createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1723265331506
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd20600.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose21-08-2024 16:00:00
tenderQueryClose14-08-2024 16:00:00
technicalBidOpenNone
publishedDate10-08-2024 18:34:24
publishedByPostPWD_EE_DIV_DVG
publishedByUserKPE15413 - G NARENDRA BABU
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonG Narendra Babu
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber8105684077
tenderSupplierListNone
tenderSchedule
createdTs1723265331538
version4
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/BR/WORK_INDENT14058
titleConstruction of Revetment for Bridge at Ch 5.55Km in SH-48 Basavapattana to join SH-50 (via Sagarapet-Doddagatta-Tyavanige-Dummi) Road in channagiri Taluk at
descriptionConstruction of Revetment for Bridge at Ch 5.55Km in SH-48 Basavapattana to join SH-50 (via Sagarapet-Doddagatta-Tyavanige-Dummi) Road in channagiri Taluk
categoryWORKS
categoryTextWorks
ecv697242.33
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1702
locationNamePWD Division Office Davanagere
provisionalAmount825000.0
groupOverheadTotalNone
fileNumberAEE/PWD/CNG/SH/Bridge/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17232653320000NoneNoneBridges/CulvertsConstruction of Revetment for Bridge at Ch 5.55Km in SH-48 Basavapattana to join SH-50 (via Sagarapet-Doddagatta-Tyavanige-Dummi) Road in channagiri Taluk at697242.33
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3742301139683NoneVol-I, Page 8, Item No.1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (SR Vol-I, Page.8 /Item No.1.14.1)Cum107.1107.115.84FalseNoneNoneFalseNoneFalse1696.4640
3742302139683NoneSR Vol-I, Page.16, Item No.2.4.2Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (SR Vol-I, Page.16 /Item No.2.4.2)Cum6639.156639.152.88FalseNoneNoneFalseNoneFalse19120.7520
3742303139683NoneSR Vol-3, Page.69 .Item No.8.25(i)Metal Beam Crash Barrier,Type - A, "W" : Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 (SR Vol-3, Page.69 /Item No.8.25(i))m3822.03822.0160.0FalseNoneNoneFalseNoneFalse611520.00
3742304139683NoneV-3, P-129, Item no.14.4Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification, (A)stone/Boulder, (V-3, P-129, Item no.14.4)Cum2007.62007.624.0FalseNoneNoneFalseNoneFalse48182.40
3742305139683NoneSR Vol-I, Page.7,Item No.1.8onstruction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (SR Vol-I, Page.7 Item No.1.8)Cum497.7497.733.6FalseNoneNoneFalseNoneFalse16722.720
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17232653320000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17232653320001NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union Territory.None
17232653320001NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of kpp portal due to internet connectivity issues and technical glitches at bidders endNone
17232653320000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17232653320000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17232653320001NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17232653320001NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17232653320001NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costsNone
17232653320001NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17232653320001NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing kppp PortalNone
17232898770000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17232898810000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund/ etc., applies to latest order availableNone
17232898860000NoneNoneELIGIBILITYDisputes shall be settled by a Aribitator or set of Arbitrators appointed by Karnataka Arbitration centre Rules 2012None
17232898910000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17232899030000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Executive Engineer reserves the right to verify the documents before approval.None
17232899080000NoneNoneELIGIBILITYThe employer reserves the rights to Reject or accept any or all the tenders without assigning any reasons.None
17232899140000NoneNoneELIGIBILITYThe tenderer should maintain the work/road during the defective liability period Upto 31.08.2025None
17232899160000NoneNoneELIGIBILITYThe successful Tenderer shall deliver to the Employer a Security deposit in any of the forms given Clause 29.1 of ITT for an amount equivalent to 5% of the Contract price plus additional security for unbalanced tenders in accordance with Clause 25.5 & 29.1 of ITT and Clause 44 of the Conditions of Contract.None
17232899250000NoneNoneELIGIBILITYContractor should take all precautions to ensure that no damage is caused to the existing works and other similar structures which have been constructed by other agencies during project execution. If any damage is caused, it has to be rectified at his own risk and cost.None
17232899290000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incidents happens on account of negligence or any project activity. Contractor should indemnify the client to that extent.None
17232899340000NoneNoneELIGIBILITYAll the items in the tender include all lead, lifts, loading unloading, transportation, labour, hire charges of machinery curing for concrete works, cost and conveyance of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNone
17232900500000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, PWD Division, Davanagere during office hours on all working days.None
17232900560000NoneNoneELIGIBILITYThe contractors assessed available tender capacity will be calculated as per the clause 3.6 of STD tender document Attached.None
17232900620000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act.None
17232900680000NoneNoneELIGIBILITYWork should be carried out according to IRC Specifications for roads and the contractor has to establish field laboratory at the work site as per the IRC SpecificationsNone
17232900740000NoneNoneELIGIBILITYThe Tenderer should furnish all the necessary original documents mentioned above to the Executive engineerNone
17232900790000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents KW-1 K.P.W.D. and further orders thereon.None
17232900840000NoneNoneELIGIBILITYAs per the government circular no : FD/447/expenditure/12/2022/dated:30/07/2022 GST will be added to the contract amount separately. Hence the Contractor has to quote the rates exclusive of GSTNone
17232900890000NoneNoneELIGIBILITYPeriod for completion of this work is Upto 31.08.2024None
17232900950000NoneNoneELIGIBILITYRoyalty: The contractor should abide to follow KMMCR 1994 RULE 36 AND RULE 42 without fail.None
17232901000000NoneNoneELIGIBILITYEstimate rates are excluding GST and the prevailing GST 18% of Amount Put to tender is added in the form of Lump sum in sanctioned Estimate as per the guidelines in Common SR 2021-22 GO:PWD 51 RDF 2019 Bangaluru Dt:18.03.2022. Therefore, amount put to Tender or ECV amount is excluding GST. In the kppp - portal there is no option to add GST Separately over and above the amount put to Tender, during Draft Tender Schedule Process. Hence even though the tender has been invited by opting for the INCLUSIVE option, the item wise rates do not include GST. Hence, GST will be paid separately for the quoted amount as per the government circular no : FD/447/expenditure/12/2022/dated:30/07/2022. Therefore GST Declaration Certificate must be uploaded mandatorily by the prospective biddersNone
17232901130000NoneNoneELIGIBILITYAs per the tender schedule / BOQ the successful bidder is required to provide road conductors/mazdoor s along with motorcycle for the maintenance and supervisionn of the road section. In this regard the bidder is required to adhere to the requirements of the RTO.None
17232901180000NoneNoneELIGIBILITYThe successful bidder is required to pay minimum wages to road conductor as per labour department rules and acts without fail and it is also required to pay the fuel charges (full amount provided in the estimate/tender) to the road conductor.None
17232901270000NoneNoneELIGIBILITYIt is the responsibility of the successful bidder to provide the road conductor/mazdoor as per the BOO and carry out the necessary works for maintenance of roads as per the direction of Engineer in charge of work/section officer/Assistant Executive Engineer in addition to the works carried out by the contractor as per the BOO.None
17232901340000NoneNoneELIGIBILITYThe road conductor/mazdoor should maintain the road section as per the directions of the Engineer in charge and to monitor and avoid unauthorized excavation, unauthorized occupation of the road section and other illegal activities, in the road section alloted to him and if any illegal activities found in the section, should be brought to the notice of concerned section officer immediately.None
17232901440000NoneNoneELIGIBILITYThe successful bidder has to follow the prevailing government orders regarding Royalty charges. The contractor has to submit MDP Certificate along with the running contractor bills. Otherwise department will take necessary action as per the government orders/circulars.None
17232901530000NoneNoneELIGIBILITYIn the case of the death of the contractor after executing the agreement / commencement of the work, his legal heir, if is an eligible registered contractor and is willing can execute and compete the work at the accepted tender rates irrespective of the cost of the work.None
17232901610000NoneNoneELIGIBILITYContractor should carryout additional test required to test the suitability of materials.None
17232901660000NoneNoneELIGIBILITYFormation levels and other data furnished are bare minimum the contractor should make all efforts to validate and to get additional data if required at his own cost.None
17232901710000NoneNoneELIGIBILITYMaterials like steel, cement etc., required for the work shall be procured by the tenderer themselves and should got tested by the quality control authority before use on the work at their own cost.None
17232901760000NoneNoneELIGIBILITYContractor should adhere to HSE (Health Safety Environment) policy applicable for similar projects. Contractor to that extent should submit HSE document defining all the procedure including the policies before execution of the project.None
17232901810000NoneNoneELIGIBILITYContractor should take all precautions to ensure that no damage is caused to the existing structures which have been constructed by other agencies during project execution. If any damage is caused, it has to be rectified at his own risk and cost.None
17232901870000NoneNoneELIGIBILITYThe above mentioned road should be maintained properly free from potholes and other maintenance works upto 12 months.None
17232901940000NoneNoneELIGIBILITYThe contractors must appoint the road conductors as per the categories for this works allotted.For exmple SC,ST and Others.None
17232901990000NoneNoneELIGIBILITYThe contractor should be responsible for all deduction of the labours wages as per the Labour Act.The Public Works Department will not be held responsible for the same.None
17232902060000NoneNoneELIGIBILITYThe contractors must make the payments of wages to the Road Conductor on monthly basis, irrespective of payment cleared by the Public Works Department.None
17232902120000NoneNoneELIGIBILITYThe contractor will get payments based on the Schedule B only , except that no payment will be made by the Public Works Department.None
17232902210000NoneNoneELIGIBILITYThe contractor must follow and bind to the circular No. PWD995.IFA.2023 E dated 24.05.2024 issued by the Government in this regard.None
17232902290000NoneNoneELIGIBILITYThere shall not be any employee - employer relationship between the Department and the Road Conductor deployed.None
17232902350000NoneNoneELIGIBILITYThe contractor must ensure that the deployed Road Conductor Should own two wheeler Motor vehicle compulsorily.None
17232902400000NoneNoneELIGIBILITYThe contractor must ensure that the deployed Road Conductor should fulfill the duties and responsibilities mentioned in the circular No. PWD/995/IFA/2023 (E) Dated 24.05.2024 issued by the Government in this regard.None
17232902530000NoneNoneELIGIBILITYThe contractor must ensure that the deployed Road Conductor should fulfill the duties and responsibilities mentioned in the circular No. PWD/995/IFA/2023 (E) Dated 24.05.2024 issued by the Government in this regard.None
17232902590000NoneNoneELIGIBILITYThe contractor must provide or supply required tools and plants such as Spade, Pic axe,peg, sickle etc.To the deployed Road Conductors as and when required to perform his duties.No additional payment will be paid by the Public Works Department in this regard.None
17232902640000NoneNoneELIGIBILITYThe Road Conductor should be in charge for the chainages allocated by the department for the whole year to perform his duties.None
17232902690000NoneNoneELIGIBILITYThe Road Conductors should intimate the section officers regarding the progress of all the work taken up in the road, road cuttingd and illlegal activities if any in strech of road which is allocated by the department to him.None
17232902740000NoneNoneELIGIBILITYDuring rainy season the Road Conductors should clear obstacles on the road if any and should intimate the section officers in this regard.None
17232902780000NoneNoneELIGIBILITYThe Road Conductors should maintain the dairy, perform the duties assigned bythe section officers and should get signature of Section Officers accordingly.None
17232902840000NoneNoneELIGIBILITYThe Road Conductor should share the GPS photos of the road works in the assigned stretch to the concern section officers.None
17232902900000NoneNoneELIGIBILITYThe Rate paid to the Road conductor Should not be less than the minimum wages declared from the labour department of Government of KarnatakaNone
17232902990000NoneNoneELIGIBILITYThe tenderer should complete patching potholes and other necessary works within three months or stipulated period as deirected by Engineer incharge of work.None
17232903140000NoneNoneELIGIBILITYTenderer should maintain the road in good condition free from potholes and has to carryout all necessary maintainance work for a period of 12 months as directed by Engineer in charge of work.None
17232903210000NoneNoneELIGIBILITYTenders not complying with above conditions, will not be considered for Tender Evaluation.None
17232903260000NoneNoneELIGIBILITYThe item rates quoted shall include cost of royalty charges on construction materials & other taxes as per the rates provided in prevailing cost & conveyance of all materials, Curing, Watering, unloading with all leads & lifts labour, hire charges of machinery equipments etc., complete including all incidental charges. All the items shall be executed as directed by the Engineer in charge of the work.None
17232903310000NoneNoneELIGIBILITYIf the tender of the successful tenderer is seriously unbalanced in relation to the Employers estimate of the cost of the work to be performed under the contract, the Employer may require the Tenderer to produce detailed price analysis for any or all items of the Bill of Quantities, to demonstrate the internal consistency of those prices with the construction methods and schedule proposed. After evaluation of the price analyses, the Employer may require that the amount of the performance security set forth in Clause 24 be increased at the expense of the successful Tenderer to a level sufficient to protect the Employer against financial loss in the event of default of the successful under the contract.None
17232903360000NoneNoneELIGIBILITYThe Increse in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17232903410000NoneNoneELIGIBILITYBidder must posses valid G S T Certificate.None
17232903470000NoneNoneELIGIBILITYThe Successful bidder has to follow the Director of Mines Geology Department Circular Dated: 07-11-2023 regarding MDP Certificate along with the Running contractor bills, otherwise department will take necessary action as per the government Orders/Circulars.None
17232903520000NoneNoneELIGIBILITYAny deviation/erroe/mistakes found in units of items, they should be read as unified SR 2023-24 and the rates shall be quoted accordinglyNone
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
The each Tenderer in his name should have achieved in at least TWO financial year a minimum financial turnover in all classes of civil engineering construction works only for Rs 8.23 lakhs in last five years i.e. 2019-20 to 2023-24 Submit the Income tax Returns and balance sheet indicating the contract receipts certified by the chartered accountantTrueTechnical Bid
The Tenderer should be a PWD Class-IV & above Registered contractor.TrueTechnical Bid
To qualify for Award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 & 2023-24 satisfactorily completed as prime contractor, at least one similar work such as road work of value not less than Rs.4.12 lakhs. Work done Certificate issued by competent Authority of rank not less than Executive Engineer.TrueTechnical Bid
The Tenderer should submit the scanned copy of the last 5 years balance sheet indicating the civil work contract receipts certified by the chartered accountant. Submit the balance sheet indicating the contract receipts certified by the chartered accountant with UDIN No/Auditor & Tax consultant with their registration no, who ever is applicable.TrueTechnical Bid
GST Registration CertificateTrueTechnical Bid
GST Declaration Certificate must be uploaded mandatorily by the prospective bidders.TrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
Bridges/CulvertsDavanagereChannagiriDavangereDAVANGERESH BridgeNoneNoneNoneNoneNoneNone
tenderAddressNone
tenderRecallDTONone