createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1724225728625
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd11650.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose06-09-2024 16:00:00
tenderQueryClose22-08-2024 13:09:17
technicalBidOpenNone
publishedDate21-08-2024 13:12:16
publishedByPostDMA_EE1_CC_HD
publishedByUserKPE11812 - VITTAL M TUBAKE
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonVittal M Tubake
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08362213834
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1724225728672
version4
createdDateNone
modifiedDateNone
tenderNumberDMA/2024-25/OW/WORK_INDENT26558
titleConstruction of RCC Open Drain and CD in ward no 35 at Bairdevarkoppa Harijan Kere
descriptionConstruction of RCC Open Drain and CD in ward no 35 at Bairdevarkoppa Harijan Kere
categoryWORKS
categoryTextWorks
ecv466000.00
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2170
locationNameDMA City Corporation Hubballi-Dharawada
provisionalAmount466000.0
groupOverheadTotal73843.59
fileNumber228304
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17242257290000NoneNoneOther WorksConstruction of RCC Open Drain and CD in ward no 35 at Bairdevarkoppa Harijan Kere392156.41
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3826166145699NonePg.No. 6 Item.No.1.5.2 Volume 1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds of soils. Depth exceeding 1.5 m, but not exceeding 3 mCum358.05358.0569.71FalseNoneNoneFalseNoneFalse24959.66550
3826167145699Nonevol 1 Pg no 15 item no-2.1.3Providing and laying in position plain cement concrete for levellingcourse for all works in foundation. The granite/trap/basalt crushedgraded coarse aggregates and fine aggregates as per relevant ISCodes machine mixed, laid in layers not exceeding 150 mm thickness,well compacted using plate vibrators, including all lead & lifts, cost ofall materials of quality, labour, Usage charges of machineries, curing,and all the other appurtenances required to complete the work as pertechnical specifications. (The cost of steel reinforcement & formworkshall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregatesCum6288.456288.459.61FalseNoneNoneFalseNoneFalse60432.00450
3826168145699NonePg.No.16 Item.No2.4.2Volume 1Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)Cum6962.556962.5522.76FalseNoneNoneFalseNoneFalse158467.6380
3826169145699Nonevol 1 Pg no 18 item no-2.1.1hSupplying, Fixing & Placing TMT Fe 550 Reinforcement in Foundation/ Substructure/ Superstructure complete as per Drawing and Technical SpecificationsTonne82961.5582961.551.044FalseNoneNoneFalseNoneFalse86611.85820
3826170145699Nonevol 1 Pg no 111 Sl no-4Appendix I-Additionalities for Formwork, Centering & Scaffolding cement concrete drains .Finished rate of concrete per m3 35%.Cum2436.892436.8922.76FalseNoneNoneFalseNoneFalse55463.61640
3826171145699NonePg.No.17 Item.No.3.1 Volume 3Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of workCum89.2589.2569.71FalseNoneNoneFalseNoneFalse6221.61750
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17242257310000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17242257310001NoneNoneELIGIBILITYValid contractor Registration Certificate issued from competent authority in appropriate contractor classNone
17242257310001NoneNoneELIGIBILITYFinancial Turnover Certificate obtained and certified by the Registered Valid Chartered Accountant indicating the Registration no of Chartered Accountant with UDIN number details along with profit and loss statement tallying the annual TurnoverNone
17242257310000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17242257310000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17242257310001NoneNoneELIGIBILITYWork done certificate for the work performed as prime contractor (in the same name) on works of Similar Nature over during the five years specified (Similar Nature of work done certificate i.e, 50% of amount put to tenderNone
17242257310000NoneNoneELIGIBILITYTotal value of civl engineering works executed and payments received in the last five years (year-wise)None
17242257310000NoneNoneELIGIBILITYList of existing commitments and ongoing workNone
17242257310000NoneNoneELIGIBILITYList of works for which tenders already submittedNone
17242257310001NoneNoneELIGIBILITYUnconditional Line of credit i.e, 30% of amount put to tender obtained from Nationalised/Scheduled Banks in Given Pro-forma in the bid documentNone
17242258620000NoneNoneELIGIBILITYValid PAN Card and Valid GST Registration certificatesNone
17242258730000NoneNoneELIGIBILITYAll conditions As per kw1None
17242258820000NoneNoneELIGIBILITYContractor Contact phone number , address and e-mail id are mandatoryNone
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Similar nature of work done certificateTrueTechnical Bid
Contractor Registration CertificateTrueTechnical Bid
Line of CreditTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone