1723112975000 | 0 | None | None | Buildings | Construction of compound wall around OHT and RO plant near Government Girls College | 407583.41 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3725550 | 138180 | None | Code01 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work n all kinds of soils Depth upto 3 m | Cum | 249.26 | 249.26 | 5.89 | False | None | None | False | None | False | 1468.1414 | 0 | 3725551 | 138180 | None | Code02 | Wet Mix Macadam (Plant mix method) : Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | Cum | 2635.77 | 2635.77 | 5.4 | False | None | None | False | None | False | 14233.158 | 0 | 3725552 | 138180 | None | Code03 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates | Cum | 5833.92 | 5833.92 | 5.4 | False | None | None | False | None | False | 31503.168 | 0 | 3725553 | 138180 | None | Code04 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately)M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates | Cum | 10194.53 | 10194.53 | 3.29 | False | None | None | False | None | False | 33540.0037 | 0 | 3725554 | 138180 | None | Code05 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification | Tonne | 92140.71 | 92140.71 | 0.33 | False | None | None | False | None | False | 30406.4343 | 0 | 3725555 | 138180 | None | Code06 | Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-inCharge. | Kg | 140.08 | 140.08 | 1500.0 | False | None | None | False | None | False | 210120.0 | 0 | 3725556 | 138180 | None | Code07 | Providing and fixing G.I. chain link fabric fencing of required width inmesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineerin-charge. (Made of G.I. wire of dia. 4 mm, PVC coated to achieve outer dia not less than 5 mm in required colour and shade | Sqm | 140.08 | 140.08 | 28.8 | False | None | None | False | None | False | 4034.304 | 0 | 3725557 | 138180 | None | Code08 | Providing and laying 80mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS15658 for Commercial Traffic Axle load repetitions upto 10MSA & for Residential Streets of approved shape and colour, laid in required pattern and including over 40mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (WMM/WBM Base to be paid separately as per relevant technical specification) | Sqm | 1195.83 | 1195.83 | 36.0 | False | None | None | False | None | False | 43049.88 | 0 | 3725558 | 138180 | None | Code09 | Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 15 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409 a. PCC M15 grade for kerb base | Mtr | 249.26 | 249.26 | 24.0 | False | None | None | False | None | False | 5982.24 | 0 | 3725559 | 138180 | None | Code10 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on newwork over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge | Mtr | 172.01 | 172.01 | 193.28 | False | None | None | False | None | False | 33246.0928 | 0 |
|