createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1723629093674
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee770.00
emd51878.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose31-08-2024 16:00:00
tenderQueryClose21-08-2024 16:00:00
technicalBidOpen02-09-2024 16:00:00
publishedDate16-08-2024 18:17:49
publishedByPostTP_CO_YLP
publishedByUserKPE15669 - SUNIL SUBHASH GAVADE
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonSunil S Gavade
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9986773995
tenderSupplierListNone
tenderSchedule
createdTs1723629093703
version4
createdDateNone
modifiedDateNone
tenderNumberDMA/2024-25/BD/WORK_INDENT24755
titleConstruction of Proposed 4 TPD MRF Centre Material Recovery Facility of PEB Structure Primary Shed in Shistamudi SWM Site at Yellapur Town Panchayat MRF Phase 1
descriptionConstruction of Proposed 4 TPD MRF Centre Material Recovery Facility of PEB Structure Primary Shed in Shistamudi SWM Site at Yellapur Town Panchayat MRF Phase 1
categoryWORKS
categoryTextWorks
ecv3060814.77
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2425
locationNameDMA Town Panchayat Yellapura
provisionalAmount3100000.0
groupOverheadTotal466903.95
fileNumberTP/YLP/MRF/01
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17236290940000NoneNoneBuildingsConstruction of Proposed 4 TPD MRF Centre Material Recovery Facility of PEB Structure Primary Shed in Shistamudi SWM Site at Yellapur Town Panchayat MRF Phase 12593910.82
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3778583142641Nonecode01KSRB 1-1.14.1: Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. (Item No. 1.14.1 Page No. 8 Vol.1 PWD SR)Cum114.24114.2429.41FalseNoneNoneFalseNoneFalse3359.79840
3778584142641Nonecode02KSRB 2-2.1.2: Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates (The cost of steel reinforcement & formwork shall be paid separately. Specification No. KBS 2.1, (Item No. 2.1.2 Page No. 15 Vol.1 PWD SR)Cum6343.686343.6828.97FalseNoneNoneFalseNoneFalse183776.40960
3778585142641Nonecode03KSRB 2-2.3.2:Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately). M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Specification No. KBS 2.3., 2.3 (Item No. 2.3.2 Page No. 16 Vol.1 PWD SR & Appendix I page No.115)Cum7838.217838.217.12FalseNoneNoneFalseNoneFalse55808.05520
3778586142641Nonecode04KSRB 2-2.3.2:Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately). M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Specification No. KBS 2.3., 2.3 (Item No. 2.3.2 Page No. 16 Vol.1 PWD SR & Appendix I page No.115)Cum12337.9212337.920.33FalseNoneNoneFalseNoneFalse4071.51360
3778587142641Nonecode05KSRB 2-2.3.2:Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately). M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Specification No. KBS 2.3., 2.3 (Item No. 2.3.2 Page No. 16 Vol.1 PWD SR & Appendix I page No.115)Cum7838.217838.2128.62FalseNoneNoneFalseNoneFalse224329.57020
3778588142641Nonecode06KSRB 2-2.2.3.1 :Providing and laying in Reinforced cement concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately). M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.2.3 Page No. 15 Vol.1 PWD SR & Appendix I page No.115)Cum7096.327096.324.82FalseNoneNoneFalseNoneFalse34204.26240
3778589142641Nonecode07KSRB 2.11 Steel Fabrication: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. (Item No. 2.11 Page No. 18 Vol.1 PWD SR)Kg100.19100.192773.1FalseNoneNoneFalseNoneFalse277836.8890
3778590142641Nonecode08KSRB 5-5.4: Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) . (Item No. 5.4 Page No. 9 Vol.2 PWD SR)Cum7155.687155.6816.67FalseNoneNoneFalseNoneFalse119285.18560
3778591142641Nonecode09KSRB 1-1.8: Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work (Item No. 1.8 Page No. 7 Vol.1 PWD SR)Cum530.88530.88128.79FalseNoneNoneFalseNoneFalse68372.03520
3778592142641Nonecode10KSRB 6-6.33: Providing and constructing load bearing wall with Solid Concrete blocks of size 400x150x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. (Item No. 6.33 Page No. 17 Vol.2 PWD SR)Cum1378.721378.7213.66FalseNoneNoneFalseNoneFalse18833.31520
3778593142641Nonecode11KSRB 8-8.3.1: Providing 15mm/18mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(Item No. 8.2.1, Page No. 41, Vol.2)Sqm330.4330.4187.56FalseNoneNoneFalseNoneFalse61969.8240
3778594142641Nonecode12Providing and fixing Structural Steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-inCharge. (Item No. 11.2, Page No. 77, Vol.2)Kgs126.56126.566130.0FalseNoneNoneFalseNoneFalse775812.80
3778595142641Nonecode13Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm ( Plus 0.05 percent) total coated thickness with zinc coating 120 g/m2 as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 m or as desired by Engineerin-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. (Item No. 7.38, Page No. 26, Vol.2)Sqm636.16636.16518.21FalseNoneNoneFalseNoneFalse329664.47360
3778596142641Nonecode14KSRB 8-8.51 : Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge.(Item No. 8.51, Page No. 50, Vol.2)Sqm112.0112.0187.56FalseNoneNoneFalseNoneFalse21006.720
3778597142641Nonecode15KSRB 8-8.54.1 : Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. One coat as per specifications and as per directions of Engineer in charge.(Item No. 8.54.1, Page No. 50, Vol.2)No81.7681.7691.08FalseNoneNoneFalseNoneFalse7446.70080
3778598142641Nonecode16KSRB 8-8.75.2 : Finishing walls with Premium Acrylic Smooth exterior paint of required shade : Old work (one coats applied @ 0.83 l/10 m²) including preparing the surface after thoroughly cleaning the surface to remove all dirt,dust and foreign matter , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(Item No. 8.75.2, Page No. 53, Vol.2)No81.7681.7691.08FalseNoneNoneFalseNoneFalse7446.70080
3778599142641Nonecode17KSRB 11-11.6.1:Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters. 80x1.25 mm M.S. laths with 1.25 mm thick top cover including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (Item No. 11.6.1, Page No. 76, Vol.2)Sqm2948.962948.969.0FalseNoneNoneFalseNoneFalse26540.640
3778600142641Nonecode18KSRB 11-11.8.4:Extra for providing 2 HP Mild Steel Auto Reverse Shutter Gearbox for operating rolling shutters including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.(Item No. 11.8.4, Page No. 77, Vol.2)No27648.3227648.321.0FalseNoneNoneFalseNoneFalse27648.320
3778601142641Nonecode19KSRB 11-11.35.1.1:Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate sections and other sections of approved make conforming to IS: 733 and IS:1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing, paneling and dash fasteners to be paid for separately) :For Fixed Portion: Powder coated aluminium (minimum thickness of powder coating 50 micron) including cost of materials, labour, usage charges of machinery complete as per specifications..(Item No. 11.35.1.1, Page No. 87, Vol.2)Kg506.24506.24240.0FalseNoneNoneFalseNoneFalse121497.60
3778602142641Nonecode20Internal Electric worksJob225000.0225000.01.0FalseNoneNoneFalseNoneFalse225000.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17236290950000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17236290950000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17236290950000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17236290950000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17236290950000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17236291080000NoneNoneELIGIBILITYGST Applicable as per Prevailing RateNone
17236291130000NoneNoneELIGIBILITYAll Conditions as per Tender DocumentsNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNonesatisfactory completed as a prime contractor at least one similar work such as Construction of Proposed 4 TPD MRF Centre of PEB Structure to an extent of 90 percent of the cost of the work, such as any Similar work of value not less than Rs.23,34,519.00Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneAttach valid KPWD Civil Registration Certificate obtained from the issuing authoritiesCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneExecuted in one year for a continuous period of 12 months the following minimum quantities of work12 usually 80 percent of the annual of requirementCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneLiquid assets and/or availability of credit facilities of not less than Rs. 7,78,173.00Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Liquid assets and/or availability of credit facilities
NoneNoneNoneNoneWith UDIN Number achieved in at least two financial years an average annual financial turnover of Rs. 51,87,820.00Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
With UDIN Number achieved in at least two financial years an average annual financial turnover of Rs. 51,87,820.00TrueTechnical Bid
satisfactory completed as a prime contractor at least one similar work such as Construction of Proposed 4 TPD MRF Centre of PEB Structure to an extent of 90 percent of the cost of the work, such as any Similar work of value not less than Rs.23,34,519.00TrueTechnical Bid
Executed in one year for a continuous period of 12 months the following minimum quantities of work12 usually 80 percent of the annual of requirementTrueTechnical Bid
Liquid assets and/or availability of credit facilities of not less than Rs. 7,78,173.00TrueTechnical Bid
Attach valid KPWD Civil Registration Certificate obtained from the issuing authoritiesTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone