1724668507000 | 0 | None | None | Buildings | Construction of K.P.S. School Yakkundi (Dise Code 29011210205) in Savadatti Taluk | 2636965.11 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3856609 | 147481 | None | code01 | Construction of School Building : -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications including setting out, shoring, strutting, barricading, caution lights including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work 1.14.1 In all kinds of soils Depth upto 3 m with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 107.1 | 107.1 | 60.99 | False | None | None | False | None | False | 6532.029 | 0 | 3856610 | 147481 | None | code02 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 6511.05 | 6511.05 | 14.65 | False | None | None | False | None | False | 95386.8825 | 0 | 3856611 | 147481 | None | code03 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with 20% partial replacement with Recycled concrete aggregate (RCA) with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 7188.3 | 7188.3 | 5.6 | False | None | None | False | None | False | 40254.48 | 0 | 3856612 | 147481 | None | code04 | Formwork, Centering & Scaffolding, Isolated foundation of Builduing percentageon finished rate of conerete per m3 is FR*8% with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 533.22 | 533.22 | 5.6 | False | None | None | False | None | False | 2986.032 | 0 | 3856613 | 147481 | None | code05 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 6708.45 | 6708.45 | 18.17 | False | None | None | False | None | False | 121892.5365 | 0 | 3856614 | 147481 | None | code06 | Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 454.65 | 454.65 | 24.54 | False | None | None | False | None | False | 11157.111 | 0 | 3856615 | 147481 | None | code07 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 6847.05 | 6847.05 | 5.73 | False | None | None | False | None | False | 39233.5965 | 0 | 3856616 | 147481 | None | code08 | Formwork,Centering & Scaffolidingwork, Column of Builduing 70% with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 4696.56 | 4696.56 | 3.89 | False | None | None | False | None | False | 18269.6184 | 0 | 3856617 | 147481 | None | code09 | Formwork,Centering & Scaffoliding work , Plinth beam of Builduing 50% with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 3326.4 | 3326.4 | 4.39 | False | None | None | False | None | False | 14602.896 | 0 | 3856618 | 147481 | None | code10 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 7115.85 | 7115.85 | 15.3 | False | None | None | False | None | False | 108872.505 | 0 | 3856619 | 147481 | None | code11 | Formwork,Centering & Scaffolidingwork, Beams and Lintle of Builduing - 60% with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 4311.09 | 4311.09 | 3.2585 | False | None | None | False | None | False | 14047.686765 | 0 | 3856620 | 147481 | None | code12 | Formwork,Centering & Scaffolidingwork,Roof Slab of Builduing - 60% with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 3592.58 | 3592.58 | 9.48 | False | None | None | False | None | False | 34057.6584 | 0 | 3856621 | 147481 | None | code13 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M-20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 7249.2 | 7249.2 | 0.189 | False | None | None | False | None | False | 1370.0988 | 0 | 3856622 | 147481 | None | code14 | Formwork,Centering & Scaffoliding work,Chajja of Builduing 45% with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 3132.68 | 3132.68 | 0.19 | False | None | None | False | None | False | 595.2092 | 0 | 3856623 | 147481 | None | code15 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening cutting, bending, hooking, laping/welding joints, tying with binding wire soft nnealed steel wire and other ancilary operations complete as per drawing and technical specification with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Kg | 93929.85 | 93929.85 | 3.29 | False | None | None | False | None | False | 309029.2065 | 0 | 3856624 | 147481 | None | code16 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 8621.55 | 8621.55 | 23.55 | False | None | None | False | None | False | 203037.5025 | 0 | 3856625 | 147481 | None | code17 | Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per direc tions of Engineer-in-chare with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 349.65 | 349.65 | 172.23 | False | None | None | False | None | False | 60220.2195 | 0 | 3856626 | 147481 | None | code18 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 253.05 | 253.05 | 73.32 | False | None | None | False | None | False | 18553.626 | 0 | 3856627 | 147481 | None | code19 | Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:3 (1 cement: 3 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curincomplete as per specifications and as per directions of Engineer-in-charge with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 339.15 | 339.15 | 65.83 | False | None | None | False | None | False | 22326.2445 | 0 | 3856628 | 147481 | None | code20 | Providing and laying Vitrified tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08 % and conforming to I.S. 15622 of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry
@ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete Size of Tile 600x600 mm with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 1233.75 | 1233.75 | 63.4 | False | None | None | False | None | False | 78219.75 | 0 | 3856629 | 147481 | None | code21 | Finishing walls with water proofing cement paint of required shade : Old work (one coats @ 2.20 kg/10 m²) complete. including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 58.8 | 58.8 | 172.23 | False | None | None | False | None | False | 10127.124 | 0 | 3856630 | 147481 | None | code22 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and in cluding water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 143.85 | 143.85 | 73.32 | False | None | None | False | None | False | 10547.082 | 0 | 3856631 | 147481 | None | code23 | Providing and fixing factory made ISI marked steel glazed doors, windows and ventilators, side /top /centre hung, with beading and all members such as F7D,F4B, K11 B and K12 B etc. complete of standard rolled steel sections, joints mitred and flash butt welded and sash bars tenoned and riveted, including providing and fixing of hinges, pivots, including priming coat of approved steel primer, but excluding the cost of other fittings, complete all as per approved design, (sectional weight of only steel members shall be measured for payment). Fixing with carbon steel galvanised dash fastener of required dia and size (to be paid for separately) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 112.35 | 112.35 | 460.8 | False | None | None | False | None | False | 51770.88 | 0 | 3856632 | 147481 | None | code24 | ELECTRICAL Work :-
Concealed Conduit System :Supplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary - 25mm dia 2mm thick with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Mtr | 53.0 | 53.0 | 5.0 | False | None | None | False | None | False | 265.0 | 0 | 3856633 | 147481 | None | code25 | Supplying heavy gauge PVC Conduit Pipe .... dia ....... mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. - 25mm dia 2mm thick with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Mtr | 54.0 | 54.0 | 5.0 | False | None | None | False | None | False | 270.0 | 0 | 3856634 | 147481 | None | code26 | Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. - Short point upto 3Mtr from tapping point to out let via switch box with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Point | 160.0 | 160.0 | 2.0 | False | None | None | False | None | False | 320.0 | 0 | 3856635 | 147481 | None | code27 | Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. - Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch box with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Point | 250.0 | 250.0 | 1.0 | False | None | None | False | None | False | 250.0 | 0 | 3856636 | 147481 | None | code28 | Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. - Long point above 6Mtr upto 10Mtr from tapping point to out let via switch box with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Point | 375.0 | 375.0 | 1.0 | False | None | None | False | None | False | 375.0 | 0 | 3856637 | 147481 | None | code29 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.The following additional tests are compulsory either to be conducted at works or independent lab with witness by inspecting authority.Additional Tests for FRLS-Applicable Standard Oxygen Index -IS 694-1990, Clause 16.8 Temperature Index -IS 694-1990, Clause 16.13 Smoke Density -IS 694-1990, Clause 16.14 Test for Halogen Acid Gas evaluation -IS 694-1990, Clause 16.12 - 1.5 sqmm with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Mtr | 20.5 | 20.5 | 3.0 | False | None | None | False | None | False | 61.5 | 0 | 3856638 | 147481 | None | code30 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.The following additional tests are compulsory either to be conducted at works or independent lab with witness by inspecting authority.Additional Tests for FRLS-Applicable Standard Oxygen Index -IS 694-1990, Clause 16.8 Temperature Index -IS 694-1990, Clause 16.13 Smoke Density -IS 694-1990, Clause 16.14 Test for Halogen Acid Gas evaluation -IS 694-1990, Clause 16.12 - 2.5 sqmm with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Mtr | 32.0 | 32.0 | 3.0 | False | None | None | False | None | False | 96.0 | 0 | 3856639 | 147481 | None | code31 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.The following additional tests are compulsory either to be conducted at works or independent lab with witness by inspecting authority.Additional Tests for FRLS-Applicable Standard Oxygen Index -IS 694-1990, Clause 16.8 Temperature Index -IS 694-1990, Clause 16.13 Smoke Density -IS 694-1990, Clause 16.14 Test for Halogen Acid Gas evaluation -IS 694-1990, Clause 16.12 - 4 sqmm with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Mtr | 45.0 | 45.0 | 5.0 | False | None | None | False | None | False | 225.0 | 0 | 3856640 | 147481 | None | code32 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete. - 8Way with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 140.0 | 140.0 | 2.0 | False | None | None | False | None | False | 280.0 | 0 | 3856641 | 147481 | None | code33 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete. - 10-12Way with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 160.0 | 160.0 | 2.0 | False | None | None | False | None | False | 320.0 | 0 | 3856642 | 147481 | None | code34 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. - 8 Module with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 200.0 | 200.0 | 1.0 | False | None | None | False | None | False | 200.0 | 0 | 3856643 | 147481 | None | code35 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. - 10-12 Module with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 230.0 | 230.0 | 2.0 | False | None | None | False | None | False | 460.0 | 0 | 3856644 | 147481 | None | code36 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. - 6Amps one way Switch with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 70.0 | 70.0 | 3.0 | False | None | None | False | None | False | 210.0 | 0 | 3856645 | 147481 | None | code37 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. - 6Amps 3way socket with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 105.0 | 105.0 | 3.0 | False | None | None | False | None | False | 315.0 | 0 | 3856646 | 147481 | None | code38 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. - Stepped Fan Regulator with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 290.0 | 290.0 | 3.0 | False | None | None | False | None | False | 870.0 | 0 | 3856647 | 147481 | None | code39 | Extra for supplying 4mm thick white plastic plate and covering for junction boxes of size ...... mm conduit using necessary machine screws. - 110mm with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | No | 11.0 | 11.0 | 1.0 | False | None | None | False | None | False | 11.0 | 0 | 3856648 | 147481 | None | code40 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 volts, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. - 48" Sweep (1200mm) Regular model with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 2090.0 | 2090.0 | 4.0 | False | None | None | False | None | False | 8360.0 | 0 | 3856649 | 147481 | None | code41 | Supplying of .....feet -PVC Batten with integrated LED tube .... W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI greater than 80. Power Input: 220-240V@ 50/60Hz & Power factor greater than 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fitting 1 x 4' 20/22 w with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 375.0 | 375.0 | 5.0 | False | None | None | False | None | False | 1875.0 | 0 | 3856650 | 147481 | None | code42 | Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clamps. - On wall/ ceiling / Rafter / Girders with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 110.0 | 110.0 | 3.0 | False | None | None | False | None | False | 330.0 | 0 | 3856651 | 147481 | None | code43 | Fixing a ceiling /wall mounting fan of all capacities and all types, with necessary clamps and 'S' hook made out of 15mm dia MS rod, with 5 amps. ceiling rose of approved quality with necessary length of 23/0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 260.0 | 260.0 | 4.0 | False | None | None | False | None | False | 1040.0 | 0 | 3856652 | 147481 | None | code44 | Supply and fixing polished wood board made of not less than 15mm thick plank on both sides of not more than 2 pieces and fixing the same to the wall using tapered inverted wooden plugs screws. - 15"x12"x2" with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 170.0 | 170.0 | 2.0 | False | None | None | False | None | False | 340.0 | 0 | 3856653 | 147481 | None | code45 | Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. - 32Amps with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 174.0 | 174.0 | 2.0 | False | None | None | False | None | False | 348.0 | 0 | 3856654 | 147481 | None | code46 | Construction Of Library Building : -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications including setting out, shoring, strutting, barricading, caution lights including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work 1.14.1 In all kinds of soils Depth upto 3 m with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 107.1 | 107.1 | 60.23 | False | None | None | False | None | False | 6450.633 | 0 | 3856655 | 147481 | None | code47 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 6511.05 | 6511.05 | 14.65 | False | None | None | False | None | False | 95386.8825 | 0 | 3856656 | 147481 | None | code48 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with 20% partial replacement with Recycled concrete aggregate (RCA) with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 7188.3 | 7188.3 | 5.6 | False | None | None | False | None | False | 40254.48 | 0 | 3856657 | 147481 | None | code49 | Formwork, Centering & Scaffolding, Isolated foundation of Builduing percentageon finished rate of conerete per m3 is FR*8% with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 533.22 | 533.22 | 5.6 | False | None | None | False | None | False | 2986.032 | 0 | 3856658 | 147481 | None | code50 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 6708.45 | 6708.45 | 18.17 | False | None | None | False | None | False | 121892.5365 | 0 | 3856659 | 147481 | None | code51 | Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 454.65 | 454.65 | 28.12 | False | None | None | False | None | False | 12784.758 | 0 | 3856660 | 147481 | None | code52 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 6847.05 | 6847.05 | 5.73 | False | None | None | False | None | False | 39233.5965 | 0 | 3856661 | 147481 | None | code53 | Formwork,Centering & Scaffolidingwork, Column of Builduing 70% with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 4696.56 | 4696.56 | 3.94 | False | None | None | False | None | False | 18504.4464 | 0 | 3856662 | 147481 | None | code54 | Formwork,Centering & Scaffoliding work , Plinth beam of Builduing 50% with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 3326.4 | 3326.4 | 4.39 | False | None | None | False | None | False | 14602.896 | 0 | 3856663 | 147481 | None | code55 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 7115.85 | 7115.85 | 16.76 | False | None | None | False | None | False | 119261.646 | 0 | 3856664 | 147481 | None | code56 | Formwork,Centering & Scaffolidingwork, Beams and Lintle of Builduing - 60% with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 4311.09 | 4311.09 | 3.2585 | False | None | None | False | None | False | 14047.686765 | 0 | 3856665 | 147481 | None | code57 | Formwork,Centering & Scaffolidingwork,Roof Slab of Builduing - 60% with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 3592.58 | 3592.58 | 10.94 | False | None | None | False | None | False | 39302.8252 | 0 | 3856666 | 147481 | None | code58 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M-20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 7249.2 | 7249.2 | 0.189 | False | None | None | False | None | False | 1370.0988 | 0 | 3856667 | 147481 | None | code59 | Formwork,Centering & Scaffoliding work,Chajja of Builduing 45% with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 3132.68 | 3132.68 | 0.19 | False | None | None | False | None | False | 595.2092 | 0 | 3856668 | 147481 | None | code60 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening cutting, bending, hooking, laping/welding joints, tying with binding wire soft nnealed steel wire and other ancilary operations complete as per drawing and technical specification with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Kg | 93929.85 | 93929.85 | 3.29 | False | None | None | False | None | False | 309029.2065 | 0 | 3856669 | 147481 | None | code61 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 8621.55 | 8621.55 | 24.57 | False | None | None | False | None | False | 211831.4835 | 0 | 3856670 | 147481 | None | code62 | Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per direc tions of Engineer-in-chare with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 349.65 | 349.65 | 175.41 | False | None | None | False | None | False | 61332.1065 | 0 | 3856671 | 147481 | None | code63 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 253.05 | 253.05 | 76.32 | False | None | None | False | None | False | 19312.776 | 0 | 3856672 | 147481 | None | code64 | Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:3 (1 cement: 3 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curincomplete as per specifications and as per directions of Engineer-in-charge with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 339.15 | 339.15 | 65.83 | False | None | None | False | None | False | 22326.2445 | 0 | 3856673 | 147481 | None | code65 | Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 1622.25 | 1622.25 | 65.75 | False | None | None | False | None | False | 106662.9375 | 0 | 3856674 | 147481 | None | code66 | Finishing walls with water proofing cement paint of required shade : Old work (one coats @ 2.20 kg/10 m²) complete. including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 58.8 | 58.8 | 175.41 | False | None | None | False | None | False | 10314.108 | 0 | 3856675 | 147481 | None | code67 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and in cluding water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 143.85 | 143.85 | 76.32 | False | None | None | False | None | False | 10978.632 | 0 | 3856676 | 147481 | None | code68 | Providing and fixing factory made ISI marked steel glazed doors, windows and ventilators, side /top /centre hung, with beading and all members such as F7D,F4B, K11 B and K12 B etc. complete of standard rolled steel sections, joints mitred and flash butt welded and sash bars tenoned and riveted, including providing and fixing of hinges, pivots, including priming coat of approved steel primer, but excluding the cost of other fittings, complete all as per approved design, (sectional weight of only steel members shall be measured for payment). Fixing with carbon steel galvanised dash fastener of required dia and size (to be paid for separately) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 112.35 | 112.35 | 460.8 | False | None | None | False | None | False | 51770.88 | 0 | 3856677 | 147481 | None | code69 | ELECTRICAL Work :-
Concealed Conduit System :Supplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary - 25mm dia 2mm thick with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Mtr | 53.0 | 53.0 | 5.0 | False | None | None | False | None | False | 265.0 | 0 | 3856678 | 147481 | None | code70 | Supplying heavy gauge PVC Conduit Pipe .... dia ....... mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. - 25mm dia 2mm thick with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Mtr | 54.0 | 54.0 | 5.0 | False | None | None | False | None | False | 270.0 | 0 | 3856679 | 147481 | None | code71 | Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. - Short point upto 3Mtr from tapping point to out let via switch box with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Point | 160.0 | 160.0 | 2.0 | False | None | None | False | None | False | 320.0 | 0 | 3856680 | 147481 | None | code72 | Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. - Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch box with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Point | 250.0 | 250.0 | 1.0 | False | None | None | False | None | False | 250.0 | 0 | 3856681 | 147481 | None | code73 | Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. - Long point above 6Mtr upto 10Mtr from tapping point to out let via switch box with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Point | 375.0 | 375.0 | 1.0 | False | None | None | False | None | False | 375.0 | 0 | 3856682 | 147481 | None | code74 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.The following additional tests are compulsory either to be conducted at works or independent lab with witness by inspecting authority.Additional Tests for FRLS-Applicable Standard Oxygen Index -IS 694-1990, Clause 16.8 Temperature Index -IS 694-1990, Clause 16.13 Smoke Density -IS 694-1990, Clause 16.14 Test for Halogen Acid Gas evaluation -IS 694-1990, Clause 16.12 - 1.5 sqmm with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Mtr | 20.5 | 20.5 | 3.0 | False | None | None | False | None | False | 61.5 | 0 | 3856683 | 147481 | None | code75 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.The following additional tests are compulsory either to be conducted at works or independent lab with witness by inspecting authority.Additional Tests for FRLS-Applicable Standard Oxygen Index -IS 694-1990, Clause 16.8 Temperature Index -IS 694-1990, Clause 16.13 Smoke Density -IS 694-1990, Clause 16.14 Test for Halogen Acid Gas evaluation -IS 694-1990, Clause 16.12 - 2.5 sqmm with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Mtr | 32.0 | 32.0 | 3.0 | False | None | None | False | None | False | 96.0 | 0 | 3856684 | 147481 | None | code76 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.The following additional tests are compulsory either to be conducted at works or independent lab with witness by inspecting authority.Additional Tests for FRLS-Applicable Standard Oxygen Index -IS 694-1990, Clause 16.8 Temperature Index -IS 694-1990, Clause 16.13 Smoke Density -IS 694-1990, Clause 16.14 Test for Halogen Acid Gas evaluation -IS 694-1990, Clause 16.12 - 4 sqmm with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Mtr | 45.0 | 45.0 | 5.0 | False | None | None | False | None | False | 225.0 | 0 | 3856685 | 147481 | None | code77 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete. - 8Way with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 140.0 | 140.0 | 2.0 | False | None | None | False | None | False | 280.0 | 0 | 3856686 | 147481 | None | code78 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete. - 10-12Way with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 160.0 | 160.0 | 2.0 | False | None | None | False | None | False | 320.0 | 0 | 3856687 | 147481 | None | code79 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. - 8 Module with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 200.0 | 200.0 | 1.0 | False | None | None | False | None | False | 200.0 | 0 | 3856688 | 147481 | None | code80 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. - 10-12 Module with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 230.0 | 230.0 | 2.0 | False | None | None | False | None | False | 460.0 | 0 | 3856689 | 147481 | None | code81 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. - 6Amps one way Switch with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 70.0 | 70.0 | 3.0 | False | None | None | False | None | False | 210.0 | 0 | 3856690 | 147481 | None | code82 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. - 6Amps 3way socket with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 105.0 | 105.0 | 3.0 | False | None | None | False | None | False | 315.0 | 0 | 3856691 | 147481 | None | code83 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. - Stepped Fan Regulator with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 290.0 | 290.0 | 3.0 | False | None | None | False | None | False | 870.0 | 0 | 3856692 | 147481 | None | code84 | Extra for supplying 4mm thick white plastic plate and covering for junction boxes of size ...... mm conduit using necessary machine screws. - 110mm with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | No | 11.0 | 11.0 | 1.0 | False | None | None | False | None | False | 11.0 | 0 | 3856693 | 147481 | None | code85 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 volts, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. - 48" Sweep (1200mm) Regular model with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 2090.0 | 2090.0 | 4.0 | False | None | None | False | None | False | 8360.0 | 0 | 3856694 | 147481 | None | code86 | Supplying of .....feet -PVC Batten with integrated LED tube .... W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI greater than 80. Power Input: 220-240V@ 50/60Hz & Power factor greater than 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. - LED light fitting 1 x 4'- 20/22 w with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 375.0 | 375.0 | 5.0 | False | None | None | False | None | False | 1875.0 | 0 | 3856695 | 147481 | None | code87 | Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clamps. - On wall/ ceiling / Rafter / Girders with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 110.0 | 110.0 | 3.0 | False | None | None | False | None | False | 330.0 | 0 | 3856696 | 147481 | None | code88 | Fixing a ceiling /wall mounting fan of all capacities and all types, with necessary clamps and 'S' hook made out of 15mm dia MS rod, with 5 amps. ceiling rose of approved quality with necessary length of 23/0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 260.0 | 260.0 | 4.0 | False | None | None | False | None | False | 1040.0 | 0 | 3856697 | 147481 | None | code89 | Supply and fixing polished wood board made of not less than 15mm thick plank on both sides of not more than 2 pieces and fixing the same to the wall using tapered inverted wooden plugs screws. - 15"x12"x2" with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 170.0 | 170.0 | 2.0 | False | None | None | False | None | False | 340.0 | 0 | 3856698 | 147481 | None | code90 | Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. - 32Amps with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 174.0 | 174.0 | 2.0 | False | None | None | False | None | False | 348.0 | 0 |
|