createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1723787678265
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd37500.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose27-08-2024 17:29:25
tenderQueryClose22-08-2024 10:25:14
technicalBidOpenNone
publishedDate16-08-2024 11:27:11
publishedByPostDMA_EE2_CC_MYS
publishedByUserKPE16495 - MAHESH M S
bidValidityPeriod90
noOfCalls2
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonlohith
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9980819479
tenderSupplierListNone
tenderSchedule
createdTs1723787678268
version13
createdDateNone
modifiedDateNone
tenderNumberDMA/2023-24/OW/WORK_INDENT2751/CALL-2
titleCONSTRUCTION OF GAJIBO IN HUNASURU ROAD IN WARD 42
descriptionCONSTRUCTION OF GAJIBO IN HUNASURU ROAD IN WARD 42
categoryWORKS
categoryTextWorks
ecv1256467.55
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2163
locationNameDMA City Corporation Mysuru
provisionalAmount1500000.0
groupOverheadTotalNone
fileNumberEE/W/MCC/2023-24/TN-06/08
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17237876780001NoneNoneOther WorksCONSTRUCTION OF GAJIBO IN HUNASURU ROAD IN WARD 421256467.55
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3786169143027Nonecode1.12 v1Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depthCum68.2568.2523.04FalseNoneNoneFalseNoneFalse1572.480
3786170143027Nonecode2.1.2 v1Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregatesCum5466.35466.34.32FalseNoneNoneFalseNoneFalse23614.4160
3786171143027Nonecode3.1 v3Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of workCum33.633.623.04FalseNoneNoneFalseNoneFalse774.1440
3786172143027Nonecode5.4 v2Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)Cum5619.65619.615.36FalseNoneNoneFalseNoneFalse86317.0560
3786173143027Nonecode2.2.2.1 v1Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. 8% for formworkCum6780.196780.1918.42FalseNoneNoneFalseNoneFalse124891.09980
3786174143027Nonecode13.1 v3Supplying, Fitting and Placing un-coated TMT Fe500 & above bar Reinforcement in sub-structure complete as per Drawing and Technical SpecificationsTonne92461.9592461.951.66FalseNoneNoneFalseNoneFalse153486.8370
3786175143027Nonecode1.9 v1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 mCum214.2214.257.6FalseNoneNoneFalseNoneFalse12337.920
3786176143027Nonecode8.41 v2Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargeSqm136.5136.5420.0FalseNoneNoneFalseNoneFalse57330.00
3786177143027Nonecode9.24 v2Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent.Sqm3013.53013.578.4FalseNoneNoneFalseNoneFalse236258.40
3786178143027Nonecode11.28 v2Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.Kg525.0525.0540.0FalseNoneNoneFalseNoneFalse283500.00
3786179143027Nonecode11.25.2 v2Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-ChargeKg126.0126.01480.0FalseNoneNoneFalseNoneFalse186480.00
3786180143027Nonecode8.2.2 v2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-chargeSqm241.5241.5308.0FalseNoneNoneFalseNoneFalse74382.00
3786181143027Nonecode8.28 v2Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm69.369.3224.0FalseNoneNoneFalseNoneFalse15523.20
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17237876780000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17237876780000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17237876780000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17237876780000NoneNoneELIGIBILITYDepartment Registration DetailsNone
17237876780000NoneNoneELIGIBILITYTotal value of civl engineering works executed and payments received in the last five years (year-wise)None
17237876780000NoneNoneELIGIBILITYList of existing commitments and ongoing workNone
17237876780000NoneNoneELIGIBILITYList of works for which tenders already submittedNone
17237876780000NoneNoneELIGIBILITYBanker DetailsNone
17237876780000NoneNoneELIGIBILITYOTHER CONDITIONS APPLY ACCORDING TO KW-1 DOCUMENTNone
17237876780000NoneNoneELIGIBILITYEstimations are prepared excluding the 18 percent GSTNone
17237876780000NoneNoneELIGIBILITYUDIN Number Should Be Mentioned In The Turn Over Certificate And Also It Should Be Active Other Wise Tender Will Be RejectedNone
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate with Active UDIN Number Should Be MentionedTrueTechnical Bid
PWD Registration CertificateTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone