tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1723615156000 | 0 | None | None | Buildings | PART-A GROUND FLOOR | 5111889.06 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3774095 | 142262 | None | PWD CSR 2023-24, Vol-I, P. No.8, I. No. 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the Work - in all kind of Soils Depth upto 3m, Basic Rate : 102.00, AW 3 percent : 3.06, Finished Rate : 105.06 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 105.06 | 105.06 | 352.64 | False | None | None | False | None | False | 37048.3584 | 0 | 3774096 | 142262 | None | PWD CSR 2023-24, Vol-I, P. No. 7, I. No. 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. Basic Rate : 266.00, AW 3 percent : 7.98, Finished Rate : 273.98 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 273.98 | 273.98 | 328.83 | False | None | None | False | None | False | 90092.8434 | 0 | 3774097 | 142262 | None | PWD CSR 2023-24, Vol-I, P. No. 15, I. No. 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates, Basic Rate : 5989.00, AW 3 percent : 179.67 Finished Rate : 6168.67 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 6168.67 | 6168.67 | 56.05 | False | None | None | False | None | False | 345753.9535 | 0 | 3774098 | 142262 | None | PWD CSR 2023-24, Vol-I, P. No. 15, I. No. 2.2.3 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of formwork is included) - M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Basic Rate : 6336.00, AW 3 percent : 190.08, Formwork Charges at 3 percent : 195.78, Finished Rate : 6721.86 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 6721.86 | 6721.86 | 55.08 | False | None | None | False | None | False | 370240.0488 | 0 | 3774099 | 142262 | None | PWD CSR 2023-24, Vol-I, P. No. 15, I. No. 2.2.3 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of formwork is included) - M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Basic Rate : 6336.00, AW 3 percent : 190.08, Formwork Charges at 70 percent : 4568.26, Finished Rate : 11094.34 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 11094.34 | 11094.34 | 3.51 | False | None | None | False | None | False | 38941.1334 | 0 | 3774100 | 142262 | None | PWD CSR 2023-24, Vol-I, P. No. 16, I. No. 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of formwork is included) - M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Basic Rate : 6336.00, AW 3 percent : 190.08, Formwork Charges at 70 percent : 4568.26, Finished Rate : 11094.34 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 11094.34 | 11094.34 | 1.87 | False | None | None | False | None | False | 20746.4158 | 0 | 3774101 | 142262 | None | PWD CSR 2023-24, Vol-I, P. No. 16, I. No. 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of formwork is included) - M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Basic Rate : 6336.00, AW 3 percent : 190.08, Formwork Charges at 50 percent : 3263.04, Finished Rate : 9789.12 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 9789.12 | 9789.12 | 18.13 | False | None | None | False | None | False | 177476.7456 | 0 | 3774102 | 142262 | None | PWD CSR 2023-24, Vol-I, P. No. 16, I. No. 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building, Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications - (The cost of formwork is included) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Basic Rate :6843.00, AW 3 percent : 205.29, Formwork Charges at 70 percent : 4933.80, Finished Rate : 11982.09 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 11982.09 | 11982.09 | 10.71 | False | None | None | False | None | False | 128328.1839 | 0 | 3774103 | 142262 | None | PWD CSR 2023-24, Vol-I, P. No. 16, I. No. 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building, Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications - (The cost of formwork is included) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Basic Rate :6843.00, AW 3 percent : 205.29, Formwork Charges at 60 percent : 4228.97, Finished Rate : 11277.26 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 11277.26 | 11277.26 | 17.83 | False | None | None | False | None | False | 201073.5458 | 0 | 3774104 | 142262 | None | PWD CSR 2023-24, Vol-I, P. No. 16, I. No. 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building, Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications - (The cost of formwork is included) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Basic Rate :6843.00, AW 3 percent : 205.29, Formwork Charges at 50 percent : 3524.15, Finished Rate : 10572.44 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 10572.44 | 10572.44 | 37.44 | False | None | None | False | None | False | 395832.1536 | 0 | 3774105 | 142262 | None | PWD CSR 2023-24, Vol-I, P. No. 18, I. No. 2.11.a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification - Buildings, Basic Rate :89457.00, AW 3 percent : 2683.71, Finished Rate : 92140.71 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Tonne | 92140.71 | 92140.71 | 10.8 | False | None | None | False | None | False | 995119.668 | 0 | 3774106 | 142262 | None | PWD SR 2023-24, Vol-II, P. No. 9, I. No. 5.2 | Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) Basic Rate : 6618.00 AW 3 percent : 198.54, Finished Rate : 6816.54 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 6816.54 | 6816.54 | 29.22 | False | None | None | False | None | False | 199179.2988 | 0 | 3774107 | 142262 | None | PWD SR 2023-24, Vol-II, P. No. 9, I. No. 5.3 | Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) Basic Rate : 6205.00 AW 3 percent : 186.15, Finished Rate : 6391.15 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 6391.15 | 6391.15 | 21.74 | False | None | None | False | None | False | 138943.601 | 0 | 3774108 | 142262 | None | PWD SR 2023-24, Vol-II, P. No. 9, I. No. 5.4 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) Basic Rate : 6389.00 AW 3 percent : 191.67, Finished Rate : 6580.67 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 6580.67 | 6580.67 | 7.12 | False | None | None | False | None | False | 46854.3704 | 0 | 3774109 | 142262 | None | PWD SR 2023-24, Vol-II, P. No. 13, I. No. 6.4 | Providing Brick work with common burnt clay modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. Basic Rate : 8661.00, AW 3 percent : 259.83, Finished Rate : 8920.83 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 8920.83 | 8920.83 | 3.77 | False | None | None | False | None | False | 33631.5291 | 0 | 3774110 | 142262 | None | PWD SR 2023-24, Vol-II, P. No. 14, I. No. 6.8 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. Basic Rate : 7969.00, AW 3 percent : 239.07, Finished Rate : 8208.07 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Cum | 8208.07 | 8208.07 | 68.02 | False | None | None | False | None | False | 558312.9214 | 0 | 3774111 | 142262 | None | PWD SR 2023-24, Vol-II, P. No. 41, I. No. 8.1.2 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Basic Rate : 241.00, AW 3 percent : 7.23, Finished Rate : 248.23 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 248.23 | 248.23 | 606.17 | False | None | None | False | None | False | 150469.5791 | 0 | 3774112 | 142262 | None | PWD SR 2023-24, Vol-II, P. No. 41, I. No. 8.2.2 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Basic Rate : 279.00, AW 3 percent : 8.37, Finished Rate : 287.37 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 287.37 | 287.37 | 234.66 | False | None | None | False | None | False | 67434.2442 | 0 | 3774113 | 142262 | None | PWD SR 2023-24, Vol-II, P. No. 46, I. No. 8.33.1 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 L/10 m² over and including one coat of Special primer applied @ 0.75 L/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labor complete as per specifications and as per directions of Engineer-in-charge. (The gloss should be 50% @ 60 degree angle with 10 years life) Basic Rate : 158.00, A.W 3% : 4.74, Finished rate : 162.74 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 162.74 | 162.74 | 840.83 | False | None | None | False | None | False | 136836.6742 | 0 | 3774114 | 142262 | None | PWD SR 2023-24, Vol-II, P. No. 48, I. No. 8.40 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Basic Rate : 115.00, AW 3 percent : 3.45, Finished Rate : 118.45 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 118.45 | 118.45 | 182.49 | False | None | None | False | None | False | 21615.9405 | 0 | 3774115 | 142262 | None | PWD SR 2023-24, Vol-II, P. No. 63, I. No. 9.24 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent. Basic Rate : 2852.00, AW 3 percent : 85.56, Finished Rate : 2937.56 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 2937.56 | 2937.56 | 98.3 | False | None | None | False | None | False | 288762.148 | 0 | 3774116 | 142262 | None | PWD SR 2023-24, Vol-II, P. No. 64, I. No. 9.34 | Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, including cost of materials, labour, curing, polishing complete as per specifications. Basic Rate : 1545.00, AW 3 percent : 46.35, Finished Rate : 1591.35 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 1591.35 | 1591.35 | 142.31 | False | None | None | False | None | False | 226465.0185 | 0 | 3774117 | 142262 | None | PWD SR 2023-24, Vol-II, P. No. 77, I. No. 11.3 | Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2 mm and braced with flat iron diagonals 20x5 mm size, with top and bottom rail of T-iron 40x40x6 mm, with 40 mm dia steel pulleys, complete with bolts, nuts, locking arrangement, stoppers, handles, including applying a priming coat of approved steel primer including cost of materials ,labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. Basic Rate : 8276.00, AW 3 percent : 248.28, Finished Rate : 8524.28 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 8524.28 | 8524.28 | 5.88 | False | None | None | False | None | False | 50122.7664 | 0 | 3774118 | 142262 | None | PWD SR 2023-24, Vol-II, P. No. 78, I. No. 11.6.2 | Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters. 80x1.20 mm M.S. laths with 1.20 mm thick top cover including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. Basic Rate : 2503.00, AW 3 percent : 75.09, Finished Rate : 2578.09 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 2578.09 | 2578.09 | 73.44 | False | None | None | False | None | False | 189334.9296 | 0 | 3774119 | 142262 | None | PWD SR 2023-24, Vol-II, P. No. 84, I. No. 11.26.1 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. Basic Rate : 138.00, AW 3 percent : 4.14, Finished Rate : 142.14 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Kg | 142.14 | 142.14 | 178.85 | False | None | None | False | None | False | 25421.739 | 0 | 3774120 | 142262 | None | PWD SR 2023-24, Vol-II, P. No. 109, I. No. 12.85 | Providing and fixing of louvered ventilator made out of multi chambered UPVC Matching to RAL-9016 sections and with minimum TiO2 Titanium Dioxide at 6PHR with TPE Thermo Plastic Elastomer and lead free with gaskets grey color having isolated drainage and reinforced with Galvanized Iron profile through out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium powder coated in white will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm. Maximum possible size 1000mm x 1000mm. The cost is inclusive of all fixtures and separate charges for minor T and P's shall not be made, Basic Rate : 5719.00, AW 3 percent : 171.57,Finished Rate : 5890.57 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sqm | 5890.57 | 5890.57 | 6.48 | False | None | None | False | None | False | 38170.8936 | 0 | 3774121 | 142262 | None | PWD SR 2023-24, Vol-II, P. No. 127, I. No. 13.56 | Making soak pit 2.5 m diameter 3.0 m deep with 45 x 45 cm dry brick honey comb shaft with bricks and PVC S.W.R drain pipe 100 mm diameter, 1.8 m long complete as per standard design.With common burnt clay (non modular) bricks of class designation 3.5 Basic Rate : 23024.00, AW 3 percent : 690.72, Finished Rate : 23714.72 (Unit 1 Soat Pit) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Per Pit | 23714.72 | 23714.72 | 1.0 | False | None | None | False | None | False | 23714.72 | 0 | 3774122 | 142262 | None | PWD SR 2023-24, Vol-V, P. No. 140, I. No. 12.4 | Geophysical investigation at site for sinking borewells for Providing drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner or Schlumbergers's method, including reconnaissance survey of geological formation. Geophysical investigation of existing ground water in the vicinity, its quality, quantity and acceptability of the users, indicating the location of the site, recommended depth of casing pipe required to seal the top unconsolidated formation including an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depth of drilling required to cover full depth of aquifer proposed to be tapped, probable yield and other information required including transportation of instruments and accessories to work site, engaging technical personal and labour required etc. NOTE: 1) Additional rate on item 1&2 is allowed for drilling in over burden and fixing Casing pipes beyond 20 M (for fixing Casing pipes only) a) Above 20 M and upto 30 M - 15%, b) Above 30 M - 30% (Measurement of overburden is restricted to the depth of casing pipe fixed excluding initial depth of 20M and projection above ground level). 2) A sum of Rs. 100/- is to be deducted for Dry Borewell towards yield test. etc. complete. Basic Rate : 5288.00, AW 3 percent : 158.64, Finished Rate : 5446.64 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 5446.64 | 5446.64 | 1.0 | False | None | None | False | None | False | 5446.64 | 0 | 3774123 | 142262 | None | PWD SR 2023-24, Vol-V, P. No. 139, I. No. 12.2.1 | Sinking borewell of 150mm dia. clear, using super fast hydraulic rig of capacity 250 PSIG & above 900 CMF and above, in all strata of earth, including over burden upto 20M, fixing of casing pipes, collars and cap with ncessary cutting, threading and welding including transportation of rig and supporting vehicles, crew charges, cost of consumables, cost of yield test at the final depth with a minimum working of compressor for one hour etc. complete. The cost excludes the cost of casing pipes, collars and caps etc.) for: (Above 300m of drilling add 10% for every 50m depth) Borewell depth of 0 to 50 Mtrs, Basic Rate : 309.00, AW 3 percent : 9.27, Finished Rate : 318.27 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Mtr | 318.27 | 318.27 | 50.0 | False | None | None | False | None | False | 15913.5 | 0 | 3774124 | 142262 | None | PWD SR 2023-24, Vol-V, P. No. 139, I. No. 12.2.2 | Sinking borewell of 150mm dia. clear, using super fast hydraulic rig of capacity 250 PSIG & above 900 CMF and above, in all strata of earth, including over burden upto 20M, fixing of casing pipes, collars and cap with ncessary cutting, threading and welding including transportation of rig and supporting vehicles, crew charges, cost of consumables, cost of yield test at the final depth with a minimum working of compressor for one hour etc. complete. The cost excludes the cost of casing pipes, collars and caps etc.) Borewell depth of 50 to 100 Mtrs Basic Rate : 387.00, AW 3 percent : 11.61, Finished Rate : 398.61 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Mtr | 398.61 | 398.61 | 50.0 | False | None | None | False | None | False | 19930.5 | 0 | 3774125 | 142262 | None | PWD SR 2023-24, Vol-V, P. No. 139, I. No. 12.2.3 | Sinking borewell of 150mm dia. clear, using super fast hydraulic rig of capacity 250 PSIG & above 900 CMF and above, in all strata of earth, including over burden upto 20M, fixing of casing pipes, collars and cap with ncessary cutting, threading and welding including transportation of rig and supporting vehicles, crew charges, cost of consumables, cost of yield test at the final depth with a minimum working of compressor for one hour etc. complete. The cost excludes the cost of casing pipes, collars and caps etc.) Borewell depth of 100 to 150 Mtrs Basic Rate : 412.00, AW 3 percent : 12.36, Finished Rate : 424.36 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Mtr | 424.36 | 424.36 | 50.0 | False | None | None | False | None | False | 21218.0 | 0 | 3774126 | 142262 | None | PWD SR 2023-24, Vol-V, P. No. 139, I. No. 12.2.4 | Sinking borewell of 150mm dia. clear, using super fast hydraulic rig of capacity 250 PSIG & above 900 CMF and above, in all strata of earth, including over burden upto 20M, fixing of casing pipes, collars and cap with ncessary cutting, threading and welding including transportation of rig and supporting vehicles, crew charges, cost of consumables, cost of yield test at the final depth with a minimum working of compressor for one hour etc. complete. The cost excludes the cost of casing pipes, collars and caps etc. Borewell depth of 150 to 200 Mtrs Basic Rate : 478.00, AW 3 percent : 14.34, Finished Rate : 492.34 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Mtr | 492.34 | 492.34 | 50.0 | False | None | None | False | None | False | 24617.0 | 0 | 3774127 | 142262 | None | PWD SR 2023-24, Vol-V, P. No. 139, I. No. 12.2.5 | Sinking borewell of 150mm dia. clear, using super fast hydraulic rig of capacity 250 PSIG and above 900 CMF and above, in all strata of earth, including over burden upto 20M, fixing of casing pipes, collars and cap with ncessary cutting, threading and welding including transportation of rig and supporting vehicles, crew charges, cost of consumables, cost of yield test at the final depth with a minimum working of compressor for one hour etc. complete. The cost excludes the cost of casing pipes, collars and caps etc. Borewell depth of 200 to 250 Mtrs Basic Rate : 560.00, AW 3 percent : 16.80, Finished Rate : 576.80 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Mtr | 576.8 | 576.8 | 50.0 | False | None | None | False | None | False | 28840.0 | 0 |
| 1723615156000 | 0 | None | None | Buildings | PART-B -INTERNAL ELECTRIFICATION | 161404.78 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3774128 | 142263 | None | Electrical Works for the Year 2023-24 I.No 1.2.1 | Supplying heavy gauge PVC conduit pipe ......mmdia.......mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary (Basic Rate : 66.00, AW 3 percent : 1.98, Finished Rate : 67.98) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Mtr | 67.98 | 67.98 | 190.0 | False | None | None | False | None | False | 12916.2 | 0 | 3774129 | 142263 | None | Electrical Works for the Year 2023-24 I.No 1.5.1 | Supplying and fixing PVC/metal conduit Deep junction box (Basic Rate : 49.00, AW 3 percent : 1.47, Finished Rate : 50.47) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 50.47 | 50.47 | 30.0 | False | None | None | False | None | False | 1514.1 | 0 | 3774130 | 142263 | None | Electrical Works for the Year 2023-24 I.No 1.6.4 | Supplying and flush mounting teak wooden box without front plank, made of not less than 12 mm thick wood, after due groove cutting, finishing with necessary cement plastering complete. 8"x6"x3" (203x152x76mm) (Basic Rate : 86.00, AW 3 percent : 2.58, Finished Rate : 88.58) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 88.58 | 88.58 | 12.0 | False | None | None | False | None | False | 1062.96 | 0 | 3774131 | 142263 | None | Electrical Works for the Year 2023-24 I.No 1.6.5 | Supplying and flush mounting teak wooden box without front plank, made of not less than 12 mm thick wood, after due groove cutting, finishing with necessary cement plastering complete. 4"x4"x3" ( 101x101x76mm) (Basic Rate : 74.00, AW 3 percent : 2.22, Finished Rate : 76.22) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 76.22 | 76.22 | 24.0 | False | None | None | False | None | False | 1829.28 | 0 | 3774132 | 142263 | None | Electrical Works for the Year 2023-24 I.No 1.13 | Supplying And Fixing Metal Fan Box with Round Hook. (Basic Rate : 117.00, AW 3 percent : 3.51, Finished Rate : 120.51) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | No | 120.51 | 120.51 | 12.0 | False | None | None | False | None | False | 1446.12 | 0 | 3774133 | 142263 | None | Electrical Works for the Year 2023-24 I.No 2.1.1 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5 Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6Amps flush type P
control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Short point upto 3Mtr from tapping point to out let via switch (Basic Rate : 285.00, AW 3 percent : 8.55, Finished Rate : 293.55) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Point | 293.55 | 293.55 | 6.0 | False | None | None | False | None | False | 1761.3 | 0 | 3774134 | 142263 | None | Electrical Works for the Year 2023-24 I.No 2.1.2 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5 Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch (Basic Rate : 394.00, AW 3 percent : 11.82, Finished Rate : 405.82) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Point | 405.82 | 405.82 | 10.0 | False | None | None | False | None | False | 4058.2 | 0 | 3774135 | 142263 | None | Electrical Works for the Year 2023-24 I.No 2.3.2 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS694:2010 - 1.5 Sqmm (Basic Rate : 26.00, AW 3 percent : 0.78, Finished Rate : 26.78) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Mtr | 26.78 | 26.78 | 570.0 | False | None | None | False | None | False | 15264.6 | 0 | 3774136 | 142263 | None | Electrical Works for the Year 2023-24 I.No 2.3.3 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS694:2010 - 2.5 Sqmm (Basic Rate : 42.00, AW 3 percent : 1.26, Finished Rate : 43.26) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Mtr | 43.26 | 43.26 | 380.0 | False | None | None | False | None | False | 16438.8 | 0 | 3774137 | 142263 | None | Electrical Works for the Year 2023-24 I.No 3.6.1 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6Amps one way (Basic Rate : 102.00, AW 3 percent : 3.06, Finished Rate : 105.06) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 105.06 | 105.06 | 30.0 | False | None | None | False | None | False | 3151.8 | 0 | 3774138 | 142263 | None | Electrical Works for the Year 2023-24 I.No 3.6.2 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6Amps two way (Basic Rate : 166.00, AW 3 percent : 4.98, Finished Rate : 170.98) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 170.98 | 170.98 | 15.0 | False | None | None | False | None | False | 2564.7 | 0 | 3774139 | 142263 | None | Electrical Works for the Year 2023-24 I.No 3.6.3 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Three Way socket (Basic Rate : 171.00, AW 3 percent : 5.13, Finished Rate : 176.13) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 176.13 | 176.13 | 15.0 | False | None | None | False | None | False | 2641.95 | 0 | 3774140 | 142263 | None | Electrical Works for the Year 2023-24 I.No 3.6.4 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. Stepped Fan Regulator Two Module (Basic Rate : 357.00, AW 3 percent : 10.71, Finished Rate : 367.71) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 367.71 | 367.71 | 12.0 | False | None | None | False | None | False | 4412.52 | 0 | 3774141 | 142263 | None | Electrical Works for the Year 2023-24 I.No 3.6.9 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 32A DP Switch (Basic Rate : 326.00, AW 3 percent : 9.78, Finished Rate : 335.78) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 335.78 | 335.78 | 12.0 | False | None | None | False | None | False | 4029.36 | 0 | 3774142 | 142263 | None | Electrical Works for the Year 2023-24 I.No 3.6.10 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6/16A Universal Socket (Basic Rate : 236.00, AW 3 percent : 7.08, Finished Rate : 243.08) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 243.08 | 243.08 | 12.0 | False | None | None | False | None | False | 2916.96 | 0 | 3774143 | 142263 | None | Electrical Works for the Year 2023-24 I.No 3.8 | Supplying 4mm thick plastic sheet with necessary nitches for fixing switches, regulators etc, and fixing on existing wooden or metal box using N.F. screws. (Basic Rate : 0.41, AW 3 percent : 0.01, Finished Rate : 0.42) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Sq CM | 0.42 | 0.42 | 10000.0 | False | None | None | False | None | False | 4200.0 | 0 | 3774144 | 142263 | None | Electrical Works for the Year 2023-24 I.No 5.7.2 | Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. (Basic Rate : 241.00, AW 3 percent : 7.23, Finished Rate : 248.23) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 248.23 | 248.23 | 3.0 | False | None | None | False | None | False | 744.69 | 0 | 3774145 | 142263 | None | Electrical Works for the Year 2023-24 I.No 5.18.1 | Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 Amps SP (Basic Rate : 415.00, AW 3 percent : 12.45, Finished Rate : 427.45) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 427.45 | 427.45 | 12.0 | False | None | None | False | None | False | 5129.4 | 0 | 3774146 | 142263 | None | Electrical Works for the Year 2023-24 I.No 5.18.4 | Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 Amps DP (Basic Rate : 739.00, AW 3 percent : 22.17, Finished Rate : 761.17) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 761.17 | 761.17 | 12.0 | False | None | None | False | None | False | 9134.04 | 0 | 3774147 | 142263 | None | Electrical Works for the Year 2023-24 I.No 5.19.3 | Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure. (Basic Rate : 1492.00, AW 3 percent : 44.76, Finished Rate : 1536.76) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 1536.76 | 1536.76 | 12.0 | False | None | None | False | None | False | 18441.12 | 0 | 3774148 | 142263 | None | Electrical Works for the Year 2023-24 I.No 6.4.1 | Supplying of Ceiling Fan with Capacitor rating As per guideline of BEE 5 star rating and IS:374 / 19 and also comply with IS: 1709/1984 with latest amendment, Rated voltage 220 V/50 Hz, Rated power upto 35 W +/- 10 %, Rated current As per IS:374/19, Rated power factor 0.9 lagging(min), Rated speed 350 +/- 10% RPM, Rated air delivery 210 +/- 10% Cubic Meter Minimum, Rated service value 6.2 CMM / W, Three Blades of blade leaf 1.05 mm thick Aluminium Alloy sheet, Class B motor insulation, Bearing Two ball bearings, Top 6202, Bottom 6201, as per IS specification, Motor winding. Temp rise Shall not exceed 75 deg C over and ambient of 40 0C by resistance method at 245 V, Insulation resistance Shall not be less than Two Mega Ohms (2M Ohms), Leakage current Should not exceed 210 Micro Amp, Power input, W& current, Air Delivery & Fan Speed as per IS:374/2019 with latest amendment, 2year manufacturer Warranty. (BLDC fans) (Basic Rate : 2677.00, AW 3 percent : 80.31, Finished Rate : 2757.31) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 2757.31 | 2757.31 | 12.0 | False | None | None | False | None | False | 33087.72 | 0 | 3774149 | 142263 | None | Electrical Works for the Year 2023-24 I.No 11.3.2 | Supplying of .feet - PVC Batten with integrated LED tube .W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V @ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. (Basic Rate : 690.00, AW 3 percent : 20.70, Finished Rate : 710.70) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 710.7 | 710.7 | 15.0 | False | None | None | False | None | False | 10660.5 | 0 | 3774150 | 142263 | None | Electrical Works for the Year 2023-24 I.No 13.7.1 | Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. (Basic Rate : 122.00, AW 3 percent : 3.66, Finished Rate : 125.66) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 125.66 | 125.66 | 15.0 | False | None | None | False | None | False | 1884.9 | 0 | 3774151 | 142263 | None | Electrical Works for the Year 2023-24 I.No 13.1 | Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing 'S'' hook with fan regulator to the existing board together with supplying and fixing 5 A. ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring. (Basic Rate : 171.00, AW 3 percent : 5.13, Finished Rate : 176.13) ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work | Each | 176.13 | 176.13 | 12.0 | False | None | None | False | None | False | 2113.56 | 0 |
|
|
---|