createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1724218639122
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd25000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose06-09-2024 16:00:00
tenderQueryClose05-09-2024 17:30:00
technicalBidOpenNone
publishedDate22-08-2024 13:22:36
publishedByPostPWD_EE_DIV_CTD
publishedByUserKPE15936 - MONAPPA
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonEE PWD CTA
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08194222446
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1724218639162
version9
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/RD/WORK_INDENT14594
titleConstruction of CC Road at Pudakalahally Village Holalkere Constituency Chitradurga Taluk
descriptionConstruction of CC Road at Pudakalahally Village Holalkere Constituency Chitradurga Taluk
categoryWORKS
categoryTextWorks
ecv844667.09
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1703
locationNamePWD Division Office Chitradurga
provisionalAmount1000000.0
groupOverheadTotal0.0
fileNumberKPWD/CTA/SUB-DN/PUDAKALAHALLY/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17242186390000NoneNoneRoadsConstruction of CC Road at Pudakalahally Village Holalkere Constituency Chitradurga Taluk844667.09
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3823939145581NoneV-1, P.No.8, Sl.No.1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workCum102.0102.0168.75FalseNoneNoneFalseNoneFalse17212.50
3823940145581NoneV-3, P.No.18, Sl.No.3.11Preparation and Surface Treatment of Formation. Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with 8-10 t smooth wheeled roller, complete as per clause 310 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workSqm4.04.0562.5FalseNoneNoneFalseNoneFalse2250.00
3823941145581NoneV-3, P.No.17 Sl.No.3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workCum493.0493.056.25FalseNoneNoneFalseNoneFalse27731.250
3823942145581NoneV-3, P.No.26 Sl.No.4.17Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workCum2559.02559.084.38FalseNoneNoneFalseNoneFalse215928.420
3823943145581NoneV-3, P.No. 149, Sl.No. 16.28Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14- days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workCum6754.06754.084.38FalseNoneNoneFalseNoneFalse569902.520
3823944145581NoneV-3, P.No.65 Sl.No.8.8Direction and Place Identification Signs with size more than 0.9 m2 size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area exceeding 0.9 m2 fixed over back support frame of min 40 x 40 x 5mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing ---- Including cost and conveyance of all materials labour HOM of machineries equipment lead and lift loading and unloading charges, transportation and all other incidental charges etc. complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the workSqm9702.09702.01.2FalseNoneNoneFalseNoneFalse11642.40
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17242186400001NoneNoneELIGIBILITYTenders from Joint ventures are not acceptableNone
17242186400001NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union TerritoryNone
17242186400001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17242186400000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17242186400000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17242186400002NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidderNone
17242186400001NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should furnish qualification information as per clause-3 and section- 3 of Standard Tender Document attached to this tender and all the Formats prescribed in the bid documents shall be filled by the tenderer in full and complete manner. Otherwise the tender will be rejectedNone
17242186400001NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and legible. At the time of opening of Tender all the original documents should be produced for verification without fail to the Executive Engineer, Superintending Engineer, Chief Engineer. Otherwise the tender will be rejected. During the time of evaluation of bids, if the employer finds any certification / information furnished is false, such tender will be rejectedNone
17242186400001NoneNoneELIGIBILITYWork done certificate should be issued by competent authority not below the rank of Executive EngineerNone
17242186400001NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing Karnataka public Procurement portal and the employer is not responsible for non production of uploaded documents in Karnataka public Procurement portal. The tenderer has to ensure that all the documents required are uploaded correctlyNone
17242187360000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents of K.P.W.D. and further orders thereon. The employer reserves the rights to Reject or accept any or all the tenders without assigning any reasonsNone
17242187410000NoneNoneELIGIBILITYWithin 20 days of receipt of the Letter of Acceptance, the successful Tenderer shall deliver to the Employer a Security deposit for an amount equivalent to 5percent of the Contract price plus additional security for unbalanced tenders (Difference between amount put to tender and quoted amount)None
17242187460000NoneNoneELIGIBILITYThe tender of any tenderer who does not accept the conditions contained in the tender document is liable to be rejected. Conditional tenders will not be accepted.None
17242187540000NoneNoneELIGIBILITYThe cost of tender form shall not be refundable. The tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs. No interest will be paid by the Government on the Earnest money depositNone
17242187580000NoneNoneELIGIBILITYThe rates quoted shall be through rates for finished items of work inclusive of all lead and lifts, loading and unloading charges, all incidental charges and all taxes Local or General, Royalty etc., complete payable to the Government or Local bodies in the RegionNone
17242187620000NoneNoneELIGIBILITYThe rates quoted shall be inclusive of providing barricading fittings of danger lights, Jungle clearance near work spot / watchman etc., complete and maintained till completion of work and removing on completion as directed by the Engineer-in-charge of work. Rates quoted should includes clearance of site prior to commencement of work and its closure in all respects and holds good for all works under all conditions of site, moisture and weatherNone
17242187680000NoneNoneELIGIBILITYA Cess of 1% of the total approved amount of contract will be deducted from the work bill towards the Building and other construction workers welfare in accordance with the Govt. Order No. LD 300 LET 2006 Bangalore dated 18-1-2007. Royalty on construction materials and other taxes will be deducted as per prevailing Government orders. Contractor should follow strictly the prevailing rules of labour actNone
17242187720000NoneNoneELIGIBILITYAll the materials required for the work shall be procured by the tenderer themselves and should got tested by the quality control authority before use on the work at their own cost. All quantity and gradation of metal collected for the works should be got approved by the competent authority before useNone
17242187760000NoneNoneELIGIBILITYContractor should execute the project with least impact to the environment. The Contractor should maintain the work during defective liability period as per contract conditionsNone
17242187810000NoneNoneELIGIBILITYOmission and Typographical errors which is in the opinion of the Executive Engineer, will not be a ground for claims of extra payment. If any of the dates mentioned happens to be a general holiday, the next working day will holds goodNone
17242187860000NoneNoneELIGIBILITYThe Successful bidder has to follow the prevailing Government orders regarding Royalty Charges. The Contractor has to submit MDP Certificate along with the running contractor bills. Otherwise Department will take necessary action as per the Government Orders / Circulars.None
17242187900000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, Public Works Department, Division, Chitradurga during office hours on all working daysNone
17242188000000NoneNoneELIGIBILITYThe tenderer should have registration under section 7 of Building and other construction works act 1966. (As per G.O. No. LD 95 LET 2013, Bangalore dated 01-4-2013None
17242188070000NoneNoneELIGIBILITYThe increase in GST shall not be paid in the extended period of contract for which the contracts alone is responsible for delay as determined by the authority while granting the extension of timeNone
17242188150000NoneNoneELIGIBILITYThe Defects Liability Period is One YearNone
17242188190000NoneNoneELIGIBILITYAs per Government order FD 447 EXP-12 2022 dated 30.07.2022, 18% GST will be added to the Contract amount separately.None
17242188230000NoneNoneELIGIBILITYThe tenderer should be a KPWD registered Class-IV and Above ContractorNone
17242188270000NoneNoneELIGIBILITYAs this work is approved under deposit Head. user Department will not give Tender premium above the amount put to tender.None
17242188330000NoneNoneELIGIBILITYThe period for completion of the work is 03 months (Including Monsoon)None
17242188520000NoneNoneELIGIBILITYEstimate are excluding GST as per common SR 2021-22 and Prevailing GST (18% of Amount put to Tender) Amount is kept in form of Lump sum in sanctioned estimate according in Common SR (GO:PWD 51RDF 2019 Bengaluru Dt: 18.03.2022), Therefore, Amount put to Tender and ECV Amount are Excluding GST, KPPP-PORTAL format has no options to add GST Separately at Stage of Draft Tender schedule process for Over all Amount put to tender, tender has been inviting through an option with INCLUSIVE, But the item wise rates do not include GST, Hence , GST will be paid separately for the quoted amount accordingly, Declaration Certificate must be Attached mandatorily.None
17242188580000NoneNoneELIGIBILITYEstimate rates are excluding GST as per common SR 2023-24 and prevailing GST 18 percent of Amount put to tender amount is kept in form of Lump sum in sanctioned estimate according to guidelines in common SR GO PWD 51 RDF 2019 Bangalore dt 18.03.2022, Therefore, amount put to tender and ECV amount are excluding GST. Hence, GST will be paid separately for S.R Item only the quoted amount accordingly. Declaration certificate must be attached mandatorily.None
17242208930000NoneNoneELIGIBILITYWork sanctioned under Head of Account 8443 Deposit ContributionNone
17243129510000NoneNoneELIGIBILITYThe Successful bidder has to fallow the prevailing Government orders regarding royalty charges. The contractor has to submit Material Dispatch Permit (MDP) for all naturally available Resources / Materials along with the running contract bills, otherwise necessary action will be taken as per GO/Circulars.None
17243129560000NoneNoneELIGIBILITYAs per GO Circular No. FD 417 Expenditure-12/2024 Dt. 09.08.2024 The Government and the contractor are bound to Pay/refund accordingly if the GST rates are revised during the contract period.None
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
The Tender should be a KPWD Registered Class-IV and above contractor Attach Registration CertificateTrueTechnical Bid
Annual Turnover Certificates of last 5 years i.e. period of 2019-20 to 2023-24 Attach Balance sheets & Profit & Loss account statements indicating the contract receipts related to civil engineering construction works duly certified by the chartered accountant.TrueTechnical Bid
To qualify for Award of this contract, each Tenderer should have in his name in the last five years, satisfactorily completed as prime contractor, at least one similar work of value not less than Rs. 4.98 lakhs. Attach Work done Certificate issued by competent authority of rank not less than Executive Engineer.TrueTechnical Bid
The requisite E.M.D. as prescribed in e-portal should be submitted by the contractor.TrueTechnical Bid
Tenderers address and contact detailsTrueTechnical Bid
Statement showing the Existing commitments and ongoing works, in the prescribed proforma as per 1.3 A of Section 3 of Qualification information should be furnished.TrueTechnical Bid
Statement showing Details of works for which tenders are already submitted in the prescribed proforma as per 1.3 B of Section 3 of Qualification information should be furnished.TrueTechnical Bid
GST Declaration CertificateTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
RoadsChitradurgaChitradurgaChitradurgaHOLALKEREChitradurgaNoneNoneNoneNoneNoneNone
tenderAddressNone
tenderRecallDTONone