tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1722490771000 | 0 | None | None | Roads | Construction of CC Road and Drain On Achamatti cross Kalhal Road from km 4.00 and km 5.00 in Chikkanaragund village of Naragund taluk Gadag district.CC Road | 14704307.78 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3662649 | 133684 | None | Volume 1 PG 8 INO. 1.14.1 ) | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
---- Work should be executed as per the instruction of Engineer in charge | Cum | 126.38 | 126.38 | 2466.0 | False | None | None | False | None | False | 311653.08 | 0 | 3662650 | 133684 | None | Volume-3( 18 3.11 ) | Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with 8-10 t smooth wheeled roller, completeas per clause 310 Volume-3 ( P.No 18 SI.No 3.11 )
---- Work should be executed as per the instruction of Engineer in charge | Sqm | 4.96 | 4.96 | 5480.0 | False | None | None | False | None | False | 27180.8 | 0 | 3662651 | 133684 | None | Volume-3 Pg 17 it.no. 3.6 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. Volume-3 (P 17 SI No 3.6)
---- Work should be executed as per the instruction of Engineer in charge | Cum | 610.83 | 610.83 | 1188.0 | False | None | None | False | None | False | 725666.04 | 0 | 3662652 | 133684 | None | Volume-3 Pg no. 23 it.no. 4.2 (V) | Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 V) For Grading -V Material. Volume-3 (P 23 I No 4.2(V))
---- Work should be executed as per the instruction of Engineer in charge | Cum | 2922.8 | 2922.8 | 734.5 | False | None | None | False | None | False | 2146796.6 | 0 | 3662653 | 133684 | None | VOLUME-3 P.No.26 It.No:4.17 | Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in m3 2,394.00 uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.(VOLUME-3 P.No.26 It.No:4.17)
---- Work should be executed as per the instruction of Engineer in charge | Cum | 3170.6 | 3170.6 | 586.12 | False | None | None | False | None | False | 1858352.072 | 0 | 3662654 | 133684 | None | Volume-3 Pgno. 50 it.no. 6.5 | Construction of M30 Grade un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with OPC @ 270 kg/m3 and GGBS@ 90 kg/m3 , coarse and fine aggregate conforming to IS 383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design transported to site, laid with a paver finisher, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures, curing compound, steel channels, finishing to lines and grades as per drawing.
---- Work should be executed as per the instruction of Engineer in charge | Cum | 9712.52 | 9712.52 | 781.5 | False | None | None | False | None | False | 7590334.38 | 0 | 3662655 | 133684 | None | Volume-3 pg no 51 it no.6.8.2 | Providing and laying 80mm thick factory made precast M -30
grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS
15658 for Commercial Traffic Axle load repetitions upto 10MSA
& for Residential Streets of approved shape and colour, laid in
required pattern and including over 40mm thick compacted bed
of coarse sand, filling the joints with fine sand etc. all complete as
per the direction of Engineer-in-charge. (WMM/WBM Base to be
paid separately as per relevant technical specification) ---- Work should be executed as per the instruction of Engineer in charge | Sqm | 1438.48 | 1438.48 | 1150.0 | False | None | None | False | None | False | 1654252.0 | 0 | 3662656 | 133684 | None | Volume-3 pg no 74it no 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of
providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of
Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum
reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than
19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by
the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.
---- Work should be executed as per the instruction of Engineer in charge | Nos | 452.24 | 452.24 | 200.0 | False | None | None | False | None | False | 90448.0 | 0 | 3662657 | 133684 | None | Volume-3 pg no 67it no 8.15 | 803 Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (VOLUME-3, P.67 I No. 8.15)
---- Work should be executed as per the instruction of Engineer in charge | Sqm | 656.67 | 656.67 | 137.0 | False | None | None | False | None | False | 89963.79 | 0 | 3662658 | 133684 | None | Volume 3 PgNo. 64 it.no. 8.5(IV) | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite mate
---- Work should be executed as per the instruction of Engineer in charge | Nos | 4430.66 | 4430.66 | 10.0 | False | None | None | False | None | False | 44306.6 | 0 | 3662659 | 133684 | None | Volume 3 pgno. 65 it.no 8.7 | Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area exceeding 0.9 m2 fixed over back support frame of min 40 x 40 x 5mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing (VOLUME-3,P.No:65 I No. 8.7)
---- Work should be executed as per the instruction of Engineer in charge | Sqm | 11163.39 | 11163.39 | 3.0 | False | None | None | False | None | False | 33490.17 | 0 | 3662660 | 133684 | None | Volume-3 pgno. 76 it.no.8.48 | Supply and installation of retro- reflective Chevron signboards of 600x450mm made out of cube corner micro prismatic grade sheeting confirming to Type XI standards of IRC:67:2022 & ASTM D 4956-09 specification & fixed over 3 mm thick Aluminium Composite Panel sheet having minimum 0.30 mm thick aluminum skin on both sides & fixed over back support frame of 25x25x 3mm MS angle frame. Supported on 75 mm dia OR 75x75x6mm Mild steel with clear height of not less than 2.1 m from the ground level to the bottom of the Sign board & 60 cm below ground level. The sign post should be painted with one coat of red oxide paint and two coats of synthetic enamel paint of black and white colour with bands of 30 cm height, firmly fixed to the ground by means of foundation with M 20 grade cement, concrete foundation size of 45 cm x 45 cm x 60 cm including cost & conveyance of all materials, equipment,machinery & Labour with all leads and lifts for satisfactory completion of the work as directed by Engineer incharge.
---- Work should be executed as per the instruction of Engineer in charge | Nos | 4443.05 | 4443.05 | 5.0 | False | None | None | False | None | False | 22215.25 | 0 | 3662661 | 133684 | None | Volume-3 pgno. 74 it.no 8.42.3 | Supplying and fixing M15 grade precast cement concrete Kerb stones for Roadway, Sidewalls and gutters fixed with CM 1:3 fixed and finsihed in line as per direction of Engineer in charge. (The cost of PCC shall be paid extra)
---- Work should be executed as per the instruction of Engineer in charge | m | 573.66 | 573.66 | 150.0 | False | None | None | False | None | False | 86049.0 | 0 | 3662662 | 133684 | None | Volume-3 Pgno. A-13 it.no. 103 | RCC Pipe NP 4 heavy duty non presure pipe 300 mm dia Volume-3 ( P A12 SI No 090 )
---- Work should be executed as per the instruction of Engineer in charge | m | 1180.0 | 1180.0 | 20.0 | False | None | None | False | None | False | 23600.0 | 0 |
| 1722490771000 | 1 | None | None | Roads | Construction of CC Road and Drain On Achamatti cross Kalhal Road from km 4.00 and km 5.00 in Chikkanaragund village of Naragund taluk Gadag district.Drain | 8461196.94 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3662663 | 133685 | None | V-1 (page no. 8)1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications,
including setting out, shoring, strutting, barricading, caution lights,including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work (In all kinds of soils Depth upto 3 m) ---- Work should be executed as per the instruction of Engineer in charge | Cum | 126.38 | 126.38 | 1467.0 | False | None | None | False | None | False | 185399.46 | 0 | 3662664 | 133685 | None | V-1 (page no. 54)1.23 | Providing and Filling in foundation with granite / trap broken metal 100mm. and down size, with approved sand including handpacking, ramming, watering, including cost of all materials and labour with all lead and lift. complete as per specifications. ---- Work should be executed as per the instruction of Engineer in charge | Cum | 3323.0 | 3323.0 | 334.8 | False | None | None | False | None | False | 1112540.4 | 0 | 3662665 | 133685 | None | V-1 page no. 15)2.1.1 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical pecifications. (The cost of steel reinforcement & formwork shall be paid separately) (Mix 1:5:10 (M10) Using 40 mm and down size graded crushed coarse
aggregates) ---- Work should be executed as per the instruction of Engineer in charge | Cum | 6613.78 | 6613.78 | 111.6 | False | None | None | False | None | False | 738097.848 | 0 | 3662666 | 133685 | None | V-1 (page no. 16)2.4.2 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed with super lasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials,quality confirming to the equirements of relevant IS codes , bour,Usage charges of machinery, curing and all the other appurtenances required to omplete the work as per technical specificatio M20 Design Mix Using 20 mm nominal size graded crushed coarseaggregates) ---- Work should be executed as per the instruction of Engineer in charge | Cum | 7834.2 | 7834.2 | 376.63 | False | None | None | False | None | False | 2950594.746 | 0 | 3662667 | 133685 | None | V-1 (Page No.111)SL.NO.3 | Addendum I Percentage Additionalities for Formwork Centering Scaffolding 3.Foundation, Substructure of Cross drainages 5 Percentage on finished rate of concrete per m3 ---- Work should be executed as per the instruction of Engineer in charge | Sqm | 391.71 | 391.71 | 85.39 | False | None | None | False | None | False | 33448.1169 | 0 | 3662668 | 133685 | None | V-1 (Page No.111)SL.NO.4 | AddendumI Percentage Additionalities for Formwork, Centering Scaffolding 4.Cement Concrete Drain Walls 35 Percentage on finished rate of concrete per m3 ---- Work should be executed as per the instruction of Engineer in charge | Sqm | 2741.97 | 2741.97 | 268.73 | False | None | None | False | None | False | 736849.5981 | 0 | 3662669 | 133685 | None | V-1 (Page No.90)2.11 | Supplying, Fitting and Placing TMT Fe 500 & above Reinforcement in Foundation / Substructure / Superstructure complete as per Drawing and Technical Specifications.item No.2.11(h) ---- Work should be executed as per the instruction of Engineer in charge | t | 110837.22 | 110837.22 | 22.02 | False | None | None | False | None | False | 2440635.5844 | 0 | 3662670 | 133685 | None | V-1 (Page o.35)1.11 | Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Work should be executed as per the instruction of Engineer in charge | Cum | 536.49 | 536.49 | 491.4 | False | None | None | False | None | False | 263631.186 | 0 |
| 1722490771000 | 0 | None | None | Roads | 5 Year Maintenance | 251740.17 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3662671 | 133686 | None | Volume 3 Page No 95 I.No 10.16 | Removing & Resetting existing Heavy Duty Cobble/Interlockingstones/Pavers of thickness 60/75/80/100mm using Cement and 40mm thick sand bed ( average thickness ) and compacting with plate vibrator to achieve final desired compaction & setting of paver to its final level , including cost of materials, labour and usage charges of machinery complete as per specifications. (The cost of new paver/stones required shall be added separately) (SR 2023-24 Vol No III, Page No: 95, Item No:10.16) ---- Work should be executed as per the instruction of Engineer in charge | Sqm | 599.68 | 599.68 | 34.5 | False | None | None | False | None | False | 20688.96 | 0 | 3662672 | 133686 | None | Volume 3 Page No A-12 I.No 80.0 | Paver Block (Factory made) 80 mm th (SR 2023-24 Vol No III, Page No: A-12 , Item No:80)
---- Work should be executed as per the instruction of Engineer in charge | Sqm | 892.08 | 892.08 | 28.75 | False | None | None | False | None | False | 25647.3 | 0 | 3662673 | 133686 | None | Volume 3 Page No 95 I.No 10.16 | Removing & Resetting existing Heavy Duty Cobble/Interlockingstones/Pavers of thickness 60/75/80/100mm using Cement and 40mm thick sand bed ( average thickness ) and compacting with plate vibrator to achieve final desired compaction & setting of paver to its final level , including cost of materials, labour and usage charges of machinery complete as per specifications. (The cost of new paver/stones required shall be added separately) (SR 2023-24 Vol No III, Page No: 95, Item No:10.16)
---- Work should be executed as per the instruction of Engineer in charge | Sqm | 599.68 | 599.68 | 57.5 | False | None | None | False | None | False | 34481.6 | 0 | 3662674 | 133686 | None | Volume 3 Page No A-12 I.No 80.0 | Paver Block (Factory made) 80 mm th (SR 2023-24 Vol No III, Page No: A-12 , Item No:80)
---- Work should be executed as per the instruction of Engineer in charge | Sqm | 892.08 | 892.08 | 34.5 | False | None | None | False | None | False | 30776.76 | 0 | 3662675 | 133686 | None | Volume 3 Page No 95 I.No 10.16 | Removing & Resetting existing Heavy Duty Cobble/Interlockingstones/Pavers of thickness 60/75/80/100mm using Cement and 40mm thick sand bed ( average thickness ) and compacting with plate vibrator to achieve final desired compaction & setting of paver to its final level , including cost of materials, labour and usage charges of machinery complete as per specifications. (The cost of new paver/stones required shall be added separately) (SR 2023-24 Vol No III, Page No: 95, Item No:10.16)
---- Work should be executed as per the instruction of Engineer in charge | Sqm | 599.68 | 599.68 | 86.25 | False | None | None | False | None | False | 51722.4 | 0 | 3662676 | 133686 | None | Volume 3 Page No A-12 I.No 80.0 | Paver Block (Factory made) 80 mm th (SR 2023-24 Vol No III, Page No: A-12 , Item No:80)
---- Work should be executed as per the instruction of Engineer in charge | Sqm | 892.08 | 892.08 | 57.5 | False | None | None | False | None | False | 51294.6 | 0 | 3662677 | 133686 | None | Volume 3 Page No 95 I.No 10.20 | Removing and resetting of precast kerb stones fixed with CM 1:3 fixed and finished in line as per direction of Engineer in charge. (The cost of PCC shall be paid extra)
---- Work should be executed as per the instruction of Engineer in charge | m | 43.37 | 43.37 | 15.0 | False | None | None | False | None | False | 650.55 | 0 | 3662678 | 133686 | None | Volume 3 Page No 92 I.No 10.9 | Repair of old Joints Sealant : Removal of existing sealant and re sealing of contraction, longitudinal or expansion joints in concrete pavement with fresh sealant material (SR 2023-24 Vol No III, Page No: 92 , Item No:10.9)
---- Work should be executed as per the instruction of Engineer in charge | m | 79.3 | 79.3 | 460.0 | False | None | None | False | None | False | 36478.0 | 0 |
|
|
---|
technicalCriterionList | createdTs | version | createdDate | modifiedDate | description | criterionCategoryText | criterionTypeOthersValue | tenderTechnicalCriterionDocumentList |
---|
None | None | None | None | To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2019-20 ,2020-21,2021-22,2022-23 and 2023-24 Satisfactorily completed as prime contractor, at least one similar work such as Construction of CC Road Works of value not less than Rs 117.10 lakhs | Past Experience | None | createdTs | version | createdDate | modifiedDate | documentName |
---|
None | None | None | None | Work Done Certificate |
| None | None | None | None | Executed in any one year the following minimum quantities of work1)Earthwork/Flling /Subgrade/Embankment-4489.92 Cum 2)PCC/RCC -1015.78 Cum | Past Experience | None | createdTs | version | createdDate | modifiedDate | documentName |
---|
None | None | None | None | Others -- quantity wise workdone certificate |
| None | None | None | None | List of existing commitments and ongoing works | Past Experience | None | createdTs | version | createdDate | modifiedDate | documentName |
---|
None | None | None | None | Others -- List of existing commitments and ongoing works |
| None | None | None | None | Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded | Past Experience | None | createdTs | version | createdDate | modifiedDate | documentName |
---|
None | None | None | None | Others -- on letter head |
| None | None | None | None | Tenderers who meet the above specified minimum qualifying criteria, will only be qualified,if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under Assessed available tender capacity-( AxNx1.5-B )whereA-Maximum value of civil engineering works executed in any one year during the last five years (updated to 2024-25 price level) taking into account the completed as well as works in progress.N -Number of years prescribed for completion of the works for which tenders are invited -0.5 Year.B-Value at 2024-25 price level, of existing commitments and on-going works to be completed during the next 0.5 year (Period of completion of the works for which tenders are invited) | Capabilities of Vendor | None | createdTs | version | createdDate | modifiedDate | documentName |
---|
None | None | None | None | Others -- Calculation sheet on letter head |
| None | None | None | None | Assessed Tender Capacity shall be more than the Tendered Amount | Capabilities of Vendor | None | createdTs | version | createdDate | modifiedDate | documentName |
---|
None | None | None | None | Others -- assessed tender capacity on letter head |
| None | None | None | None | 3.3 a Each Tenderer should further demonstrate :As per this note, each tenderer should demonstrate availability of few key equipments /machinery for execution of the work . However as per Govt circular no GO-FD/AE 263/EXP12-2022 dt-11-05-2022, this clause for owning key equipments for works costing up to Rs.3.00 crores is exempted. However it is obligatory for the contractor to use the following machineries for various activities involved in construction as per Morth specification.Sl No. Name of machinery 1)Excavator JCB / Hitachi 2)Tippers3)Concrete Batching Plant4)Water Tanker5)Shuttering Materials6)Transit Mixers7)Selfloading Moblie Concrete Batching Plant of min 2 cum capacity | Capabilities of Vendor | None | createdTs | version | createdDate | modifiedDate | documentName |
---|
None | None | None | None | Others -- list of machinery |
| None | None | None | None | To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e. , 2019-20 ,2020-21,2021-22,2022-23 and 2023-24 , (a) acheived in at least two financial years a minimum financial turnover of Rs. 468.50 lakhs (in all classes of civil engineering construction works only) 33.( As per GOVT Circuler No PW 60 CRM 2021 Bangaluru Dtd-08-11-2021) | Financial Status | None | createdTs | version | createdDate | modifiedDate | documentName |
---|
None | None | None | None | Audited CA Certificate of Annual Turnover |
| None | None | None | None | Maximum of Civil Engineering works executed in any one year during the last five years (updated to 2024-25 price level) taking into account the completed as well as works in progress. (Financial turnover of previous years shall be given a weight of 10% per year to bring them to the price level of the 2024-25) | Financial Status | None | createdTs | version | createdDate | modifiedDate | documentName |
---|
None | None | None | None | Others -- Information on the Letter Head of the tenderer |
| None | None | None | None | Value at 2024-25 price level, of existing commitments and on-going works to be executed during the next 12 months(Financial commitment of previous years shall be given a weight of 10% per year to bring them to the price level of the 2024-25), (Monthwise commitment shall be furnished). | Financial Status | None | createdTs | version | createdDate | modifiedDate | documentName |
---|
None | None | None | None | Others -- statement on the letter head of the tenderer |
| None | None | None | None | Liquid assets and /or availability of credit facilities of no less than Rs. 117.10Lakhs (estimated cash flow for 3 months of peak construction period) | Financial Status | None | createdTs | version | createdDate | modifiedDate | documentName |
---|
None | None | None | None | Line of Credit |
| None | None | None | None | The EMD of Rs.3,52,000 shall be paid in full through e-payment or in two parts i.e,Part(1)Rs. 1,00,000.00 by e-payment part (2)2,52,000 in the form of BG to be upload. | Financial Status | None | createdTs | version | createdDate | modifiedDate | documentName |
---|
None | None | None | None | Others -- EMD Details |
| None | None | None | None | Banker Details for reference | Others | Banker Details for reference | createdTs | version | createdDate | modifiedDate | documentName |
---|
None | None | None | None | Others -- Banker Details for reference |
| None | None | None | None | Information on litigation in which the Tender is involved. | Others | Information on litigation in which the Tender is involved. | createdTs | version | createdDate | modifiedDate | documentName |
---|
None | None | None | None | Others -- Information on litigation in which the Tender is involved. |
| None | None | None | None | Information of the works for which Tender acceptance letters are received. | Others | New work | createdTs | version | createdDate | modifiedDate | documentName |
---|
None | None | None | None | Others -- New work |
|
|
---|