createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1724477752284
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee1250.00
emd81000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose09-09-2024 17:00:00
tenderQueryClose09-09-2024 16:00:00
technicalBidOpenNone
publishedDate26-08-2024 17:48:49
publishedByPostDMA_EE1_CC_DVG
publishedByUserKPE12146 - MANOHAR B
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonManohar B EE
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08192234444
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1724477752334
version5
createdDateNone
modifiedDateNone
tenderNumberDMA/2024-25/RD/WORK_INDENT26296
titleConstruction of CC road in SOG colony C block 8th main and 10th main cross and anjaneya cotton mill qtrs from Gopalappas house to soubhagyamma house and road beside anganwadi kendra in ward no.31 of davangere city
descriptionConstruction of CC road in SOG colony C block 8th main and 10th main cross and anjaneya cotton mill qtrs from Gopalappas house to soubhagyamma house and road beside anganwadi kendra in ward no.31 of davangere city
categoryWORKS
categoryTextWorks
ecv5000000.00
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2160
locationNameDMA City Corporation Davanagere
provisionalAmount5000000.0
groupOverheadTotal989950.03
fileNumberDMA/DCC/W-35/2024-25/01
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17244777520000NoneNoneRoadsConstruction of CC road in SOG colony C block 8th main and 10th main cross and anjaneya cotton mill qtrs from Gopalappas house to soubhagyamma house and road beside anganwadi kendra in ward no.31 of davangere city4010049.97
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3851038147101NoneP.no 08 i.no 1.12 Volume I) 2024-25 SREarth work in surface excavation by mechanical means for lowering &leveling the ground for all works other than foundation in all kinds ofsoils & upto depth not exceeding 300mm as per drawing and technicalspecifications, including setting out, shoring, strutting, barricading,caution lights, removal of stumps and other deleterious matter includingdressing of excavated surfaces, disposing off or levelling the excavatedearth or sorting & stacking the selected earth for reuse in a radiusof 50 m and lift upto 1.5 m including cost of labour, tools, usage ofmachinery & other appurtenances required to complete the work. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.Cum99.7599.75780.6FalseNoneNoneFalseNoneFalse77864.850
3851039147101NoneP No.15, I No.3.7 ) 2024-25 SR Volume I3.7 305.3.4 Compacting Original GroundCompacting original ground supporting embankmentLoosening, leveling and Compacting original ground supportingembankment to facilitate placement of first layer of embankment,scarified to a depth of 150 mm, mixedwith water at OMC andthen compacted by rolling so as to achieve minimum dry densityas given in Table 300-2 for embankment construction. m3 87.00 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.Cum110.25110.25365.71FalseNoneNoneFalseNoneFalse40319.52750
3851040147101NoneP No.7, I No.1.8) 2024-25 SRVolume IKSRRB M300- Construction of Embankment with Material Gravel/ Murrum. KSRRB M300-53. Construction of embankment with approved material Gravel/Murrum with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement Table 300- 2 complete as per specifications.(which includes cost of gravel / murrum, watering charges & compaction by vibratory roller) MORTH Specification No. 305 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.Cum497.7497.7388.67FalseNoneNoneFalseNoneFalse193441.0590
3851041147101NoneP NO 24 I NO 4.27) 2024-25 SRVolume IIIWet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uiform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.Cum2686.952686.95349.31FalseNoneNoneFalseNoneFalse938578.50450
3851042147101NoneP No.138, I No.20.30)2024-25 SRVolume IIIProviding and constructing un-reinforced plain cementconcrete pavement, thickness as per design, over aprepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc.complete. as per the directions of the Engineer-in-charge of the work ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.Cum7091.77091.7288.72FalseNoneNoneFalseNoneFalse2047515.6240
3851043147101Nonei no 9.32 p No 64) 2024-25 SRVolume II6.8.2 IRC SP 63:2018Providing and laying 80mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Traffic Axle load repetitions upto 10MSA & for Residential Streets of approved shape and colour, laid in required pattern and including over 40mm thick compacted bed of coarse sand, filling the joints with finesand etc. all complete as per the direction of Engineer-in-charge. (WMM/WBM Base to be paid separately as per relevant technical specification)m2 1,161.00 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.Sqm1219.051219.0536.0FalseNoneNoneFalseNoneFalse43885.80
3851044147101NoneP.No.193 I.No.27.1 ) T461A 2024-25 SRVOLUME VRepairs to Machinehole for different depths including removal of debris,levelling the brick masonry, construction of brick masonry upto Groundlevel, providing CC coping alround the MH cover, plastering both inside and outside to the brick masonry and fixing of manhole frame and cover, curing, refilling with appurtenances complete. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.No8577.458577.4527.0FalseNoneNoneFalseNoneFalse231591.150
3851045147101None2024-25 SR(P.No.6. INo.1.60)Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.Cum508.2508.219.98FalseNoneNoneFalseNoneFalse10153.8360
3851046147101NoneP.No.15. item no 2.1.2 Volume IProviding and laying in position plain cement concrete for levelling course for all works in foundation. Mix 1:4:8 (M5) Using 40 mm nominal size graded crushed coarse aggregates The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) 2.1.2 Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates m 5,364.00 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.Cum5947.25947.24.46FalseNoneNoneFalseNoneFalse26524.5120
3851047147101NoneP.No.17 I.No. 2.4.2 Vol I2.4 Providing and laying in position Reinforced cement concrete for allSub structures of building, Irrigation works, Sub structure works ofbridges, Drain works & other parallel works from 0.50m to 3.50 mheight. The granite/trap/basalt crushed graded coarse aggregates andfine aggregates as per relevant IS Codes machine mixed with superplasticisers, laid in layers, well compacted using needle vibrators,providing weep holes wherever necesary, including all lead & lifts, costof all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technicalspecifications. (The cost of steel reinforcement & formwork to be paidseparately)2.4.2 M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.Cum6639.156639.1523.29FalseNoneNoneFalseNoneFalse154625.80350
3851048147101NoneAppendix 1Appendix 1-Additionalities for Formwork, centering & Scaffolding ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.Cum2323.72323.713.94FalseNoneNoneFalseNoneFalse32392.3780
3851049147101NoneP NO 71 I NO 9.3 Volume IIISupplying, Fitting and Placing TMT Fe 550 & above Reinforcement in Foundation / Substructure Superstructure complete as per Drawing and Technical Specifications. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.Tonne90516.390516.31.3FalseNoneNoneFalseNoneFalse117671.190
3851050147101NoneP No P NO 15 No-3.1 VOLUME III1.10 Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.Cum168.0168.065.58FalseNoneNoneFalseNoneFalse11017.440
3851051147101NoneP No P NO 15 No-3.1 VOLUME IIIRemoval of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.Cum89.2589.25735.0FalseNoneNoneFalseNoneFalse65598.750
3851052147101NoneP.No.151. item no 21C-4 VOLUME IIIProviding and fixing RCC name board of size 1.35x0.60x0.04 m fixed in reinforced cement concrete poles of size 0.10x0.10x2.60m in cement concrete M 20 proportion using 20mm and down size graded metal machine mixed with 10mm dia main steel bars and 8mm dia stirpes as shown in drawing. The board shall be provided with 12mm thick cement plaster in cement mortar 1:4 on both the sides. The poles shall be embedded in the ground for a depth of 0.5 m with cement concrete M 10 proportion. The board shall be fixed as per the drawing and at the place indicated by the Engineer in charge of the work. The cost includes excavation, cost of all materials, cost of steel, painting, centering, transportation charges & fixing charges.No. 5,861.0(Vol-03 SR-24-25 I.No. 8.55 PG NO-79) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.No6154.056154.051.0FalseNoneNoneFalseNoneFalse6154.050
3851053147101NoneP.No.134, 1 M010)1 M010Supplying PVC ringtite pipes conforming to IS 4985:2000 with latestamendments and conveying to worksite, rolling and lowering intotrenches, laying true to line and level and perfect linking at joints, testingand commissioning, including loading unloading at both destinations andcuts of pipes wherever necessary including jointing of PVC pipes andspecials (excluding cost of specials) with jointing of approved type, withall labour with all lead & lift including encasing the pipe alround to a depthof not less than 15 cms. with soft gravel or selected earth available fromthe excavation etc. complete and giving necessary hydraulic test to therequired pressure as per ISS (Contractor will make his own arrangementsfor procuring water for testing) etc. for:1.1 M010A PVC pipes 25mm dia, 10kg/sqcm & class 5 m 48 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.m50.450.460.0FalseNoneNoneFalseNoneFalse3024.00
3851054147101None2024-25 SR VOL-5 IR-4 Pg No.134 I.No.10.1.3)10.1 Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete 10.1.3 PVC pipes 50mm dia., 6 kg/sqcm & class 5 m 101 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.m106.05106.0510.0FalseNoneNoneFalseNoneFalse1060.50
3851055147101None2024-25 SR VOL-5 IR-4 Pg No.134 I.No.1.5)Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: 10.1.7 PVC pipes 110mm dia., 6 kg/sqcm & class 3 m 411 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete.m431.55431.5520.0FalseNoneNoneFalseNoneFalse8631.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17244777530000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17244777530000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17244777530000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17244777530000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17244777530000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17244777530001NoneNoneELIGIBILITYCorrigendum / modifications / correction, if any, will be published in the KPP portal only.None
17244777530001NoneNoneELIGIBILITYTenderers are required to read the Bid Documents carefully before submission of their bid. Any discrepancies observed in the documents uploaded by the tenderer the tender shall liable to rejected. The Employer reserves the right to reject any or all Tenders without assigning any reason or what so ever. Conditional tenders will not be accepted.None
17244777530001NoneNoneELIGIBILITYAs per Karnataka State Government order No.LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27-07-2007, a sum amounting to 1%of the bill amount will be deducted towards Construction Labour Welfare fund. Royalty on construction materials and other taxes will be deducted as per prevailing Govt., orders as may be modified from time to time.None
17244777530001NoneNoneELIGIBILITYWork done certificate should be issued by competent authority not below the rank of Executive Engineer and Submitted Work done certificate should include E-PROCUREMENT INDENT NUMBER. The Tenderer shall scan Original Workdone certificates / Turnover Statements and any other documents specified by the employer and attach the scanned file to the Bid. The Original Documents shall be produced for physical verification within one week from the date of Technical bid opening or when called for during evaluation of tender.None
17244777530001NoneNoneELIGIBILITYa) Financial turnover of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2024-25. b) The Tenderer should maintain the Work during defective liability period i.e., ONE Year from the completion date. c) The Tenders are invited as per Standard tender Bid Document, All terms and conditions as per tender documents and Other details can be seen in the tender documents.None
17244777530000NoneNoneELIGIBILITYList of existing commitments and ongoing worksNone
17244777530000NoneNoneELIGIBILITYList of works for which tenders already submittedNone
17244777530001NoneNoneELIGIBILITYAs per Government Order NO: FD 675 EXP 12 /2020 Banglore Dated 22-12-2020 action will be taken if the documents submitted by the tenderer found to be misleading /forged or fake.None
17244777530001NoneNoneELIGIBILITYThe tenderer should be a PWD registered Contractor - Class-3 and aboveNone
17244777530001NoneNoneELIGIBILITYBidders have to quote and execute the work as per the detailed specification given in Sanctioned estimate and the instructions of the Engineer incharge. The copy of the estimate can be obtained from the Asst. Executive Engineers office, City Corporation Davanagere during Office hours.None
17244777530001NoneNoneELIGIBILITYCertificate of registration in the labor Department / Provident Fund / ESI should be enclosed and shall engage a construction worker who is registered with the Karnataka Building and construction Workers Welfare Board.None
17244777530001NoneNoneELIGIBILITYAs per the Govt. Order No.DE 447 Exp-12/2022 Dated : 30-07-2022 GST will be added to the contract amount separately.None
17244778590000NoneNoneELIGIBILITYDetails As per 1.2 of Section 3 of Qualification information in Standard Bid document i.e., In last five years period achieved in at least two financial Year for other category and one Financial Year for SC & ST category an minimum annual financial turnover should not be less than cost of the work, Turnover certificate from CA with valid UDIN No. along with profit loss, Balance Sheet and IT ReturnsNone
17244778630000NoneNoneELIGIBILITYDetails As per 1.3 of Section 3 of Qualification information in Standard Bid document i.e., Satisfactorily completed at least one Similar work for other category of value not less than 50 Percent and Any Construction work for SC and ST category of value not less than 25 percent of cost of the work as prime contractor. Certificate issued by not below the rank of Executive Engineer or equivalent with eprocurement Indent Number.None
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Details as per 1.1 of Section 3 of Qualification information in Standard Bid document i.e., Registration certificateTrueTechnical Bid
Details As per 1.2 of Section 3 of Qualification information in Standard Bid document i.e., In last five years period achieved in at least two financial Year for other category and one Financial Year for SC & ST category an minimum annual financial turnover should not be less than cost of the work, Turnover certificate from CA with valid UDIN No. along with profit loss, Balance Sheet and IT ReturnsTrueTechnical Bid
Details As per 1.3 of Section 3 of Qualification information in Standard Bid document i.e., Satisfactorily completed at least one Similar work for other category of value not less than 50 Percent and Any Construction work for SC and ST category of value not less than 25 percent of cost of the work as prime contractor. Certificate issued by not below the rank of Executive Engineer or equivalent with eprocurement Indent Number.TrueTechnical Bid
Details as per 1.4A, B, 1.5 and etc., of Section 3 of Qualification information in Standard Bid document.TrueTechnical Bid
Certificate of registration in the Labour Department/ Provident Fund /ESITrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone