| 1723046679000 | 0 | None | None | Buildings | Construction of garden in the garden space of W.No.02 Majunath Nagar of R.S.No.843/E bearing Plot No.49 coming under Vijayapur city. | 1948155.53 | | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
|---|
| 3717668 | 137584 | None | 2.4(i)b | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.B)In area of thorny jungle (PWD SR 2023-24 Vol-3, P.No-9, I.No-2.4(i)b) | Sqm | 1575.0 | 1575.0 | 25.03 | False | None | None | False | None | False | 39422.25 | 0 | | 3717669 | 137584 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth (PWD SR 2023-24, Vol-1, P.No-8, I No-1.12) | Cum | 99.75 | 99.75 | 250.33 | False | None | None | False | None | False | 24970.4175 | 0 | | 3717670 | 137584 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (PWD SR 2023-24, Vol-1, P.No-8, I No-1.14.1) | Cum | 107.1 | 107.1 | 109.78 | False | None | None | False | None | False | 11757.438 | 0 | | 3717671 | 137584 | None | 2.1.2 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24, Vol-1, P.No-15, I.No-2.1.2) | Cum | 5947.2 | 5947.2 | 21.71 | False | None | None | False | None | False | 129113.712 | 0 | | 3717672 | 137584 | None | 5.1.1 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) (PWD SR 2023-24, Vol-2, P.No-9, I.No-5.1.1) | Cum | 5891.55 | 5891.55 | 115.8 | False | None | None | False | None | False | 682241.49 | 0 | | 3717673 | 137584 | None | 2.1.4 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24, Vol-1, P.No-15, I.No-2.1.4) | Cum | 6527.85 | 6527.85 | 11.8 | False | None | None | False | None | False | 77028.63 | 0 | | 3717674 | 137584 | None | 8.3.1 | Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24, Vol-2, P.No-41, I.No-8.3.1) | Sqm | 371.7 | 371.7 | 231.6 | False | None | None | False | None | False | 86085.72 | 0 | | 3717675 | 137584 | None | 8.28 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24, Vol-2, P.No-45, I.No-8.28) | Sqm | 93.45 | 93.45 | 231.6 | False | None | None | False | None | False | 21643.02 | 0 | | 3717676 | 137584 | None | 11.25.2 | Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (PWD SR 2023-24, Vol-2, P.No-84, I.No-11.25.2) | Kg | 142.8 | 142.8 | 157.5 | False | None | None | False | None | False | 22491.0 | 0 | | 3717677 | 137584 | None | 8.33.3 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24, Vol-2, P.No-47, I.No-8.33.3) | Sqm | 145.95 | 145.95 | 5.25 | False | None | None | False | None | False | 766.2375 | 0 | | 3717678 | 137584 | None | 11.34A | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding (PWD SR 2023-24, Vol-2, P.No-86, I.No-11.34A) | Kg | 176.4 | 176.4 | 2326.94 | False | None | None | False | None | False | 410472.216 | 0 | | 3717679 | 137584 | None | 11.25.2 | Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (PWD SR 2023-24, Vol-2, P.No-84, I.No-11.25.2) | Kg | 142.8 | 142.8 | 1539.85 | False | None | None | False | None | False | 219890.58 | 0 | | 3717680 | 137584 | None | 2.2.1 | Providing and laying in position Reinforced cement concrete for all Foundation works. The ranite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24, Vol-1, P.No-15, I No - 2.2.1 ) | Cum | 6601.35 | 6601.35 | 1.52 | False | None | None | False | None | False | 10034.052 | 0 | | 3717681 | 137584 | None | 22.20 | Form Work : As per recommendatin of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate for drain formworks consider 5% ( PWD SR 2021-22 Vol- 2 , P.No -A-7,I No - 22.20 ) | Sqm | 330.07 | 330.07 | 12.7 | False | None | None | False | None | False | 4191.889 | 0 | | 3717682 | 137584 | None | 2.11b | Supplying, Fitting and Placing TMT Fe 500 & above Reinforcement in Foundation / Substructure / Superstructure complete as per Drawing and Technical Specifications. Foundations of Bridges (PWD SR 2023-24 Vol-1,P.No -18,I No-2.11.b) | Tonne | 90516.3 | 90516.3 | 0.08 | False | None | None | False | None | False | 7241.304 | 0 | | 3717683 | 137584 | None | 11.59 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge. (Made of G.I. wire of dia. 4 mm, PVC coated to achieve outer dia not less than 5 mm in required colour and shade (PWD SR 2023-24, Vol- 2, P.No -95, I No -11.59) | Sqm | 883.05 | 883.05 | 227.4 | False | None | None | False | None | False | 200805.57 | 0 |
|