tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1723541585000 | 0 | None | None | Roads | PKG 621 (B) CROSS DRAINAGE WORKS | 220353.26 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3767201 | 141836 | None | 1.14.1 | Excavation Mechanical Means
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications,
including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the
excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work
In all kinds of soils Depth upto 3 m"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 126.38 | 126.38 | 500.0 | False | None | None | False | None | False | 63190.0 | 0 | 3767202 | 141836 | None | 2.2.1 | Concrete for Foundation Works
Providing and laying in position Reinforced cement concrete for all Foundation works. The granite /trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)
M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7789.59 | 7789.59 | 6.8 | False | None | None | False | None | False | 52969.212 | 0 | 3767203 | 141836 | None | 2.1 h | TMT for All Structures
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft
annealed steel wire and other ancilary operations complete as per drawing and technical specification"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Tonne | 97894.63 | 97894.63 | 0.01 | False | None | None | False | None | False | 978.9463 | 0 | 3767204 | 141836 | None | 13.14 | Painting on concrete surface
Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2."
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 104.08 | 104.08 | 101.25 | False | None | None | False | None | False | 10538.1 | 0 | 3767205 | 141836 | None | 8.18 | Guard Stones / Boundary Pillers
Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 926.77 | 926.77 | 100.0 | False | None | None | False | None | False | 92677.0 | 0 |
| 1723541585000 | 1 | None | None | Roads | PKG 621 (B) Construction of Field Culverts | 385943.15 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3767206 | 141837 | None | 1.14.1 | Excavation Mechanical Means
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications,
including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the
excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work
In all kinds of soils Depth upto 3 m"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 126.38 | 126.38 | 55.16 | False | None | None | False | None | False | 6971.1208 | 0 | 3767207 | 141837 | None | 2.1.4 | Levelling Course - M10
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwor shall be paid separately)
Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7702.86 | 7702.86 | 3.44 | False | None | None | False | None | False | 26497.8384 | 0 | 3767208 | 141837 | None | 2.1 h | TMT for All Structures
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft
annealed steel wire and other ancilary operations complete as per drawing and technical specification"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Tonne | 97894.63 | 97894.63 | 0.373 | False | None | None | False | None | False | 36514.69699 | 0 | 3767209 | 141837 | None | 34.17 | Concrete for Sub Structure Works
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other
M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7834.2 | 7834.2 | 15.96 | False | None | None | False | None | False | 125033.832 | 0 | 3767210 | 141837 | None | 9.1 i | Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row .
Laying Reinforced cement concrete pipe NP4 / prestressed concrete pipe for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets
i. 1000 mm . ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 11744.48 | 11744.48 | 15.0 | False | None | None | False | None | False | 176167.2 | 0 | 3767211 | 141837 | None | 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 329.57 | 329.57 | 14.43 | False | None | None | False | None | False | 4755.6951 | 0 | 3767212 | 141837 | None | 1.1 | Form work as per Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 626.74 | 626.74 | 15.96 | False | None | None | False | None | False | 10002.7704 | 0 |
| 1723541585000 | 0 | None | None | Roads | PKG 621 (B) Road Portion | 54158469.36 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3767213 | 141838 | None | 16.29 | Providing and fixing of typical SHDP type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in rectangle shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The rectangle shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the rectangle shaped plate and middle plate and this square section will be welded to the bottom point of the rectangle shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 UNISR2023-24,V-3,PageNo.149Item No.16.29 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 19021.13 | 19021.13 | 2.0 | False | None | None | False | None | False | 38042.26 | 0 | 3767214 | 141838 | None | 2.5 | Clearing and Grubbing Road Land.
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness."
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 486.93 | 486.93 | 263.88 | False | None | None | False | None | False | 128491.0884 | 0 | 3767215 | 141838 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 117.71 | 117.71 | 8796.0 | False | None | None | False | None | False | 1035377.16 | 0 | 3767216 | 141838 | None | 3.5 | Recycling pavement by cold milling of existing bituminous layers, planning the surface after cold milling, reclaiming excavated material to the extent of 30 per cent of the required quantity, hauling and stock piling the reclaimed material near the central recycling plant after carrying out necessary checks and evaluation, adding fresh material including rejuvenators as required, mixing in a hot mix plant, transporting and laying at site and compacting to the required grade, level and thickness, all as specified in clause 519 using
Bituminous Concrete Grading - II"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 11753.15 | 11753.15 | 769.65 | False | None | None | False | None | False | 9045811.8975 | 0 | 3767217 | 141838 | None | 3.6 | Construction of Subgrade and Earthen Shoulders
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 610.83 | 610.83 | 1838.95 | False | None | None | False | None | False | 1123285.8285 | 0 | 3767218 | 141838 | None | 5.3 | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 17.34 | 17.34 | 51310.0 | False | None | None | False | None | False | 889715.4 | 0 | 3767219 | 141838 | None | 5.12 c | Dense Graded Bituminous Macadam Grading - II for traffic 20 MSADense Graded Bituminous Macadam Grading - II for traffic
20 MSA Providing and laying Dense Graded Bituminous Macadam with
40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 11707.31 | 11707.31 | 2693.78 | False | None | None | False | None | False | 31536917.5318 | 0 | 3767220 | 141838 | None | 5.16 c | Bituminous Concrete Grading II for traffic 20 MSA
Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade,
level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 13461.74 | 13461.74 | 769.65 | False | None | None | False | None | False | 10360828.191 | 0 |
| 1723541585000 | 1 | None | None | Roads | PKG 621 (B) Road Safety Measures | 8298519.05 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3767221 | 141839 | None | 8.16(i) | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc5th kilometre stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 6295.36 | 6295.36 | 4.0 | False | None | None | False | None | False | 25181.44 | 0 | 3767222 | 141839 | None | 8.16(ii) | Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc(ii) Ordinary kilometer stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 3626.55 | 3626.55 | 19.0 | False | None | None | False | None | False | 68904.45 | 0 | 3767223 | 141839 | None | 8.16(iii) | Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc(iii) 200 m stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(iii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 1043.24 | 1043.24 | 76.0 | False | None | None | False | None | False | 79286.24 | 0 | 3767224 | 141839 | None | 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes."
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 656.67 | 656.67 | 2793.5 | False | None | None | False | None | False | 1834407.645 | 0 | 3767225 | 141839 | None | 8.6 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012."
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 5882.77 | 5882.77 | 32.0 | False | None | None | False | None | False | 188248.64 | 0 | 3767226 | 141839 | None | 8.6 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012."
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 7954.38 | 7954.38 | 36.0 | False | None | None | False | None | False | 286357.68 | 0 | 3767227 | 141839 | None | 8.6 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012."
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 8238.11 | 8238.11 | 24.0 | False | None | None | False | None | False | 197714.64 | 0 | 3767228 | 141839 | None | 8.6 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012."
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 5512.31 | 5512.31 | 36.0 | False | None | None | False | None | False | 198443.16 | 0 | 3767229 | 141839 | None | 8.6 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012."
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 5294.25 | 5294.25 | 55.0 | False | None | None | False | None | False | 291183.75 | 0 | 3767230 | 141839 | None | 8.6 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012."
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 8208.38 | 8208.38 | 36.0 | False | None | None | False | None | False | 295501.68 | 0 | 3767231 | 141839 | None | 8.17 | Road Delineators
Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79 and the drawings."
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 2504.02 | 2504.02 | 45.0 | False | None | None | False | None | False | 112680.9 | 0 | 3767232 | 141839 | None | 8.31 | Rumble Strips
Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint."
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 232.93 | 232.93 | 553.0 | False | None | None | False | None | False | 128810.29 | 0 | 3767233 | 141839 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warrantyfor satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 452.24 | 452.24 | 3054.0 | False | None | None | False | None | False | 1381140.96 | 0 | 3767234 | 141839 | None | 8.14 i | Painting Lines, Dashes, Arrows etc on Roads in Two Coats on Old Work
Painting lines, dashes, arrows etc on roads in two coats on old work with ready mixed road marking paint conforming to IS: 164 on bituminous surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control
Over 10 cm in width"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 146.0 | 146.0 | 46.13 | False | None | None | False | None | False | 6734.98 | 0 | 3767235 | 141839 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 117.71 | 117.71 | 5.2 | False | None | None | False | None | False | 612.092 | 0 | 3767236 | 141839 | None | 8.25 i | Metal Beam Crash Barrier
Providing and erecting a ""W"" metal beam crash barriersystem comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal
beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 4509.96 | 4509.96 | 700.0 | False | None | None | False | None | False | 3156972.0 | 0 | 3767237 | 141839 | None | 8.18 | Guard Stones / Boundary Pillers
Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 926.77 | 926.77 | 50.0 | False | None | None | False | None | False | 46338.5 | 0 |
| 1723541585000 | 0 | None | None | Roads | PKG 621 (B) Maintenance Year 1 | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3767238 | 141840 | None | Vol - 3, Vide P.No 9, I. Code 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.(quantity to be executed 288) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3767239 | 141840 | None | Vol - 3, Vide P.No 147, I. Code 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. - Rates are inclusive of GST 18% quantity to be exucuted 19880) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3767240 | 141840 | None | Vol - 3, Vide P.No 91, I. Code 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 - Rates are inclusive of GST 18%(quantity to be executed 894.6)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3767241 | 141840 | None | Vol - 3, Vide P.No 91, I. Code 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 - Rates are inclusive of GST 18%(quantity to be executed 29820)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3767242 | 141840 | None | Vol - 3, Vide P.No 91, I. Code 10.5 | Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Rates are inclusive of GST 18%(quantity to be executed 0) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3767243 | 141840 | None | Vol - 1, Vide P.No 8, I. Code 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) - Rates are inclusive of GST 18%(quantity to be executed 75)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1723541585000 | 0 | None | None | Roads | PKG 621 (B) Maintenance Year 2 | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3767244 | 141841 | None | Vol - 3, Vide P.No 9, I. Code 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. - Rates are inclusive of GST 18%(quantity to be executed 288) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3767245 | 141841 | None | Vol - 3, Vide P.No 147, I. Code 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. - Rates are inclusive of GST 18%(quantity to be executed 7952)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3767246 | 141841 | None | Vol - 3, Vide P.No 91, I. Code 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 - Rates are inclusive of GST 18%(quantity to be executed 894.6)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3767247 | 141841 | None | Vol - 3, Vide P.No 91, I. Code 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 - Rates are inclusive of GST 18%(quantity to be executed 2982)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3767248 | 141841 | None | Vol - 3, Vide P.No 91, I. Code 10.5 | Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Rates are inclusive of GST 18%(quantity to be executed 0) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3767249 | 141841 | None | Vol - 1, Vide P.No 8, I. Code 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) - Rates are inclusive of GST 18%(quantity to be executed 75)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1723541585000 | 1 | None | None | Roads | PKG 621 (B) Maintenance Year 3 | 767914.89 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3767250 | 141842 | None | Vol - 3, Vide P.No 9, I. Code 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 564.84 | 564.84 | 79.16 | False | None | None | False | None | False | 44712.7344 | 0 | 3767251 | 141842 | None | Vol - 3, Vide P.No 147, I. Code 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 8.62 | 8.62 | 5864.0 | False | None | None | False | None | False | 50547.68 | 0 | 3767252 | 141842 | None | Vol - 3, Vide P.No 91, I. Code 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 56.05 | 56.05 | 659.7 | False | None | None | False | None | False | 36976.185 | 0 | 3767253 | 141842 | None | Vol - 3, Vide P.No 91, I. Code 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 139.41 | 139.41 | 2199.0 | False | None | None | False | None | False | 306562.59 | 0 | 3767254 | 141842 | None | Vol - 3, Vide P.No 91, I. Code 10.5 | Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 612.26 | 612.26 | 256.55 | False | None | None | False | None | False | 157075.303 | 0 | 3767255 | 141842 | None | Vol - 1, Vide P.No 8, I. Code 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 136.54 | 136.54 | 1260.0 | False | None | None | False | None | False | 172040.4 | 0 |
| 1723541585000 | 1 | None | None | Roads | PKG 621 (B) Maintenance Year 4 | 785280.1 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3767256 | 141843 | None | Vol - 3, Vide P.No 9, I. Code 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 564.84 | 564.84 | 79.16 | False | None | None | False | None | False | 44712.7344 | 0 | 3767257 | 141843 | None | Vol - 3, Vide P.No 147, I. Code 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 8.62 | 8.62 | 5864.0 | False | None | None | False | None | False | 50547.68 | 0 | 3767258 | 141843 | None | Vol - 3, Vide P.No 91, I. Code 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 56.05 | 56.05 | 659.7 | False | None | None | False | None | False | 36976.185 | 0 | 3767259 | 141843 | None | Vol - 3, Vide P.No 91, I. Code 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 139.41 | 139.41 | 2199.0 | False | None | None | False | None | False | 306562.59 | 0 | 3767260 | 141843 | None | Vol - 3, Vide P.No 91, I. Code 10.5 | Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 612.26 | 612.26 | 256.55 | False | None | None | False | None | False | 157075.303 | 0 | 3767261 | 141843 | None | Vol - 1, Vide P.No 8, I. Code 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 136.54 | 136.54 | 1260.0 | False | None | None | False | None | False | 172040.4 | 0 | 3767262 | 141843 | None | 16.22 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting ofmandatory requlatory cautionary nformatory and place identifications sign board as perdrawings and technical specification Clause 1910
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 2083.2 | 2083.2 | 7.33 | False | None | None | False | None | False | 15269.856 | 0 | 3767263 | 141843 | None | 16.24i | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 285.86 | 285.86 | 7.33 | False | None | None | False | None | False | 2095.3538 | 0 |
| 1723541585000 | 0 | None | None | Roads | PKG 621 (B) Maintenance Year 5 | 1275576.01 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3767264 | 141844 | None | Vol - 3, Vide P.No 9, I. Code 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 584.31 | 584.31 | 79.16 | False | None | None | False | None | False | 46253.9796 | 0 | 3767265 | 141844 | None | Vol - 3, Vide P.No 147, I. Code 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 8.92 | 8.92 | 5864.0 | False | None | None | False | None | False | 52306.88 | 0 | 3767266 | 141844 | None | Vol - 3, Vide P.No 91, I. Code 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 57.98 | 57.98 | 659.7 | False | None | None | False | None | False | 38249.406 | 0 | 3767267 | 141844 | None | Vol - 3, Vide P.No 91, I. Code 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 144.22 | 144.22 | 4398.0 | False | None | None | False | None | False | 634279.56 | 0 | 3767268 | 141844 | None | Vol - 3, Vide P.No 91, I. Code 10.5 | Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 636.35 | 636.35 | 513.1 | False | None | None | False | None | False | 326511.185 | 0 | 3767269 | 141844 | None | Vol - 1, Vide P.No 8, I. Code 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 141.25 | 141.25 | 1260.0 | False | None | None | False | None | False | 177975.0 | 0 |
| 1723541585000 | 1 | None | None | Roads | PKG 621 (B) Maintenance Year 6 | 31195177.47 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3767270 | 141845 | None | Vol - 3, Vide P.No 147, I. Code 16.22 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 3048.1 | 3048.1 | 7.33 | False | None | None | False | None | False | 22342.573 | 0 | 3767271 | 141845 | None | Vol - 3, Vide P.No 148, I. Code 16.24 i | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 316.49 | 316.49 | 7.33 | False | None | None | False | None | False | 2319.8717 | 0 | 3767272 | 141845 | None | Vol - 3, Vide P.No 66, I. Code 8.1 | Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 167.46 | 167.46 | 3200.0 | False | None | None | False | None | False | 535872.0 | 0 | 3767273 | 141845 | None | Vol - 3, Vide P.No 63, I. Code 8.4 | Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | cm | 1.38 | 1.38 | 4500.0 | False | None | None | False | None | False | 6210.0 | 0 | 3767274 | 141845 | None | Vol - 3, Vide P.No 31, I. Code 5.3i | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 18.43 | 18.43 | 51310.0 | False | None | None | False | None | False | 945643.3 | 0 | 3767275 | 141845 | None | Vol - 3, Vide P.No 38, I. Code 5.16 C | Bituminous Concrete Grading II for traffic less than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects - Rates are inclusive of GST 18 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 16693.0 | 16693.0 | 1539.3 | False | None | None | False | None | False | 25695534.9 | 0 | 3767276 | 141845 | None | Vol - 3, Vide P.No 67, I. Code 8.15 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 814.27 | 814.27 | 2793.5 | False | None | None | False | None | False | 2274663.245 | 0 | 3767277 | 141845 | None | Vol - 3, Vide P.No 74, I. Code 8.43 | Supplying & fixing of Solar Raised Pavement Markers made of polycarbonate molded body with circular shape, solar powered, LED self illumination in active mode, 360 degree illumination and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face in passive mode. The marker shall support a load of 20000 kg tested in ccordance to ASTM D 4280. The marker should be resistant to dust and water ingress according to IP 65 standards and should withstand tempertures in the range of 0 C to 70 C. Color of lighting could be provided in red or yellow amber) as per requirement and typicl frequency of blinking is 1 Hz. There should be current losses of less than 20 microamperes at 2.4 V in sleepcharging mode to enhance the life of the marker and a full charge should provide for a minimum autonomy of 50 hours. The height, width and length of the marker shall not be ess than 10 mm x 100 mm x 100 mm. Also, the surface diameter of the marker shall not be less than 100 mm respectively. The weight of the marker shall not exceed 0.5 kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive and complete as directed by the Engineer - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 560.77 | 560.77 | 3054.0 | False | None | None | False | None | False | 1712591.58 | 0 |
| 1723541585000 | 0 | None | None | Roads | PKG 621 (A) Road Portion | 51907663.23 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3767278 | 141846 | None | 16.29 | Providing and fixing of typical SHDP type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in rectangle shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The rectangle shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the rectangle shaped plate and middle plate and this square section will be welded to the bottom point of the rectangle shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 UNISR2023-24,V-3,PageNo.149Item No.16.29 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 19021.13 | 19021.13 | 2.0 | False | None | None | False | None | False | 38042.26 | 0 | 3767279 | 141846 | None | 2.5 (ii) a | Clearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungleUNI SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 486.93 | 486.93 | 100.98 | False | None | None | False | None | False | 49170.1914 | 0 | 3767280 | 141846 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1,Page No. 8 Item No.1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 117.7 | 117.7 | 2160.0 | False | None | None | False | None | False | 254232.0 | 0 | 3767281 | 141846 | None | SR 2023-24 V- 3 Item No 3.5 Page No 17 | Recycling pavement by cold milling of existing bituminous layers, planning the surface after cold milling, reclaiming excavated material to the extent of 30 per cent of the required quantity, hauling and stock piling the reclaimed material near the central recycling plant after carrying out necessary checks and evaluation, adding fresh material including rejuvenators as required, mixing in a hot mix plant, transporting and laying at site and compacting to the required grade, level and thickness, all as specified in clause 519 using
Bituminous Concrete Grading - II
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 11753.15 | 11753.15 | 280.03 | False | None | None | False | None | False | 3291234.5945 | 0 | 3767282 | 141846 | None | SR 2023-24 V- 1 Item No 1.8 Page No 7 | Embankment from Barrow Materials
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 587.29 | 587.29 | 655.0 | False | None | None | False | None | False | 384674.95 | 0 | 3767283 | 141846 | None | SR 2023-24 V- 3 Item No 3.6 Page No 17 | Construction of Subgrade and Earthen Shoulders
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 610.83 | 610.83 | 3688.23 | False | None | None | False | None | False | 2252881.5309 | 0 | 3767284 | 141846 | None | SR 2023-24 V- 3 Item No 4.2iv Page No 23 | By Mix in Place Method
Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 2922.8 | 2922.8 | 1306.72 | False | None | None | False | None | False | 3819281.216 | 0 | 3767285 | 141846 | None | SR 2023-24 V- 3 Item No 4.17 Page No 26 | Wet Mix Macadam (Plant mix method)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3170.6 | 3170.6 | 1747.88 | False | None | None | False | None | False | 5541828.328 | 0 | 3767286 | 141846 | None | SR 2023-24 V- 3 Item No 5.1 Page No 31 | Prime Coat over WMM/WBM
Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 50.8 | 50.8 | 5895.0 | False | None | None | False | None | False | 299466.0 | 0 | 3767287 | 141846 | None | SR 2023-24 V- 3 Item No 5.3 Page No 31 | Tack coat on Bituminous surface
Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 14.87 | 14.87 | 37410.0 | False | None | None | False | None | False | 556286.7 | 0 | 3767288 | 141846 | None | SR 2023-24 V- 3 Item No 5.12 c Page No 35 | Dense Graded Bituminous Macadam Grading - II for traffic 20 MSADense Graded Bituminous Macadam Grading - II for traffic
20 MSA Providing and laying Dense Graded Bituminous Macadam with
40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 11707.31 | 11707.31 | 1624.44 | False | None | None | False | None | False | 19017822.6564 | 0 | 3767289 | 141846 | None | SR 2023-24 V- 3 Item No 5.16 c Page No 37 | Bituminous Concrete Grading II for traffic 20 MSA
Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per
cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade,
level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 13461.74 | 13461.74 | 1122.3 | False | None | None | False | None | False | 15108110.802 | 0 | 3767290 | 141846 | None | SR 2023-24 V- 3 Item No 6.8.2 Page No 51 | Precast Cement Concrete Interlocking Blocks
Providing and laying 80mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Traffic Axle load repetitions upto 10MSA & for Residential Streets of approved shape and colour, laid in required pattern and including over 40mm thick compacted bed
of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (WMM/WBM Base to be paid separately as per relevant technical specification) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 1438.48 | 1438.48 | 900.0 | False | None | None | False | None | False | 1294632.0 | 0 |
| 1723541585000 | 1 | None | None | Roads | PKG 621 (A) Road Furnitures | 19608366.08 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3767291 | 141847 | None | SR 2023-24, V-3,Pg. No. 67 I. No.8.16i | Kilometre Stone
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC
5th kilometre stone (precast)
UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 6295.36 | 6295.36 | 1.0 | False | None | None | False | None | False | 6295.36 | 0 | 3767292 | 141847 | None | SR 2023-24, V-3,Pg. No. 67 I. No.8.16ii | Kilometre Stone
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC
5th kilometre stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16ii ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 3636.55 | 3636.55 | 6.0 | False | None | None | False | None | False | 21819.3 | 0 | 3767293 | 141847 | None | SR 2023-24, V-3, Iteam No 8.16 iii Page No 67 | Kilometre Stone
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC
200 m stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 1043.24 | 1043.24 | 24.0 | False | None | None | False | None | False | 25037.76 | 0 | 3767294 | 141847 | None | SR 2023-24, V-3, Iteam No 8.15 Page No 67 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 656.67 | 656.67 | 2740.65 | False | None | None | False | None | False | 1799702.6355 | 0 | 3767295 | 141847 | None | SR 2023-24, V-3, Iteam No 8.6 ii Page No 64-65 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012.90 cm equilateral triangle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 5882.77 | 5882.77 | 18.0 | False | None | None | False | None | False | 105889.86 | 0 | 3767296 | 141847 | None | SR 2023-24, V-3, Iteam No 8.6 vii, Page No 64-65 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012.90 cm circular ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 7954.38 | 7954.38 | 23.0 | False | None | None | False | None | False | 182950.74 | 0 | 3767297 | 141847 | None | SR 2023-24, V-3, Iteam No 8.6 ix, Page No 64-65 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012.90 mm x 75 mm rectangular ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 8238.11 | 8238.11 | 18.0 | False | None | None | False | None | False | 148285.98 | 0 | 3767298 | 141847 | None | SR 2023-24, V-3, Iteam No 8.6 xi, Page No 64-65 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012.60 mm x 50 mm rectangular
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 5512.31 | 5512.31 | 16.0 | False | None | None | False | None | False | 88196.96 | 0 | 3767299 | 141847 | None | SR 2023-24, V-3, Iteam No 8.6 xii, Page No 64-65 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012.60 cm x 45 cm rectangular
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 5294.25 | 5294.25 | 25.0 | False | None | None | False | None | False | 132356.25 | 0 | 3767300 | 141847 | None | SR 2023-24, V-3, Iteam No 8.6 xv, Page No 64-65 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 90 cm high octagon
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 8208.38 | 8208.38 | 21.0 | False | None | None | False | None | False | 172375.98 | 0 | 3767301 | 141847 | None | SR 2023-24, V-3, Iteam No 8.17, Page No 67 | Road Delineators
Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79 and the drawings. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 2504.02 | 2504.02 | 370.0 | False | None | None | False | None | False | 926487.4 | 0 | 3767302 | 141847 | None | SR 2023-24, V-3 Iteam No 8.31, Page No 71 | Rumble Strips
Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 232.93 | 232.93 | 405.0 | False | None | None | False | None | False | 94336.65 | 0 | 3767303 | 141847 | None | SR 2023-24, V-3 Iteam No 8.43, Page No 74 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warrantyfor satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 452.24 | 452.24 | 1496.25 | False | None | None | False | None | False | 676664.1 | 0 | 3767304 | 141847 | None | SR 2023-24, V-3 Iteam No 8.14i, Page No 66 | Painting Lines, Dashes, Arrows etc on Roads in Two Coats on Old Work
Painting lines, dashes, arrows etc on roads in two coats on old work with ready mixed road marking paint conforming to IS: 164 on bituminous surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control
Over 10 cm in width ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 177.18 | 177.18 | 51.25 | False | None | None | False | None | False | 9080.475 | 0 | 3767305 | 141847 | None | SR 2023-24, V-1 Iteam No 1.12 Page No 8 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 1 * 6 Reels | 117.71 | 117.71 | 18.94 | False | None | None | False | None | False | 2229.4274 | 0 | 3767306 | 141847 | None | SR 2023-24, V-3, Iteam No 8.25i, Page No 69 | Metal Beam Crash Barrier
Providing and erecting a ""W"" metal beam crash barriersystem comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal
beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 4509.96 | 4509.96 | 2545.0 | False | None | None | False | None | False | 11477848.2 | 0 | 3767307 | 141847 | None | SR 2023-24, V-3 Iteam No 8.18 Page No 67 | Guard Stones / Boundary Pillers
Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 926.77 | 926.77 | 200.0 | False | None | None | False | None | False | 185354.0 | 0 | 3767308 | 141847 | None | SR 2023-24 V- 3 Item No 14.4 A Page No 129 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical
specifications Stone/Boulder
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 2368.97 | 2368.97 | 1500.0 | False | None | None | False | None | False | 3553455.0 | 0 |
| 1723541585000 | 0 | None | None | Roads | PKG 621 (A) CD Repair | 63190.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3767309 | 141848 | None | SR 2023-24 V- 1 Item No 1.14.1 Page No 8 | Excavation Mechanical Means
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications,
including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the
excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work
In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 126.38 | 126.38 | 500.0 | False | None | None | False | None | False | 63190.0 | 0 |
| 1723541585000 | 1 | None | None | Roads | PKG 621 (A) Field Culverts | 964098.46 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3767310 | 141849 | None | SR 2023-24, V-1 Iteam No 1.14.1 Page No 8 | Excavation Mechanical Means
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications,
including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the
excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work
In all kinds of soils Depth upto 3 m
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 126.38 | 126.38 | 137.9 | False | None | None | False | None | False | 17427.802 | 0 | 3767311 | 141849 | None | SR 2023-24, V-1 Iteam No 2.1.4 Page No 15 | Levelling Course - M10
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwor shall be paid separately)
Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7702.86 | 7702.86 | 8.59 | False | None | None | False | None | False | 66167.5674 | 0 | 3767312 | 141849 | None | SR 2023-24,V-1 Iteam No 2.1 h Page No 18 | TMT for All Structures
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft
annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | t | 97894.63 | 97894.63 | 0.93 | False | None | None | False | None | False | 91042.0059 | 0 | 3767313 | 141849 | None | SR 2023-24, V-1 Iteam No 2.4.2 Page No 16 | Concrete for Sub Structure Works
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other
M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7834.2 | 7834.2 | 39.86 | False | None | None | False | None | False | 312271.212 | 0 | 3767314 | 141849 | None | SR 2023-24, V-3 Iteam No 9.1 i, Page No 87 | Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row .
Laying Reinforced cement concrete pipe NP4 / prestressed concrete pipe for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets
i. 1000 mm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 11744.48 | 11744.48 | 37.5 | False | None | None | False | None | False | 440418.0 | 0 | 3767315 | 141849 | None | SR 2023-24, V-1 Iteam No 1.9 Page No 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 329.57 | 329.57 | 36.08 | False | None | None | False | None | False | 11890.8856 | 0 | 3767316 | 141849 | None | Addendum I | Form work as per Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Percentage | 623.74 | 623.74 | 39.89 | False | None | None | False | None | False | 24880.9886 | 0 |
| 1723541585000 | 0 | None | None | Roads | PKG 621 (A) Maintenance Chapter | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3767317 | 141850 | None | Vol - 3, Vide P.No 9, I. Code 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.(quantity to be executed 288) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3767318 | 141850 | None | Vol - 3, Vide P.No 147, I. Code 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. - Rates are inclusive of GST 18% quantity to be exucuted 19880) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3767319 | 141850 | None | Vol - 3, Vide P.No 91, I. Code 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 - Rates are inclusive of GST 18%(quantity to be executed 894.6)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3767320 | 141850 | None | Vol - 3, Vide P.No 91, I. Code 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 - Rates are inclusive of GST 18%(quantity to be executed 29820)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3767321 | 141850 | None | Vol - 3, Vide P.No 91, I. Code 10.5 | Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Rates are inclusive of GST 18%(quantity to be executed 0) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3767322 | 141850 | None | Vol - 1, Vide P.No 8, I. Code 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) - Rates are inclusive of GST 18%(quantity to be executed 75)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1723541585000 | 0 | None | None | Roads | PKG 621 (A) Maintenance Year 2 | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3767323 | 141851 | None | Vol - 3, Vide P.No 9, I. Code 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. - Rates are inclusive of GST 18%(quantity to be executed 288) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3767324 | 141851 | None | Vol - 3, Vide P.No 147, I. Code 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. - Rates are inclusive of GST 18%(quantity to be executed 7952)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3767325 | 141851 | None | Vol - 3, Vide P.No 91, I. Code 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 - Rates are inclusive of GST 18%(quantity to be executed 894.6)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3767326 | 141851 | None | Vol - 3, Vide P.No 91, I. Code 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 - Rates are inclusive of GST 18%(quantity to be executed 2982)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3767327 | 141851 | None | Vol - 3, Vide P.No 91, I. Code 10.5 | Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Rates are inclusive of GST 18%(quantity to be executed 0) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3767328 | 141851 | None | Vol - 1, Vide P.No 8, I. Code 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) - Rates are inclusive of GST 18%(quantity to be executed 75)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1723541585000 | 1 | None | None | Roads | PKG 621 (A) Maintenance Year 3 | 258602.17 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3767329 | 141852 | None | S.R. 2023-24, Vol - 3 Vide Page No. 9 Itm 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Including 18% GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 545.36 | 545.36 | 30.29 | False | None | None | False | None | False | 16518.9544 | 0 | 3767330 | 141852 | None | Vol - 3, Vide P.No 147, I. Code 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 8.32 | 8.32 | 2280.0 | False | None | None | False | None | False | 18969.6 | 0 | 3767331 | 141852 | None | Vol - 3, Vide P.No 91, I. Code 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 54.12 | 54.12 | 256.5 | False | None | None | False | None | False | 13881.78 | 0 | 3767332 | 141852 | None | Vol - 3, Vide P.No 91, I. Code 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 134.6 | 134.6 | 855.0 | False | None | None | False | None | False | 115083.0 | 0 | 3767333 | 141852 | None | Vol - 3, Vide P.No 147, I. Code 16.22 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 2753.2 | 2753.2 | 2.85 | False | None | None | False | None | False | 7846.62 | 0 | 3767334 | 141852 | None | Vol - 3, Vide P.No 148, I. Code 16.24i | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 285.86 | 285.86 | 2.85 | False | None | None | False | None | False | 814.701 | 0 | 3767335 | 141852 | None | Vol - 3, Vide P.No 91, I. Code 10.5 | Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 591.15 | 591.15 | 99.75 | False | None | None | False | None | False | 58967.2125 | 0 | 3767336 | 141852 | None | Vol - 1, Vide P.No 8, I. Code 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 131.83 | 131.83 | 90.0 | False | None | None | False | None | False | 11864.7 | 0 | 3767337 | 141852 | None | Vol - 3, Vide P.No 66, I. Code 8.1 | Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 151.26 | 151.26 | 60.0 | False | None | None | False | None | False | 9075.6 | 0 | 3767338 | 141852 | None | Vol - 3, Vide P.No 63, I. Code 8.4 | Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | cm | 1.24 | 1.24 | 4500.0 | False | None | None | False | None | False | 5580.0 | 0 |
| 1723541585000 | 0 | None | None | Roads | PKG 621 (A) Maintenance Year 4 | 403448.31 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3767339 | 141853 | None | Vol - 3, Vide P.No 9, I. Code 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 564.84 | 564.84 | 30.29 | False | None | None | False | None | False | 17109.0036 | 0 | 3767340 | 141853 | None | Vol - 3, Vide P.No 147, I. Code 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 8.62 | 8.62 | 2280.0 | False | None | None | False | None | False | 19653.6 | 0 | 3767341 | 141853 | None | Vol - 3, Vide P.No 91, I. Code 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 56.05 | 56.05 | 256.5 | False | None | None | False | None | False | 14376.825 | 0 | 3767342 | 141853 | None | Vol - 3, Vide P.No 91, I. Code 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 139.41 | 139.41 | 855.0 | False | None | None | False | None | False | 119195.55 | 0 | 3767343 | 141853 | None | Vol - 3, Vide P.No 91, I. Code 10.5 | Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 612.26 | 612.26 | 99.75 | False | None | None | False | None | False | 61072.935 | 0 | 3767344 | 141853 | None | Vol - 1, Vide P.No 8, I. Code 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 136.54 | 136.54 | 1260.0 | False | None | None | False | None | False | 172040.4 | 0 |
| 1723541585000 | 0 | None | None | Roads | PKG 621 (A) Maintenance Year 5 | 604451.24 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3767345 | 141854 | None | Vol - 3, Vide P.No 9, I. Code 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 584.31 | 584.31 | 30.29 | False | None | None | False | None | False | 17698.7499 | 0 | 3767346 | 141854 | None | Vol - 3, Vide P.No 147, I. Code 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 8.92 | 8.92 | 2280.0 | False | None | None | False | None | False | 20337.6 | 0 | 3767347 | 141854 | None | Vol - 3, Vide P.No 91, I. Code 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 57.98 | 57.98 | 256.5 | False | None | None | False | None | False | 14871.87 | 0 | 3767348 | 141854 | None | Vol - 3, Vide P.No 91, I. Code 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 144.22 | 144.22 | 1710.0 | False | None | None | False | None | False | 246616.2 | 0 | 3767349 | 141854 | None | Vol - 3, Vide P.No 91, I. Code 10.5 | Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 636.35 | 636.35 | 199.5 | False | None | None | False | None | False | 126951.825 | 0 | 3767350 | 141854 | None | Vol - 1, Vide P.No 8, I. Code 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 141.25 | 141.25 | 1260.0 | False | None | None | False | None | False | 177975.0 | 0 |
| 1723541585000 | 0 | None | None | Roads | PKG 621 (A) Maintenance Year 6 | 23046232.28 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3767351 | 141855 | None | Vol - 3, Vide P.No 147, I. Code 16.22 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 3048.1 | 3048.1 | 2.85 | False | None | None | False | None | False | 8687.085 | 0 | 3767352 | 141855 | None | Vol - 3, Vide P.No 148, I. Code 16.24 i | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 316.49 | 316.49 | 2.85 | False | None | None | False | None | False | 901.9965 | 0 | 3767353 | 141855 | None | Vol - 3, Vide P.No 66, I. Code 8.1 | Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 167.46 | 167.46 | 3200.0 | False | None | None | False | None | False | 535872.0 | 0 | 3767354 | 141855 | None | Vol - 3, Vide P.No 63, I. Code 8.4 | Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | cm | 1.38 | 1.38 | 4500.0 | False | None | None | False | None | False | 6210.0 | 0 | 3767355 | 141855 | None | Vol - 3, Vide P.No 31, I. Code 5.3i | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 18.43 | 18.43 | 37410.0 | False | None | None | False | None | False | 689466.3 | 0 | 3767356 | 141855 | None | Vol - 3, Vide P.No 38, I. Code 5.16 C | Bituminous Concrete Grading II for traffic less than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects - Rates are inclusive of GST 18 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 16693.0 | 16693.0 | 1122.3 | False | None | None | False | None | False | 18734553.9 | 0 | 3767357 | 141855 | None | Vol - 3, Vide P.No 67, I. Code 8.15 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 814.27 | 814.27 | 2740.65 | False | None | None | False | None | False | 2231629.0755 | 0 | 3767358 | 141855 | None | Vol - 3, Vide P.No 74, I. Code 8.43 | Supplying & fixing of Solar Raised Pavement Markers made of polycarbonate molded body with circular shape, solar powered, LED self illumination in active mode, 360 degree illumination and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face in passive mode. The marker shall support a load of 20000 kg tested in ccordance to ASTM D 4280. The marker should be resistant to dust and water ingress according to IP 65 standards and should withstand tempertures in the range of 0 C to 70 C. Color of lighting could be provided in red or yellow amber) as per requirement and typicl frequency of blinking is 1 Hz. There should be current losses of less than 20 microamperes at 2.4 V in sleepcharging mode to enhance the life of the marker and a full charge should provide for a minimum autonomy of 50 hours. The height, width and length of the marker shall not be ess than 10 mm x 100 mm x 100 mm. Also, the surface diameter of the marker shall not be less than 100 mm respectively. The weight of the marker shall not exceed 0.5 kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive and complete as directed by the Engineer - Rates are inclusive of GST 18%
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 560.77 | 560.77 | 1496.0 | False | None | None | False | None | False | 838911.92 | 0 |
|
|
---|