1723361596000 | 0 | None | None | Other Works | Construction of Drains of Size 0.45m X 0.45m at ISWM Site in TP Chinchali Limit | 900332.02 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3749892 | 140458 | None | code01 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work PWD Common DSR 2023-24 Volume 1 (P No: 5 I.No:1.4.1) Rate 242.00+5%=254.10 | Cum | 254.1 | 254.1 | 173.91 | False | None | None | False | None | False | 44190.531 | 0 | 3749893 | 140458 | None | code02 | Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work PWD Road and bridges DSR 2023-24 Volume 3 (P No: 17 I.No:3.1) Rate 85.00+5%=89.25 | Cum | 89.25 | 89.25 | 110.825 | False | None | None | False | None | False | 9891.13125 | 0 | 3749894 | 140458 | None | code03 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. M 10 Grade Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates PWD Common DSR 2023-24 Volume 1 (P No: 15 I.No:2.1.3 )Rate 5989.00 +5%=6288.45 | Cum | 6288.45 | 6288.45 | 27.28 | False | None | None | False | None | False | 171548.916 | 0 | 3749895 | 140458 | None | code04 | Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD Common DSR 2023-24 Volume 1 (P No: 16 I.No:2.3.1) Rate 6323.00+5%=6639.15 | Cum | 6639.15 | 6639.15 | 47.3137 | False | None | None | False | None | False | 314122.751355 | 0 | 3749896 | 140458 | None | code05 | Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate For Drain Form Works Consider 35% PWD Common DSR 2023-24 Volume 2 (P No: A-7 I.No:22.2) | Cum | 2323.7 | 2323.7 | 47.313 | False | None | None | False | None | False | 109941.2181 | 0 | 3749897 | 140458 | None | code06 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification All other type of structures PWD common SR 2023-24 Volume 1 (P No: 18 I.No: 2.11.h) . Rate 79011.00+5%=82961.55 | MT | 82961.55 | 82961.55 | 2.9865 | False | None | None | False | None | False | 247764.669075 | 0 | 3749898 | 140458 | None | code07 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications PWD common SR 2021-22 Volume 1 (P No: 5 I.No: 1.4.1) . Rate 160.00+5%=168.00 | Cum | 168.0 | 168.0 | 17.1 | False | None | None | False | None | False | 2872.8 | 0 |
|