| 1722948936000 | 0 | None | None | Other Works | Package No.03 Construction of Compound Wall in SWM Site in Bilagi Town. | 2024416.72 | | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
|---|
| 3706419 | 136685 | None | code01 | Earth work in surface excavation for stripping, seating of bund, Road way by manual means for lowering & levelling the ground for all works other than foundation & depth in Ordinary rock and soft rock upto 300mm depth as per drawing and technical specifications, including setting out, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete work.(PWD SR 2023-24 / Volumme I / I.NO-1.2 /P.NO-5) | Cum | 603.75 | 603.75 | 16.5 | False | None | None | False | None | False | 9961.875 | 0 | | 3706420 | 136685 | None | code02 | Earth work excavation by manual means for drains,canals and similar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, re moval of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sort ing & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work (PWD SR 2023-24 / Volumme I / I.NO-1.4.1 /P.NO-5) | Cum | 254.1 | 254.1 | 118.37 | False | None | None | False | None | False | 30077.817 | 0 | | 3706421 | 136685 | None | code03 | Construction of Embankment by excavating the available approved Gravel / Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.(The laps and wastages shall not be measured separately) (PWD SR 2023-24 / Volumme I / I.NO-1.8 /P.NO-7) | Cum | 497.7 | 497.7 | 67.82 | False | None | None | False | None | False | 33754.014 | 0 | | 3706422 | 136685 | None | code04 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) (PWD SR 2023-24 / Volumme I /I.NO-2.1.2 /P.NO-15) | Cum | 5947.2 | 5947.2 | 11.76 | False | None | None | False | None | False | 69939.072 | 0 | | 3706423 | 136685 | None | code05 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) (PWD SR 2023-24 / Volumme II / I.NO-5.1.1 /P.NO-9) | Cum | 5891.55 | 5891.55 | 22.28 | False | None | None | False | None | False | 131263.734 | 0 | | 3706424 | 136685 | None | code06 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm and down size graded crushed coarse aggregates (PWD SR 2023-24 / Volumme I / I.NO-2.2.1 /P.NO-15) | Cum | 6601.35 | 6601.35 | 39.26 | False | None | None | False | None | False | 259169.001 | 0 | | 3706425 | 136685 | None | code07 | For Centering according to the Table For Finished Concrete ( P.No A-7 Volume II ) i.e = | Cum | 330.07 | 330.07 | 39.26 | False | None | None | False | None | False | 12958.5482 | 0 | | 3706426 | 136685 | None | code08 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm and down size graded crushed coarse aggregates (PWD SR 2021-22 / Volumme I / I.NO-2.5.1 /P.NO-17) | Cum | 6961.5 | 6961.5 | 6.82 | False | None | None | False | None | False | 47477.43 | 0 | | 3706427 | 136685 | None | code09 | For Centering according to the Table For Finished Concrete ( P.No A-7 Volume II ) i.e = | Cum | 4873.05 | 4873.05 | 6.82 | False | None | None | False | None | False | 33234.201 | 0 | | 3706428 | 136685 | None | code10 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.(The laps and wastages shall not be measured separately) (PWD SR 2023-24 Item no-2.11 (a) Vol-I Page No-18) | Cum | 93.93 | 93.93 | 3738.23 | False | None | None | False | None | False | 351131.9439 | 0 | | 3706429 | 136685 | None | code11 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.. (PWD SR 2023-24 / Volumme II / I.NO-6.2 /P.NO-13) | Kg | 8377.95 | 8377.95 | 15.18 | False | None | None | False | None | False | 127177.281 | 0 | | 3706430 | 136685 | None | code12 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.(PWD SR 2023-24 / Volumme II / I.NO-6.7 /P.NO-13) | Cum | 8621.55 | 8621.55 | 50.6 | False | None | None | False | None | False | 436250.43 | 0 | | 3706431 | 136685 | None | code13 | Providing and laying Cement concrete pavement with 1:2:4 for commercial & residential building floors, hardpaths, footpaths using 1 ce ment : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size, including finishing complete as per Engineer incharge (PWD SR 2023-24 / Volumme II / I.NO-9.4 /P.NO-59) | Cum | 6999.3 | 6999.3 | 4.43 | False | None | None | False | None | False | 31006.899 | 0 | | 3706432 | 136685 | None | code14 | Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge..:(PWD SR 2023-24 / Volumme II / I.NO-8.3.2 /P.NO-41) | Cum | 349.65 | 349.65 | 572.0 | False | None | None | False | None | False | 199999.8 | 0 | | 3706433 | 136685 | None | code15 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.:(PWD SR 2023-24 / Volumme II / I.NO-8.25 /P.NO-45) | Sqm | 143.85 | 143.85 | 572.0 | False | None | None | False | None | False | 82282.2 | 0 | | 3706434 | 136685 | None | code16 | Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in Charge..:(PWD SR 2023-24 / Volumme II / I.NO-11.25.2 /P.NO-84) | Kg | 136.0 | 136.0 | 588.0 | False | None | None | False | None | False | 79968.0 | 0 | | 3706435 | 136685 | None | code17 | Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in Charge..:(PWD SR 2023-24 / Volumme II / I.NO-11.25.2 /P.NO-84) | Kg | 142.8 | 142.8 | 621.6 | False | None | None | False | None | False | 88764.48 | 0 |
|