tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1724133156000 | 0 | None | None | Buildings | Civil Works | 1524028.41 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3815923 | 144970 | None | Common DSR 2023-24 Volume II.No1.14.1P.No. 08 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 107.1 | 107.1 | 82.62 | False | None | None | False | None | False | 8848.602 | 0 | 3815924 | 144970 | None | Common DSR 2023-24 Volume II.No2.1.3P.No. 15 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6288.45 | 6288.45 | 8.24 | False | None | None | False | None | False | 51816.828 | 0 | 3815925 | 144970 | None | Common DSR 2023-24 Volume II.No2.2.1P.No. 15 | Providing and laying in position Cement Concrete for all Foundation works.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6601.35 | 6601.35 | 15.54 | False | None | None | False | None | False | 102584.979 | 0 | 3815926 | 144970 | None | Common DSR 2023-24 Volume II.No2.2.1P.No. 15 | Add Formwork/Centering Charges Vide Common DSR P.No.111 Vol-I Sl No a For a.Isolated at 8% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 528.11 | 528.11 | 15.54 | False | None | None | False | None | False | 8206.8294 | 0 | 3815927 | 144970 | None | Common DSR 2023-24 Volume II.No2.4.2P.No. 16 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6639.15 | 6639.15 | 10.39 | False | None | None | False | None | False | 68980.7685 | 0 | 3815928 | 144970 | None | Common DSR 2023-24 Volume II.No2.4.2P.No. 16 | Add Formwork/Centering Charges Vide Common DSR P.No.111 Vol-I Sl No 2 For Plinth Beams of Buildings at 50% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3319.58 | 3319.58 | 10.39 | False | None | None | False | None | False | 34490.4362 | 0 | 3815929 | 144970 | None | Common DSR 2023-24 Volume II.No1.9P.No. 07 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 279.3 | 279.3 | 41.32 | False | None | None | False | None | False | 11540.676 | 0 | 3815930 | 144970 | None | Common DSR 2023-24 Volume II.No1.11P.No. 07 | Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 454.65 | 454.65 | 59.87 | False | None | None | False | None | False | 27219.8955 | 0 | 3815931 | 144970 | None | Common DSR 2023-24 Volume II.No2.5.1P.No. 16 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6961.5 | 6961.5 | 15.57 | False | None | None | False | None | False | 108390.555 | 0 | 3815932 | 144970 | None | Common DSR 2023-24 Volume II.No2.5.1P.No. 16 | Add Formwork/Centering Charges Vide Common DSR P.No.111 Vol-I Sl No 9 For RCC Columns / Shaft (Slip Centering) at 70% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4873.05 | 4873.05 | 1.53 | False | None | None | False | None | False | 7455.7665 | 0 | 3815933 | 144970 | None | Common DSR 2023-24 Volume II.No2.5.1P.No. 16 | Add Formwork/Centering Charges Vide Common DSR P.No.112 Vol-I Sl No 14 For RCC Beams, Lintels & Troughs of Aqueducts at 60% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4176.9 | 4176.9 | 4.56 | False | None | None | False | None | False | 19046.664 | 0 | 3815934 | 144970 | None | Common DSR 2023-24 Volume II.No2.5.1P.No. 16 | Add Formwork/Centering Charges Vide Common DSR P.No.112 Vol-I Sl No 19 For Chejjas, Canopy & Other Architectural projections of minor sections at 45% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3132.68 | 3132.68 | 0.55 | False | None | None | False | None | False | 1722.974 | 0 | 3815935 | 144970 | None | Common DSR 2023-24 Volume II.No2.5.1P.No. 16 | Vide Common DSR P.No.112 Vol-I Sl No 15 For RCC Roof Slabs at 50% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3480.75 | 3480.75 | 8.93 | False | None | None | False | None | False | 31083.0975 | 0 | 3815936 | 144970 | None | Common DSR 2023-24 Volume II.No2.11aP.No. 18 | Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening,cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | t | 93929.85 | 93929.85 | 3.33 | False | None | None | False | None | False | 312786.4005 | 0 | 3815937 | 144970 | None | Common DSR 2023-24 Volume III.No6.32P.No. 17 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1375.5 | 1375.5 | 77.21 | False | None | None | False | None | False | 106202.355 | 0 | 3815938 | 144970 | None | Common DSR 2023-24 Volume III.No6.34P.No. 17 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1159.2 | 1159.2 | 22.62 | False | None | None | False | None | False | 26221.104 | 0 | 3815939 | 144970 | None | Common DSR 2023-24 Volume II.No2.1.4P.No. 15 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6527.85 | 6527.85 | 0.75 | False | None | None | False | None | False | 4895.8875 | 0 | 3815940 | 144970 | None | Common DSR 2023-24 Volume III.No8.5.2P.No. 42 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 366.45 | 366.45 | 217.07 | False | None | None | False | None | False | 79545.3015 | 0 | 3815941 | 144970 | None | Common DSR 2023-24 Volume III.No8.4.2P.No. 41 | Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 327.6 | 327.6 | 182.57 | False | None | None | False | None | False | 59809.932 | 0 | 3815942 | 144970 | None | Common DSR 2023-24 Volume III.No8.51P.No. 50 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 105.0 | 105.0 | 299.75 | False | None | None | False | None | False | 31473.75 | 0 | 3815943 | 144970 | None | Common DSR 2023-24 Volume III.No8.27P.No. 45 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 55.65 | 55.65 | 299.75 | False | None | None | False | None | False | 16681.0875 | 0 | 3815944 | 144970 | None | Common DSR 2023-24 Volume III.No8.39P.No. 48 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost ofmaterials, labour complete as per specifications and as per directions of Engineer-in-charge.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 133.35 | 133.35 | 299.75 | False | None | None | False | None | False | 39971.6625 | 0 | 3815945 | 144970 | None | Common DSR 2023-24 Volume III.No8.31P.No. 46 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives with pure Acrylic Resin, UV resistant, dirt & pick up resistant, Alkali & Water resistant of required shade: New work (Two coats applied @ 1.43 L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 186.9 | 186.9 | 217.07 | False | None | None | False | None | False | 40570.383 | 0 | 3815946 | 144970 | None | Common DSR 2023-24 Volume III.No11.34BP.No. 86 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Kg | 192.15 | 192.15 | 260.37 | False | None | None | False | None | False | 50030.0955 | 0 | 3815947 | 144970 | None | Common DSR 2023-24 Volume III.No12.13.1P.No. 100 | Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 103755.75 | 103755.75 | 0.2 | False | None | None | False | None | False | 20751.15 | 0 | 3815948 | 144970 | None | Common DSR 2023-24 Volume III.No12.51P.No. 104 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost ofmaterials, labourcharges, complete as per specifications.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 1066.8 | 1066.8 | 4.0 | False | None | None | False | None | False | 4267.2 | 0 | 3815949 | 144970 | None | Common DSR 2023-24 Volume III.No12.57.5P.No. 105 | Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. 35 mm thick one side teak and one side commercial
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 4091.85 | 4091.85 | 6.4 | False | None | None | False | None | False | 26187.84 | 0 | 3815950 | 144970 | None | Common DSR 2023-24 Volume III.No12.89P.No. 110 | Providing &fixing of 2.5 track x 2-panel sliding windowsmade out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at6PHR with TPE(Thermo Plastic Elastomer) and lead free, gasketsgrey colour having isolated drainage and reinforced with Galvanized Iron profile through- out the window frame. The outer frame having an overall size of 94mm width x 45mm height with reinforcement of 1mm thickness and Sash with overall size of 39mm x 58mm with GI reinforcementof 1.5mm and mesh sash of size 25mm x42mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 1819mm x 1819mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 6878.55 | 6878.55 | 4.32 | False | None | None | False | None | False | 29715.336 | 0 | 3815951 | 144970 | None | Common DSR 2023-24 Volume III.No12.85P.No. 109 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 6004.95 | 6004.95 | 3.42 | False | None | None | False | None | False | 20536.929 | 0 | 3815952 | 144970 | None | Common DSR 2023-24 Volume III.No11.26.2P.No. 84 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. E.R.W. tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Kg | 136.5 | 136.5 | 75.0 | False | None | None | False | None | False | 10237.5 | 0 | 3815953 | 144970 | None | Common DSR 2023-24 Volume III.No8.41P.No. 48 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 175.35 | 175.35 | 36.17 | False | None | None | False | None | False | 6342.4095 | 0 | 3815954 | 144970 | None | Common DSR 2023-24 Volume III.No9.36P.No. 64 | Providing flooring with25mm thick polished Cuddapah slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab , including cost of materials, labour, curing, polishing complete as per specifications.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1732.5 | 1732.5 | 30.17 | False | None | None | False | None | False | 52269.525 | 0 | 3815955 | 144970 | None | Common DSR 2023-24 Volume III.No9.31P.No. 64 | Providing and laying Polished Sadarahalli Grey Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 20 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 2189.25 | 2189.25 | 11.73 | False | None | None | False | None | False | 25679.9025 | 0 | 3815956 | 144970 | None | Common DSR 2023-24 Volume III.No9.9P.No. 60 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/m2 including pointing the joints with white cement and matching pigment etc., complete.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1129.8 | 1129.8 | 6.12 | False | None | None | False | None | False | 6914.376 | 0 | 3815957 | 144970 | None | Common DSR 2023-24 Volume III.No10.14P.No. 71 | Providing and fixing1stquality ceramic glazed walltiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1161.3 | 1161.3 | 22.48 | False | None | None | False | None | False | 26106.024 | 0 | 3815958 | 144970 | None | Common DSR 2023-24 Volume IIII.No6.8.1P.No. 51 | Precast Cement Concrete interlocking Blocks Providing and laying 60mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Cycle Tracks & Pedestrian Footpaths of approved shape and colour, laid in required pattern and including over 30mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in- charge. (WMM/WBM Base to be paid separately if necessary as per relevant technical specification)
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1121.4 | 1121.4 | 6.62 | False | None | None | False | None | False | 7423.668 | 0 | 3815959 | 144970 | None | Common DSR 2023-24 Volume III.No8.84P.No. 55 | Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 498.75 | 498.75 | 3.6 | False | None | None | False | None | False | 1795.5 | 0 | 3815960 | 144970 | None | Common DSR 2023-24 Volume III.No22.15.2P.No. 218 | Providing and fixing stainless steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Handles 300mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 577.5 | 577.5 | 4.0 | False | None | None | False | None | False | 2310.0 | 0 | 3815961 | 144970 | None | Common DSR 2023-24 Volume III.No22.15.4P.No. 219 | Providing and fixing stainless steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Aldrop 16mm dia, 300mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 393.75 | 393.75 | 8.0 | False | None | None | False | None | False | 3150.0 | 0 | 3815962 | 144970 | None | Common DSR 2023-24 Volume III.No22.15.6P.No. 219 | Providing and fixing stainless steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Tower Bolts 200x10mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 157.5 | 157.5 | 8.0 | False | None | None | False | None | False | 1260.0 | 0 | 3815963 | 144970 | None | Common DSR 2023-24 Volume III.No22.15.8P.No. 219 | Providing and fixing stainless steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS hinges 125 mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 52.5 | 52.5 | 12.0 | False | None | None | False | None | False | 630.0 | 0 | 3815964 | 144970 | None | Common DSR 2023-24 Volume III.No22.15.10P.No. 219 | Providing and fixing stainless steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Door stopper 75mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 105.0 | 105.0 | 4.0 | False | None | None | False | None | False | 420.0 | 0 | 3815965 | 144970 | None | Common DSR 2023-24 Volume III.No8.49P.No. 49 | Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Per Cmtr | 4.2 | 4.2 | 5000.0 | False | None | None | False | None | False | 21000.0 | 0 | 3815966 | 144970 | None | I.NoGEM RATE | ALLARK Non Magnetic White Dry Erase Writing board of dimensions (in mm) 1200 x 600, Dry erase markers containing non-permanent ink, Dry Erase Writing board Type Non Magnetic, Frame Material Wrought Aluminium and Aluminium Alloys as per IS 1285, Front Surface material of the Dry erase writing board Resin Coated Steel sheet, Corners of Dry erase writing board ABS Corners, Core Material Medium Density Fibre Boards as per IS 12406, 1200 x 600, Core material Thickness (In mm ) with Tolerance +/- 1 mm 9 mm and Frame material thickness ( In mm) with Tolerance +/- 0.1 mm 1.2 mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 2485.0 | 2485.0 | 3.0 | False | None | None | False | None | False | 7455.0 | 0 |
| 1724133156000 | 0 | None | None | Buildings | Water Supply & Sanitary Works | 86397.99 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3815967 | 144971 | None | Common DSR 2023-24 Volume II.No1.17.1P.No. 10 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds of soils. Depth upto 1.50 m ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 275.1 | 275.1 | 23.4 | False | None | None | False | None | False | 6437.34 | 0 | 3815968 | 144971 | None | Common DSR 2023-24 Volume II.No1.10P.No. 07 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 168.0 | 168.0 | 23.4 | False | None | None | False | None | False | 3931.2 | 0 | 3815969 | 144971 | None | Common DSR 2023-24 Volume III.No13.12P.No. 119 | Providing and fixing C.P. brass bib cock of approved quality conforming to IS:8931
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 666.75 | 666.75 | 5.0 | False | None | None | False | None | False | 3333.75 | 0 | 3815970 | 144971 | None | Common DSR 2023-24 Volume III.No13.21.2P.No. 120 | Providing and fixing PTMT, push cock of approved quality and colour. 15 mm nominal bore, 80 mm long, weighing not less than 46 g
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 140.7 | 140.7 | 4.0 | False | None | None | False | None | False | 562.8 | 0 | 3815971 | 144971 | None | Common DSR 2023-24 Volume III.No13.15P.No. 119 | Providing and fixing C.P. brass stop cock (concealed) of standard design and of approved make conforming to IS:8931.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 761.25 | 761.25 | 2.0 | False | None | None | False | None | False | 1522.5 | 0 | 3815972 | 144971 | None | Common DSR 2023-24 Volume III.No13.4.1P.No. 117 | Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) : 25 mm nominal bore
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 576.45 | 576.45 | 1.0 | False | None | None | False | None | False | 576.45 | 0 | 3815973 | 144971 | None | Common DSR 2023-24 Volume III.No13.5.2P.No. 117 | Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete : 20 mm nominal bore
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 329.7 | 329.7 | 1.0 | False | None | None | False | None | False | 329.7 | 0 | 3815974 | 144971 | None | Common DSR 2023-24 Volume III.No13.8.2.2P.No. 118 | Providing and fixing unplasticised PVC connection pipe with brass unions : 45 cm length 20 mm nominal bore
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 115.5 | 115.5 | 1.0 | False | None | None | False | None | False | 115.5 | 0 | 3815975 | 144971 | None | Common DSR 2023-24 Volume III.No13.32.2P.No. 122 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. 20 mm nominal dia pipes
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 397.95 | 397.95 | 10.0 | False | None | None | False | None | False | 3979.5 | 0 | 3815976 | 144971 | None | Common DSR 2023-24 Volume III.No13.31.3P.No. 122 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Internal work - Exposed on wall 25 mm nominal dia Pipes
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 333.9 | 333.9 | 20.0 | False | None | None | False | None | False | 6678.0 | 0 | 3815977 | 144971 | None | Common DSR 2023-24 Volume III.No13.31.4P.No. 122 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Internal work - Exposed on wall 32 mm nominal dia Pipes
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 420.0 | 420.0 | 20.0 | False | None | None | False | None | False | 8400.0 | 0 | 3815978 | 144971 | None | Common DSR 2023-24 Volume III.No13.53P.No. 126 | Constructing brick masonry chamber for underground C.I. inspection chamber and bends with bricks in cement mortar 1:4 (1 cement : 4 coarse sand) C.I. cover with frame (light duty) 455x610 mm internal dimensions, total weight of cover with frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg), R.C.C. top slab with 1:1.5:3 mix (1 cement : 1.5 fine sand : 3 graded stone aggregate 20 mm nominal size), foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand), finished smooth with a floating coat of neat cement on walls and bed concrete etc. complete as per standard design: Inside dimensions 455x610 mm and 45 cm deep for single pipe line : With common burnt clay (non modular) bricks of class designation 3.5
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Ch | 5924.1 | 5924.1 | 2.0 | False | None | None | False | None | False | 11848.2 | 0 | 3815979 | 144971 | None | Common DSR 2023-24 Volume III.No13.34P.No. 123 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | l | 9.45 | 9.45 | 1000.0 | False | None | None | False | None | False | 9450.0 | 0 | 3815980 | 144971 | None | Common DSR 2023-24 Volume III.No14.1.1P.No. 131 | Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device(handlelever) conforming to IS :7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 5128.2 | 5128.2 | 1.0 | False | None | None | False | None | False | 5128.2 | 0 | 3815981 | 144971 | None | Common DSR 2023-24 Volume III.No14.2.1P.No. 131 | Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever), conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required : W.C. pan with ISI marked white solid plastic seat and lid
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 5079.9 | 5079.9 | 1.0 | False | None | None | False | None | False | 5079.9 | 0 | 3815982 | 144971 | None | Common DSR 2023-24 Volume III.No14.7.2P.No. 132 | Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Wash basin size 630x450 mm with a single 15 mm C.P. brass pillar tap
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 2689.05 | 2689.05 | 1.0 | False | None | None | False | None | False | 2689.05 | 0 | 3815983 | 144971 | None | Common DSR For 2023-24Volume VI.NoM697P.No.A-45 | RCC pipe NP3 1200 mm dia & 2.5 M long
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 6090.0 | 6090.0 | 1.0 | False | None | None | False | None | False | 6090.0 | 0 | 3815984 | 144971 | None | Common DSR For 2023-24Volume VI.No10.2.10P.No.114 | Providing UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. complete for: Pipes of SN 8, 160mm dia. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 731.85 | 731.85 | 14.0 | False | None | None | False | None | False | 10245.9 | 0 |
| 1724133156000 | 0 | None | None | Buildings | Electrification | 65626.58 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3815985 | 144972 | None | Common DSR For 2023-24Volume VI.No13.40.1P.No.157 | Supply and delivery of Centrifugal pumpset at site brand new best make and with discharge duty confirming to ISI standards and its latest amendments. 2 HP, Size 65x50 Head 13M, Discharge 462 LPM ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 16390.5 | 16390.5 | 1.0 | False | None | None | False | None | False | 16390.5 | 0 | 3815986 | 144972 | None | Common DSR For 2023-24Volume VI.No13.34P.No.156 | Labour charges for erection of outdoor type panel board and meter board units with all necessary materials and labour, tools and equipments including providing cement concrete foundation bed etc., complete as per specification, with testing of as per instructions of engineer incharge of work.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Job | 1522.5 | 1522.5 | 1.0 | False | None | None | False | None | False | 1522.5 | 0 | 3815987 | 144972 | None | Common DSR For 2023-24Volume VI.No13.26P.No.155 | Supply and delivery at site delivery of best indigenous brand new MCB (Miniature Circuit Breakers) of required capacity as per IS 88228/1978 and its latest amendments and with ISI Mark of 6/10/16/20/25/40 Amps with scalable box.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Per 3 Poles | 1207.5 | 1207.5 | 1.0 | False | None | None | False | None | False | 1207.5 | 0 | 3815988 | 144972 | None | Common DSR For 2023-24Volume VI.No13.39P.No.157 | Earthing: Providing and fixing and wiring earth electrode for grounding circuits IC cutouts and other equipments on the meter board in the pit. The pits should be filled up with equal proportion of salt and charcoal 150mm around the pipe to complete depth. The connection from the pipe to the conduits etc. is to established through GI wire of sizes as per clause 7.3.3 of IS 732 using 12mm bolts, nuts, washers and check nuts, the pipe shall have 16 through holes of 12mm dia.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Job | 3937.5 | 3937.5 | 1.0 | False | None | None | False | None | False | 3937.5 | 0 | 3815989 | 144972 | None | I.No1.2.1PWD Elec SR 2023-24 P.No. 02 | Supplying heavy gauge PVC conduit pipe.mm dia.mm thick confirming to IS2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduits hould be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 19/20 mm dia 2 mm thick
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 69.3 | 69.3 | 20.0 | False | None | None | False | None | False | 1386.0 | 0 | 3815990 | 144972 | None | I.No1.2.2PWD Elec SR 2023-24 P.No. 02 | Supplying heavy gauge PVC conduit pipe.mm dia.mm thick confirming to IS2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduits hould be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 25 mm dia 2 mm thick
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 81.9 | 81.9 | 20.0 | False | None | None | False | None | False | 1638.0 | 0 | 3815991 | 144972 | None | I.No1.4.1PWD Elec SR 2023-24 P.No. 02 | Supplying and fixing sheet Metal box made out of 18SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. 75 x 75 x 65 mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 111.3 | 111.3 | 1.0 | False | None | None | False | None | False | 111.3 | 0 | 3815992 | 144972 | None | I.No1.4.2PWD Elec SR 2023-24 P.No. 02 | Supplying and fixing sheet Metal box made out of 18SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. 100 x 75 x 65 mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 123.9 | 123.9 | 2.0 | False | None | None | False | None | False | 247.8 | 0 | 3815993 | 144972 | None | I.No1.4.4PWD Elec SR 2023-24 P.No. 02 | Supplying and fixing sheet Metal box made out of 18SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. 180 x 90 x 65 mm
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 169.05 | 169.05 | 2.0 | False | None | None | False | None | False | 338.1 | 0 | 3815994 | 144972 | None | I.No1.5.1PWD Elec SR 2023-24 P.No. 02 | Supplying and fixing PVC/metal conduit Deep junction box 19/20 mm deep Junction box
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 51.45 | 51.45 | 3.0 | False | None | None | False | None | False | 154.35 | 0 | 3815995 | 144972 | None | I.No1.5.2PWD Elec SR 2023-24 P.No. 03 | Supplying and fixing PVC/metal conduit Deep junction box 25 mm deep Junction box
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 58.8 | 58.8 | 1.0 | False | None | None | False | None | False | 58.8 | 0 | 3815996 | 144972 | None | I.No1.7.1PWD Elec SR 2023-24 P.No. 03 | Extra for Groove cutting in brick wall/CC floor to the suitable depth for concealing of Conduit/GI pipe and plastering, finishing upto wall surface complete. upto 50 mm conduit in brick wall
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 30.45 | 30.45 | 9.0 | False | None | None | False | None | False | 274.05 | 0 | 3815997 | 144972 | None | I.No1.13PWD Elec SR 2023-24 P.No. 04 | Supplying And Fixing Metal Fan Box with Round Hook.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 122.85 | 122.85 | 4.0 | False | None | None | False | None | False | 491.4 | 0 | 3815998 | 144972 | None | I.No2.2.1PWD Elec SR 2023-24 P.No. 05 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Short point upto 3m from tapping point to out let via switch box
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 282.45 | 282.45 | 7.0 | False | None | None | False | None | False | 1977.15 | 0 | 3815999 | 144972 | None | I.No2.2.2PWD Elec SR 2023-24 P.No. 05 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Medium point above 3m upto 6m from tapping point to out let via switch box
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 397.95 | 397.95 | 2.0 | False | None | None | False | None | False | 795.9 | 0 | 3816000 | 144972 | None | I.No2.3.2PWD Elec SR 2023-24 P.No. 05 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694: 2010. 1.5 mm2
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 27.3 | 27.3 | 100.0 | False | None | None | False | None | False | 2730.0 | 0 | 3816001 | 144972 | None | I.No2.3.3PWD Elec SR 2023-24 P.No. 05 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694: 2010. 2.5 mm2
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 44.1 | 44.1 | 18.0 | False | None | None | False | None | False | 793.8 | 0 | 3816002 | 144972 | None | I.No3.5.1PWD Elec SR 2023-24 P.No. 08 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 1 to 2 Module
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 143.85 | 143.85 | 1.0 | False | None | None | False | None | False | 143.85 | 0 | 3816003 | 144972 | None | I.No3.5.3PWD Elec SR 2023-24 P.No. 08 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 4 Module
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 183.75 | 183.75 | 2.0 | False | None | None | False | None | False | 367.5 | 0 | 3816004 | 144972 | None | I.No3.5.5PWD Elec SR 2023-24 P.No. 08 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 8 Module
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 298.2 | 298.2 | 2.0 | False | None | None | False | None | False | 596.4 | 0 | 3816005 | 144972 | None | I.No3.6.1PWD Elec SR 2023-24 P.No. 09 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A One Way Switch
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 107.1 | 107.1 | 9.0 | False | None | None | False | None | False | 963.9 | 0 | 3816006 | 144972 | None | I.No3.6.4PWD Elec SR 2023-24 P.No. 09 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. Stepped Fan Regulator Two Module
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 374.85 | 374.85 | 2.0 | False | None | None | False | None | False | 749.7 | 0 | 3816007 | 144972 | None | I.No3.6.7PWD Elec SR 2023-24 P.No. 09 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 16A One Way Switch
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 189.0 | 189.0 | 1.0 | False | None | None | False | None | False | 189.0 | 0 | 3816008 | 144972 | None | I.No3.6.10PWD Elec SR 2023-24 P.No. 09 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6/16A Universal Socket
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 247.8 | 247.8 | 2.0 | False | None | None | False | None | False | 495.6 | 0 | 3816009 | 144972 | None | I.No3.7PWD Elec SR 2023-24 P.No. 09 | Supplying and fixing 32A security and energy saving DP switch with key tag suitable to operate on 230 V, 50Hz AC supply & completely wired on existing box.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 678.3 | 678.3 | 1.0 | False | None | None | False | None | False | 678.3 | 0 | 3816010 | 144972 | None | I.No5.7.2PWD Elec SR-2 2023-24 P.No. 14 | Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. 32 A
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 253.05 | 253.05 | 1.0 | False | None | None | False | None | False | 253.05 | 0 | 3816011 | 144972 | None | I.No5.18.1PWD Elec SR 2023-24 P.No. 17 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 A SP
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 435.75 | 435.75 | 1.0 | False | None | None | False | None | False | 435.75 | 0 | 3816012 | 144972 | None | I.No5.19.8PWD Elec SR 2023-24 P.No. 18 | Supplying and fixing regular MCB distribution boards on wall/ woodboard/ flush mounting using required clamps, bolts, nuts etc.,with provision for fixing suitable type capacity MCB's singlephase/ 3phase/ single door with powder coated painting Made out of 14SWG MS enclosure. II - Double Door 8 Way SP & N
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1946.7 | 1946.7 | 1.0 | False | None | None | False | None | False | 1946.7 | 0 | 3816013 | 144972 | None | I.No5.40.2PWD Elec SR 2023-24 P.No. 20 | Supplying.A rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/ FRP/ DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete 250 A 4 x 30 x 10 mm Aluminium Strips
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 3606.75 | 3606.75 | 0.5 | False | None | None | False | None | False | 1803.375 | 0 | 3816014 | 144972 | None | I.No5.35PWD Elec SR 2023-24 P.No. 19 | Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 32/63 A three phase 4 wire whole current class-1 Accuracy Energy Meter.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 5990.25 | 5990.25 | 1.0 | False | None | None | False | None | False | 5990.25 | 0 | 3816015 | 144972 | None | I.No12.56PWD Elec SR-2 P.No. 54 | Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40mmdia 2.90mm thick GIpipe 2.5m long buried in a pit. The pit should be filled with equal proportion of salt and charcoal 150mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per lSI specification 7.3.3. of IS732 using12mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 3685.5 | 3685.5 | 1.0 | False | None | None | False | None | False | 3685.5 | 0 | 3816016 | 144972 | None | I.No6.1PWD Elec SR-2 2023-24 P.No. 30 | Supplying exhaust fan of 1440 RPM of 300 mm (12") size with bracket blades complete for light duty suitable to operate on 230V 50Hz, AC Supply.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1566.6 | 1566.6 | 1.0 | False | None | None | False | None | False | 1566.6 | 0 | 3816017 | 144972 | None | I.No6.3.1PWD Elec SR-2 2023-24 P.No. 30 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. 48" Sweep (1200 mm) Regular model
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 3095.4 | 3095.4 | 2.0 | False | None | None | False | None | False | 6190.8 | 0 | 3816018 | 144972 | None | I.No11.3.2PWD Elec SR-2 P.No. 43 | Supplying of .feet PVC Batten with integrated LED tube . W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220240V@ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fitting 1 x 4' 20/22 W ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 724.5 | 724.5 | 4.0 | False | None | None | False | None | False | 2898.0 | 0 | 3816019 | 144972 | None | I.No12.21PWD Elec SR-2 2023-24, P.No. 50 | Supplying and fixing of 5'-80 W of T8 Fluorescent Tube with 54W power consumption with low 3mg Mercury content less phosphor coating Operating voltage range from 180V to 265V, 50Hz AC power Supply
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 546.0 | 546.0 | 1.0 | False | None | None | False | None | False | 546.0 | 0 | 3816020 | 144972 | None | I.No12.25.2Part I Elec P.No. 41 | Supplying of patty fitting, made out of CRCA Sheet metal body with locking type holder completely wired with HF Electronic Ballast, Operating voltage range from 180V to 265V, 50Hz AC power supply excluding Tube. 1 x 4' Tube light fitting.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 357.0 | 357.0 | 1.0 | False | None | None | False | None | False | 357.0 | 0 | 3816021 | 144972 | None | I.No12.46PWD SR-2 2023-24 P.No. 52 | Supplying & Fixing of 70-150 W lamp holder 2 Pin
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 66.15 | 66.15 | 3.0 | False | None | None | False | None | False | 198.45 | 0 | 3816022 | 144972 | None | I.No13.7.1PWD SR-2 2023-24 P.No. 56 | Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clA. On wall/ ceiling / Rafter / Girders
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 128.1 | 128.1 | 5.0 | False | None | None | False | None | False | 640.5 | 0 | 3816023 | 144972 | None | I.No13.10PWD SR-2 2023-24 P.No. 57 | Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing 'S'' hook with fan regulator to the existing board together with supplying and fixing 5 A. ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 179.55 | 179.55 | 2.0 | False | None | None | False | None | False | 359.1 | 0 | 3816024 | 144972 | None | I.No13.14PWD SR-2 2023-24 P.No. 57 | Fixing one exhaust fan in the nitch already left in the wall with bolts and nuts and 5 A. ceiling rose with sufficient length of 23/0.0076 inch PVC insulated twin core wire.
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 516.6 | 516.6 | 1.0 | False | None | None | False | None | False | 516.6 | 0 |
|
|
---|