1724736756000 | 0 | None | None | Buildings | Construction of Toilet in PU College in Yaragatti of Saundatti Taluka | 758703.64 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3861016 | 147793 | None | code01 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1 6 1 cement 6 coarse sand including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 7978.0 | 7978.0 | 6.75 | False | None | None | False | None | False | 53851.5 | 0 | 3861017 | 147793 | None | code02 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3 5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1 4 1 cement 4 coarse sand including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 8211.0 | 8211.0 | 22.82 | False | None | None | False | None | False | 187375.02 | 0 | 3861018 | 147793 | None | code03 | Providing and laying in position Cement Concrete for all Foundation works. The granite trap basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes labour Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications 2.2.1.1 M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 6595.0 | 6595.0 | 3.25 | False | None | None | False | None | False | 21433.75 | 0 | 3861019 | 147793 | None | code04 | Providing and laying in position Cement Concrete for all Super structures of building , Road works Water works Irrigation works & super structure works of bridges upto 3 50 m height. The granite trap basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators The cost includes all lead & lifts cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. 2.5.1 M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 6904.0 | 6904.0 | 11.87 | False | None | None | False | None | False | 81950.48 | 0 | 3861020 | 147793 | None | code05 | 11.32 Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. The laps and wastages shall not be measured separately with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Kg | 88.0 | 88.0 | 1012.55 | False | None | None | False | None | False | 89104.4 | 0 | 3861021 | 147793 | None | code06 | Shuttering For Mating Footing with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 197.85 | 197.85 | 3.25 | False | None | None | False | None | False | 643.0125 | 0 | 3861022 | 147793 | None | code07 | Shuttering For Column Footing 70% with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 4832.8 | 4832.8 | 2.62 | False | None | None | False | None | False | 12661.936 | 0 | 3861023 | 147793 | None | code08 | Shuttering For PB Beam 50% with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 3452.0 | 3452.0 | 2.62 | False | None | None | False | None | False | 9044.24 | 0 | 3861024 | 147793 | None | code09 | Shuttering For Slab Beam 60% with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 4142.4 | 4142.4 | 2.97 | False | None | None | False | None | False | 12302.928 | 0 | 3861025 | 147793 | None | code10 | Shuttering For Slab Beam 50% with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 3452.0 | 3452.0 | 5.21 | False | None | None | False | None | False | 17984.92 | 0 | 3861026 | 147793 | None | code11 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1 4 1 cement 4 fine sand including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials labour curing complete as per specifications and as per directions of Engineer-in-charge with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 295.0 | 295.0 | 181.59 | False | None | None | False | None | False | 53569.05 | 0 | 3861027 | 147793 | None | code12 | 8.8 Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 1 cement 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 16 1 cement 6 fine sand to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 371.0 | 371.0 | 88.49 | False | None | None | False | None | False | 32829.79 | 0 | 3861028 | 147793 | None | code13 | Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1 3 1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 1106.0 | 1106.0 | 26.33 | False | None | None | False | None | False | 29120.98 | 0 | 3861029 | 147793 | None | code14 | Providing and fixing 1st quality ceramic glazed floor tiles conforming to IS : 15622 (thickness to be specified by the manufacturer ) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge in skirting, risers of steps and dados over 12 mm thick bed of cement Mortar 1:3 (1 cement: 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per m2 including pointing in white cement mixed with pigment of matching shade complete with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 1106.0 | 1106.0 | 9.72 | False | None | None | False | None | False | 10750.32 | 0 | 3861030 | 147793 | None | code15 | Providing and fixing white vitreous china water closet squatting pan (Indian type) : 14.13.1 Long pattern W.C. pan of size 580 mm with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 1428.0 | 1428.0 | 9.0 | False | None | None | False | None | False | 12852.0 | 0 | 3861031 | 147793 | None | code16 | Providing and fixing white vitreous china squatting plate urinal with integral rim longitudinal flush pipe with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 2835.0 | 2835.0 | 5.0 | False | None | None | False | None | False | 14175.0 | 0 | 3861032 | 147793 | None | code17 | Providing & fixing factory made PVC Door frame of size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet metered cut at corners & jointed 2 No.s of 150mm long brackets of 15x15mm M.S Square tube, the entire door frame to be reinforced with 19x19mm M.S Square tube of 19 gauge. The door frame to be fixed to the wall using M.S. Screws of 65/80mm size complete as per manufacturers specification & direction of Engineer-in-charge with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 318.0 | 318.0 | 48.6 | False | None | None | False | None | False | 15454.8 | 0 | 3861033 | 147793 | None | code18 | Providing & fixing 30mm thick factory made rigid foam Prelam Panelled Door Shutters made from M.S. tube of 19x19mm, 19 gauge for stiles and 15x15mm for top & bottom rails, covered with heat moulded Prelaminated PVC C Channel of 5mm thick sheet & 30x50mm wide to form stiles & 5mm thick & 75mm wide Prelaminated PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet Prelaminated on either side fitted in the M.S. frame, Sealed to the stiles & rails with PVC Designer beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75mm Aluminium hinges. 12.55.1 -do- with both side prelam with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 2366.0 | 2366.0 | 12.15 | False | None | None | False | None | False | 28746.9 | 0 | 3861034 | 147793 | None | code19 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 137.0 | 137.0 | 181.59 | False | None | None | False | None | False | 24877.83 | 0 | 3861035 | 147793 | None | code20 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 89.0 | 89.0 | 88.48 | False | None | None | False | None | False | 7874.72 | 0 | 3861036 | 147793 | None | code21 | 11.34A Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Kg | 134.93 | 134.93 | 113.4 | False | None | None | False | None | False | 15301.062 | 0 | 3861037 | 147793 | None | code22 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | No | 9.0 | 9.0 | 1000.0 | False | None | None | False | None | False | 9000.0 | 0 | 3861038 | 147793 | None | code23 | Providing and fixing Unplasticised Polyvinyl Chloride (uPVC) pipes, for cold water supply including all uPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step uPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 25 mm nominal dia Pipes with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 224.0 | 224.0 | 36.0 | False | None | None | False | None | False | 8064.0 | 0 | 3861039 | 147793 | None | code24 | Providing and fixing Unplasticised Polyvinyl Chloride (uPVC) pipes, for cold water supply including all uPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step uPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 20 mm nominal dia Pipes with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 172.0 | 172.0 | 30.0 | False | None | None | False | None | False | 5160.0 | 0 | 3861040 | 147793 | None | code25 | C.P. Brass bibcock 15 mm with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 305.0 | 305.0 | 15.0 | False | None | None | False | None | False | 4575.0 | 0 |
|