1723880270000 | 0 | None | None | Other Works | Construction of drain in Sector No.9 at Ambedkar Galli in Ward No.35 Belagavi | 988061.38 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3795345 | 143838 | None | P.No.44, I.No.1.17.1, Vol-1, SR 2023-24 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm (Depth upto 1.50m not exceeding 1.5m in width) trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and evelling the bottom of trench to the extent required, utilising the available excavated earth locally for the work etc., and All kinds of soils. Depth upto 1.50m | Cum | 324.62 | 324.62 | 118.42 | False | None | None | False | None | False | 38441.5004 | 0 | 3795346 | 143838 | None | P.No.35, I.No. 1.10, Vol-1 SR 23-24 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications | Cum | 198.24 | 198.24 | 21.0 | False | None | None | False | None | False | 4163.04 | 0 | 3795347 | 143838 | None | P.No.05, I.No.1.1B, Vol-3, S.R. 2023-24 | Loading and Unloading of Stone Boulder/Stone aggregates/ Sand/Kankar/Moorum Tipper 10 m3 | Cum | 147.44 | 147.44 | 96.0 | False | None | None | False | None | False | 14154.24 | 0 | 3795348 | 143838 | None | I. No. 1.4(i)A, Vol-3, SR 2023-24 | Cost of Haulage Excluding Loading and Unloading Case-1 : Surfaced Road Taking output 10 t load and lead 10 km = 100 t.km | T.Km | 14.87 | 14.87 | 122.89 | False | None | None | False | None | False | 1827.3743 | 0 | 3795349 | 143838 | None | P.No.15,I. No. 2.1.4, Vol -1, SR 2023-24 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap /basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates | Cum | 7702.86 | 7702.86 | 16.715 | False | None | None | False | None | False | 128753.3049 | 0 | 3795350 | 143838 | None | P.No.16, I.No.2.4.2, Vol-1, SR 2023-24 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.Cement Concrete Drain Wall 5% on finished rate of concrete per m3 Raft | Cum | 8225.91 | 8225.91 | 19.8225 | False | None | None | False | None | False | 163058.100975 | 0 | 3795351 | 143838 | None | P.No.16, I.No.2.4.2, Vol-1, SR 2023-24 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.Cement Concrete Drain Wall 35% on finished rate of concrete per m3 Wall | Cum | 10576.17 | 10576.17 | 24.03 | False | None | None | False | None | False | 254145.3651 | 0 | 3795352 | 143838 | None | P.No.16, I.No.2.4.2, Vol-1, SR 2023-24 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.Cement Concrete Drain Wall 50% on finished rate of concrete per m3 CD Slab | Cum | 11751.3 | 11751.3 | 1.35 | False | None | None | False | None | False | 15864.255 | 0 | 3795353 | 143838 | None | P.No.16, I.No.2.4.2, Vol-1, SR 2023-24 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Ramp & Pipeside Concrete | Cum | 7834.2 | 7834.2 | 7.582 | False | None | None | False | None | False | 59398.9044 | 0 | 3795354 | 143838 | None | P.No.90, I.No.2.11h, Vol-1, S.R. 2023-24 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification All other type of structures | Tonne | 97894.63 | 97894.63 | 1.862 | False | None | None | False | None | False | 182279.80106 | 0 | 3795355 | 143838 | None | P.No.187, I.No. 16.1.2, Vol-V, S.R. 2023-24 | Providing, lowering, laying, jointing, testing and commissioning of Glazed Stone Ware Pipes of following dia, conforming to IS 651:1992, IS 4127 with latest amendments, including conveying to work site, caulking with hemp dipped in tar and jointing with CM 1:1.5 using OPC, perfect linking and curing for 10 days and testing with water etc. with all lead, lifts and as per Technical Specifications. The cost to include the cost of all jointing materials, necessary survey works for laying of sewer lines etc. complete. The contractor will make own arrangements for procuring water for testing. 150 mm dia. pipes | Rmtr | 719.86 | 719.86 | 175.0 | False | None | None | False | None | False | 125975.5 | 0 |
|