1724673394000 | 0 | None | None | Water supply/sewage lines | Construction/Upgradation of Sewerage System for Ranebennur city under NGT environmental compensation fund and ULB fund with 5 years Operation and maintenance in DBOT model. | 128842474.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3857675 | 147577 | None | RBN01 | Part-A
A1. Construction of UGD and Improvement Works to Nala & Drains
a)Excavation in all kind of strata at varying depths
b) Providing & laying of 160 and 200mm dia 'U'PVC SN-8 class and 250 and 300 mm dia RCC NP-3 pipe and construction of RCC machine holes chambers in Siddheshwar Nagara,Sadashiv Nagara, Chidambara Nagar and Maruti Nagara in Ranebennur town (L : 7378 m) including restoration works in flexible and rigid pavements.
c)Providing and Construction of RCC machine hole chambers, of 1.2 m,1.5m, dia cast-insitu / Pre-cast with heavy duty SFRC cover and frame, for varying depths (the depth may vary as per the site condition).
f)Any other appurtenance/Allied works applicable as per the site conditions and design requirement
Note : 1) All works and items shall be executed as per the IS, MoRTH specifications, CPHEEO guidelines and specifications mentioned in the contract.
2) Work shall be carried out as per the instructions of the engineer incharge.
3) Drawings are enclosed are for tender purpose only. | Job | 48496633.0 | 48496633.0 | 1.0 | False | None | None | False | None | False | 48496633.0 | 0 | 3857676 | 147577 | None | RBN02 | Part-A
A1. Construction of UGD and Improvement Works to Nala & Drains
e)Providing House Service Connections (HSC) :1120 Nos. (which shall be laid from inside the customer property to Machine hole as per site condition)
Any other appurtenance/Allied works applicable as per the site conditions and design requirement
Note : 1) All works and items shall be executed as per the IS, MoRTH specifications, CPHEEO guidelines and specifications mentioned in the contract.
2) Work shall be carried out as per the instructions of the engineer incharge.
3) Drawings are enclosed are for tender purpose only. | Job | 9383382.0 | 9383382.0 | 1.0 | False | None | None | False | None | False | 9383382.0 | 0 | 3857677 | 147577 | None | RBN03 | Part-A
A1. Construction of UGD and Improvement Works to Nala & Drains
a)Diversion of sewage flowing in open drain near STP to existing wet well in STP
b)Diversion of sewage in drains to the proposed Wetwell at Chowdeshwari Nagar
c)Construction of Retaining Wall on either side of the Nala flowing towards Gangajala kere for a length of 700 m
c)Diversion of water course if required,and Road restoration as per site requirement
d)Any other appurtenance/Allied works applicable as per the site conditions and design requirement
Note : 1) All works and items shall be executed as per the IS, MoRTH specifications, CPHEEO guidelines and specifications mentioned in the contract.
2) Work shall be carried out as per the instructions of the engineer incharge.
3) Drawings are enclosed are for tender purpose only. | Job | 38995694.0 | 38995694.0 | 1.0 | False | None | None | False | None | False | 38995694.0 | 0 | 3857678 | 147577 | None | RBN04 | Part-A
A2.Construction of RCC Wet Well including Electro mechanical Works at Chowdeshwari Layout
a)Construction of RCC Wet well cum Pump house to house pumps of required capacity & Pre-treatment Units, bar screen of manual type, with provision of inspection chamber, grit chamber, with silt trap arrangement and stair case arrangement for the maintenance in screen chamber for the wet well of capacity 4.05 MLD at Chowdeshwari Layout
Any other appurtenance/Allied works applicable as per the site conditions and design requirement
Note : 1) All works and items shall be executed as per the IS, MoRTH specifications, CPHEEO guidelines and specifications mentioned in the contract.
2) Work shall be carried out as per the instructions of the engineer incharge.
3) Drawings are enclosed are for tender purpose only. | Job | 8076980.0 | 8076980.0 | 1.0 | False | None | None | False | None | False | 8076980.0 | 0 | 3857679 | 147577 | None | RBN05 | Part-A
A2.Construction of RCC Wet Well including Electro mechanical Works at Chowdeshwari Layout
a)Providing, Laying, Jointing, testing & commissioning of required diameter of DI K-7 Class Rising main from Wet well at Doddakeri to existing Ridge MH near railway track of minimum Length: 60 m including necessary pipe ancillary works, including restoration works in flexible and rigid pavements.
b)Any other appurtenance/Allied works applicable as per the site conditions and design requirement
Note : 1) All works and items shall be executed as per the IS, MoRTH specifications, CPHEEO guidelines and specifications mentioned in the contract.
2) Work shall be carried out as per the instructions of the engineer incharge.
3) Drawings are enclosed are for tender purpose only. | Job | 506446.0 | 506446.0 | 1.0 | False | None | None | False | None | False | 506446.0 | 0 | 3857680 | 147577 | None | RBN06 | Part-A
A2.Construction of RCC Wet Well including Electro mechanical Works at Chowdeshwari Layout
a)Supply, Erection, Electrification, testing & Commissioning of Non-clog Sewage Pump sets of required capacity to proposed wetwell near Chowdeshwari Layout including panel bords etc along with all accessories at Wet well including allied works such as Chain link fencing etc
b)Providing and commissioning of 11 KV express feeder line, substation including transformer of 100 KVA and internal electrical works for proposed wet well including approvals from ESCOMS.(under self execution)
c)Any other appurtenance/Allied works applicable as per the site conditions and design requirement
Note : 1) All works and items shall be executed as per the IS, MoRTH specifications, CPHEEO guidelines and specifications mentioned in the contract.
2) Work shall be carried out as per the instructions of the engineer incharge.
3) Drawings are enclosed are for tender purpose only. | Job | 5029025.0 | 5029025.0 | 1.0 | False | None | None | False | None | False | 5029025.0 | 0 | 3857681 | 147577 | None | RBN07 | Part- B - Sewage Treatment Plant - Rehabilitation Works of STP at Halagi road.
a)Supply, Erecting, testing, with all necessary cables and other accessories and commissioning of 7.5 HP high speed aerators (min 10 Nos) in STP to make the existing Facultative Aerated Lagoon (FAL) to bring the treated water to satisfy NGT norms.
b)Repair and reconditioning of existing 50 HP sewage non clog pumps and its control panel and other accessories of pumps, panel etc and making it to working condition
c)Any other appurtenance/Allied works applicable as per the site conditions and design requirement
Note : 1) All works and items shall be executed as per the IS, MoRTH specifications, CPHEEO guidelines and specifications mentioned in the contract.
2) Work shall be carried out as per the instructions of the engineer incharge.
3) Drawings are enclosed are for tender purpose only. | Job | 2998033.0 | 2998033.0 | 1.0 | False | None | None | False | None | False | 2998033.0 | 0 | 3857682 | 147577 | None | RBN08 | Part- C- Operation and Maintainance of proposed Wet well and proposed componets of STP.
1st Year: Operation & Maintenance works for proposed wet well, repairs and reconditioning of existing pumping machineries, control panel and high-speed aerators (excluding energy charges), including Defect Liability Period.
Note: 1) All works and items shall be executed as per the IS, MoRTH specifications, CPHEEO guidelines and specifications mentioned in the contract.
2) Work shall be carried out as per the instructions of the engineer incharge.
3) Drawings are enclosed are for tender purpose only. | Job | 994400.0 | 994400.0 | 1.0 | False | None | None | False | None | False | 994400.0 | 0 | 3857683 | 147577 | None | RBN09 | Part- C- Operation and Maintainance of proposed Wet well and proposed componets of STP.
2nd Year: Operation & Maintenance works for proposed wet well, repairs and reconditioning of existing pumping machineries, control panel and high-speed aerators (excluding energy charges)
Note: 1) All works and items shall be executed as per the IS, MoRTH specifications, CPHEEO guidelines and specifications mentioned in the contract.
2) Work shall be carried out as per the instructions of the engineer incharge.
3) Drawings are enclosed are for tender purpose only. | Job | 3094566.0 | 3094566.0 | 1.0 | False | None | None | False | None | False | 3094566.0 | 0 | 3857684 | 147577 | None | RBN10 | Part- C- Operation and Maintainance of proposed Wet well and proposed componets of STP.
3rd Year: Operation & Maintenance works for proposed wet well, repairs and reconditioning of existing pumping machineries, control panel and high-speed aerators (excluding energy charges)
Note: 1) All works and items shall be executed as per the IS, MoRTH specifications, CPHEEO guidelines and specifications mentioned in the contract.
2) Work shall be carried out as per the instructions of the engineer incharge.
3) Drawings are enclosed are for tender purpose only. | Job | 3404023.0 | 3404023.0 | 1.0 | False | None | None | False | None | False | 3404023.0 | 0 | 3857685 | 147577 | None | RBN11 | Part- C- Operation and Maintainance of proposed Wet well and proposed componets of STP.
4th Year: Operation & Maintenance works for proposed wet well, repairs and reconditioning of existing pumping machineries, control panel and high-speed aerators (excluding energy charges)
Note: 1) All works and items shall be executed as per the IS, MoRTH specifications, CPHEEO guidelines and specifications mentioned in the contract.
2) Work shall be carried out as per the instructions of the engineer incharge.
3) Drawings are enclosed are for tender purpose only. | Job | 3744425.0 | 3744425.0 | 1.0 | False | None | None | False | None | False | 3744425.0 | 0 | 3857686 | 147577 | None | RBN12 | Part- C- Operation and Maintainance of proposed Wet well and proposed componets of STP.
5th Year: Operation & Maintenance works for proposed wet well, repairs and reconditioning of existing pumping machineries, control panel and high-speed aerators (excluding energy charges)
Note: 1) All works and items shall be executed as per the IS, MoRTH specifications, CPHEEO guidelines and specifications mentioned in the contract.
2) Work shall be carried out as per the instructions of the engineer incharge.
3) Drawings are enclosed are for tender purpose only. | Job | 4118867.0 | 4118867.0 | 1.0 | False | None | None | False | None | False | 4118867.0 | 0 |
|