noticeInvitingTenderDTO
createdTs1724300988710
version6
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd37500.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose02-09-2024 17:29:59
tenderQueryClose29-08-2024 17:02:57
technicalBidOpenNone
publishedDate22-08-2024 10:13:25
publishedByPostCMC_MCOM_HAV
publishedByUserKPE16478 - PARASHURAM M CHALAVADI
bidValidityPeriod90
noOfCalls2
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonPARASHURAM M CHALAVADI
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9110888518
tenderSupplierListNone
tenderSchedule
createdTs1724300988713
version11
createdDateNone
modifiedDateNone
tenderNumberDMA/2024-25/OW/WORK_INDENT19649/CALL-2
titleCONSTRUCTION OF FENCING, PAVERS AND BUILDING STRUCTURE ON THE SIDE OF HEGEERE JACKWELL WHICH SUPPLIES WATER TO THE CITY AT HAVERI CMC
descriptionCONSTRUCTION OF FENCING, PAVERS AND BUILDING STRUCTURE ON THE SIDE OF HEGEERE JACKWELL WHICH SUPPLIES WATER TO THE CITY AT HAVERI CMC
categoryWORKS
categoryTextWorks
ecv1498717.69
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2330
locationNameDMA City Municipal Council Haveri
provisionalAmount1500000.0
groupOverheadTotal228617.95
fileNumberNO1/15THFC2021-22/2024-25/CMCHVR/TS306
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17243009890000NoneNoneOther WorksCONSTRUCTION OF FENCING, PAVERS AND BUILDING STRUCTURE ON THE SIDE OF HEGEERE JACKWELL WHICH SUPPLIES WATER TO THE CITY AT HAVERI CMC1270099.74
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3831887146051NoneITEMCODE001Earth work excavation for Foundation by mechanical means for all works and depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery and other appurtenaces required to complete the work-In all kinds of soils Depth upto 3 m CSR -23-24,Vol-1, Page No.8 Item No.1.14.2Cum122.85122.85187.2FalseNoneNoneFalseNoneFalse22997.520
3831888146051NoneITEMCODE002Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite or trap or basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead and lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. The cost of steel reinforcement and formwork shall be paid separately -Mix 1:3:6 M10 Using 40 mm nominal size graded crushed coarse aggregate CSR -23-24,Vol-1, Page No.15 Item No.2.1.3Cum6168.676168.677.3458FalseNoneNoneFalseNoneFalse45313.8160860
3831889146051NoneITEMCODE003Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works and other parallel works from 0.50m to 3.50 m height. The granite or trap or basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead and lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. CSR -23-24,Vol-1, Page No.16 Item No.2.4.2Cum6512.696512.6914.5223FalseNoneNoneFalseNoneFalse94579.2379870
3831890146051NoneITEMCODE004Centering and Shuttering :Additionalities for formwork,centering and scaffolding Added on finished rate of concrete for formwork 1.Foundation upto Plinth b. All other types 3percent CSR -23-24,Vol-1, Addendum I - Page No.111 SI no.1 bCum195.38195.3810.44FalseNoneNoneFalseNoneFalse2039.76720
3831891146051NoneITEMCODE005Centering and Shuttering :Additionalities for formwork,centering and scaffolding Added on finished rate of concrete for formwork 2.Plinth Beams of Building 50 percent CSR -23-24,Vol-1, Addendum I - Page No.111 SI no.2Cum3256.343256.341.7194FalseNoneNoneFalseNoneFalse5598.9509960
3831892146051NoneITEMCODE006Centering and Shuttering :Additionalities for formwork,centering and scaffolding Added on finished rate of concrete for formwork 9.RCC Columns or Shaft Slip Centering 70 percent CSR -23-24,Vol-1, Addendum I - Page No.111 SI no.9Cum4558.884558.881.6284FalseNoneNoneFalseNoneFalse7423.6801920
3831893146051NoneITEMCODE007Filling approved earth excluding rock in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m 1 cement : 6 coarse sand CSR -23-24,Vol-1, Page No.7 Item No.1.11Cum445.99445.99172.2679FalseNoneNoneFalseNoneFalse76829.7607210
3831894146051NoneITEMCODE008Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works and super structure works of bridges upto 3.50 m height. The granite or trap or basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead and lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. The cost of steel reinforcement, dowel bars and formwork to be paid separately -M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates CSR -23-24,Vol-1, Page No.16, Item No.2.5.1Cum6828.96828.914.4182FalseNoneNoneFalseNoneFalse98460.445980
3831895146051NoneITEMCODE009Centering and Shuttering :Additionalities for formwork,centering and scaffolding Added on finished rate of concrete for formwork 2.Plinth Beams of Building 50 percent CSR -23-24,Vol-1, Addendum I - Page No.111 SI no.2Cum3414.453414.451.7816FalseNoneNoneFalseNoneFalse6083.184120
3831896146051NoneITEMCODE010Centering and Shuttering :Additionalities for formwork,centering and scaffolding Added on finished rate of concrete for formwork 9.RCC Columns or Shaft Slip Centering 70 percent CSR -23-24,Vol-1, Addendum I - Page No.111 SI no.9Cum4780.234780.232.9256FalseNoneNoneFalseNoneFalse13985.0408880
3831897146051NoneITEMCODE011Centering and Shuttering :Additionalities for formwork,centering and scaffolding Added on finished rate of concrete for formwork 14.RCC Beams, Lintels and Troughs of Aqueducts 60 percent CSR -23-24,Vol-1, Addendum I - Page No.112 SI no.14Cum4097.344097.340.7217FalseNoneNoneFalseNoneFalse2957.0502780
3831898146051NoneITEMCODE012Centering and Shuttering :Additionalities for formwork,centering and scaffolding Added on finished rate of concrete for formwork 19.Chejjas, Canopy and Other Architectural projections of minor sections 45 percent CSR -23-24,Vol-1, Addendum I - Page No.112 SI no.19Cum3073.03073.00.9828FalseNoneNoneFalseNoneFalse3020.14440
3831899146051NoneITEMCODE013Centering and Shuttering :Additionalities for formwork,centering and scaffolding Added on finished rate of concrete for formwork 14.RCC Beams, Lintels and Troughs of Aqueducts 60 percent CSR -23-24,Vol-1, Addendum I - Page No.112 SI no.14Cum4097.344097.341.7815FalseNoneNoneFalseNoneFalse7299.411210
3831900146051NoneITEMCODE014Centering and Shuttering :Additionalities for formwork,centering and scaffolding Added on finished rate of concrete for formwork 15. RCC Roof Slabs 50 percent CSR -23-24,Vol-1, Addendum I - Page No.112 SI no.15Cum3414.453414.454.3217FalseNoneNoneFalseNoneFalse14756.2285650
3831901146051NoneITEMCODE015Supplying, fitting and placing TMT FE 550 or 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping or welding joints, tying with binding wire or soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. CSR -23-24,Vol-1, Page No.18, Item No.2.11 aTonne92140.7192140.713.0735FalseNoneNoneFalseNoneFalse283194.4721850
3831902146051NoneITEMCODE016Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar1:6 1 cement : 6 coarse sand including cost of all materials, labour, scaffolding and usage charges of machinery and other incidental charges complete as per the direction of engineer incharge of work. CSR -23-24,Vol-2, Page No.13, Item No.6.2Cum8217.348217.3412.9688FalseNoneNoneFalseNoneFalse106569.0389920
3831903146051NoneITEMCODE017Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:3 1 cement: 3 fine sand to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.. External Plastering CSR -23-24,Vol-2, Page No.41, Item No.8.4.1Sqm332.69332.69105.936FalseNoneNoneFalseNoneFalse35243.847840
3831904146051NoneITEMCODE018Providing 12 mm cement plaster with cement mortar 1:4 1 cement: 4 fine sand to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.. Internal Plastering CSR -23-24,Vol-2, Page No.41, Item No.8.1.1Sqm262.65262.6567.68FalseNoneNoneFalseNoneFalse17776.1520
3831905146051NoneITEMCODE019Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. CSR -23-24,Vol-2, Page No.50 Item No.8.51Sqm103.0103.091.68FalseNoneNoneFalseNoneFalse9443.040
3831906146051NoneITEMCODE020Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove ll dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge CSR -23-42,Vol-2, Page No.45 Item No.8.27Sqm54.5954.5991.68FalseNoneNoneFalseNoneFalse5004.81120
3831907146051NoneITEMCODE021Wall painting with premium acrylic emulsion paint of interior grade, having VOC Volatile Organic Compound content less than 50 grams or litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. CSR -23-24,Vol-2, Page No.50 Item No.8.54.2Sqm113.3113.3105.936FalseNoneNoneFalseNoneFalse12002.54880
3831908146051NoneITEMCODE022Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in Charge.. CSR -23-24,Vol-2, Page No.77 Item No.11.5.1Sqm4612.344612.348.28FalseNoneNoneFalseNoneFalse38190.17520
3831909146051NoneITEMCODE023Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings or wooden frames with rawl plugs screws etc CSR -23-24,Vol-2, Page No.83 Item No.11.17Kgs188.49188.49367.2FalseNoneNoneFalseNoneFalse69213.5280
3831910146051NoneITEMCODE024Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. CSR -23-24,Vol-2, Page No.48 Item No.8.41Sqm172.01172.0119.008FalseNoneNoneFalseNoneFalse3269.566080
3831911146051NoneITEMCODE025Finishing with Epoxy paint two coats at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Enginer-in-charge. CSR -23-24,Vol-2, Page No.47 Item No.8.36.1Sqm181.28181.2819.008FalseNoneNoneFalseNoneFalse3445.770240
3831912146051NoneITEMCODE026Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications. CSR -23-24,Vol-2, Page No.64 Item No.9.34Sqm1591.351591.3532.292FalseNoneNoneFalseNoneFalse51387.87420
3831913146051NoneITEMCODE027Wiring for lighting or power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 1.5 Sqmm PWD Electrical SR 2023-24 2.3.2 P.NO.5Mtr26.7826.78150.0FalseNoneNoneFalseNoneFalse4017.00
3831914146051NoneITEMCODE028Supplying and replacing ceiling fan regulator 900mm to 1500mm. PWD Electrical SR 2023-24 12.6 P.NO.48Nos393.46393.462.0FalseNoneNoneFalseNoneFalse786.920
3831915146051NoneITEMCODE029Supplying and fixing of modular switch and connected accessories on existing modular switch plate as per IS 3854 and IS 1293. PWD Electrical SR 2023-24 3.6.1 P.NO.9Sqm105.06105.065.0FalseNoneNoneFalseNoneFalse525.30
3831916146051NoneITEMCODE030Supplying and fixing of retrofit type - LED bulb W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degree K, CRI 70 percent . efficacy 80 lumen per W, life 25000 burning hours and Compliance to IS 10322 or IEC 60598, LM 79 and LM 80. The LED are driven by HF electronic driver integrated in the system, with PF 0.95, power loss should 5 percent of lamp Wage., short circuit and open circuit protection to be integrated in the circuit, THD less than 20 percent , Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL or CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition PWD Electrical SR 2023-24,Nos438.78438.786.0FalseNoneNoneFalseNoneFalse2632.680
3831917146051NoneITEMCODE031Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning Hrs 50000 hr at Lumen Maintenance of 70 percent , maximum light intensity should be between 60 degrees to 70 degrees. CCT 5500K, IP66 optical and electrical compartment and impact resistance of complete luminaire IK08. Power Factor 0.9 with mains, Surge Protection- Min 5KV along with Over voltage or Overload, short circuit or miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50 or 60Hz application. Compliance to IS 10322 or IEC 60598, LM 79 and LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with ........W System Power consumption. LED Efficiency1301m or w, nominal CRI 75. Luminaire manufacturer should have in-house facility accredited by P No 46; I No 11.8.3Nos6171.766171.762.0FalseNoneNoneFalseNoneFalse12343.520
3831918146051NoneITEMCODE032Supplying and Fixing of........mm dia class A GI pipe bracket upto 2 ms long bent at suitable angle and fixing to this bracket 1x40 or 2x40 W fluorescent tube street light fitting of all capacities to GI or GI or rail or RCC pole or wall using suitable clA, bolts, and nuts and wiring using suitable capacity wires - Using 32mm dia G.I.Pipe P No 45; I No 13.1.2Nos1076.351076.353.0FalseNoneNoneFalseNoneFalse3229.050
3831919146051NoneITEMCODE033Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system 48" Sweep 1200 mm Regular model PWD Electrical SR 2023-24,item no6.3.1 p.no.30 48" Sweep 1200 mm Regular modelNos3073.523073.522.0FalseNoneNoneFalseNoneFalse6147.040
3831920146051NoneITEMCODE034Supplying heavy gauge PVC conduit pipe ....... dia ....... mm thickconfirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc , and fixing using inverted wood plugs in case of RCC ceiling and RCC wall or stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws-25 mm dia 2 mm thick PWD Electrical SR 2023-24,item no 1.1.2 p.no.02Mtr81.3781.37150.0FalseNoneNoneFalseNoneFalse12205.50
3831921146051NoneITEMCODE035Supplying of 1440rpm heavy duty exhaust fan with bracket blades suitable to operate on 230V 50Hz, AC Supply complete PWD Electrical SR 2023-24,item no 6.2.1 p.no.30Each3058.073058.072.0FalseNoneNoneFalseNoneFalse6116.140
3831922146051NoneITEMCODE036Cutting holes of required size in brick masonry wall for fixing of exhaust fan including providing and fixing 300 mm dia PVC pipe conforming BIS-12818 and making good the same with CM 1:4 etc. complete as per direction of Engineer-in-charge..Each227.63227.632.0FalseNoneNoneFalseNoneFalse455.260
3831923146051NoneITEMCODE037Providing and fixing MS ladder between landings, 45 cms wide using angle iron of specified sizes, 20mm MS bars at 25 cms. centre to centre, with necessary supports of same angle iron etc. as directed, including hand railing on both sides with 25mm dia. GI pipes with angle iron props at 2 mtrs. intervals and 0.5M heigh, including fixing in ground with CC 1:2:4 and two coats of anticorrosive bituminous paint etc. with all lead and lifts etc. complete with:MS angle of 65 x 65 x 10mm CSR -23-24,Vol-2, Page No.7.1.1 Item No.85Mtr4508.314508.314.05FalseNoneNoneFalseNoneFalse18258.65550
3831924146051NoneITEMCODE038Construction of Embankment by excavating the available approved Gravel or Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage and all other appurtenaces required to complete the work.Cum488.22488.2296.0FalseNoneNoneFalseNoneFalse46869.120
3831925146051NoneITEMCODE039Providing and constructing 300 mm thick rubble stone pitching set in CM 1: 5 proportion by volume with pin headers at 2 per m2 including cost of all materials from approved source, labour, packing stone chips and mortar into joints, finishing, curing and all other ancillary operations complete Note: If 150 mm thick murum bed is to be provided below pitching, add 93.00 or m2 CSR -23-24,Vol-4, Page No.54 Item No.3.43Cum1077.381077.3896.0FalseNoneNoneFalseNoneFalse103428.480
3831926146051NoneITEMCODE040Furniture, Chairs and Table etc.executed quantity only.No17000.017000.01.0FalseNoneNoneFalseNoneFalse17000.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17243009890000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17243009890000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17243009890000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17243009890000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17243009890000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17243009890000NoneNoneELIGIBILITYValid contracter licencse CLAss-IV and aboveNone
17243009890000NoneNoneELIGIBILITYEligible Tenderers will be qualified only if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under where Assessed available tender capacity equal to ( AxNx2.5 - B )None
17243009890000NoneNoneELIGIBILITYList of existing commitments and ongoing workNone
17243009890000NoneNoneELIGIBILITYList of works for which tenders already submittedNone
17243009890000NoneNoneELIGIBILITYBanker DetailsNone
17243009890000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer in its name should have in the last five years i.e. 2019-2020 to 2023-2024 TURNOVER from certified chatered accountantNone
17243009890000NoneNoneELIGIBILITYShould have satisfactorily completed as a prime contractor for at least ONE similar work such as CONSTRUCTION OF BUILDING/BUILDING RENOVATION WORK to an extent of 50% of the cost of the work(7.50LAKH). i.e., 2019-2020 to 2023-2024.None
17243009890000NoneNoneELIGIBILITYliquid assets and /or availability of credit facilities of no less than Rs.4.50lakhs (Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc. (usually the equivalent of the estimated cash flow for three months in the peak construction period)None
17243009890000NoneNoneELIGIBILITYEven though the tenderers meet the above criteria, they are subject to be disqualified if they have1.made misleading or false representations in the forms, statements and attachments submitted in proof of the qualification requirements2.record of poor performance such as abandoning the works, not properly completing the contract, inordinate delays in completion, litigation history, or financial failures etc.3.participated in the previous Tender for the same work and had quoted unreasonably high tender prices and could not furnish rational justificationNone
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate of last five years as per tender document 2019-20 TO 2023-24TrueTechnical Bid
Valid pwd contracter licencse CLAss-IV and aboveTrueTechnical Bid
Should have satisfactorily completed as a prime contractor for at least ONE similar work such as CONSTRUCTION OF BUILDING/BUILDING RENOVATION WORK to an extent of 50percent of the cost of the work-7.50LAKH. i.e., 2019-2020 to 2023-2024.TrueTechnical Bid
liquid assets and /or availability of credit facilities of no less than Rs.4.50lakhsTrueTechnical Bid
other documents as per tender documentTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone