1723182853000 | 0 | None | None | Buildings | Construction of Govt Higher Primary School Room at Nukkanahalli Village in Thoradevandahalli G.P in Kolar Taluk | 1375601.9 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3733407 | 138953 | None | CSR_V2_IN 19.9.1 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineerin- charge.In cement mortar ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 934.56 | 934.56 | 5.69 | False | None | None | False | None | False | 5317.6464 | 0 | 3733408 | 138953 | None | CSR_V2_IN 19.24 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-chargw ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 213.58 | 213.58 | 23.55 | False | None | None | False | None | False | 5029.809 | 0 | 3733409 | 138953 | None | CSR_V2_IN 19.28 | Dismantling stone slab roofing over wooden karries or R.C.C. battens (dismantling karries and battens to be paid for separately), including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 2140.52 | 2140.52 | 9.11 | False | None | None | False | None | False | 19500.1372 | 0 | 3733410 | 138953 | None | CSR_V2_IN 19.12.2 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking to the appropriate disposal area as per direction of Engineerin- charge ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 309.16 | 309.16 | 7.83 | False | None | None | False | None | False | 2420.7228 | 0 | 3733411 | 138953 | None | CSR_V2_IN 19.27.1 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material to the appropriate disposal area as per direction of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 128.62 | 128.62 | 91.12 | False | None | None | False | None | False | 11719.8544 | 0 | 3733412 | 138953 | None | CSR_V1_IN 1.4.1 | Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 285.56 | 285.56 | 30.0 | False | None | None | False | None | False | 8566.8 | 0 | 3733413 | 138953 | None | CSR_V1_IN 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 120.36 | 120.36 | 30.02 | False | None | None | False | None | False | 3613.2072 | 0 | 3733414 | 138953 | None | CSR_V1_IN 1.5.2 | Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. 2 Depth exceeding 1.5m, but not exceeding 3 m ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 525.1 | 525.1 | 7.51 | False | None | None | False | None | False | 3943.501 | 0 | 3733415 | 138953 | None | CSR_V1_IN 2.1.3 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 7067.02 | 7067.02 | 12.15 | False | None | None | False | None | False | 85864.293 | 0 | 3733416 | 138953 | None | CSR_V2_IN 5.5 | Providing and constructing Laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S 3620/1979 having compressive strength not less than 3.5 N/mm2 for saturated dry samples -For Foundation in CM 1:6 ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 7521.32 | 7521.32 | 13.93 | False | None | None | False | None | False | 104771.9876 | 0 | 3733417 | 138953 | None | CSR_V2_IN 5.6 | Providing and constructing Laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S 3620/1979 having compressive strength not less than 3.5 N/mm2 for saturated dry samples -For Basement in CM 1:6 ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 7608.64 | 7608.64 | 5.37 | False | None | None | False | None | False | 40858.3968 | 0 | 3733418 | 138953 | None | CSR_V1_IN 2.2.1.1 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 7418.66 | 7418.66 | 8.27 | False | None | None | False | None | False | 61352.3182 | 0 | 3733419 | 138953 | None | CSR_V1_IN 1 | Centering charges @ 8% over finished rates for the Foundation upto Plinth a. Isolated ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 592.36 | 592.36 | 6.95 | False | None | None | False | None | False | 4116.902 | 0 | 3733420 | 138953 | None | CSR_V1_IN 1a | Centering charges @ 50% Plinth Beam of Building ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 3708.74 | 3708.74 | 1.32 | False | None | None | False | None | False | 4895.5368 | 0 | 3733421 | 138953 | None | CSR_V2_IN 8.19.1 | Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 300.9 | 300.9 | 20.4 | False | None | None | False | None | False | 6138.36 | 0 | 3733422 | 138953 | None | CSR_V1_IN 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 313.88 | 313.88 | 37.53 | False | None | None | False | None | False | 11779.9164 | 0 | 3733423 | 138953 | None | CSR_V2_IN 6.4 | Providing Brick work with common burnt clay modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 10219.98 | 10219.98 | 15.08 | False | None | None | False | None | False | 154117.2984 | 0 | 3733424 | 138953 | None | CSR_V1_IN 2.5.2 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 8074.74 | 8074.74 | 14.59 | False | None | None | False | None | False | 117810.4566 | 0 | 3733425 | 138953 | None | CSR_V1_IN 8 | Centering charges @ 70% over finished rates for the Columns ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 5652.2 | 5652.2 | 3.06 | False | None | None | False | None | False | 17295.732 | 0 | 3733426 | 138953 | None | CSR_V1_IN 12 | Centering charges @ 60% over finished rates for the Beams & Lintels of Building ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 4843.9 | 4843.9 | 4.43 | False | None | None | False | None | False | 21458.477 | 0 | 3733427 | 138953 | None | CSR_V1_IN 13 | Centering charges @ 50% Roof Slab of Buildings ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 4036.78 | 4036.78 | 7.1 | False | None | None | False | None | False | 28661.138 | 0 | 3733428 | 138953 | None | CSR_V2_IN 11.5.1 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 5284.04 | 5284.04 | 1.89 | False | None | None | False | None | False | 9986.8356 | 0 | 3733429 | 138953 | None | CSR_V2_IN 11.34a | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Kg | 198.24 | 198.24 | 120.96 | False | None | None | False | None | False | 23979.1104 | 0 | 3733430 | 138953 | None | CSR_V2_IN 12.86 | Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm X 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 6360.2 | 6360.2 | 5.76 | False | None | None | False | None | False | 36634.752 | 0 | 3733431 | 138953 | None | CSR_V2_IN 9.21.2 | Providing and laying Vitrified tiles with thickness 9-10 mm in floor with different sizes with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately). Size of Tile 600x600 mm ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 1460.84 | 1460.84 | 44.8 | False | None | None | False | None | False | 65445.632 | 0 | 3733432 | 138953 | None | CSR_V2_IN 9.11 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc complete. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 1049.02 | 1049.02 | 14.33 | False | None | None | False | None | False | 15032.4566 | 0 | 3733433 | 138953 | None | CSR_V2_IN 8.2.1 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 348.1 | 348.1 | 176.83 | False | None | None | False | None | False | 61554.523 | 0 | 3733434 | 138953 | None | CSR_V2_IN 8.4.1 | Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:3 (1 cement: 3 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 381.14 | 381.14 | 42.3 | False | None | None | False | None | False | 16122.222 | 0 | 3733435 | 138953 | None | CSR_V2_IN 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 118.0 | 118.0 | 219.13 | False | None | None | False | None | False | 25857.34 | 0 | 3733436 | 138953 | None | CSR_V2_IN 8.30 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 205.32 | 205.32 | 119.16 | False | None | None | False | None | False | 24465.9312 | 0 | 3733437 | 138953 | None | CSR_V2_IN 8.39 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 149.86 | 149.86 | 99.96 | False | None | None | False | None | False | 14980.0056 | 0 | 3733438 | 138953 | None | CSR_V2_IN 8.40 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 135.7 | 135.7 | 35.82 | False | None | None | False | None | False | 4860.774 | 0 | 3733439 | 138953 | None | CSR_V1_IN 2.11a | Supplying, fitting and placing TMT FE 550 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Kg | 105559.26 | 105559.26 | 1.74 | False | None | None | False | None | False | 183673.1124 | 0 | 3733440 | 138953 | None | CSR_V2_IN 15.1 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 964.06 | 964.06 | 46.04 | False | None | None | False | None | False | 44385.3224 | 0 | 3733441 | 138953 | None | CSR_V5_IN 1.7 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Rmtr | 464.92 | 464.92 | 5.6 | False | None | None | False | None | False | 2603.552 | 0 | 3733442 | 138953 | None | CSR_V2_IN 11.26.2 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. E.R.W. tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineerin-Charge ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Kg | 153.4 | 153.4 | 45.0 | False | None | None | False | None | False | 6903.0 | 0 | 3733443 | 138953 | None | CSR_V2_IN 7.38 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per m2 as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 m or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever requiredge ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 670.24 | 670.24 | 45.56 | False | None | None | False | None | False | 30536.1344 | 0 | 3733444 | 138953 | None | CSR_V6_IN 1.1.2 | Open Conduit System;Supplying heavy gauge PVC conduit pipe . dia . mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc , and fixing using inverted wood plugs in case of RCC ceiling and RCC wall/ stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws. 25 mm dia 2 mm thick ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Mtr | 95.58 | 95.58 | 80.0 | False | None | None | False | None | False | 7646.4 | 0 | 3733445 | 138953 | None | CSR_V6_IN 1.1.3 | Open Conduit System;Supplying heavy gauge PVC conduit pipe . dia . mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc , and fixing using inverted wood plugs in case of RCC ceiling and RCC wall/ stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws. 32 mm dia 2.5 mm thick ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Mtr | 125.08 | 125.08 | 40.0 | False | None | None | False | None | False | 5003.2 | 0 | 3733446 | 138953 | None | CSR_V6_IN 1.6.4 | Supplying and flush mounting teak wooden box without front plank, made of not less than 12 mm thick wood, after due groove cutting, finishing with necessary cement plastering complete. 8" x 6" x 3" (203 x 152 x 76 mm) ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Each | 101.48 | 101.48 | 2.0 | False | None | None | False | None | False | 202.96 | 0 | 3733447 | 138953 | None | CSR_V6_IN 1.6.5 | Supplying and flush mounting teak wooden box without front plank, made of not less than 12 mm thick wood, after due groove cutting, finishing with necessary cement plastering complete. 4" x 4" x 3" ( 101 x 101 x 76 mm) ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Each | 87.32 | 87.32 | 1.0 | False | None | None | False | None | False | 87.32 | 0 | 3733448 | 138953 | None | CSR_V6_IN 2.2.1 | Point wiring using Copper wire without switch.: Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet.Short point upto 3m from tapping point to out let via switch box ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Point | 317.42 | 317.42 | 3.0 | False | None | None | False | None | False | 952.26 | 0 | 3733449 | 138953 | None | CSR_V6_IN 2.2.2 | Point wiring using Copper wire without switch.: Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Medium point above 3m upto 6m from tapping point to out let via switch box ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Point | 447.22 | 447.22 | 3.0 | False | None | None | False | None | False | 1341.66 | 0 | 3733450 | 138953 | None | CSR_V6_IN 2.2.3 | Point wiring using Copper wire without switch.: Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Long point above 6m upto 10m from tapping point to out let via switch box ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Point | 654.94 | 654.94 | 6.0 | False | None | None | False | None | False | 3929.64 | 0 | 3733451 | 138953 | None | CSR_V6_IN 2.3.1 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.1 mm2 ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Mtr | 22.42 | 22.42 | 145.0 | False | None | None | False | None | False | 3250.9 | 0 | 3733452 | 138953 | None | CSR_V6_IN 2.3.2 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 1.5 mm2 ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Mtr | 30.68 | 30.68 | 190.0 | False | None | None | False | None | False | 5829.2 | 0 | 3733453 | 138953 | None | CSR_V6_IN 2.3.3 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 2.5 mm2 ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Mtr | 49.56 | 49.56 | 150.0 | False | None | None | False | None | False | 7434.0 | 0 | 3733454 | 138953 | None | CSR_V6_IN 2.3.4 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete. 8 Way ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Mtr | 74.34 | 74.34 | 70.0 | False | None | None | False | None | False | 5203.8 | 0 | 3733455 | 138953 | None | CSR_V6_IN 3.3.2 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete. 4-5 Way ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Each | 146.32 | 146.32 | 3.0 | False | None | None | False | None | False | 438.96 | 0 | 3733456 | 138953 | None | CSR_V6_IN 3.3.4 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete. 8 Way ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Each | 258.42 | 258.42 | 3.0 | False | None | None | False | None | False | 775.26 | 0 | 3733457 | 138953 | None | CSR_V6_IN 3.3.5 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete. 8 Way ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Each | 307.98 | 307.98 | 4.0 | False | None | None | False | None | False | 1231.92 | 0 | 3733458 | 138953 | None | CSR_V6_IN 3.5.2 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 4 Module ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Each | 206.5 | 206.5 | 8.0 | False | None | None | False | None | False | 1652.0 | 0 | 3733459 | 138953 | None | CSR_V6_IN 3.5.4 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 8 Module ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Each | 335.12 | 335.12 | 6.0 | False | None | None | False | None | False | 2010.72 | 0 | 3733460 | 138953 | None | CSR_V6_IN 3.5.5 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 10-12 Module ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Each | 405.92 | 405.92 | 7.0 | False | None | None | False | None | False | 2841.44 | 0 | 3733461 | 138953 | None | CSR_V6_IN 3.6.1 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A One Way Switch ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Each | 120.36 | 120.36 | 5.0 | False | None | None | False | None | False | 601.8 | 0 | 3733462 | 138953 | None | CSR_V6_IN 3.6.3 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Three Way socket ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Each | 201.78 | 201.78 | 2.0 | False | None | None | False | None | False | 403.56 | 0 | 3733463 | 138953 | None | CSR_V6_IN 3.6.4 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. Stepped Fan Regulator Two Module ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Each | 442.5 | 442.5 | 2.0 | False | None | None | False | None | False | 885.0 | 0 | 3733464 | 138953 | None | CSR_V6_IN 3.6.10 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 32A DP Switch ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Each | 384.68 | 384.68 | 1.0 | False | None | None | False | None | False | 384.68 | 0 | 3733465 | 138953 | None | CSR_V6_IN 3.6.11 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6/16A Universal Socket ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Each | 278.48 | 278.48 | 4.0 | False | None | None | False | None | False | 1113.92 | 0 | 3733466 | 138953 | None | CSR_V6_IN 3.8 | Supplying 4mm thick plastic sheet with necessary nitches for fixing switches, regulators etc, and fixing on existing wooden or metal box using N.F. screws. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | cm | 0.48 | 0.48 | 350.0 | False | None | None | False | None | False | 168.0 | 0 | 3733467 | 138953 | None | CSR_V6_IN 5.17.4 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 A DP ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Each | 872.02 | 872.02 | 1.0 | False | None | None | False | None | False | 872.02 | 0 | 3733468 | 138953 | None | CSR_V6_IN 5.17.8 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 40 A TPN ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Each | 3591.92 | 3591.92 | 3.0 | False | None | None | False | None | False | 10775.76 | 0 | 3733469 | 138953 | None | CSR_V6_IN 5.18.8 | Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clA, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/single door with powder coated painting Made out of 14 SWG MS enclosure. 8 Way SP & N ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Each | 1760.56 | 1760.56 | 1.0 | False | None | None | False | None | False | 1760.56 | 0 | 3733470 | 138953 | None | CSR_V6_IN 6.3.1 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. 48" Sweep (1200 mm) Regular model ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Each | 3521.12 | 3521.12 | 2.0 | False | None | None | False | None | False | 7042.24 | 0 | 3733471 | 138953 | None | CSR_V6_IN 13.11 | Fixing a ceiling /wall mounting fan of all capacities and all types, with necessary clA and 'S' hook made out of 15mm dia MS rod, with 5 A. ceiling rose of approved quality with necessary length of 23/0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Each | 371.7 | 371.7 | 2.0 | False | None | None | False | None | False | 743.4 | 0 | 3733472 | 138953 | None | CSR_V6_IN 11.3.3 | Supplying of .feet -PVC Batten with integrated LED tube . W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V@ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fitting 1 x 4'36/40 W ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Each | 1497.42 | 1497.42 | 4.0 | False | None | None | False | None | False | 5989.68 | 0 | 3733473 | 138953 | None | CSR_V6_IN 13.7.1 | Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clA. On wall/ ceiling / Rafter / Girders ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Each | 143.96 | 143.96 | 4.0 | False | None | None | False | None | False | 575.84 | 0 | 3733474 | 138953 | None | CSR_V5_SL.N 7 | Supplying & Fixing of Earthing Materials Pipe type for grounding (Single Electrode with accessories as per BESCOM Specification. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Set | 2912.24 | 2912.24 | 1.0 | False | None | None | False | None | False | 2912.24 | 0 | 3733475 | 138953 | None | CSR_V5_SL NO 7 | Supplying of GI Wire 8 SWG as per BESCOM Specification. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Kg | 91.86 | 91.86 | 35.0 | False | None | None | False | None | False | 3215.1 | 0 | 3733476 | 138953 | None | CSR_V6_IN 8.5 | Supplying & Fixing of Power strip ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Each | 1719.26 | 1719.26 | 1.0 | False | None | None | False | None | False | 1719.26 | 0 | 3733477 | 138953 | None | CSR_V6_IN 5.46.2 | Supplying and fixing of Modular MCB Devices (Tripper) With Breaking capacity of 6kA. 40 A SP ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Each | 354.0 | 354.0 | 1.0 | False | None | None | False | None | False | 354.0 | 0 |
|