1723280626000 | 0 | None | None | Other Works | Construction of Check Dam at Saradgi Barrage joining Nala to Divert the Nala Water to Downstream in Kalaburagi City. (Est Cost Rs. 51.00 Lakhs) (Category-ST) (15th FC NMPC Grant) | 4284990.75 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3744787 | 139897 | None | 001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. VOLUME 3 2023-24 SL
2.5 (ii) a | 100 Sqm | 412.65 | 412.65 | 49.0 | False | None | None | False | None | False | 20219.85 | 0 | 3744788 | 139897 | None | 002 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means Cement Concrete Grade M-15 & M-20 VOLUME 3 2023-24 SL 2.8 (ii) a | Cum | 754.95 | 754.95 | 17.5 | False | None | None | False | None | False | 13211.625 | 0 | 3744789 | 139897 | None | 003 | Earth work excavation In all kinds of soils Depth upto 3 m for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work volume I sl no 1.14.1 | Cum | 107.1 | 107.1 | 15195.0 | False | None | None | False | None | False | 1627384.5 | 0 | 3744790 | 139897 | None | 004 | Providing and laving in nocition Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates volume 1 item no 2.2.1 | Cum | 6601.35 | 6601.35 | 1.02 | False | None | None | False | None | False | 6733.377 | 0 | 3744791 | 139897 | None | 005 | Providing centering, shuttering, formwork, scaffolding, etc., complete with all lead and lifts and as directed by Engineer Incharge | Cum | 332.64 | 332.64 | 1.02 | False | None | None | False | None | False | 339.2928 | 0 | 3744792 | 139897 | None | 006 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specificationAll other type of structures. volume 1 sl no 2.11 | MT | 82961.55 | 82961.55 | 0.19 | False | None | None | False | None | False | 15762.6945 | 0 | 3744793 | 139897 | None | 007 | Providing and constructing 300mm thick dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete. volume 4 sl no 3.41.2 | Sqm | 477.75 | 477.75 | 660.0 | False | None | None | False | None | False | 315315.0 | 0 | 3744794 | 139897 | None | 008 | Providing and placing sand bags consisting of empty cement bags filled with 35 to 40 kg locally available sand for forming ring bund including cost of all materials, labour, plugging joints with selected earth, and all other ancillary operations complete. volume 4 sl no 7.1.Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and suchsimillar works in all kinds of soils, as per drawing and technical | Each | 71.4 | 71.4 | 80.0 | False | None | None | False | None | False | 5712.0 | 0 | 3744795 | 139897 | None | 009 | Earth work excavation by manual means for drains, canals, waste weir, draft,approach channels, key trenches, foundation of Buildings & bridges and suchsimillar works in all kinds of soils, as per drawing and technical specifications,including setting out, shoring, strutting, barricading, caution lights, removalof stumps and other deleterious matter, excavated surface leveled and sidesneatly dressed disposing off the excavated stuff or sorting & stacking theselected stuff for reuse in a radius of 50 m and lift upto 1.5m including cost oflabour, tools & other appurtenaces required to complete the work. VOLUME
1 2023-24 SL. 1.4.2, P No.05 | Cum | 271.95 | 271.95 | 241.5 | False | None | None | False | None | False | 65675.925 | 0 | 3744796 | 139897 | None | 010 | Sand - M-Sand VOLUME 1 2023-24 SL .64, P No.A40 | Cum | 1549.8 | 1549.8 | 70.0 | False | None | None | False | None | False | 108486.0 | 0 | 3744797 | 139897 | None | 011 | Stone Boulders 300mm VOLUME 1 2023-24 SL.80, P No. A40 | Cum | 700.35 | 700.35 | 70.0 | False | None | None | False | None | False | 49024.5 | 0 | 3744798 | 139897 | None | 012 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges ofmachinery, curing, and all the other appurtenances required to complete thework as per technical specifications. Mix 1:2:4 Using 40 mm nominal size graded crushed coarse aggregates VOLUME 1 2023-24 Item No.2.1.5, P No.15 | Cum | 6463.8 | 6463.8 | 21.0 | False | None | None | False | None | False | 135739.8 | 0 | 3744799 | 139897 | None | 013 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates VOLUME 1 2023-24 Item No.2.2.1, P No.15 | Cum | 6601.35 | 6601.35 | 126.0 | False | None | None | False | None | False | 831770.1 | 0 | 3744800 | 139897 | None | 014 | Adding 10 Percentage for Earth retaining structures Additional on finished rate of concrete per m3 for Formwork, Centering & Scaffolding. (As per 2023-24
CSR VOL-I,Appendix I,SI.No:-11,Pg No:-111) | Cum | 660.14 | 660.14 | 126.0 | False | None | None | False | None | False | 83177.64 | 0 | 3744801 | 139897 | None | 015 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / softannealed steel wire and other ancilary operations complete as per drawing andtechnical specification. VOLUME 1 2023-24 Item No.2.11(e), P No.18 | t | 93284.1 | 93284.1 | 10.71 | False | None | None | False | None | False | 999072.711 | 0 | 3744802 | 139897 | None | 016 | Design, fabrication, supply, erection, testing and commissioning of vertical lift sliding type all interchangeable (except bottom element) stoplog gate elements consisting of skin plate, horizontal and verticalgirders, stiffeners, lifting pins, bronze padded slide blocks, guide shoes, rubber seals, clamps with all accessories for spillway including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and three coats cold applied coal tar epoxy paint, seal fixing and all other ancillary operations complete as per specifications and approved drawings. 2023-24) volume 4 sl no 6.5., P No.74 | t | 147315.0 | 147315.0 | 0.05 | False | None | None | False | None | False | 7365.75 | 0 |
|