1723982734000 | 1 | None | None | Irrigation and Other Works | Construction of Protection Wall at Ch 75.30Km of SBC Main Canal & Repair & Restoration of Main gate of Dy-25 of SBC | 586744.34 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3802849 | 144332 | None | 001 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. (Depth exceeding 1.5m, but not exceeding 3 m) | Cum | 271.95 | 271.95 | 25.2 | False | None | None | False | None | False | 6853.14 | 0 | 3802850 | 144332 | None | 002 | Providing and laying in-situ vibrated M-10 grade cement concrete using 80 mm down approved, clean, hard graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishingcuring with all other ancillary operations complete. | Cum | 6463.8 | 6463.8 | 2.1 | False | None | None | False | None | False | 13573.98 | 0 | 3802851 | 144332 | None | 003 | Providing, fabricating and placing in position steel reinforcement bars for RCC structures including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, lapping welding joints wherever required, tying with 1.25 mm diameter soft annealed steel wire and all other ancillary operations complete. | Kg | 93.28 | 93.28 | 386.55 | False | None | None | False | None | False | 36057.384 | 0 | 3802852 | 144332 | None | 004 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates with placing and sinking plums of size 150 to 80 mm upto 15 percent for gravity type structures including cost of all materials, machinery, labour,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete. | Cum | 6502.65 | 6502.65 | 22.4 | False | None | None | False | None | False | 145659.36 | 0 | 3802853 | 144332 | None | 005 | Providing and laying insitu vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for bed lining of canal including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete. | Cum | 6369.3 | 6369.3 | 0.94 | False | None | None | False | None | False | 5987.142 | 0 | 3802854 | 144332 | None | 006 | Providing and laying insitu vibrated M-15 grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for side lining of canal including cost of all materials, machinery, labour,cleaning, batching, mixing, formwork, supports, placing in position, levelling, vibrating, finishing junction of bed and sides to required curvature, finishing side slopes, curing with all other ancillary operations complete. | Cum | 8688.75 | 8688.75 | 0.935 | False | None | None | False | None | False | 8123.98125 | 0 | 3802855 | 144332 | None | 007 | Providing casing embankment for breached / damaged portion of canal using approved pervious /semi-pervious soil in layers of 100 to 150 mm ( before compaction ) including cost of all materials, machinery, labour, all operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, sectioning sides / edges, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller or pneumatic / vibrating plate compactors with all other ancillary operations complete. | Cum | 691.95 | 691.95 | 400.0 | False | None | None | False | None | False | 276780.0 | 0 | 3802856 | 144332 | None | 008 | Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical lift gate ( with top seal ) consisting of skin plate, siffeners, horizontal and vertical girders, wheels, guide rollers, rubber seals with all accessories for canal escape / regulator vent including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, seal fixing and all other ancillary operations complete as per specifications and approved drawings. | Tonne | 185325.0 | 185325.0 | 0.252 | False | None | None | False | None | False | 46701.9 | 0 | 3802857 | 144332 | None | 009 | DesDesign, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical lift gate consisting of skin plate, vertical and horizontal girders, wheels, stiffeners, lifting brackets, guide shoes, rubber seals with all accessories for barrage including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, seal fixing and all other ancillary operations complete as per specifications and approved drawings. | Tonne | 161490.0 | 161490.0 | 0.105 | False | None | None | False | None | False | 16956.45 | 0 | 3802858 | 144332 | None | 010 | Design, fabrication, supply, erection, testing and commissioning of adequate capacity screw type hoist consisting of supporting structure, platfom, railing, ladder with all accessories for operating canal escape/ regulator gate including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, greasing, applying two coats of zinc chromate red oxide primer and three coats of approved synthetic enamel paint and all other ancillary operations complete as per specifications and approved drawings. | Tonne | 50085.0 | 50085.0 | 0.6 | False | None | None | False | None | False | 30051.0 | 0 |
|