1724473597000 | 0 | None | None | Other Works | CONSTRUCTION OF COMPOUND WALL TO GOVERNMENT PRIMARY SCHOOL NEAR BUDIHAL ROAD SPS NAGAR IN WARD NO 05 | 2215725.86 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3850892 | 147087 | None | 19.7.1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge. VOL 2(pg no 187, i no 19.7.1) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 506.1 | 506.1 | 10.48 | False | None | None | False | None | False | 5303.928 | 0 | 3850893 | 147087 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the workIn all kinds of soils Depth upto 3 m(volume -1 COMMON SRi no 1.14.1, pg no 8 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 107.1 | 107.1 | 340.52 | False | None | None | False | None | False | 36469.692 | 0 | 3850894 | 147087 | None | 1.8 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.(common sr-2022) (P No 7 I NO 1.8) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 497.7 | 497.7 | 224.78 | False | None | None | False | None | False | 111873.006 | 0 | 3850895 | 147087 | None | 2.1.2 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates(common sr)(P No.15. I No.2.1.2) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 5947.2 | 5947.2 | 28.9 | False | None | None | False | None | False | 171874.08 | 0 | 3850896 | 147087 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (common sr)(P.No.16, I.NO 2.4.2) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 6639.15 | 6639.15 | 24.25 | False | None | None | False | None | False | 160999.3875 | 0 | 3850897 | 147087 | None | 2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure worksof bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(common sr)(P.No.16, I.NO 2.5.1) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 6961.5 | 6961.5 | 12.9 | False | None | None | False | None | False | 89803.35 | 0 | 3850898 | 147087 | None | APPENDIX 1 | Centering, shuttering, strutting, propping and removal of formwork (50% of finished rate of concrete) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 3319.58 | 3319.58 | 9.04 | False | None | None | False | None | False | 30009.0032 | 0 | 3850899 | 147087 | None | APPENDIX 1 | Centering, shuttering, strutting, propping and removal of formwork (70% of finished rate of concrete) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 4647.41 | 4647.41 | 16.14 | False | None | None | False | None | False | 75009.1974 | 0 | 3850900 | 147087 | None | APPENDIX 1 | Centering, shuttering, strutting, propping and removal of formwork (70% of finished rate of concrete) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 4873.05 | 4873.05 | 9.32 | False | None | None | False | None | False | 45416.826 | 0 | 3850901 | 147087 | None | 2.11 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification Buildings( p.no.18, I.NO.2.11) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Tonne | 93929.85 | 93929.85 | 2.729 | False | None | None | False | None | False | 256334.56065 | 0 | 3850902 | 147087 | None | 6.2 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.( SOR for buildings I No 6.2 pg no 13) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 8376.9 | 8376.9 | 83.19 | False | None | None | False | None | False | 696874.311 | 0 | 3850903 | 147087 | None | 11.25.2 | Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in- Charge.( SOR for buildings I No 11.25.2 pg no 84) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Kg | 142.8 | 142.8 | 480.0 | False | None | None | False | None | False | 68544.0 | 0 | 3850904 | 147087 | None | 11.58 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineerin- charge. (Made of G.I. wire of dia 4 mm)( SOR for buildings I No 11.58 pg no 95) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Sqm | 843.15 | 843.15 | 65.5 | False | None | None | False | None | False | 55226.325 | 0 | 3850905 | 147087 | None | 8.3.2 | Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Page No.41, Item.No 8.3.2 Vol-2 ). ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Sqm | 289.8 | 289.8 | 917.0 | False | None | None | False | None | False | 265746.6 | 0 | 3850906 | 147087 | None | 8.21 | Providing White washing with lime to give an even shade :New work (three coats) with lime of approved quality, including cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(Page No.26, Item.No 8.21 Vol-2 ) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Sqm | 27.3 | 27.3 | 1834.0 | False | None | None | False | None | False | 50068.2 | 0 | 3850907 | 147087 | None | 8.25 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Page No.45, Item.No 8.25 Vol-2) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Sqm | 110.25 | 110.25 | 524.0 | False | None | None | False | None | False | 57771.0 | 0 | 3850908 | 147087 | None | 1.10 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications vol 1(I No 1.10 pg no 7) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 168.0 | 168.0 | 23.58 | False | None | None | False | None | False | 3961.44 | 0 | 3850909 | 147087 | None | 3.11 | Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work (roads and bridges) ( p.nO15., I.NO.3.11) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 89.25 | 89.25 | 316.94 | False | None | None | False | None | False | 28286.895 | 0 | 3850910 | 147087 | None | 8.55 | Providing and fixing RCC name board of size 1.35x0.60x0.04,0.10x0.10x2.60m in cement concrete M 20 proportion using20mm and down size graded metal machine mixed with10mm dia main steel bars and 8mm dia stirpes as shown indrawing. The board shall be provided with 12mm thick cement plaster in cement mortar 1:4 on both the sides. The poles shallbe embedded in the ground for a depth of 0.5 m with cementconcrete M 10 proportion. The board shall be fixed as per thedrawing and at the place indicated by the Engineer in chargeof the work. The cost includes excavation, cost of all materials,cost of steel, painting, centering, transportation charges &fixing charges.804roads and bridges(pg no 78 I no 8.55) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Each | 6154.05 | 6154.05 | 1.0 | False | None | None | False | None | False | 6154.05 | 0 |
|