1724662108000 | 0 | None | None | Buildings | Construction of toilet to Government Lower Primary School at Harijanwada of Malkhed village in Sedam Taluka under KKRDB MICRO for the year 2019-20. | 829313.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3855471 | 147423 | None | 001 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the workwith all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work | Cum | 107.1 | 107.1 | 31.6 | False | None | None | False | None | False | 3384.36 | 0 | 3855472 | 147423 | None | 002 | Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work | Cum | 5947.2 | 5947.2 | 5.72 | False | None | None | False | None | False | 34017.984 | 0 | 3855473 | 147423 | None | 003 | Providing and laying in position reinforced Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work | Cum | 7160.4 | 7160.4 | 3.89 | False | None | None | False | None | False | 27853.956 | 0 | 3855474 | 147423 | None | 004 | Providing and laying in position reinforced Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work | Cum | 11602.5 | 11602.5 | 2.42 | False | None | None | False | None | False | 28078.05 | 0 | 3855475 | 147423 | None | 005 | Providing and laying in position reinforced Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work | Cum | 10939.5 | 10939.5 | 4.02 | False | None | None | False | None | False | 43976.79 | 0 | 3855476 | 147423 | None | 006 | Providing and laying in position reinforced Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work | Cum | 10939.5 | 10939.5 | 3.56 | False | None | None | False | None | False | 38944.62 | 0 | 3855477 | 147423 | None | 007 | Providing Random rubble masonry with hard stone in foundation and
plinth including levelling up with cement concrete 1:6:12 (1 cement : 6
coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work. | Cum | 5891.6 | 5891.6 | 5.95 | False | None | None | False | None | False | 35055.02 | 0 | 3855478 | 147423 | None | 008 | Providing Size Stone masonry with hard stone in foundation & plinth with
Cement mortar 1:6 (1 cement : 6 coarse sand)with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work. | Cum | 6708.5 | 6708.5 | 7.61 | False | None | None | False | None | False | 51051.685 | 0 | 3855479 | 147423 | None | 009 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work | MT | 93929.85 | 93929.85 | 1.39 | False | None | None | False | None | False | 130562.4915 | 0 | 3855480 | 147423 | None | 010 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work | Cum | 497.7 | 497.7 | 12.66 | False | None | None | False | None | False | 6300.882 | 0 | 3855481 | 147423 | None | 011 | Providing Brick work with common burnt clay Non Modular bricks ofclass designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work | Cum | 8621.6 | 8621.6 | 18.56 | False | None | None | False | None | False | 160016.896 | 0 | 3855482 | 147423 | None | 012 | Providing and fixing in position collapsible steel shutters with vertical
channels 20x10x2 mm and braced with flat iron diagonals 20x5 mm size, with top and bottom rail of T-iron 40x40x6 mm, with 40 mm dia steel pulleys, complete with bolts, nuts, locking arrangement, stoppers,
handles, including applying a priming coat of approved steel primer
including cost of materials ,labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work | Sqm | 8689.8 | 8689.8 | 5.04 | False | None | None | False | None | False | 43796.592 | 0 | 3855483 | 147423 | None | 013 | Providing and fixing M.S. grills of required pattern in frames of windows
etc. with M.S. flats, square or round bars etc. including priming coat with
approved steel primer all complete. Fixed to openings /wooden frames
with rawl plugs screws etc.with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work | Kgs | 192.2 | 192.2 | 35.64 | False | None | None | False | None | False | 6850.008 | 0 | 3855484 | 147423 | None | 014 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work | Sqm | 120.8 | 120.8 | 14.99 | False | None | None | False | None | False | 1810.792 | 0 | 3855485 | 147423 | None | 015 | Providing 15 mm cement plaster on the rough side of single or half brick
wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners
wherever required smooth rendering, providing and removing scaffolding,
including cost of materials, labour, curing complete as per specifications
and as per directions of Engineer-in-charge. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work | Sqm | 293.0 | 293.0 | 199.92 | False | None | None | False | None | False | 58576.56 | 0 | 3855486 | 147423 | None | 016 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2including pointing the joints with white cement and matching pigments
etc., complete. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work | Sqm | 933.45 | 933.45 | 17.3 | False | None | None | False | None | False | 16148.685 | 0 | 3855487 | 147423 | None | 017 | Providing skirting, dadooing, rises of steps with white glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement
slurry over existing rough plaster surface using glazed tiles of approved
make and size including cost of materials, labour, complete as per
specifications. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work | Sqm | 1461.6 | 1461.6 | 25.79 | False | None | None | False | None | False | 37694.664 | 0 | 3855488 | 147423 | None | 018 | Providing & fixing factory made PVC Door frame of size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet metered cut at corners & jointed 2 No.s of 150mm long brackets of 15x15mm M.S Square tube, the entire door frame to be reinforced with 19x19mm M.S Square tube of 19 gauge. The door frame to be fixed to the wall using M.S. Screws of 65/80mm size complete as per manufacturers specification & direction of Engineer-in-charge. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work. | Sqm | 333.9 | 333.9 | 34.2 | False | None | None | False | None | False | 11419.38 | 0 | 3855489 | 147423 | None | 019 | Providing & fixing 30mm thick factory made rigid foam Prelam Panelled Door Shutters made from M.S. tube of 19x19mm, 19 gauge for stiles and
15x15mm for top & bottom rails, covered with heat moulded Prelaminated
PVC C Channel of 5mm thick sheet & 30x50mm wide to form stiles & 5mm thick & 75mm wide Prelaminated PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet Prelaminated on either side fitted in the M.S. frame, Sealed to the stiles & rails with PVC Designer beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75mm Aluminium hinges.with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work. | Sqm | 2142.0 | 2142.0 | 9.45 | False | None | None | False | None | False | 20241.9 | 0 | 3855490 | 147423 | None | 020 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly
brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost
of materials, labour complete as per specifications and as per directions
of Engineer-in-charge. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work. | Sqm | 143.85 | 143.85 | 49.43 | False | None | None | False | None | False | 7110.5055 | 0 | 3855491 | 147423 | None | 021 | Finishing walls with water proofing cement paint of required shade :New
work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after
thoroughly brooming the surface to remove all dirt, dust, mortar drops
and foreign matter including preparing the surface even and sand paper
smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work. | Sqm | 93.45 | 93.45 | 77.52 | False | None | None | False | None | False | 7244.244 | 0 | 3855492 | 147423 | None | 022 | Providing and fixing water closet squatting pan (Indian type W.C. pan )
with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever
required: with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work. | Nos | 5128.2 | 5128.2 | 6.0 | False | None | None | False | None | False | 30769.2 | 0 | 3855493 | 147423 | None | 023 | Providing and placing on terrace, polyethylene water storage tanks with manhole lid and suitable locking arrangements, making holes of suitable diameter for inlet, outlet and over flow pipes, including cost of all materials, labour, transport charges, HOM of equipments and testing complete as per specifications. Specification with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work | Ltr | 9.45 | 9.45 | 1000.0 | False | None | None | False | None | False | 9450.0 | 0 | 3855494 | 147423 | None | 024 | Providing and fixing brass bib cock of approved quality : with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work | Nos | 320.25 | 320.25 | 6.0 | False | None | None | False | None | False | 1921.5 | 0 | 3855495 | 147423 | None | 025 | Supplying HDPE pipes conforming to IS 4984:1995 with latest amendments and conveying to work site including loading and unloading at both destination and rolling, lowering into trenches, laying true to line and jointing of pipes and specials by electrofusion welding, as per standerd procedure and guide lines including encasing the pipe around to a depth not less than 15cms with cleaned soft gravel or selected earth available from the excavation etc., complete giving hydraulic test as per relevant IS Specification with all lead and lift including , testing and commissioning. The rate is exclusive of required specials and fittings etc., complete Contractor will make his own arrangement for procuring water for testing)Upto 110mm with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work | Mtr | 1019.55 | 1019.55 | 5.0 | False | None | None | False | None | False | 5097.75 | 0 | 3855496 | 147423 | None | 026 | Providing and fixing Chorinated Ploy Venyl chioride (CPCV) Pipes conforming to IS 15778, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings This includes jointing of pipes and fittings with one step solvent cement, trenching refilling & testing of joints complete. (external work) with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per specification and directions of the Engineer incharge of the work 20mm dia | Mtr | 397.95 | 397.95 | 30.0 | False | None | None | False | None | False | 11938.5 | 0 |
|