createdTs1724478800817
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee1360.00
emd108136.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose30-09-2024 17:00:00
tenderQueryClose28-08-2024 17:00:00
technicalBidOpen03-10-2024 11:00:00
publishedDate27-08-2024 10:42:40
publishedByPostTP_CO_YDM
publishedByUserKPE14881 - SANTOSH KUMAR
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonSantosh Kumar
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9972430009
tenderSupplierListNone
tenderSchedule
createdTs1724478800845
version4
createdDateNone
modifiedDateNone
tenderNumberDMA/2024-25/OW/WORK_INDENT26339
titleConstruction of Processing Shed at SWM Site in Yadrami Town
descriptionConstruction of Processing Shed at SWM Site
categoryWORKS
categoryTextWorks
ecv5406787.56
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2319
locationNameDMA Town Panchayat Yedrami
provisionalAmount5428000.0
groupOverheadTotalNone
fileNumberTPY/SBM/6/202425
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17244788010000NoneNoneOther WorksConstruction of Processing Shed at SWM Site in Yadrami Town5406787.56
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3851131147108None00001Item Description : Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work SR vol 1 it no 1.16 pg no 9 Cum581.7581.788.0FalseNoneNoneFalseNoneFalse51189.60
3851132147108None0002Item Description : Providing and laying in position plain cement concrete for levellingcourse for all works in foundation. The granite/trap/basalt crushedgraded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness,well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing,and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3;6 (M-10) Using 40 mm nominal size graded crushed coarse aggregates PG NO. 15 item no. 2.1.3 volome (01) (4th quarter issue rates) Cum5831.75831.78.0FalseNoneNoneFalseNoneFalse46653.60
3851133147108None0003Item Description :Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machinemixed with super plasticizers laid in finished layers, well compactedusing needle vibrators, including all lead & lifts, cost of all materials,quality confirming to the requirements of relevant IS codes , labour,Usage charges of machinery, curing and all the otherappurtenances required to complete the work as per technical specifications. (The costof steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PG NO. 16 item no. 2.4.2 volome (01) (4th quarter issue rates) Cum6266.06266.035.19FalseNoneNoneFalseNoneFalse220500.540
3851134147108None0004Item Description :Supplying, Fitting and Placing TMT Fe 500 & above inforcement in Foundation / Substructure /Superstructure complete as per Drawing and Technical Specifications.( Specification No. KBS 4.6.3 PWD SR 2021-22 PG NO. 71 item no. 9.3 volome (03) (4th quarter issue rates) Tonne76650.076650.03.25FalseNoneNoneFalseNoneFalse249112.50
3851135147108None00007Item Description :Providing and removing centering, shuttering, strutting, propping etc., and removal of form work As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate as per table below VOL.2 P.NO A.7 I.NO.22.2 Foundation, Sub structure of Cross drainages 5 Sqm313.23313.23132.0FalseNoneNoneFalseNoneFalse41346.360
3851136147108None00007Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -II Material VOl-2 it no 4.2 pg no 23 Cum2553.62553.686.4FalseNoneNoneFalseNoneFalse220631.040
3851137147108None00007Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. Using Screening Crushable type such as Moorum or Gravel VOL-3 it no 4.14 pg no 26 Cum2272.22272.286.4FalseNoneNoneFalseNoneFalse196318.080
3851138147108None0008Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 14:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 140 kg/ m3 , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 7 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 t vibratory roller, finishing and curing. VOL-3 it no 6.1 pg no 49 Cum5166.05166.082.4FalseNoneNoneFalseNoneFalse425678.40
3851139147108None00009Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design,laid in approved fixed side formwork (steel channel,laying and fixing of 125 micron thick polythene film,wedges, steel plates including levelling the formwork asper drawing), spreading the concrete with shovels, rakes,compacted using needle, screed and plate vibrators andfinished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts,loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per thedirections of the Engineer-in-charge of the work. Pg. No. 138 Item No.20.29 volome (III) (4th quarter issue rates) Cum6837.66837.686.4FalseNoneNoneFalseNoneFalse590768.640
3851140147108None00001Vaccum de-watering with vaccum pump and suction mat and compaction with skin floater clubbed with floating disc including cost of generator, HOM of machinery, Screed Vibratory, Power Floater, blade and disc etc., with all lead and lift.(P-177/I-22.7) Cum90.090.0864.0FalseNoneNoneFalseNoneFalse77760.00
3851141147108None00010Providing and fixing pre engineered building for the composting recycling and waste segregation area including the necessary structural member(truss consisting of ISA ISLC,insert plate,cleat angle,other necessary structural member,side closer upto 1m aboveGL with door/window openings including skylight and turbo ventilator )including shop painting and two coats of anti-corrosive paint.Provide galvanised sheet for the roofing and walls including gutters and downtake pipes.The cost includes all Supply, Fabrication, Erection and Sheet Fixing of approximately Steel Components for Building as per Specification-Inclusiv freight Charges-Sq. Mtr@Rs.3800 Sqm3800.03800.0864.0FalseNoneNoneFalseNoneFalse3283200.00
3851142147108None000011Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with 8-10 t smooth wheeled roller, complete as per clause 310 VOL-3 it no 3.11 pg no 18 Cum4.24.2864.0FalseNoneNoneFalseNoneFalse3628.80
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17244788020000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17244788020000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17244788020000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17244788020000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17244788020000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNonesimilar work done 50 % estimate costPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
PWD Contractor Registration CertificateTrueTechnical Bid
GST Registration certificate and PAN CardTrueTechnical Bid
Last three year Income Tax Return CertificateTrueTechnical Bid
Last five year Annual Turnover Certificate Achieved in At least Two financial Years an average annual turnover for the amount estimate cost 54.28lakhsTrueTechnical Bid
Similar Nature of Work Done Certificate achieved at least 50 Percent of Estimate Cost 27.14lakhsTrueTechnical Bid
Line of Credit 30 Percent of the estimate amount 16.28akhsTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
Other WorksKalaburagiYedramiGulbargaJEWARGIYedrami16NoneNone76NoneNone