noticeInvitingTenderDTO
createdTs1724138720375
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyRESERVED
invitingStrategyTextReserved
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd25000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose04-09-2024 16:00:00
tenderQueryClose21-08-2024 13:59:33
technicalBidOpenNone
publishedDate20-08-2024 13:03:43
publishedByPostDMA_EE1_CC_HD
publishedByUserKPE11812 - VITTAL M TUBAKE
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonVittal M Tubake
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08362213834
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1724138720421
version4
createdDateNone
modifiedDateNone
tenderNumberDMA/2024-25/BD/WORK_INDENT26620
titleConstruction of Muktidhama building for cremation in the Hindu cemetery of Tarihala village in ward no. 31, zone 07, HDMC.
descriptionConstruction of Muktidhama building for cremation in the Hindu cemetery of Tarihala village in ward no. 31, zone 07, HDMC.
categoryWORKS
categoryTextWorks
ecv2000000.00
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2170
locationNameDMA City Corporation Hubballi-Dharawada
provisionalAmount2000000.0
groupOverheadTotal312948.54
fileNumber228294
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17241387200000NoneNoneBuildingsConstruction of Muktidhama building for cremation in the Hindu cemetery of Tarihala village in ward no. 31, zone 07, HDMC.1687051.46
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3817012145087Nonecode Vol-1 Page No.5 Item no..1.4.1Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges andsuch simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. (UNI SR 2023-24 Vol-I / Page No.5 / Item No.1.4.1)Cum254.1254.171.517FalseNoneNoneFalseNoneFalse18172.46970
3817013145087Nonecode Vol-1 Page No.15 Item no..2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates. (UNI SR 2023-24 Vol-I / Page No.59 / Item No.2.1.3)Cum6288.456288.4523.86FalseNoneNoneFalseNoneFalse150042.4170
3817014145087Nonecode Vol-1 Page No.16 Item no..2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (UNI SR 2023-24 Vol-I / Page No.16 / Item No.2.5.1)Cum6961.56961.551.77FalseNoneNoneFalseNoneFalse360396.8550
3817015145087Nonecode Vol-1 Page No.111 Sl.no. 1.aAs per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. For Foundation upto Plinth, a. Isolated works 8% (UNI SR 2023-24 Vol-1 / Page no.111 / Sl.no.1.a / Addendum I Percentage Additionalities for Form work, Centering & Scaffolding)Cum556.92556.923.27FalseNoneNoneFalseNoneFalse1821.12840
3817016145087Nonecode Vol-1 Page No.111 Sl.no. 9As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. For RCC Columns / Shaft (Slip Centering) works 70% (UNI SR 2023-24 Vol-1 / Page no.111 / Sl.no.9 / Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding)Cum4873.054873.057.11FalseNoneNoneFalseNoneFalse34647.38550
3817017145087Nonecode Vol-1 Page No.111 Sl.no. 2As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. For Plinth Beams of Buildings works 50% (UNI SR 2023-24 Vol-1 / Page no.111 / Sl.no.2 / Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding)Cum3480.753480.757.66FalseNoneNoneFalseNoneFalse26662.5450
3817018145087Nonecode Vol-1 Page No.112 Sl.no.14As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. For RCC Beams, Lintels & Troughs of Aqueducts works 60% UNI SR 2023-24 Vol-1 / Page no.112 / Sl.no.14 / Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding)Cum4176.94176.96.04FalseNoneNoneFalseNoneFalse25228.4760
3817019145087Nonecode Vol-1 Page No.112 Sl.no.15As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. For RCC Roof Slabs works 50% (UNI SR 2023-24 Vol-1 / Page no.112 / Sl.no.15 Appendix I Additionalities for Formwork, Centering & Scaffolding)Cum3480.753480.7527.7FalseNoneNoneFalseNoneFalse96416.7750
3817020145087Nonecode Vol-1 Page No.71 Item no..9.3Supplying, Fitting and Placing TMT Fe 550 & above Reinforcement in Foundation / Substructure / Superstructure complete as per Drawing and Technical Specifications. (UNI SR 2023-24 Vol-1 / Page No.71 / Item No.9.3)Tonne93929.8593929.855.54FalseNoneNoneFalseNoneFalse520371.3690
3817021145087Nonecode Vol-2 Page No.15 Item no..6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. (UNI SR 2023-24 Vol-II / Page No.15 / Item No.6.32)Sqm1375.51375.5232.19FalseNoneNoneFalseNoneFalse319377.3450
3817022145087Nonecode Vol-1 Page No.15 Item no..2.1.4Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates (UNI SR 2023-24 Vol-I / Page No.15 / Item No.2.1.4)Cum6527.856527.850.53FalseNoneNoneFalseNoneFalse3459.76050
3817023145087Nonecode Vol-1 Page No.7 Sl no..1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (UNI SR 2023-24 Vol-I / Page No.7 / Item No.1.9)Cum279.3279.3136.47FalseNoneNoneFalseNoneFalse38116.0710
3817024145087Nonecode Vol-2 Page No.82 Sl no.11.25.2Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (UNI SR 2023-24 Vol-2 / Page No.82 / Item No.11.25.2)Kg142.8142.8446.16FalseNoneNoneFalseNoneFalse63711.6480
3817025145087Nonecode Vol-2 Page No.26 Item no..7.38Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 g/m2 as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 m or as desired by Engineerin- charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. (UNI SR 2023-24 Vol-2 / Page No.26 / Item No.7.38)Sqm596.4596.448.0FalseNoneNoneFalseNoneFalse28627.20
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17241387210000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17241387210001NoneNoneELIGIBILITYValid contractor Registration Certificate issued from competent authority in appropriate contractor classNone
17241387210001NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste reserved category as prescribed in the tender documentNone
17241387210000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17241387210000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17241387800000NoneNoneELIGIBILITYFinancial Turnover Certificate obtained and certified by the Registered Valid Chartered Accountant indicating the Registration no of Chartered Accountant with UDIN number details along with profit and loss statement tallying the annual TurnoverNone
17241387940000NoneNoneELIGIBILITYWork done certificate for the work performed as prime contractor (in the same name) on works of Similar Nature over during the five years specified (Similar Nature of work done certificate i.e, 25% of amount put to tenderNone
17241388030000NoneNoneELIGIBILITYUnconditional Line of credit i.e, 30% of amount put to tender obtained from Nationalised/Scheduled Banks in Given Pro-forma in the bid documentNone
17241388150000NoneNoneELIGIBILITYValid PAN Card and Valid GST Registration certificatesNone
17241388240000NoneNoneELIGIBILITYAll conditions As per kw2None
17241388330000NoneNoneELIGIBILITYContractor Contact phone number , address and e-mail id are mandatoryNone
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Contractor Registration CertificateTrueTechnical Bid
Reserved Category Certificate SCTrueTechnical Bid
Domicile certificate of contractorTrueTechnical Bid
Line of CreditTrueTechnical Bid
Similar nature of work done certificateTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
BuildingsDharwadHubballi UrbanDharwad NorthHUBLITarihala village ward no. 31,NoneNoneNoneNoneNoneNone
tenderAddressNone
tenderRecallDTONone