createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1723386265190
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee1060.00
emd100000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose28-08-2024 16:00:00
tenderQueryClose15-08-2024 16:00:00
technicalBidOpen29-08-2024 16:05:00
publishedDate12-08-2024 15:50:40
publishedByPostTP_CO_YGT
publishedByUserKPE13436 - D N TAHASHILDAR
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonvenkatesh kamannavar
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber9945599214
mobileNumber9945599214
tenderSupplierListNone
tenderSchedule
createdTs1723386265219
version6
createdDateNone
modifiedDateNone
tenderNumberDMA/2024-25/OW/WORK_INDENT25886
titleConstruction of Processing and Storage Shed at SWM Site of Yaragatti TP.
descriptionConstruction of Processing and Storage Shed at SWM Site of Yaragatti TP.
categoryWORKS
categoryTextWorks
ecv4206730.88
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2520
locationNameDMA Town Panchayat Yaragatti
provisionalAmount5000000.0
groupOverheadTotalNone
fileNumberiswm/yaragatti
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17233862650000NoneNoneOther WorksConstruction of Processing and Storage Shed at SWM Site of Yaragatti TP.4206730.88
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3751812140697Nonecode01Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. PWD Common Volume 3 P No.17, I.No.3.7Cum108.15108.15168.0FalseNoneNoneFalseNoneFalse18169.20
3751813140697Nonecode02Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work Depth exceeding 1.5 m, but not exceeding 3 m (PWD SR 2023-24, Vol 1, Item no. 1.15.2, Page No.8)Cum437.75437.75106.45FalseNoneNoneFalseNoneFalse46598.48750
3751814140697Nonecode03Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates (PWD SR Vol-01, 2023-24, Item no. 2.1.2, Page No.15)Cum5833.925833.9218.44FalseNoneNoneFalseNoneFalse107577.48480
3751815140697Nonecode04Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR, Vol.1, 2023-24, Item no. 2.4.3, Page No.16)Cum6526.086526.0826.14FalseNoneNoneFalseNoneFalse170591.73120
3751816140697Nonecode05As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate as per table below For Drain form works Consider 8% for Isolated Footing PWD SR Vol 2 P No A-7 I NO 22-2Cum522.09522.0912.15FalseNoneNoneFalseNoneFalse6343.39350
3751817140697Nonecode06As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate as per table below For Drain form works Consider 70% for RCC Columns PWD SR Vol 2 P No A-7 I NO 22-2Cum4568.264568.264.86FalseNoneNoneFalseNoneFalse22201.74360
3751818140697Nonecode07As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate as per table below For Drain form works Consider 50% for Plinth Beams PWD SR Vol 2 P No A-7 I NO 22-2Cum3263.043263.049.13FalseNoneNoneFalseNoneFalse29791.55520
3751819140697Nonecode08Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR, Vol.1, 2023-24, Item no. 2.5.2, Page No.16)Cum7048.297048.2948.25FalseNoneNoneFalseNoneFalse340079.99250
3751820140697Nonecode09As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate as per table below For 70% for RCC Columns PWD SR Vol 2 P No A-7 I NO 22-2Cum4933.84933.814.58FalseNoneNoneFalseNoneFalse71934.8040
3751821140697Nonecode10As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate as per table below 60% for Plinth Beams PWD SR Vol 2 P No A-7 I NO 22-2Cum4228.974228.9733.62FalseNoneNoneFalseNoneFalse142177.97140
3751822140697Nonecode11Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings (PWD Vol-1 SR 2023-24, Item No. 2.11a, Page No. 18)Tonne92140.7192140.717.808FalseNoneNoneFalseNoneFalse719434.663680
3751823140697Nonecode12Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (PWD Vol-1 SR 2023-24, Item no. 1.9, Page No.7)Cum273.98273.9871.0FalseNoneNoneFalseNoneFalse19452.580
3751824140697Nonecode13Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401. (i) For Grading -I Material (PWD Vol-3 SR 2023-24, Item No. 4.2, Page No. 23)Cum2430.82430.872.45FalseNoneNoneFalseNoneFalse176111.460
3751825140697Nonecode14Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (PWD Vol-3 SR 2023-24, Item No. 4.17, Page No. 26)Cum2635.772635.7772.45FalseNoneNoneFalseNoneFalse190961.53650
3751826140697Nonecode15Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS:383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. (PWD Vol-3 SR 2023-24, Item No. 16.27, Page No. 148)Cum6565.226565.2272.45FalseNoneNoneFalseNoneFalse475650.1890
3751827140697Nonecode16Providing and fixing self-supported, ribbed, high quality, high grade (D:350 MPA Yst Min ), pre- painted Galvalume steel roof sheet, coated with bare Galvalume coating AZ 150, @ 150 gms/Smtr 55%AL,45%Zn) by hot dip process , of total coated thickness as specified for different spans with a tolerance of +/- 0.02 mm, according to technical specification confirming to A 792, with NCCA ll-1, or ECCA T4 Pencil hardness HB, NCCA standard T-Bend test. The roof should be fastened to the gutter beam, on the external sloping side, at an interval of 51mm Centre to Centre, to a depth of 65 mm with GI anchor bolts and neoprene washers & subjecting the gutter beam to Schmidt, Hammer test to ensure the anchorage of the anchor bolts. The self-supported roofing system should be designed to with stand the wind load (As per IS 875 part-3) & Earthquake load (as per IS 1893) & the design should also comply with any other technical requirements such as turbo ventilators of 0.60 mts. dia and skylights of size 4.26 x 0.60 mts. fixed one in each row @ 10.00 Mtr C/C along the length & hangers for electrical fixtures as per the requirements including cost of all materials &labour for erection, all lead and lift, loading and unloading, HOM of machineries etc., complete as per the standard detailed technical specification, design and directions of the engineer in charge of the work. (PWD SR 2018-19, Item No. 38.46.2, Page No. 148) a) Span :Above 15 Meters upto 18 Meters (b) Material Specification: Colour Coated Galvalume Sheet, weighing 11.35 g/sqm BMT: 0.90 MM, APT : 0.95 MM, tolerance +/- 0.02mmSqm1699.51699.5540.0FalseNoneNoneFalseNoneFalse917730.00
3751828140697Nonecode17Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. (PWD SR, Vol.2, Item no. 6.32, Page No.17)Sqm1349.31349.3212.25FalseNoneNoneFalseNoneFalse286388.9250
3751829140697Nonecode18Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD SR, Vol.2, Item no.8.2.1, Page No.41)Sqm303.85303.85422.25FalseNoneNoneFalseNoneFalse128300.66250
3751830140697Nonecode19Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR, Vol.2, Item no.8.25, Page No.45)Sqm141.11141.11424.5FalseNoneNoneFalseNoneFalse59901.1950
3751831140697Nonecode20Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testingand commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. PVC pipes 110mm dia., 6 kg/sqcm & class 3 (PWD SR Vol-05, 2024-25, 10.1.7, Page No.113)m423.33423.3332.0FalseNoneNoneFalseNoneFalse13546.560
3751832140697Nonecode21Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters. 80x1.25 mm M.S. laths with 1.25 mm thick top cover including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (PWD SR Vol-2, 2023-24, I No.11.6.1, Page No.78)m2711.992711.9970.05FalseNoneNoneFalseNoneFalse189974.89950
3751833140697Nonecode22Providing and fixing ball bearing for rolling shutters including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (PWD SR Vol-2, 2023-24, I No.11.7, Page No.78)Nos415.09415.094.0FalseNoneNoneFalseNoneFalse1660.360
3751834140697Nonecode23Extra for providing mechanical device chain and crank operation for operating rolling shutters: Exceeding 16.80 m² in area including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (PWD SR Vol-2, 2023-24, I No.11.8.2, Page No.78)Nos1030.01030.070.05FalseNoneNoneFalseNoneFalse72151.50
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17233862660000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17233862660000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17233862660000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17233862660000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17233862660000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17233862990000NoneNoneELIGIBILITYALL THE TERMS AND CONDITIONS ARE AS PER TENDER BOKKLETNone
17233863420000NoneNoneELIGIBILITYwork bills will made as per the availability of fundsNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneProposals for subcontracting components of works amounting to more than 20% of the contract price (for each, the qualifications and experience of the identified sub-contractor in the relevant fields should be attached)NoneNone
NoneNoneNoneNoneContractors Registration CertificatePast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneWork done CertificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTurnover CertificateFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneLine of CreditFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateFalseTechnical Bid
Company Registration CertificateFalseTechnical Bid
Reserved Category CertificateFalseTechnical Bid
Small Scale Industries CertificateFalseTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone