1723359604000 | 0 | None | None | Buildings | Construction of Fencing Compound Wall at ISWM Site in TP Chinchali Limit | 6254785.06 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3749404 | 140409 | None | code01 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the Work PWD Common DSR 2023-24 Volume 1 (P No: 8 I.No:1.14.1) Rate 102.00+5%=107.10 | Cum | 107.1 | 107.1 | 293.184 | False | None | None | False | None | False | 31400.0064 | 0 | 3749405 | 140409 | None | code02 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. M 10 Grade Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates PWD Common DSR 2023-24 Volume 1 (P No: 15 I.No:2.1.3 )Rate 5989.00 +5%=6288.45 | Cum | 6288.45 | 6288.45 | 60.8644 | False | None | None | False | None | False | 382742.73618 | 0 | 3749406 | 140409 | None | code03 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) PWD building DSR 2023-24 Volume 2 (P No: 9 I.No:5.1.1 )Rate 5,611.00+5%=5891.55 | Cum | 5891.55 | 5891.55 | 162.0 | False | None | None | False | None | False | 954431.1 | 0 | 3749407 | 140409 | None | code04 | Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD Common DSR 2023-24 Volume 1 (P No: 16 I.No:2.3.1) Rate 6323.00+5%=6639.15 | Cum | 6639.15 | 6639.15 | 109.632 | False | None | None | False | None | False | 727863.2928 | 0 | 3749408 | 140409 | None | code05 | Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate For RCC Form Works Foundation up to plinth Consider 8% PWD Common DSR 2023-24 Volume 2 (P No: A-7 I.No:22.2) | Cum | 531.13 | 531.13 | 18.3161 | False | None | None | False | None | False | 9728.230193 | 0 | 3749409 | 140409 | None | code06 | Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate For RCC Form Works Plinth Beam Consider 50% PWD Common DSR 2023-24 Volume 2 (P No: A-7 I.No:22.2) | Cum | 3319.57 | 3319.57 | 44.436 | False | None | None | False | None | False | 147508.41252 | 0 | 3749410 | 140409 | None | code07 | Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate For RCC Form Works Column Consider 50% PWD Common DSR 2023-24 Volume 2 (P No: A-7 I.No:22.2) | Cum | 4647.4 | 4647.4 | 24.4556 | False | None | None | False | None | False | 113654.95544 | 0 | 3749411 | 140409 | None | code08 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification All other type of structures PWD common SR 2023-24 Volume 1 (P No: 18 I.No: 2.11.h) . Rate 79011.00+5%=82961.55 | MT | 82961.55 | 82961.55 | 8.6061 | False | None | None | False | None | False | 713975.395455 | 0 | 3749412 | 140409 | None | code09 | Providing Brick work with common burnt clay modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. PWD building DSR 2023-24 Volume 2 (P No: 13 I.No:6.4 )Rate 8611.00+5%=9041.55 | Cum | 6639.15 | 6639.15 | 266.61 | False | None | None | False | None | False | 1770063.7815 | 0 | 3749413 | 140409 | None | code10 | Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Electric resistance or induction butt welded tubes including cost of materials, labour, usage charges of machinery complete as per
specifications and as per directions of the Engineer-in-Charge..(PWDSR 2023-24 Vol-2 P.No.83 I.No.11.16.3) Rate 122.00+5%=128.10 | Kg | 128.1 | 128.1 | 820.0799 | False | None | None | False | None | False | 105052.23519 | 0 | 3749414 | 140409 | None | code11 | Fencing with G.I. barbed wire Angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used (PWDSR 2023-24 Vol-2 P.No.95 I.No.11.57.1) Rate 18.00+5% = 18.90 | Mtr | 18.9 | 18.9 | 2070.0 | False | None | None | False | None | False | 39123.0 | 0 | 3749415 | 140409 | None | code12 | Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in- Charge. PWD building DSR 2023-24 Volume 2 (P No: 84 I.No:11.25.2) Rate 136.00+5%=142.80 | Kg | 142.8 | 142.8 | 316.0 | False | None | None | False | None | False | 45124.8 | 0 | 3749416 | 140409 | None | code13 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. PWD building DSR 2023-24 Volume 2 (P No: 41 I.No:8.1.2 )Rate 241.00+5%=253.05 | Sqm | 253.05 | 253.05 | 3059.0 | False | None | None | False | None | False | 774079.95 | 0 | 3749417 | 140409 | None | code14 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thin able priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. PWD building DSR 2023-24 Volume 2 (P No: 45 I.No:8.25 )Rate 137.00+5%=143.85 | Sqm | 143.85 | 143.85 | 3059.0 | False | None | None | False | None | False | 440037.15 | 0 |
|