1724062648000 | 0 | None | None | Roads | Construction of road at Markada Krishnanagara of 14th ward in MCC limits (15th Finance 2020-21saving grant) | 844117.5 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3810680 | 144680 | None | code01 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead (Page No. 49 Item No.-3.5 Road and Bridge SR 2023-24 VOLUME-3 ). | Sqm | 6.72 | 6.72 | 368.0 | False | None | None | False | None | False | 2472.96 | 0 | 3810681 | 144680 | None | code02 | Demolishing R.C.C. work manually/ by mechanical means including stack ing of steel bars and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge (Page No. 187 Item No19.3 Building SR 2023-24 VOLUME-2 ). | Cum | 2717.12 | 2717.12 | 0.98 | False | None | None | False | None | False | 2662.7776 | 0 | 3810682 | 144680 | None | code03 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work (Page No. 8 Item No.1.12 COMMON SR 2023-24 VOLUME-1 ). | Cum | 106.4 | 106.4 | 97.82 | False | None | None | False | None | False | 10408.048 | 0 | 3810683 | 144680 | None | code04 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: PVC pipes 200mm dia., 6 kg/sqcm & class 3 (P No. 113 Sl No.10.1.10 W.S and UGD WORKS S.R 2023-24 VOLUME -V). | Rmtr | 1248.8 | 1248.8 | 13.5 | False | None | None | False | None | False | 16858.8 | 0 | 3810684 | 144680 | None | code05 | Constructing brick masonry chamber of internal dimension 450x450mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover..( Page no 187, item no 16.10 ,W.S and UGD WORKS S.R 2023-24 VOLUME -V). | No | 4744.32 | 4744.32 | 2.0 | False | None | None | False | None | False | 9488.64 | 0 | 3810685 | 144680 | None | code06 | PVC pipes of 6 Kg/cm2 for 110mm(1.894)(P No. A45 Sl No. 677 W.S and UGD WORKS S.R 2023-24 VOLUME -V). | Rmtr | 235.2 | 235.2 | 18.0 | False | None | None | False | None | False | 4233.6 | 0 | 3810686 | 144680 | None | code07 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates (Page No. 15 Item No.-2.1.6 common SR 2023-24 VOLUME-1 ). | Cum | 6992.16 | 6992.16 | 0.65 | False | None | None | False | None | False | 4544.904 | 0 | 3810687 | 144680 | None | code08 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 14:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 140 kg/ m3 , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 7 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 t vibratory roller, finishing and curing.(Page No. 49 Item No.-6.1 Road and Bridge SR 2023-24 VOLUME-3 ). | Cum | 5510.4 | 5510.4 | 42.88 | False | None | None | False | None | False | 236285.952 | 0 | 3810688 | 144680 | None | code09 | Construction of un-reinforced plain cement concrete pavement using RMC M-30 grade with OPC @ 270 kg/m3 and GGBS@ 90 kg/m3 (75:25 proportion) as per approved mix design procedure and thickness as per design, over a prepared sub base. The superplastisiser confirming to IS 9103-1999 Reaffirmed-2008,Coarse aggregates and Fine aggregate confirming to IS:383-2016, transported to site, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work). Spreading the concrete with shovels, rackers and compacted using needle, suitable plate vibrator and finished in a continuous operation including provision of separation membrane and Hessian cloth finishing to lines and grades complete including cost of all materials, labour, all lead & lift, loading charges as per specification & direction of Engineer - incharge of the work. (Groove cutting shall be paid seperately) (Page No.51 Item No.-6.6 Road and Bridge SR 2023-24 | Cum | 7586.88 | 7586.88 | 65.21 | False | None | None | False | None | False | 494740.4448 | 0 | 3810689 | 144680 | None | code10 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (Page No. 7 Item No.-1.9 common SR 2023-24 VOLUME-III). | Cum | 297.92 | 297.92 | 12.4 | False | None | None | False | None | False | 3694.208 | 0 | 3810690 | 144680 | None | code11 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Page No. 18 Item No.2.11-h COMMON SR 2023-24 VOLUME-1 ). | Tonne | 88492.32 | 88492.32 | 0.3 | False | None | None | False | None | False | 26547.696 | 0 | 3810691 | 144680 | None | code12 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications (Page No. 16 Item No.-2.4.2 common SR 2023-24 VOLUME-1 ). | Cum | 9560.38 | 9560.38 | 2.03 | False | None | None | False | None | False | 19407.5714 | 0 | 3810692 | 144680 | None | code13 | Disposal off the excess excavated earth of all types by vehicle including loading, unloading with all lead and lifts, labour, HOM of machineries etc. for Distance of 4 to 5 km (P No. 63 Sl No. 4.5 W.S and UGD WORKS S.R 2021-22 VOLUME -V). | Cum | 147.84 | 147.84 | 86.39 | False | None | None | False | None | False | 12771.8976 | 0 |
|