1723104791000 | 0 | None | None | Buildings | Construction of Govt Higher Primary School Building at Mudimadugu Village in Mudimadugu GP in Srinivasapur Taluk, Kolar District | 2077975.75 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3722988 | 138010 | None | CSR_V1_IN 1.4.1 | Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 285.56 | 285.56 | 30.0 | False | None | None | False | None | False | 8566.8 | 0 | 3722989 | 138010 | None | CSR_V1_IN 1.5.2 | Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. 2 Depth exceeding 1.5m, but not exceeding 3 m ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 525.1 | 525.1 | 66.39 | False | None | None | False | None | False | 34861.389 | 0 | 3722990 | 138010 | None | CSR_V2_IN 4.1 | Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 139.24 | 139.24 | 46.55 | False | None | None | False | None | False | 6481.622 | 0 | 3722991 | 138010 | None | CSR_V1_IN 2.1.3 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 7067.02 | 7067.02 | 23.2 | False | None | None | False | None | False | 163954.864 | 0 | 3722992 | 138010 | None | CSR_V2_IN 5.5 | Providing and constructing Laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S 3620/1979 having compressive strength not less than 3.5 N/mm2 for saturated dry samples -For Foundation in CM 1:6 ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 7521.32 | 7521.32 | 19.06 | False | None | None | False | None | False | 143356.3592 | 0 | 3722993 | 138010 | None | CSR_V2_IN 5.6 | Providing and constructing Laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S3620/1979 having compressive strength not less than 3.5 N/mm2 for saturated dry samples -For Basement in CM 1:6 ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 7608.64 | 7608.64 | 16.03 | False | None | None | False | None | False | 121966.4992 | 0 | 3722994 | 138010 | None | CSR_V1_IN 2.2.1 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 7418.66 | 7418.66 | 13.26 | False | None | None | False | None | False | 98371.4316 | 0 | 3722995 | 138010 | None | CSR_V1_IN 1 | Centering charges @ 8% over finished rates for the Foundation upto Plinth a. Isolated ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 593.49 | 593.49 | 10.99 | False | None | None | False | None | False | 6522.4551 | 0 | 3722996 | 138010 | None | CSR_V1_IN 1a | Centering charges @ 50% over finished rates for the Plinth Beams of Building ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 3709.33 | 3709.33 | 2.27 | False | None | None | False | None | False | 8420.1791 | 0 | 3722997 | 138010 | None | CSR_V2_IN 8.19.1 | Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 300.9 | 300.9 | 22.79 | False | None | None | False | None | False | 6857.511 | 0 | 3722998 | 138010 | None | CSR_V1_IN 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 313.88 | 313.88 | 66.39 | False | None | None | False | None | False | 20838.4932 | 0 | 3722999 | 138010 | None | CSR_V2_IN 6.4 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 1545.8 | 1545.8 | 118.26 | False | None | None | False | None | False | 182806.308 | 0 | 3723000 | 138010 | None | CSR_V1_IN 2.5.2 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 8074.74 | 8074.74 | 26.41 | False | None | None | False | None | False | 213253.8834 | 0 | 3723001 | 138010 | None | CSR_V1_IN 8 | Centering charges @ 70% over finished rates for the Columns ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 5652.32 | 5652.32 | 4.62 | False | None | None | False | None | False | 26113.7184 | 0 | 3723002 | 138010 | None | CSR_V1_IN 12 | Centering charges @ 60% over finished rates for the Beams & Lintels of Building ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 4844.84 | 4844.84 | 6.4 | False | None | None | False | None | False | 31006.976 | 0 | 3723003 | 138010 | None | CSR_V1_IN 13 | Centering charges @ 50% over finished rates for the Roof Slab of Buildings. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 4037.37 | 4037.37 | 15.06 | False | None | None | False | None | False | 60802.7922 | 0 | 3723004 | 138010 | None | CSR_V1_IN 20 | Centering charges @ 45% over finished rates for the Chajja ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 3633.63 | 3633.63 | 0.33 | False | None | None | False | None | False | 1199.0979 | 0 | 3723005 | 138010 | None | CSR_V2_IN 11.5.1 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 5284.04 | 5284.04 | 12.42 | False | None | None | False | None | False | 65627.7768 | 0 | 3723006 | 138010 | None | CSR_V2_IN 11.34A | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Kg | 198.24 | 198.24 | 181.44 | False | None | None | False | None | False | 35968.6656 | 0 | 3723007 | 138010 | None | CSR_V2_IN 9.22.2 | Providing and laying Polished Glazed Vitrified tiles in floor with different sizes (thickness to be specified by the manufacturer), with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately). Size of Tile 600x600 mm ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 1564.68 | 1564.68 | 74.96 | False | None | None | False | None | False | 117288.4128 | 0 | 3723008 | 138010 | None | CSR_V2_IN 9.11 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 1049.02 | 1049.02 | 35.47 | False | None | None | False | None | False | 37208.7394 | 0 | 3723009 | 138010 | None | CSR_V2_IN 8.2.1 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 348.1 | 348.1 | 173.89 | False | None | None | False | None | False | 60531.109 | 0 | 3723010 | 138010 | None | CSR_V2_IN 8.4.1 | Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:3 (1 cement: 3 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 381.14 | 381.14 | 213.93 | False | None | None | False | None | False | 81537.2802 | 0 | 3723011 | 138010 | None | CSR_V2_IN 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 118.0 | 118.0 | 209.37 | False | None | None | False | None | False | 24705.66 | 0 | 3723012 | 138010 | None | CSR_V2_IN 8.30 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 205.32 | 205.32 | 173.89 | False | None | None | False | None | False | 35703.0948 | 0 | 3723013 | 138010 | None | CSR_V2_IN 8.39 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 149.86 | 149.86 | 209.37 | False | None | None | False | None | False | 31376.1882 | 0 | 3723014 | 138010 | None | CSR_V2_IN 8.40 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 135.7 | 135.7 | 13.97 | False | None | None | False | None | False | 1895.729 | 0 | 3723015 | 138010 | None | CSR_V1_IN 2.11a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Tonne | 105559.26 | 105559.26 | 3.14 | False | None | None | False | None | False | 331456.0764 | 0 | 3723016 | 138010 | None | CSR_V2_IN 15.1 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 964.06 | 964.06 | 105.93 | False | None | None | False | None | False | 102122.8758 | 0 | 3723017 | 138010 | None | CSR_V2_IN 20.13.1 | Flush pointing with cement mortar 1:3 (1 cement : 3 fine sand) mixed with 2% of integral water proofing compound by weight of cement for flat tile bricks on top of mud phaska ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 107.38 | 107.38 | 103.93 | False | None | None | False | None | False | 11160.0034 | 0 | 3723018 | 138010 | None | CSR_V5_IN 10.17 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Rmtr | 484.98 | 484.98 | 12.4 | False | None | None | False | None | False | 6013.752 | 0 |
|