1723532734000 | 0 | None | None | Roads | Construction of CC Road in ward no 12 mariyamma House to koteppa house, mechanic veerabadrappa house to pacchi shreenivasa house, ward no 15 chikkanakatte hampakka house to Petevasavesvara temple, in ward 20 tata S Nagaraj House to Lakshman naik house, in ward no 2 govt hospital behind juber house near, in ward no 8 banakara gurusiddappa house to hansi shivanna house and in ward no 11 shetru kaalamma house to hosapete road | 1589691.91 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3764594 | 141646 | None | item_code1 | Compacting original ground supporting embankment Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction | Cum | 130.09 | 130.09 | 24.0 | False | None | None | False | None | False | 3122.16 | 0 | 3764595 | 141646 | None | item_code2 | Construction of Subgrade and Earthen Shoulders: Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 | Cum | 610.83 | 610.83 | 24.0 | False | None | None | False | None | False | 14659.92 | 0 | 3764596 | 141646 | None | item_code3 | Wet Mix Macadam (Plant Mix Method): Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | Cum | 3170.6 | 3170.6 | 24.0 | False | None | None | False | None | False | 76094.4 | 0 | 3764597 | 141646 | None | item_code4 | Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS:383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 7897.4 | 7897.4 | 16.0 | False | None | None | False | None | False | 126358.4 | 0 | 3764598 | 141646 | None | item_code5 | Repairs Of Existing Chamber Providing and fixing SFRC frame and cover conforming to IS 12592 (part-I)-1988 and IS 12592 (part-II)- 1991 with latest amendment, including cutting slabs to the required size for the opening and fixing the cover in C.C. 1:2:4 and C.M. 1:3 plastering 20 mm thick to all exposed faces, curing for 10 days with all lead and lift with appurtenances. complete Heavy Duty | Each | 3176.8 | 3176.8 | 2.0 | False | None | None | False | None | False | 6353.6 | 0 | 3764599 | 141646 | None | item_code6 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead | Sqm | 7.43 | 7.43 | 167.0 | False | None | None | False | None | False | 1240.81 | 0 | 3764600 | 141646 | None | item_code7 | Scarifying Existing Granular Surface to a Depth of 50 mm by Manual Means | Sqm | 61.95 | 61.95 | 167.0 | False | None | None | False | None | False | 10345.65 | 0 | 3764601 | 141646 | None | item_code8 | Compacting original ground supporting embankment Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction | Cum | 130.09 | 130.09 | 25.05 | False | None | None | False | None | False | 3258.7545 | 0 | 3764602 | 141646 | None | item_code9 | Construction of Subgrade and Earthen Shoulders: Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 | Cum | 610.83 | 610.83 | 25.05 | False | None | None | False | None | False | 15301.2915 | 0 | 3764603 | 141646 | None | item_code10 | Wet Mix Macadam (Plant Mix Method): Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | Cum | 3170.6 | 3170.6 | 16.7 | False | None | None | False | None | False | 52949.02 | 0 | 3764604 | 141646 | None | item_code11 | Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS:383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 7897.4 | 7897.4 | 16.7 | False | None | None | False | None | False | 131886.58 | 0 | 3764605 | 141646 | None | item_code12 | Repairs Of Existing Chamber Providing and fixing SFRC frame and cover conforming to IS 12592 (part-I)-1988 and IS 12592 (part-II)- 1991 with latest amendment, including cutting slabs to the required size for the opening and fixing the cover in C.C. 1:2:4 and C.M. 1:3 plastering 20 mm thick to all exposed faces, curing for 10 days with all lead and lift with appurtenances. complete Heavy Duty | Each | 3176.8 | 3176.8 | 3.0 | False | None | None | False | None | False | 9530.4 | 0 | 3764606 | 141646 | None | item_code13 | Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS:383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 7897.4 | 7897.4 | 26.8025 | False | None | None | False | None | False | 211670.0635 | 0 | 3764607 | 141646 | None | item_code14 | Repairs Of Existing Chamber Providing and fixing SFRC frame and cover conforming to IS 12592 (part-I)-1988 and IS 12592 (part-II)- 1991 with latest amendment, including cutting slabs to the required size for the opening and fixing the cover in C.C. 1:2:4 and C.M. 1:3 plastering 20 mm thick to all exposed faces, curing for 10 days with all lead and lift with appurtenances. complete Heavy Duty | Each | 3176.8 | 3176.8 | 5.0 | False | None | None | False | None | False | 15884.0 | 0 | 3764608 | 141646 | None | item_code15 | Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS:383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 7897.4 | 7897.4 | 23.55 | False | None | None | False | None | False | 185983.77 | 0 | 3764609 | 141646 | None | item_code16 | Repairs Of Existing Chamber Providing and fixing SFRC frame and cover conforming to IS 12592 (part-I)-1988 and IS 12592 (part-II)- 1991 with latest amendment, including cutting slabs to the required size for the opening and fixing the cover in C.C. 1:2:4 and C.M. 1:3 plastering 20 mm thick to all exposed faces, curing for 10 days with all lead and lift with appurtenances. complete Heavy Duty | Each | 3176.8 | 3176.8 | 13.0 | False | None | None | False | None | False | 41298.4 | 0 | 3764610 | 141646 | None | item_code17 | Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS:383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 7897.4 | 7897.4 | 24.0 | False | None | None | False | None | False | 189537.6 | 0 | 3764611 | 141646 | None | item_code18 | Repairs Of Existing Chamber Providing and fixing SFRC frame and cover conforming to IS 12592 (part-I)-1988 and IS 12592 (part-II)- 1991 with latest amendment, including cutting slabs to the required size for the opening and fixing the cover in C.C. 1:2:4 and C.M. 1:3 plastering 20 mm thick to all exposed faces, curing for 10 days with all lead and lift with appurtenances. complete Heavy Duty | Each | 3176.8 | 3176.8 | 12.0 | False | None | None | False | None | False | 38121.6 | 0 | 3764612 | 141646 | None | item_code19 | Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS:383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 7897.4 | 7897.4 | 25.2 | False | None | None | False | None | False | 199014.48 | 0 | 3764613 | 141646 | None | item_code20 | Repairs Of Existing Chamber Providing and fixing SFRC frame and cover conforming to IS 12592 (part-I)-1988 and IS 12592 (part-II)- 1991 with latest amendment, including cutting slabs to the required size for the opening and fixing the cover in C.C. 1:2:4 and C.M. 1:3 plastering 20 mm thick to all exposed faces, curing for 10 days with all lead and lift with appurtenances. complete Heavy Duty | Each | 3176.8 | 3176.8 | 9.0 | False | None | None | False | None | False | 28591.2 | 0 | 3764614 | 141646 | None | item_code21 | Compacting original ground supporting embankment Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction | Cum | 130.09 | 130.09 | 22.88 | False | None | None | False | None | False | 2976.4592 | 0 | 3764615 | 141646 | None | item_code22 | Construction of Subgrade and Earthen Shoulders: Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 | Cum | 610.83 | 610.83 | 22.88 | False | None | None | False | None | False | 13975.7904 | 0 | 3764616 | 141646 | None | item_code23 | Wet Mix Macadam (Plant Mix Method): Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | Cum | 3170.6 | 3170.6 | 22.88 | False | None | None | False | None | False | 72543.328 | 0 | 3764617 | 141646 | None | item_code24 | Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS:383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 7897.4 | 7897.4 | 17.6 | False | None | None | False | None | False | 138994.24 | 0 |
|