createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1723032889872
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd34750.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose20-08-2024 16:00:00
tenderQueryClose19-08-2024 11:30:00
technicalBidOpenNone
publishedDate08-08-2024 16:45:57
publishedByPostRDPR_EE_DIV_KLR
publishedByUserKPE18654 - RAVEENDRA KULLAIAH
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonAnupama JE
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08152222570
mobileNumber8073308238
tenderSupplierListNone
tenderSchedule
createdTs1723032889914
version5
createdDateNone
modifiedDateNone
tenderNumberRDPR/2024-25/BD/WORK_INDENT6980
titleConstruction of Govt Higher Primary School Room at Nagadenahalli Village in Arikunte GP Srinivasapura Taluk Kolar District
descriptionConstruction of Govt Higher Primary School Room at Nagadenahalli Village in Arikunte GP Srinivasapura Taluk Kolar District
categoryWORKS
categoryTextWorks
ecv1340857.75
deptNameRural Development and Panchayat Raj Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location946
locationNameRDPR Division Office Kolar
provisionalAmount1390000.0
groupOverheadTotal0.0
fileNumberAEE/PRESD/SVPUR/01/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17230328900000NoneNoneBuildingsConstruction of Govt Higher Primary School Room at Nagadenahalli Village in Arikunte GP Srinivasapura Taluk1340857.75
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3715766137427NoneCSR_V2_IN 19.7.3Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge In cement Mortar ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Cum1214.221214.2210.28FalseNoneNoneFalseNoneFalse12482.18160
3715767137427NoneCSR_V2_IN 19.57Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials to the appropriate disposal area stacking serviceable and unserviceable material separately including cutting reinforcement bars. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Cum2771.822771.822.4FalseNoneNoneFalseNoneFalse6652.3680
3715768137427NoneCSR_V1_IN 1.4.1Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all Kinds of Soils depth upto 1.50m ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Cum285.56285.5630.0FalseNoneNoneFalseNoneFalse8566.80
3715769137427NoneCSR_V1_IN 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Cum120.36120.3630.02FalseNoneNoneFalseNoneFalse3613.20720
3715770137427NoneCSR_V1_IN 1.5.2Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. 2 Depth exceeding 1.5m, but not exceeding 3 m depth exceeding 1.5m but not exceeding 3m ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Cum525.1525.17.51FalseNoneNoneFalseNoneFalse3943.5010
3715771137427NoneCSR_V1_IN 2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Cum7067.027067.0223.51FalseNoneNoneFalseNoneFalse166145.64020
3715772137427NoneCSR_V2_IN 5.5Providing and constructing Laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S 3620/1979 having compressive strength not less than 3.5 N/mm2 for saturated dry samples -For Foundation in CM 1:6 ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Cum7521.327521.3213.93FalseNoneNoneFalseNoneFalse104771.98760
3715773137427NoneCSR_V2_IN 5.6Providing and constructing Laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S3620/1979 having compressive strength not less than 3.5 N/mm2 for saturated dry samples -For Basement in CM 1:6 ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Cum7608.647608.648.06FalseNoneNoneFalseNoneFalse61325.63840
3715774137427NoneCSR_V1_IN 2.2.1Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Cum7418.667418.668.27FalseNoneNoneFalseNoneFalse61352.31820
3715775137427NoneCSR_V1_IN 1Centering charges @ 8% over finished rates for the Foundation upto Plinth a. Isolated ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Cum593.49593.496.95FalseNoneNoneFalseNoneFalse4124.75550
3715776137427NoneCSR_V1_IN 1aCentering charges @ 50% Plinth Beam of Building ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Cum3709.333709.331.32FalseNoneNoneFalseNoneFalse4896.31560
3715777137427NoneCSR_V2_IN 8.19.1Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Sqm300.9300.920.4FalseNoneNoneFalseNoneFalse6138.360
3715778137427NoneCSR_V1_IN 1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Cum313.88313.8837.53FalseNoneNoneFalseNoneFalse11779.91640
3715779137427NoneCSR_V2_IN 6.4Providing Brick work with common burnt clay modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Cum10219.9810219.9815.41FalseNoneNoneFalseNoneFalse157489.89180
3715780137427NoneCSR_V1_IN 2.5.2Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Cum8074.748074.7414.59FalseNoneNoneFalseNoneFalse117810.45660
3715781137427NoneCSR_V1_IN 8Centering charges @ 70% over finished rates for the Columns ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Cum5652.315652.313.06FalseNoneNoneFalseNoneFalse17296.06860
3715782137427NoneCSR_V1_IN 12Centering charges @ 60% over finished rates for the Beams & Lintels of Building ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Cum4844.844844.844.43FalseNoneNoneFalseNoneFalse21462.64120
3715783137427NoneCSR_V1_IN 13Centering charges @ 50% Roof Slab of Buildings ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Cum4037.374037.377.1FalseNoneNoneFalseNoneFalse28665.3270
3715784137427NoneCSR_V2_IN 11.5.1Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Sqm5284.045284.046.21FalseNoneNoneFalseNoneFalse32813.88840
3715785137427NoneCSR_V2_IN 11.34AProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Kg198.24198.2490.72FalseNoneNoneFalseNoneFalse17984.33280
3715786137427NoneCSR_V2_IN 12.86Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm X 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Sqm6360.26360.24.32FalseNoneNoneFalseNoneFalse27476.0640
3715787137427NoneCSR_V2_IN 9.21.2Providing and laying Vitrified tiles with thickness 9-10 mm in floor with different sizes with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately). Size of Tile 600x600 mm ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Sqm1460.841460.8444.8FalseNoneNoneFalseNoneFalse65445.6320
3715788137427NoneCSR_V2_IN 9.11Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Sqm1049.021049.0214.33FalseNoneNoneFalseNoneFalse15032.45660
3715789137427NoneCSR_V2_IN 8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Sqm348.1348.1178.27FalseNoneNoneFalseNoneFalse62055.7870
3715790137427NoneCSR_V2_IN 8.4.1Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:3 (1 cement: 3 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Sqm381.14381.1442.3FalseNoneNoneFalseNoneFalse16122.2220
3715791137427NoneCSR_V2_IN 8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Sqm118.0118.0220.57FalseNoneNoneFalseNoneFalse26027.260
3715792137427NoneCSR_V2_IN 8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Sqm205.32205.32119.16FalseNoneNoneFalseNoneFalse24465.93120
3715793137427NoneCSR_V2_IN 8.39Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Sqm149.86149.86101.4FalseNoneNoneFalseNoneFalse15195.8040
3715794137427NoneCSR_V2_IN 8.40Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Sqm135.7135.732.58FalseNoneNoneFalseNoneFalse4421.1060
3715795137427NoneCSR_V1_IN 2.11aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Tonne105559.26105559.261.66FalseNoneNoneFalseNoneFalse175228.37160
3715796137427NoneCSR_V2_IN 15.1Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Sqm964.06964.0652.45FalseNoneNoneFalseNoneFalse50564.9470
3715797137427NoneCSR_V5_IN 1.7Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Rmtr464.92464.925.6FalseNoneNoneFalseNoneFalse2603.5520
3715798137427NoneCSR_V2_IN 11.26.2Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. E.R.W. tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineerin-Charge ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work.Kg153.4153.445.0FalseNoneNoneFalseNoneFalse6903.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17230328930000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17230328930000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17230328930001NoneNoneELIGIBILITYEMD in Prescribed as to be uploaded as per latest Government OrdersNone
17230328930000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17230328930000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17230328930001NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17230328930001NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17230328930001NoneNoneELIGIBILITYAs per Karnataka State Government order No. LD/300/LET/2006 Bangalore Dated 01.01.2007 and GO. No. PW/134/BMS/2007 Dated 27.7.2007, a sum amounting to 1% of the bill amount will be deducted welfare fundNone
17230328930001NoneNoneELIGIBILITYConditional Tenders will not be accepted.None
17230328930001NoneNoneELIGIBILITYThe tenderer shall obtain the workdone certificate of single similar nature of workdone certificate 50% of amount put to tender in the prescribed format from the competent Authority not below the rank of Executive Engineer (District level Officer) and scan the original Certificate and attach the scanned file Certificate/ Certificates shall be produced at the time of opening of Bids for physical verification.None
17230330980000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reasonNone
17230331060000NoneNoneELIGIBILITYTenderer shall note that the tenderers those found Eligible to the conditions mentioned in Section-3 Qualification Instructions to Tenderers (ITT) will only be considered for further evaluation.None
17230331120000NoneNoneELIGIBILITYAll materials required for this work, shall be procured by the Tenderer himself and should be got tested by the quality control authorities, at his own cost before use on the work.None
17230331210000NoneNoneELIGIBILITYAll the items includes with all Leads and Lifts, Loading and Unloading,Cost of materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and other incidental items which are necessary for the successful completion of the work.None
17230331270000NoneNoneELIGIBILITYThe Department is not responsible for any delay in accessing e-procurement portal.None
17230331370000NoneNoneELIGIBILITYTender Amount is Including GST AmountNone
17230331430000NoneNoneELIGIBILITYThe Project Completion Period is 08 Months including rainy seasonNone
17230331670000NoneNoneELIGIBILITYTenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under: Assessed available tendercapacity is equal to AxNx2.5 - B where A is equal to Maximum value of civil engineering works executed in any one year during the last five years updated to 2023-24 price level taking into accountthe completed as well as works in progress N is equal to Number of years prescribed for completion of the works for which tenders are invited is equal to 0.67 Year B is equal to Value, at 2023-24 price level of existing commitments and on-going works to be completed during the next 0.67 Year form the probable date of Award of this contractNone
17230331750000NoneNoneELIGIBILITYThe tenderer shall submit the single workdone certificate of similar nature work of 50% of amount put to tender (for past 5 years in any one single year) in the prescribed format from the competent Authority not below the rank of Executive Engineer (District level Officer) and scan the original Certificate and attach the scanned file Certificate/ Certificates shall be produced at the time of opening of Bids for physical verification.None
17230331910000NoneNoneELIGIBILITYThe defect liability period is 2 years from the date of complication of work failing which action will be taken as per tender conditionNone
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
KPWD Licenced Contract Registration CertificateTrueTechnical Bid
Similar work done certificate Single work 50 percent of amount put tender from competent authorities.TrueTechnical Bid
The contractor has to upload turnover certificate 2019-20 to 2023-24 of the previous 5 financial years duly certified by the charted accountant/ Auditor under his seal and signature of which turnover of any one year shall be more than amount put to tender for the purpose of evaluating tender capacityTrueTechnical Bid
Contractors must upload B- Value details of ongoing works being executed by the contractorTrueTechnical Bid
Annual Financial statements containing receipts and payments accounts, profit and loss account, Balance sheet and annual returns filing statement prepared and signed by the charted accountant or auditor under their sealTrueTechnical Bid
GST Registration Certificate copyTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
BuildingsKolarSrinivasapuraKolarSRINIVASAPURNAGADENAHALLI VILLAGE132138781338
tenderAddressNone
tenderRecallDTONone