createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1724736041008
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyRESERVED
invitingStrategyTextReserved
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd17100.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose09-09-2024 16:00:00
tenderQueryClose05-09-2024 16:00:00
technicalBidOpenNone
publishedDate27-08-2024 11:06:02
publishedByPostDMA_EEN_CC_BGV
publishedByUserKPE15719 - SIDGONDA
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonShri.Sidgonda EE CCB
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9591620679
tenderSupplierListNone
tenderSchedule
createdTs1724736041062
version4
createdDateNone
modifiedDateNone
tenderNumberDMA/2024-25/OW/WORK_INDENT26298
titleConstruction of Compound Wall at Aradhana School for Slow Learner in Ramtheerth Nagar aided by Handicapped Welfare Department of Womens and Child Development Department. (Reserved for Schedule Caste (SC) Contractors Only)
descriptionConstruction of Compound Wall at Aradhana School for Slow Learner in Ramtheerth Nagar aided by Handicapped Welfare Department of Womens and Child Development Department. (Reserved for Schedule Caste (SC) Contractors Only)
categoryWORKS
categoryTextWorks
ecv1138000.00
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2156
locationNameDMA City Corporation Belagavi
provisionalAmount1138000.0
groupOverheadTotal12505.14
fileNumberAEENORTH2SFC2024-25file03
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17247360410000NoneNoneOther WorksConstruction of Compound Wall at Aradhana School for Slow Learner in Ramtheerth Nagar aided by Handicapped Welfare Department of Womens and Child Development Department.1125494.86
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3860934147787NoneI.no.1.14.1 vol.1 SR 2023-24Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 mCum126.38126.3861.416FalseNoneNoneFalseNoneFalse7761.754080
3860935147787NoneP.No 54, I.No.1.23 vol-1, S.R. 23-24Providing and Filling in foundation with granite / trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specificationsCum3322.993322.9913.43FalseNoneNoneFalseNoneFalse44627.75570
3860936147787NoneP.No.15,I. No. 2.1.4, Vol -1, SR 2023-24Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap /basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregatesCum7702.867702.8611.268FalseNoneNoneFalseNoneFalse86795.826480
3860937147787NoneP.No.16, I.No.2.4.2, Vol-1, SR 2023-24Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.Cement Concrete Compound 50% on finished rate of concrete per m3Cum11751.2911751.2920.29FalseNoneNoneFalseNoneFalse238433.67410
3860938147787NoneP.No.90, I.No.2.11h, Vol-1, S.R. 2023-24Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification All other type of structuresTonne97894.6397894.631.9458FalseNoneNoneFalseNoneFalse190483.3710540
3860939147787NoneP.No.35, I.No. 1.10, Vol-1 SR 23-24Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specificationsCum198.24198.2436.85FalseNoneNoneFalseNoneFalse7305.1440
3860940147787NoneP.No.12, I.No.6.2 Vol-2 SR 23-24Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of workCum9884.749884.7434.776FalseNoneNoneFalseNoneFalse343751.718240
3860941147787NoneP.No.41, I.No.8.2.1 Vol-2 S.R. 23-24Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-chargeSqm365.5365.5351.0FalseNoneNoneFalseNoneFalse128290.50
3860942147787NoneP.No.45, I.No.8.28.1 Vol-2 S.R. 23-24Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm110.27110.27351.0FalseNoneNoneFalseNoneFalse38704.770
3860943147787NoneP.No.86, I.No.11.34 A.1 Vol-2 S.R. 23-24Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by weldingSqm208.15208.15189.0FalseNoneNoneFalseNoneFalse39340.350
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17247360420000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17247360420000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17247360420000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17247360420000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17247360420000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17247360560000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17247360600000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17247360630000NoneNoneELIGIBILITYWork done amount and financial turnover of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2024-25None
17247360660000NoneNoneELIGIBILITYGST is included in BOQ amount.None
17247360700000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason or what so ever.None
17247360730000NoneNoneELIGIBILITYBidders should abide to all the Terms and Conditions mentioned in the Bid Document attachedNone
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Registration Certificate from KPWD/CPWD/PRE.TrueTechnical Bid
The bidder should have submit the Scheduled Castes Certificate issued by Competent Authority.TrueTechnical Bid
The contractor belonging to the Schedule Castes shall be domicile of the State of Karnataka for more than 10 Years. Domicile Certificate issued by Competent Authority.TrueTechnical Bid
Achieved in at least one financial year a minimum financial turnover amount should be as per bid document. Annual Turnover Certificate, Profit and loss A/C sheet from CA.TrueTechnical Bid
Satisfactorily completion as a prime contractor for at least any construction work of value should be as per bid document. Work Done Certificate from Executive Engineer or Equivalent.TrueTechnical Bid
Liquid assets and/or availability of credit facilities of not less of amount and format should be as per bid document. Unconditional Credit lines/letter of credit/ certificates from the banks for meeting the fund requirement etc.TrueTechnical Bid
Format 1.1 to 1.4TrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone