No-7 - I.No-1.9) ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work. | Cum | 323.3 | 323.3 | 15.0 | False | None | None | False | None | False | 4849.5 | 0 |
|
|
---|