1723452949000 | 0 | None | None | Roads | Construction of CC Drain at Ward number 18 and Asphalt Road Widening at ward number 28 in Arsikere cmc Limits | 704527.74 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3756544 | 141101 | None | ASK01 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m (PWD SR 2023-24 Vol:1 P.NO.5 I.No: 1.4.1) | Cum | 249.26 | 249.26 | 98.85 | False | None | None | False | None | False | 24639.351 | 0 | 3756545 | 141101 | None | ASK02 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 Vol:1 P.NO.15 I.No: 2.1.3) | Cum | 6168.67 | 6168.67 | 8.63 | False | None | None | False | None | False | 53235.6221 | 0 | 3756546 | 141101 | None | ASK03 | Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification All other type of structures ( PWD SR 2023-24 Vol:1 P.NO.18 I.No: 2.11.H) | Tonne | 81381.33 | 81381.33 | 0.96 | False | None | None | False | None | False | 78126.0768 | 0 | 3756547 | 141101 | None | ASK04 | Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery,curing and all other appurtenances required to complete the work as per technical specifications. M20 Design mix using 20mm nominal size graded crushed coarse aggregates. (PWD SR 2023-24 Vol:1 P.NO.15 I.No:2.3.1 ) | Cum | 6512.69 | 6512.69 | 17.83 | False | None | None | False | None | False | 116121.2627 | 0 | 3756548 | 141101 | None | ASK05 | As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. For drain form works consider 20% (PWD SR 2023-24 Vol:3 P.NO.A-29) | Sqm | 1302.54 | 1302.54 | 17.83 | False | None | None | False | None | False | 23224.2882 | 0 | 3756549 | 141101 | None | ASK06 | Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. . (PWD SR 2023-24 Vol:3 P.NO.26 I.No: 4.17 ) | Cum | 2635.77 | 2635.77 | 21.12 | False | None | None | False | None | False | 55667.4624 | 0 | 3756550 | 141101 | None | ASK07 | Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. (PWD SR 2023-24 Vol:3 P.NO.31 I.No: 5.1 A (i) ) | Sqm | 42.23 | 42.23 | 484.0 | False | None | None | False | None | False | 20439.32 | 0 | 3756551 | 141101 | None | ASK08 | Bituminous Macadam Grading - II for traffic 20 MSA Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.4% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction (PWD SR 2023-24 Vol:3 P.NO.33 I.No: 5.8 ii (C) ) | Cum | 8144.21 | 8144.21 | 24.2 | False | None | None | False | None | False | 197089.882 | 0 | 3756552 | 141101 | None | ASK09 | Tack coat on Bituminous surface Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom . (PWD SR 2023-24 Vol:3 P.NO.31 I.No: 5.3 (i) ) | Sqm | 12.36 | 12.36 | 440.0 | False | None | None | False | None | False | 5438.4 | 0 | 3756553 | 141101 | None | ASK10 | Semi Dense Bituminous Concrete Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site,laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision. ( PWD SR 2023-24 Vol:3 P.NO.43 I.No: 21- A (1) ) | Cum | 10456.56 | 10456.56 | 12.1 | False | None | None | False | None | False | 126524.376 | 0 | 3756554 | 141101 | None | ASK11 | Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (PWD SR 2023-24 Vol:3 P.NO.17 I.No:3.6 ) | Cum | 507.79 | 507.79 | 7.92 | False | None | None | False | None | False | 4021.6968 | 0 |
|